A device and construction method for efficiently taking soil from steel pipe piles
By setting up a steel frame platform and drilling bucket on the top of the steel pipe pile, the telescopic device is used to realize the telescopic soil extraction and release of the drilling bucket, which solves the problems of large volume and low efficiency of the existing equipment, and improves the construction efficiency and simplicity of operation.
Patent Information
- Application Number
- CN202011162019.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-27
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2040-10-27
AI Technical Summary
The existing steel pipe pile soil extraction equipment has large volume, low construction efficiency, complex operation, which affects the construction efficiency of the project.
Design a device that includes setting a steel frame platform and a drill bucket on the top of the steel pipe pile. The drill bucket can be extended to the low part of the pile through a telescopic device to collect soil and shrink to the outside of the top of the pile to lay soil. Small equipment is used to simplify operation and improve construction efficiency.
The soil extraction device is small in size, convenient to load and unload, flexible construction and simple operation, greatly improving the construction efficiency of soil extraction in steel pipe piles.
Smart Images

Figure CN112459066B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of civil engineering construction, and particularly relates to a device and a construction method for efficiently taking soil from a steel pipe pile. Background Art
[0002] Steel pipe piles are mainly used for the inner wall of ports or breakwaters, and are also used in general foundation projects or bridge projects. They are generally used to construct walls in deep water or on weak foundations. When it is difficult to sink piles, soil can be taken from the pipe to help sink them, or to help the steel pipe piles to be constructed smoothly. Currently, one of the methods for taking soil from the pipe is to use large ship-borne equipment to pump mud, which is large in size and complex to operate; another method for taking soil from the pipe is to use a circulating water pump to pump mud, which is inefficient and labor-intensive. The efficiency of taking soil from steel pipe piles directly affects the construction efficiency of the entire project. Summary of the invention
[0003] The purpose of the present invention is to provide a device and a construction method for efficiently taking soil from a steel pipe pile, so as to solve the problems mentioned in the prior art that the existing soil taking equipment in the pipe is large in size, has low construction efficiency, and has a complicated operation method.
[0004] The first technical solution adopted by the present invention is a device for efficiently taking soil from a steel pipe pile, comprising a steel frame platform arranged on the top of the steel pipe pile, a drill bucket movably arranged above the steel frame platform, and a drill bucket telescopic device arranged above the steel frame platform. The drill bucket telescopic device is used for telescoping the drill bucket.
[0005] A steel frame platform is movably set on the top of the steel pipe pile, and a drill bucket is arranged on the steel frame platform. The drill bucket can be extended to the lower part of the steel pipe pile to take soil through a drill bucket telescopic device, and then retracted to the outside of the top of the steel pipe pile to release soil. The soil taking device is small in size, easy to load and unload, flexible in construction, simple to operate, and greatly improves construction efficiency.
[0006] Preferably, the steel frame platform includes an earth-taking platform and an earth-discharging platform. The earth-taking platform is movably mounted on the top of the steel pipe pile, and the earth-discharging platform is suspended outside the steel pipe pile. The earth-taking platform and the top of the earth-discharging platform form a horizontal quadrilateral, wherein the two side edges are respectively the first side edge and the second side edge, and the first side edge and the second side edge are arranged in parallel.
[0007] The drill bucket telescopic device comprises a fixed frame and a telescopic driving structure. The fixed frame is arranged above the steel frame platform, the fixed frame is fixedly connected to the drill bucket fixing rod, and the telescopic driving structure is connected below the drill bucket fixing rod.
[0008] The setting of the soil-taking platform and the soil-discharging platform improves the construction efficiency of the device. The drill bucket is extended and retracted on the soil-taking platform side to take soil and on the soil-discharging platform side to discharge soil. The drill bucket only needs to move horizontally between the first side and the second side to complete the operation.
[0009] Preferably, the telescopic driving structure includes a drill bucket telescopic rod connected to a drill bucket fixed rod, and a first motor and a driving gear for driving the drill bucket telescopic rod, and a drill bucket is connected below the drill bucket telescopic rod.
[0010] The driving gear is driven by the first motor, and the driving gear drives the drill bucket telescopic rod to be extended and retracted. The drill bucket is connected to the bottom of the drill bucket telescopic rod, so that the height of the drill bucket can be adjusted.
