Construction method using cast-in-place pile construction equipment with mud circulation, separation and slag removal functions

By integrating mud circulation, separation and slag cleaning functions in the poured pile construction equipment, the problems of mud pollution and high cost in traditional poured pile construction are solved, the recycling of mud and automatic removal of sediment are realized, and the construction efficiency and piles are improved. The bearing capacity meets environmental sanitation requirements.

CN112392036BActive Publication Date: 2024-11-15徐守田
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011249301.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-10
Publication Date
2024-11-15
Estimated Expiration
2040-11-10

AI Technical Summary

Technical Problem

Traditional cast-injected pile construction equipment has problems such as pollution, high costs and slow construction progress in mud treatment and recycling, which affects the construction site's environmental sanitation and construction efficiency.

Method used

A poured pile construction equipment with mud circulation, separation and slag cleaning functions was designed, including drilling/punching devices, mud circulation systems, mud separation systems and slag cleaning devices. The mud is realized through the built-in mud pool and mud treatment machine. recycling and automatic removal of sediment.

Benefits of technology

The effective recycling of mud is achieved, mud pollution is reduced, construction costs are reduced, construction efficiency and pile bearing capacity are improved, and sanitation requirements of urban roads and construction site environments are met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112392036B_ABST
    Figure CN112392036B_ABST
Patent Text Reader

Abstract

The present invention relates to a construction method of bored pile construction equipment with mud circulation, separation and slag cleaning functions, and its purpose is to overcome the environmental pollution caused by the discharge and transportation of a large amount of mud in the process of bored pile construction, and the insufficient bearing capacity caused by the sediment at the pile end and the shrinkage. Its structure includes a drilling / punching device, a mud circulation system, a mud separation system and a slag cleaning device. The mud circulation system and the mud separation system work together, and a mud coarse separator and a mud processor are used to discharge large pieces of sediment, and a mud detector is used to detect the quality of the recovered mud to ensure the reuse of the mud after the sediment is discharged; the slag cleaning device thoroughly cleans the sediment in the pile hole and reinforces the hole wall through a short circulation of mud, so that the mud does not fall to the ground, which has obvious public social benefits for the sanitary environment of urban roads and civilized construction sites; the pile does not shrink, the steel cage does not float, there is no sediment at the pile end, and the bearing capacity is effectively used; the mechanical equipment is systematized and automated, saving labor costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention provides a construction method using cast-in-place pile construction equipment with mud circulation, separation and slag cleaning functions, belonging to the technical field of building construction. Background Art

[0002] With the development of the national economy, civil and industrial buildings are gradually becoming high-rise, and higher requirements are placed on the quality of pile foundations. Cast-in-place piles have been recognized by design units and construction units. Common types of piles are precast piles and concrete cast-in-place piles. The disadvantages of precast piles are: low soil extrusion bearing capacity, the pile end cannot be driven into the hard soil layer and rock layer, the ground around the pile is prone to bulge, causing the adjacent pile to float, and piles are prone to breakage. The welding quality is difficult to control and the corrosion resistance is poor; concrete cast-in-place piles have better bearing capacity, pull-out resistance, shear resistance, and corrosion resistance than other pile types, and are widely used in various types of high-rise and high-class construction projects.

[0003] With the launch of sanitary and civilized city creation activities in various places, the requirements for environmental sanitation of construction sites are getting higher and higher. Due to the limitations of construction technology, traditional cast-in-place piles require the excavation of mud pools and mud circulation trenches on the ground for each pile foundation hole operation, and the liquid mud needs to be continuously configured during the drilling process, which not only increases costs but also slows down the construction progress. This leads to mud pools and mud trenches all over the construction site, affecting the environmental sanitation of the site. There is spillage and dripping during the mud transportation process, which affects the sanitation of urban roads and the environment, and cannot meet the requirements of sanitary and civilized construction sites.

[0004] Patent CN102704873A discloses a construction equipment for drilling / punching cast-in-place piles with its own mud pool and mud separation device. The movable self-contained mud pool solves the technical problem that a mud pool and a mud circulation ditch must be dug on the ground for each pile, resulting in mud pools and mud ditches all over the construction site polluting the environment. When the pile foundation is drilled to the designed depth or the drilling rig has difficulty sinking, the impact hammer of the pile driver is used to hammer the pile hole to continue sinking until it enters the rock. By impacting the rock and expanding the hole, the pile body has a higher bearing capacity.