[0011] Preferably, rollers are provided on both sides of the fixing frame, and tracks are provided on the first side and the second side. The rollers cooperate with the tracks to enable the drill bucket to translate between the soil taking platform and the soil placing platform.
[0012] In order to realize the translation of the fixing frame on the first side and the second side to realize soil taking and placing, tracks are arranged on the first side and the second side, and rollers are arranged on both sides of the fixing frame, so as to realize rolling translation, saving time and effort.
[0013] Preferably, the first side and the second side are provided with fixed outer rails, and movable inner rails are provided on both sides of the fixing frame, and the fixed outer rails are slidably matched with the movable inner rails.
[0014] This is another implementation method in which the fixed frame moves on the steel frame platform.
[0015] Preferably, soil taking positioning members and soil placing positioning members are provided on the tracks of the first side and the second side.
[0016] The movement of the fixing frame on the first side and the second side is driven by the second motor.
[0017] The setting of the positioning piece can realize the positioning of the drill bucket, so that the soil taking position and the soil releasing position are fixed, avoiding damage to the drill bucket due to position deviation.
[0018] The provision of the second motor can improve the efficiency of the drill bucket in taking and releasing soil.
[0019] Preferably, an S-shaped positioning piece is provided on the outer side of the circumference of the upper end of the steel pipe pile, and the S-shaped positioning piece includes an upper hook and a lower hook, the upper hook cooperates with the steel pipe pile, and the lower hook cooperates with the soil excavation platform.
[0020] This is one of the implementation methods of movably sleeved steel frame platforms on steel pipe piles. This implementation method is simple, easy to operate, and stable and firm.
[0021] Preferably, the upper side of the soil placing platform is supported by diagonal connecting rods.
[0022] The oblique connecting rod forms a tripod with the side of the soil-taking platform and the first side or the second side. The structure is stable and firm, making the first side and the second side horizontal, ensuring the horizontal movement of the fixed frame on the first side and the second side, that is, ensuring the horizontal movement of the drilling bucket.
[0023] The second technical solution adopted by the present invention is a construction method for a high-efficiency soil taking device in a steel pipe pile, which is specifically implemented according to the following steps:
[0024] Step 1: Assembling and adjusting the soil taking device;
[0025] First, connect the drill bucket to the drill bucket telescopic device and adjust the drill bucket; secondly, connect the fixed frame of the drill bucket telescopic device to the first side and the second side of the steel frame platform, and adjust so that the drill bucket telescopic direction is perpendicular to the steel frame platform.
[0026] Step 2, installation of the soil taking device; first, multiple S-shaped positioning pieces are evenly installed on the top of the steel pipe pile through the upper hook, and then the soil taking device is installed through the lower hook, and finally the soil taking device is adjusted to be horizontal, that is, the expansion and contraction direction of the drill bucket is parallel to the steel pipe pile;
[0027] Step 3, taking and placing soil; first, the second motor is driven to make the fixed frame slide along the first side and the second side to the soil taking positioning piece, and then the first motor is driven to drive the driving gear to extend the telescopic rod, so that the drill bucket is extended into the steel pipe pile to take soil; after the drill bucket takes soil, the first motor is driven to drive the telescopic rod to retract, so that the drill bucket returns to the top of the steel pipe pile, and then the second motor is driven to make the fixed frame slide along the first side and the second side to the soil placing positioning piece, and finally the soil is placed, and the construction is circulated in this way;
[0028] Step 4: Disassembly: First, vertically detach the steel frame platform from the hook below the S-shaped positioning piece and move it to a safe position. Then detach the S-shaped positioning piece from the steel pipe pile to complete the disassembly.
[0029] Preferably, in step 3, when the second motor drives the drill bucket to move between the soil taking platform and the soil placing platform, the drill bucket telescopic device retracts to the initial position.
[0030] During the movement, the drill bucket telescopic device is retracted to the initial position to prevent the drill bucket from colliding with the steel pipe pile and causing damage.
[0031] Beneficial effects of the present invention:
[0032] The present invention movably sets a steel frame platform on the top of the steel pipe pile, and a drill bucket is arranged on the steel frame platform. The drill bucket can be extended to the lower part of the steel pipe pile to take soil through a drill bucket telescopic device, and then retracted to the outer side of the top of the steel pipe pile to release soil. The soil taking device is small in size, convenient to load and unload, flexible in construction, simple to operate, and greatly improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the three-dimensional structure of a device for efficiently taking soil from a steel pipe pile according to the present invention;
[0034] Figure 2 This is a schematic diagram of the structure of the drill bucket for taking soil of the present invention;
[0035] Figure 3 It is a structural schematic diagram of the drilling bucket of the present invention for releasing soil;
[0036] Figure 4 It is an enlarged view of the present invention in the direction of A;
[0037] Figure 5 It is a schematic structural diagram of the S-shaped positioning piece of the present invention;
[0038] Figure 6 It is a schematic diagram of the top view of the steel frame platform of the present invention;
[0039] Figure 7 It is a schematic diagram of the main structure of the steel frame platform of the present invention.
[0040] Explanation of the accompanying drawings: 1-steel pipe pile; 2-steel frame platform; 201-soil taking platform; 202-soil placing platform; 3-drill bucket; 4-drill bucket telescopic device; 5-first side; 6-second side; 7-fixed frame; 8-telescopic drive structure; 9-fixed rod; 10-telescopic rod; 11-first motor; 12-driving gear; 13-second motor; 14-S-type positioning plate; 15-upper hook; 16-lower hook; 17-oblique connecting rod. DETAILED DESCRIPTION
[0041] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings and specific implementation methods. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] In the description of the present invention, it should be understood that the terms "center, lateral, longitudinal, up, down, front, back, left, right, vertical, horizontal, top, bottom, inside, outside" and the like indicate directions or positional relationships based on the attached Figure 1 The orientation or positional relationship shown is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0043] The first technical solution of the present invention is a device for efficiently taking soil from a steel pipe pile, and its three-dimensional structural schematic diagram is shown as follows: Figure 1 As shown, it includes a steel frame platform 2 arranged on the top of the steel pipe pile 1, a drill bucket 3 is movably arranged above the steel frame platform 2, and a drill bucket telescopic device 4 is also arranged above the steel frame platform 2. The drill bucket telescopic device 4 is used for telescoping the drill bucket 3.
[0044] A steel frame platform 2 is movably arranged on the top of the steel pipe pile 1, and a drill bucket 3 is arranged on the steel frame platform 2. The drill bucket 3 can be extended to the lower part of the steel pipe pile 1 through a drill bucket telescopic device 4 to take soil, and then retracted to the outer side of the top of the steel pipe pile 1 to release soil. The soil taking device is small in size, easy to load and unload, flexible in construction, simple to operate, and greatly improves construction efficiency.
[0045] The steel frame platform 2 is movably arranged on the steel pipe pile 1, so that the steel frame platform 2 is easy to load and unload, that is, the earth-taking device is easy to load and unload. During operation, it is only necessary to control the drill bucket telescopic device 4 to realize the telescopic movement of the drill bucket. The operation is simple and flexible, thereby greatly improving the construction efficiency.
[0046] This soil excavation device is suitable for use when the steel pipe pile 1 contains mud-water mixture, soil or small rocks. The diameter of the drill bucket 3 can be selected according to the diameter of the steel pipe pile 1. The existing drill bucket 3 has a large size distribution. The drill bucket 3 model is selected according to the amount of soil excavated and the diameter of the steel pipe pile 1. The diameter of the drill bucket 3 should be smaller than the diameter of the steel pipe pile 1. The drill bucket 3 can also be customized according to the needs. At the same time, the cutting teeth and bottom structure of the corresponding drill bucket 3 are selected according to the different strata at the bottom of the steel pipe pile 1.