[0005] However, in the actual construction process, mud discharge and large-scale mud transportation cause mud spillage and dripping, affecting urban road sanitation and leading to clogging of sewer pipes; the sediment at the pile end is not easy to remove, affecting the bearing capacity, reducing the use effect and increasing construction costs; it is easy to cause diameter reduction, affecting the quality of the pile body and construction efficiency. Summary of the invention

[0006] The present invention proposes a construction method of bored pile construction equipment with mud circulation, separation and slag cleaning functions, which aims to overcome the above-mentioned shortcomings in the bored pile construction process, improve the construction process and increase the equipment function.

[0007] The technical solution of the present invention:

[0008] The cast-in-place pile construction equipment with mud circulation, separation and slag cleaning functions comprises a drilling / punching device, a mud circulation system, a mud separation system and a slag cleaning device.

[0009] The drilling / punching device comprises a drilling rig 1, a pile driver frame 2, a drill rod 3, a drill bit 4 and an impact hammer 17. The drilling rig 1, the drill rod 3 and the drill bit 4 are connected in sequence, and the impact hammer 17 is connected to the drilling rig 1 and the pile driver frame 2 through a wire rope and a pulley block.

[0010] The mud separation system includes a mud rough separator 12, a mud sedimentation tank 13 and a mud treatment machine 14. The mud rough separator 12 is installed above the pile driver frame 2 and connected to the mud sedimentation tank 13; a mud treatment machine 14 is arranged behind the mud sedimentation tank 13; after the mud circulation system extracts the mud from the pile hole, the mud and large-particle soil sediment are initially separated by the mud rough separator 12, and the initially separated mud flows into the mud sedimentation tank 13, and after being processed by the mud treatment machine 14, it flows back to the mud circulation system.

[0011] The mud circulation system structure includes a slurry outlet pipe 5, a reverse circulation pump 6, a self-contained mud pool 7, a positive circulation pump 8, a slurry suction port 9, and a switching valve 11. The self-contained mud pool 7 is installed below the pile driver frame 2, and the self-contained mud pool 7 is connected to the mud sedimentation tank 13. The positive circulation pump 8 is arranged inside the self-contained mud pool 7, and the positive circulation pump 8 is connected to the slurry suction port 9 through a pipeline; one end of the slurry outlet pipe 5 is connected to the drilling rig, and the other end is connected to the reverse circulation pump 6 through the switching valve 11, and the switching valve 11 controls the flow direction of the mud.

[0012] The slag cleaning device comprises a mud pump 18, a conduit 19 and a slag cleaning cylinder 20. The slag cleaning cylinder 20 is connected to the pile hole casing, and the mud pump 18 is installed on the top of the conduit 19.

[0013] As a preferred solution, the structure of the mud rough separator 12 includes a slurry inlet 12-1, a chain shaft 12-2, a mesh chain plate 12-3, a motor 12-4, a gear 12-5, and a rough separator bracket 12-6. The rough separator bracket 12-6 is installed above the pile driver frame 2; the slurry inlet 12-1 is connected to the reverse circulation pump 6; the motor 12-4 and the gear 12-5 are in transmission connection, and the chain shaft 12-2 passes through the sleeve of the mesh chain plate 12-3 to form a conveyor belt. Below the mesh chain plate 12-3 is a mud sedimentation tank 13.

[0014] As a preferred solution, the mud processor 14 is detachably installed behind the mud sedimentation tank 13, and the mud processor 14 can work independently.

[0015] As a preferred solution, a mud detector 15 is provided inside the self-contained mud pool 7 to detect whether the mud in the self-contained mud pool 7 is qualified; a mud flow control valve 7 - 1 is provided at the front end and connected to the mud suction port 9 .

[0016] As a preferred solution, a casing 10 is provided at the pile hole, and a water stop ring 10-1 is provided on the inner side of the top of the casing 10; a mud recovery cylinder 16 is provided above the casing 10, and a water stop groove 16-1 is provided at the bottom of the mud recovery cylinder 16. The casing 10 and the mud recovery cylinder 16 are connected through the water stop ring 10-1 and the water stop groove 16-1, and the mud recovery cylinder 16 is located above the ground. The weight of the mud in the mud recovery cylinder 16 generates a positive pressure acting on the pile hole wall, balancing the negative pressure generated by the weight ratio of the pile hole wall to the mud, and avoiding the shrinkage and collapse of the pile hole.

[0017] As a preferred solution, the slag cleaning cylinder 20 includes a slag blocking net 20-1, a mud swirl pipe 20-2, a swirl nozzle 20-3, and a mud recovery pipe 20-4. The slag blocking net 20-1 is detachably installed inside the bottom hole of the slag cleaning cylinder 20, and the mud swirl pipe 20-2 and the mud recovery pipe 20-4 are connected to the conduit 19 together, and valves are respectively provided at the connection points to control the mud flow direction of the conduit 19; the mud swirl pipe 20-2 is provided with a plurality of swirl nozzles 20-3.

[0018] The construction method includes the following steps:

[0019] 1) Lay out the lines according to the drawings, determine the coordinates of the pile position, move the cast-in-place pile construction equipment to the pile position, sink the casing, and the drill bit 4 and the impact hammer 17 cooperate to cut the soil and sink;

[0020] 2) Mud is placed in the self-contained mud pool 7, and the mud circulation system and mud separation system are turned on; the mud enters the mud coarse separator 12 through the mud outlet pipe 5 and the reverse circulation pump 6 for preliminary separation, and the mud falls into the mud sedimentation tank 13 below the mud coarse separator 12; the clear mud liquid after sedimentation flows back to the self-contained mud pool 7, and after passing the test, flows back to the pile hole through the flow control valve 7-1 for recycling; the sediment obtained by the mud coarse separator 12 and the mud treatment machine 14 is centrally stored and treated;

[0021] 3) After the pile hole is formed, the pile driver moves to the next pile position, lowers the steel cage and installs the slag cleaning device; the mud pump 18 is turned on, and the mud and sediment in the pile hole are sucked into the mud vortex pipe 20-2 through the guide tube 19, and are ejected clockwise through the vortex nozzle 20-3 and flow into the slag intercepting net 20-1 for filtration;

[0022] 4) After the sediment is cleared, the conduit 19 is connected to the concrete hopper to pour concrete, and the mud in the pile hole flows back to the slag cleaning cylinder 20; the mud treatment machine 14 is disassembled and relocated to be installed near the pile hole, and the mud recovery pipe 20-4 is connected to the self-contained mud pool 7 through the mud treatment machine 14; the mud pump 18 is turned on, and the valve is switched to the mud recovery pipe 20-4, and the remaining mud is processed and drained back to the self-contained mud pool 7;

[0023] 5) After the concrete pouring is completed, lift the slag cleaning barrel 20 and the slag blocking net 20-1, and the sediment will fall down automatically.

[0024] Beneficial effects of the present invention:

[0025] The mud can be processed and recycled by itself, so that the mud does not fall to the ground, which has obvious public and social benefits for the sanitation environment of urban roads and civilized construction sites;

[0026] The pile does not shrink in diameter, the steel cage does not float, there is no sediment at the pile end, and the bearing capacity is effectively used;

[0027] Mechanical equipment is systematized and automated, saving labor costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Attached Figure 1 It is a structural diagram of cast-in-place pile construction equipment with mud circulation, separation and slag cleaning functions.

[0029] Attached Figure 2 It is a schematic diagram of the structure of the impact hammer of the bored pile construction equipment.

[0030] Attached Figure 3 It is a schematic diagram of the structure of a mud rough separator in a mud separation system.

[0031] Attached Figure 4 It is a schematic diagram of the elevation structure of the slag cleaning device.

[0032] Attached Figure 5 It is a top view of the structure of the slag cleaning device.

[0033] Attached Figure 6 This is a demonstration diagram of the construction process of the slag cleaning device.

[0034] In the attached figure, 1 is a drilling rig, 2 is a pile driver frame, 3 is a drill rod, 4 is a drill bit, 5 is a slurry outlet pipe, 6 is a reverse circulation pump, 7 is a self-contained mud pool, 7-1 is a mud flow control valve, 8 is a positive circulation pump, 9 is a slurry suction port, 10 is a casing, 10-1 is a water stop ring, 11 is a switching valve, 12 is a mud coarse separator, 12-1 is a slurry inlet, 12-2 is a chain shaft, 12-3 is a mesh chain plate, 12-4 is motor, 12-5 is the gear, 12-6 is the coarse separator bracket, 13 is the mud sedimentation tank, 14 is the mud treatment machine, 15 is the mud detector, 16 is the mud recovery cylinder, 16-1 is the water stop groove, 17 is the impact hammer, 18 is the mud pump, 19 is the guide tube, 20 is the slag cleaning cylinder, 20-1 is the slag blocking net, 20-2 is the mud swirl pipe, 20-3 is the swirl nozzle, and 20-4 is the mud recovery pipe. DETAILED DESCRIPTION

[0035] The technical solution of the present invention is further explained below in conjunction with the accompanying drawings.