[0047] In order to improve the construction efficiency of the soil-taking device, the steel frame platform 2 is set as a soil-taking platform 201 and a soil-discharging platform 202. The drill bucket 3 performs soil-taking work on the soil-taking platform 201 side and soil-discharging work on the soil-discharging platform 202 side. Figure 2 , Figure 3 As shown. The soil-taking platform 201 is movably mounted on the top of the steel pipe pile 1, and the soil-discharging platform 202 is suspended outside the steel pipe pile 1. The soil-taking platform 201 and the top of the soil-discharging platform 202 form a horizontal quadrilateral, wherein the two sides are the first side 5 and the second side 6, respectively, and the first side 5 and the second side 6 are arranged in parallel. The drilling bucket telescopic device 4 includes a fixed frame 7 and a telescopic driving structure 8, the fixed frame 7 is movably arranged above the first side 5 and the second side 6, the fixed frame 7 is fixedly connected to the fixed rod 9, and the fixed rod 9 is connected to the telescopic driving structure 8 below.
[0048] In order to make the first side 5 and the second side 6 level, the upper side of the soil-releasing platform 202 is supported by an oblique connecting rod 17. The oblique connecting rod 17 and the side of the soil-collecting platform 201 and the first side 5 or the second side 6 form a tripod. The structure is stable and firm, ensuring that the fixed frame 7 moves horizontally on the first side 5 and the second side 6, that is, ensuring the horizontal movement of the drilling bucket 3.
[0049] The design of the steel frame platform 2 should meet the following requirements, such as Figure 6 , Figure 7 As shown, the deadweight of the steel frame platform 2 is G, the diameter of the steel pipe pile 1 is D, the length of the first side 5 and the second side 6 extending out of the steel pipe pile 1 is L, and the height of the soil placement platform is H, then:
[0050] Where: L = 3m, H = 1m, r = 20kN / m 3 , M is the bending moment.
[0051]
[0052]
[0053] Upper pull rod tension
[0054] Select Q235 steel f=215N / mm 2
[0055] Therefore, the cross-sectional area of the upper tie rod is:
[0056] Choose a 100mm rectangular tube with a wall thickness of t
[0057]
[0058] Select t=8mm to meet the design requirements.
[0059] The lower pressure rod and the upper grid pull rod are subjected to the same force, and a rectangular tube with a wall thickness of 8mm and a side length of 100mm is selected.
[0060] The telescopic driving structure 8 includes a telescopic rod 10 connected to a fixed rod 9, and a first motor 11 and a driving gear 12 for driving the telescopic rod 10. The drill bucket 3 is connected to the lower part of the telescopic rod 10. The schematic diagram of the structure is shown in FIG. Figure 4 A is shown in the enlarged view.
[0061] The driving gear 12 is driven by the first motor 11 , and the driving gear 12 drives the drill bucket telescopic rod 10 to be telescopic. The drill bucket 3 is connected to the drill bucket telescopic rod 10 below, so that the height of the drill bucket 3 can be adjusted.
[0062] The fixing frame 7 is movably arranged above the first side 5 and the second side 6. In order to realize the translation of the fixing frame 7 on the first side 5 and the second side 6 to realize the cyclic continuous construction of taking and placing soil, the first implementation mode is: rollers are arranged on both sides of the fixing frame 7, and the first side 5 and the second side 6 are arranged with tracks, and the rollers cooperate with the tracks to make the drill bucket 3 translate between the soil taking platform 201 and the soil placing platform 202. Thus, rolling translation is realized, saving time and labor.
[0063] The second embodiment is as follows: the first side 5 and the second side 6 are provided with fixed outer rails, and movable inner rails are provided on both sides of the fixing frame 7, and the fixed outer rails and the movable inner rails are slidably matched, that is, the drawer guide rail type sliding match.
[0064] In order to make the above two implementations more time-saving and labor-saving, the second motor 13 can be connected for driving.
[0065] The first motor 11 and the second motor 13 can both be ordinary motors. The first motor 1 performs rotational driving, and the second motor 13 performs diameter driving.
[0066] In order to make the position of the drill bucket 3 relatively fixed, that is, the soil taking position and the soil placing position relatively fixed, and also to prevent the drill bucket 3 from being damaged due to position deviation, a positioning member is provided on the track of the first side 5 and the second side 6. The positioning member can be a retaining spring, a buckle or a protrusion. At the same time, in order to buffer the vibration generated during positioning, a buffer pad is provided on the positioning member.