[0036] Compare with Figure 1, a cast-in-place pile construction equipment with mud circulation, separation and slag removal functions, the structure includes a drilling / punching device, a mud circulation system, a mud separation system and a slag removal device. The drilling / punching device includes a drilling rig 1, a pile driving frame 2, a drill rod 3, a drill bit 4 and an impact hammer 17. The drilling rig 1, the drill rod 3 and the drill bit 4 are connected in sequence and are located directly above the pile hole. A casing 10 is provided at the pile hole, and a water stop ring 10-1 is provided on the inner side of the top of the casing 10; a mud recovery cylinder 16 is provided above the casing 10, and a water stop groove 16-1 is provided at the bottom of the mud recovery cylinder 16. The casing 10 and the mud recovery cylinder 16 are connected through the water stop ring 10-1 and the water stop groove 16-1, and the mud recovery cylinder 16 is located above the ground. The weight of the mud in the mud recovery cylinder 16 generates a positive pressure acting on the pile hole wall, balancing the negative pressure generated by the weight ratio of the pile hole wall to the mud, and avoiding the shrinkage and collapse of the pile hole.

[0037] The mud separation system includes a mud rough separator 12, a mud sedimentation tank 13 and a mud treatment machine 14. The mud rough separator 12 is installed above the pile driver frame 2 and connected to the mud sedimentation tank 13; a mud treatment machine 14 is arranged behind the mud sedimentation tank 13; after the mud circulation system extracts the mud from the pile hole, the mud and large-particle soil sediment are initially separated by the mud rough separator 12, and the initially separated mud flows into the mud sedimentation tank 13, and after being processed by the mud treatment machine 14, it flows back to the mud circulation system. The mud treatment machine 14 is detachably installed behind the mud sedimentation tank 13, and the mud treatment machine 14 can work independently.

[0038] The mud circulation system structure includes a slurry outlet pipe 5, a reverse circulation pump 6, a self-contained mud pool 7, a positive circulation pump 8, a slurry suction port 9, and a switching valve 11. The self-contained mud pool 7 is installed below the pile driver frame 2, and the self-contained mud pool 7 is connected to the mud sedimentation tank 13. The positive circulation pump 8 is arranged inside the self-contained mud pool 7, and the positive circulation pump 8 is connected to the slurry suction port 9 through a pipeline; one end of the slurry outlet pipe 5 is connected to the drilling rig, and the other end is connected to the reverse circulation pump 6 through a switching valve 11, and the switching valve 11 controls the flow direction of the mud. A mud detector 15 is arranged inside the self-contained mud pool 7 to detect whether the mud in the self-contained mud pool 7 is qualified; a mud flow control valve 7-1 is arranged at the front end of the self-contained mud pool 7, and is connected to the slurry suction port 9.

[0039] Compare with Figure 2 When the pile foundation is drilled to the designed depth or the drilling rig 1 is difficult to sink, the impact hammer 17 provided with the pile foundation is used to hammer the pile hole to continue to sink into the rock. The impact hammer 17 enters the rock and expands the hole, so that the pile body has a higher bearing capacity.

[0040] Compare with Figure 3The structure of the mud rough separator 12 includes a slurry inlet 12-1, a chain shaft 12-2, a mesh chain plate 12-3, a motor 12-4, a gear 12-5, and a rough separator bracket 12-6. The rough separator bracket 12-6 is installed above the pile driver frame 2; the slurry inlet 12-1 is connected to the reverse circulation pump 6; the motor 12-4 and the gear 12-5 are in transmission connection, and the chain shaft 12-2 passes through the sleeve of the mesh chain plate 12-3 to form a conveyor belt. Below the mesh chain plate 12-3 is a mud sedimentation tank 13. The mud enters the mud rough separator through the slurry inlet 12-1 for preliminary separation.

[0041] Compare with Figure 4-5 The slag cleaning device includes a mud pump 18, a conduit 19 and a slag cleaning cylinder 20. The slag cleaning cylinder 20 is connected to the pile hole casing, and the mud pump 18 is installed on the top of the conduit 19. The slag cleaning cylinder 20 includes a slag blocking net 20-1, a mud swirl pipe 20-2, a swirl nozzle 20-3, and a mud recovery pipe 20-4. The slag blocking net 20-1 is detachably installed on the inner side of the bottom hole of the slag cleaning cylinder 20, and the mud swirl pipe 20-2 and the mud recovery pipe 20-4 are connected to the conduit 19 together, and valves are respectively provided at the connection points to control the mud flow direction of the conduit 19; a plurality of swirl nozzles 20-3 are provided on the mud swirl pipe 20-2.

[0042] The construction method of the cast-in-place pile construction equipment with mud circulation, separation and slag removal functions includes the following steps:

[0043] 1) Lay out the lines according to the drawings, determine the coordinates of the pile position, move the cast-in-place pile construction equipment to the pile position, sink the casing, and the drill bit 4 and the impact hammer 17 cooperate to cut the soil and sink;

[0044] 2) Mud is placed in the self-contained mud pool 7, and the mud circulation system and mud separation system are turned on; the mud enters the mud rough separator 12 through the mud outlet pipe 5 and the reverse circulation pump 6 for preliminary separation, and the mud falls into the mud sedimentation tank 13 below the mud rough separator 12; the mud clear liquid after sedimentation flows back to the self-contained mud pool 7, and is recycled after being tested and qualified; the sediment obtained by the mud rough separator 12 and the mud treatment machine 14 is centrally stored and treated;

[0045] 3) After the pile hole is formed, the pile driver moves to the next pile position, lowers the steel cage and installs the slag removal device; Figure 6 -A, the mud pump 18 is turned on, and the mud and sediment in the pile hole are sucked into the mud vortex tube 20-2 through the guide tube 19, and are ejected clockwise through the vortex nozzle 20-3 and flow into the slag screen 20-1 for filtration;

[0046] 4) After the sediment is cleared, the conduit 19 is connected to the concrete hopper to pour concrete, and the mud in the pile hole flows back to the slag cleaning cylinder 20; the mud treatment machine 14 is disassembled and relocated to be installed near the pile hole, and the mud recovery pipe 20-4 is connected to the self-contained mud pool 7 through the mud treatment machine 14; the mud pump 18 is turned on, and the valve is switched to the mud recovery pipe 20-4, and the remaining mud is processed and drained back to the self-contained mud pool 7;

[0047] 5) As attached Figure 6 As shown in -B, after the concrete pouring is completed, the slag cleaning cylinder 20 and the slag blocking net 20-1 are lifted up, and the sediment falls down automatically.

[0048] Example 1

[0049] Lianyungang Julong Garden Real Estate Development Co., Ltd. developed two 34-story, 100-meter high-rise residential buildings with a construction area of ​​about 32,000 square meters above ground and about 10,000 square meters in the basement. The project is located in the south of Hailian East Road and the east of Julong Road in Lianyungang City. The project is located in the Julong business district with dense traffic. When it started, Lianyungang City was in the period of creating a civilized and hygienic city. The project is designed with 264 bored cast-in-place piles of φ800mm, 36 meters long, and a single pile bearing capacity of 5800KN, 180 basement piles of φ600mm, 36 meters long, and a bearing capacity of 3800KN. The pile end is required to enter the medium weathered rock 800mm, 3-5 meters underground is a pile of miscellaneous soil, 15-18 meters of old foundation stone silt, and about 10 meters of clay silt sand layer and sand layer. According to the survey report, the friction resistance calculation of strongly weathered and medium weathered rocks is obviously insufficient, and the pile end resistance is required to enter the rock, and the most important embedded rock needs to be free of sediment. The mud separation circulation cast-in-place pile construction equipment and technology were used, 450 retaining piles with a diameter of 800mm and a length of 18 meters were used, and a car reverse circulation drilling rig was used. During the construction process, the Municipal Construction Dust Office, Urban Management Bureau, Slag Office and other relevant units frequently inspected the site hygiene, mud discharge and other conditions.