[0067] In order to realize the rapid disassembly and assembly of the earth-excavating device, the steel frame platform 2 is movably arranged on the top of the steel pipe pile 1, wherein a positioning ring can be welded at a lower position on the top of the steel pipe pile 1, and the outer diameter of the positioning ring is larger than the inner diameter of the earth-excavating platform 201. The earth-excavating platform 201 is put under the top of the steel pipe pile 1 and falls on the positioning ring to realize positioning and installation.
[0068] Preferably, a plurality of S-shaped positioning pieces 14 are evenly arranged on the outer side of the upper circumference of the steel pipe pile 1, and the S-shaped positioning piece 14 includes an upper hook 15 and a lower hook 16. The upper hook 15 cooperates with the steel pipe pile 1, and the lower hook 16 cooperates with the soil-taking platform 201. Figure 5 As shown, this embodiment is simple, easy to operate, and stable and firm.
[0069] In order to facilitate the reception or transportation of soil released by the drilling bucket 3, a receiving bag or receiving pipe can be set under the soil release platform 202. When the drilling bucket 3 is translated to the soil release positioning piece, the bucket door of the drilling bucket 3 opens, and the soil will fall into the receiving bag or receiving pipe, which is convenient for receiving and transporting the soil.
[0070] The second technical solution of the present invention is a construction method for a high-efficiency soil taking device in a steel pipe pile, which is specifically implemented according to the following steps:
[0071] Step 1, assembly and adjustment of the soil taking device; first, connect the drill bucket 3 with the drill bucket telescopic device 4, and adjust the drill bucket 3; secondly, connect the fixed frame 7 of the drill bucket telescopic device 4 with the first side 5 and the second side 6 of the steel frame platform 2, and adjust so that the telescopic direction of the drill bucket 3 is perpendicular to the steel frame platform 2.
[0072] Step 2, installation of the soil taking device; first, multiple S-shaped positioning pieces 14 are evenly installed on the top of the steel pipe pile 1 through the upper hook 15, and then the soil taking device is installed through the lower hook 16, and finally the soil taking device is adjusted to be horizontal, that is, the telescopic direction of the drill bucket 3 is parallel to the steel pipe pile 1;
[0073] Step 3, taking and placing soil; first, the second motor 13 is driven to make the fixed frame 7 slide along the first side 5 and the second side 6 to the soil taking positioning piece, and then the first motor 11 is driven to drive the driving gear 12 to extend the telescopic rod 10, so that the drill bucket 3 extends into the steel pipe pile 1 to take soil; after the drill bucket 3 takes soil, the telescopic rod 10 is retracted by the first motor 11, so that the drill bucket 3 returns to the top of the steel pipe pile 1, and then the second motor 13 is driven to make the fixed frame 7 slide along the first side 5 and the second side 6 to the soil placing positioning piece, and finally the soil placing work is carried out, and the construction is circulated in this way;
[0074] Step 4, disassembly; first vertically disengage the steel frame platform 2 from the hook 16 below the S-shaped positioning piece 14 and move it to a safe position, and then disengage the S-shaped positioning piece 14 from the steel pipe pile 1 to complete the disassembly work.
[0075] Preferably, in step 3, when the second motor 13 drives the drill bucket 3 to move between the soil-taking platform 201 and the soil-discharging platform 202, the drill bucket telescopic device 4 should be retracted to the initial position, thereby preventing the drill bucket 3 from colliding with the wall of the steel pipe pile 1 and causing damage during movement.
[0076] In summary, in order to solve the problems mentioned in the prior art, such as the large size, low construction efficiency, and complicated operation method of the existing soil-taking equipment in the pipe, the present invention movably sets a steel frame platform 2 on the top of the steel pipe pile 1, and a drill bucket 3 is provided on the steel frame platform 2. The drill bucket 3 can be extended to the lower part of the steel pipe pile 1 through the drill bucket telescopic device 4 to take soil, and then retracted to the outside of the top of the steel pipe pile 1 to release soil. The soil-taking device is small in size, easy to load and unload, flexible in construction, simple to operate, and greatly improves the construction efficiency.