[0050] During the inspection, the leaders of the Construction Site Management Office were surprised to find that the mud separation circulation equipment and the reverse circulation truck drilling rig processes of this project were different. One had mud and mud pools all over the ground, while the other had no mud and the site was very clean. The mechanically separated mud was directly piled up in an orderly manner. They believed that this process equipment met the requirements of a civilized construction site and played a positive demonstration role in the development and creation of a national sanitary city. They hoped that this equipment would expand production investment to meet market demand.

[0051] After the construction was completed, the testing unit conducted a static load test on the 12 piles and found that the bearing capacity was 12000KN and the piles sank 15mm-20mm, which was a compressive rebound. After unloading, the piles rebounded 5mm, proving that the pile ends were embedded in medium-weathered rock and there was no sediment at the bottom of the piles. The ultrasonic test showed that the piles were of small strain and were Class I. The piles were accepted as qualified after one inspection by the construction party together with the quality supervision station and other relevant departments.

[0052] Example 2

[0053] The test building of Jiangsu Deyuan Pharmaceutical Co., Ltd. is located in the Development Zone of Lianyungang City. It is designed to have 126 bored cast-in-place piles with a diameter of 600mm, a pile length of 22 meters and a designed bearing capacity of 1800KN.

[0054] The geological conditions are as follows: the surface is covered with 2 meters of miscellaneous soil, 16-18 meters of silt, 1-2 meters of clay and gravel, and 1-2 meters of strongly weathered gneiss. The friction on the pile side is very small, and more than 80% of the upper load is borne by the pile end resistance.

[0055] After the construction was completed, the static load test showed that the bearing capacity reached 4000KN, and both large strain and small strain tests met the design requirements.

[0056] Example 3

[0057] Factory No. 6 of Lianyungang Xintian Technology Development Co., Ltd. is located in the north of Zhujiang Road and the west of Yuntaishan Road in Lianyungang Economic and Technological Development Zone. It is designed to have 116 bored cast-in-place piles with a diameter of 600mm, a pile length of 7-12 meters, and a bearing capacity of 2600KN. According to the geological survey report, the silt clay layer of 3-9 meters of backfilled soil 2 meters underground is very small, and the lower layer is strongly weathered rock. The bearing capacity of the pile mainly depends on the pile end resistance and the resistance of the pile entering the rock to bear the upper load. After the construction is completed, the bearing capacity reaches 5200KN after the static pressure test, and the large and small strain tests are all Class I piles, which are qualified after the supervision and acceptance of the construction party of the Quality Supervision Station.

[0058] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. Use the construction method of cast-in-place pile construction equipment with mud circulation, separation and slag removal functions, Features: The construction equipment comprises four parts: a drilling / punching device, a mud circulation system, a mud separation system and a slag cleaning device; the drilling / punching device is arranged above the pile hole to perform the drilling / punching operation; the mud circulation system and the mud separation system are arranged on the pile driving machine frame (2), and the mud separation system is embedded in the mud circulation system; after the pile hole is formed, the slag cleaning device is installed at the interface of the drill rod to cooperate in completing the concrete pouring; The mud separation system comprises a mud coarse separator (12), a mud sedimentation tank (13) and a mud treatment machine (14); the mud coarse separator (12) is installed above the pile driver frame (2), and the mud coarse separator (12) is connected to the mud sedimentation tank (13); the mud treatment machine (14) is detachably installed behind the mud sedimentation tank (13); The structure of the slurry coarse separator (12) comprises a slurry inlet (12-1), a chain shaft (12-2), a mesh chain plate (12-3), a motor (12-4), a gear (12-5) and a coarse separator bracket (12-6); the coarse separator bracket (12-6) is installed above the pile driver frame (2); the slurry inlet (12-1) is connected to the slurry circulation system; the motor (12-4) and the gear (12-5) are transmission-connected, and the chain shaft (12-2) passes through the sleeve of the mesh chain plate (12-3), together forming a conveyor belt structure; and a slurry sedimentation tank (13) is located directly below the mesh chain plate (12-3); The mud circulation system structure comprises a slurry discharge pipe (5), a reverse circulation pump (6), a self-contained mud pool (7), a positive circulation pump (8), a slurry suction port (9) and a switching valve (11); the self-contained mud pool (7) is installed below the pile driver frame (2), and the self-contained mud pool (7) is connected to the mud separation system; the positive circulation pump (8) is arranged inside the self-contained mud pool (7), and the positive circulation pump (8) is connected to the slurry suction port (9) through a pipeline; the slurry suction port (9) is arranged at the lower end of the mud flow control valve (7-1); one end of the slurry discharge pipe (5) is connected to the drilling rig, and the other end is connected to the reverse circulation pump (6) through the switching valve (11), and the switching valve (11) controls the flow direction of the mud; The slag cleaning device comprises a mud pump (18), a conduit (19) and a slag cleaning cylinder (20); the slag cleaning cylinder (20) is connected to the casing of the pile hole, the casing (10) is provided at the pile hole, and the mud pump (18) is installed on the top of the conduit (19); The slag cleaning cylinder (20) comprises a slag blocking net (20-1), a mud swirl pipe (20-2), a swirl nozzle (20-3), a mud recovery pipe (20-4), and the slag blocking net (20-1) is detachably mounted on the inner side of the bottom hole of the slag cleaning cylinder (20); the mud swirl pipe (20-2) and the mud recovery pipe (20-4) are connected to the conduit (19) together, and valves are respectively provided at the connection points to control the mud flow direction of the conduit (19); the mud swirl pipe (20-2) is provided with a plurality of swirl nozzles (20-3); The construction method includes the following steps: 1) Lay out the lines according to the drawings, determine the coordinates of the pile position, move the cast-in-place pile construction equipment to the pile position, sink the casing, and cooperate with the drill bit (4) and the impact hammer (17) to cut the soil and sink it; 2) Mud is placed in the self-contained mud pool (7), and the mud circulation system and the mud separation system are started; the mud enters the mud coarse separator (12) through the mud outlet pipe (5) and the reverse circulation pump (6), and is initially separated, and the mud falls into the mud sedimentation tank (13) below the mud coarse separator (12); the clear mud liquid after sedimentation flows back to the self-contained mud pool (7), and is recycled after being tested and qualified; the sediment obtained by the mud coarse separator (12) and the mud treatment machine (14) is centrally stored and treated; 3) After the pile hole is formed, the pile driver moves to the next pile position, lowers the steel cage and installs the slag cleaning device; the mud pump (18) is turned on, and the mud and sediment in the pile hole are sucked into the mud vortex pipe (20-2) through the guide tube (19), sprayed out clockwise through the vortex nozzle (20-3), and flow into the slag intercepting net (20-1) for filtration; 4) After the sediment is cleared, the conduit (19) is connected to the concrete hopper to pour concrete, and the mud in the pile hole flows back to the slag cleaning cylinder (20); the mud treatment machine (14) is disassembled, moved and installed near the pile hole, and the mud recovery pipe (20-4) is connected to the self-contained mud pool (7) through the mud treatment machine (14); the mud pump (18) and the mud treatment machine (14) are turned on, and the valve is switched to the mud recovery pipe (20-4), and the remaining mud is treated and drained back to the self-contained mud pool (7); 5) After the concrete pouring is completed, the slag removal barrel (20) and the slag blocking net (20-1) are lifted up, and the slag falls down automatically.

2. The construction method of the bored pile construction equipment with mud circulation, separation and slag removal functions according to claim 1, Features: The drilling / punching device comprises a drilling rig (1), a drill rod (3), a drill bit (4) and an impact hammer (17); the drilling rig (1), the drill rod (3) and the drill bit (4) are connected in sequence, and the impact hammer (17) is connected to the drilling rig (1) and the pile driver frame (2) via a steel wire rope and a pulley block.

3. The construction method of the bored pile construction equipment with mud circulation, separation and slag removal functions according to claim 1, Features: A mud detector (15) is provided inside the self-contained mud pool (7), and a mud flow control valve (7-1) is provided at the front end of the self-contained mud pool (7), and the mud flow control valve (7-1) is connected to the mud suction port (9).

4. The construction method of claim 1 using a cast-in-place pile construction equipment with mud circulation, separation and slag removal functions, Features: A water stop ring (10-1) is provided on the inner side of the top of the casing (10); a mud recovery cylinder (16) is provided above the casing (10); a water stop groove (16-1) is provided at the bottom of the mud recovery cylinder (16); the casing (10) and the mud recovery cylinder (16) are connected by the water stop ring (10-1) and the water stop groove (16-1); and the mud recovery cylinder (16) is located above the ground.