[0077] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0078] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A device for efficiently taking soil from a steel pipe pile, comprising a steel frame platform (2) arranged on the top of a steel pipe pile (1), a drill bucket (3) being movably arranged above the steel frame platform (2), and a drill bucket telescopic device (4) being further arranged above the steel frame platform (2); the drill bucket telescopic device (4) being used for telescoping the drill bucket (3); The steel frame platform (2) comprises a soil-taking platform (201) and a soil-discharging platform (202), wherein the soil-taking platform (201) is movably sleeved on the top of the steel pipe pile (1), and the soil-discharging platform (202) is suspended outside the steel pipe pile (1), and the tops of the soil-taking platform (201) and the soil-discharging platform (202) form a horizontal quadrilateral, wherein two side edges are respectively a first side edge (5) and a second side edge (6), and the first side edge (5) and the second side edge (6) are arranged in parallel; The drill bucket telescopic device (4) comprises a fixed frame (7) and a telescopic driving structure (8); the fixed frame (7) is movably arranged above the first side edge (5) and the second side edge (6); the fixed frame (7) is fixedly connected to a fixed rod (9); and the telescopic driving structure (8) is connected below the fixed rod (9).
2. The device for efficiently taking soil from a steel pipe pile according to claim 1, characterized in that: The telescopic driving structure (8) comprises a telescopic rod (10) connected to a fixed rod (9), and a first motor (11) and a driving gear (12) for driving the telescopic rod (10); a drill bucket (3) is connected below the telescopic rod (10).
3. The device for efficiently taking soil from a steel pipe pile according to claim 1, characterized in that: Rollers are provided on both sides of the fixing frame (7), and tracks are provided on the first side (5) and the second side (6). The rollers cooperate with the tracks to enable the drill bucket (3) to move in translation between the soil taking platform (201) and the soil placing platform (202).
4. The device for efficiently taking soil from a steel pipe pile according to claim 1, characterized in that: The first side edge (5) and the second side edge (6) are provided with fixed outer rails, and movable inner rails are provided on both sides of the fixed frame (7), and the fixed outer rails are slidably matched with the movable inner rails.
5. The device for efficiently taking soil from a steel pipe pile according to claim 3 or 4, characterized in that: A soil taking positioning member and a soil placing positioning member are provided on the tracks of the first side (5) and the second side (6); the movement of the fixing frame (7) on the first side (5) and the second side (6) is driven by a second motor (13).
6. The device for efficiently taking soil from a steel pipe pile according to claim 1, characterized in that: A plurality of S-shaped positioning pieces (14) are evenly arranged on the outer side of the circumference of the upper end of the steel pipe pile (1), and the S-shaped positioning piece (14) comprises an upper hook (15) and a lower hook (16), the upper hook (15) cooperates with the steel pipe pile (1), and the lower hook (16) cooperates with the soil excavation platform (201).
7. The device for efficiently taking soil from a steel pipe pile according to claim 1, characterized in that: The upper side of the soil placing platform (202) is supported by an oblique connecting rod (17).
8. The construction method for the efficient soil taking device in a steel pipe pile according to claim 1, characterized in that: Follow the steps below to implement it: Step 1: Assembling and adjusting the soil taking device; First, the drill bucket (3) is connected to the drill bucket telescopic device (4) and the drill bucket (3) is adjusted; secondly, the fixing frame (7) of the drill bucket telescopic device (4) is connected to the first side edge (5) and the second side edge (6) of the steel frame platform (2) and the drill bucket (3) is adjusted so that the telescopic direction is perpendicular to the steel frame platform (2); Step 2, installation of the soil taking device; first, multiple S-shaped positioning pieces (14) are evenly installed on the top of the steel pipe pile (1) through the upper hook (15), and then the soil taking device is installed through the lower hook (16), and finally the soil taking device is adjusted to be horizontal, and the extension direction of the drill bucket (3) is parallel to the steel pipe pile (1); Step 3, soil taking and soil placing; first, the second motor (13) is driven to make the fixed frame (7) slide along the first side (5) and the second side (6) to the soil taking positioning piece, and then the first motor (11) is driven to drive the driving gear (12) to extend the telescopic rod (10), so that the drill bucket (3) extends into the steel pipe pile (1) to take soil; after the drill bucket (3) takes soil, the first motor (11) is driven to drive the telescopic rod (10) to retract, so that the drill bucket (3) returns to the top of the steel pipe pile (1), and then the second motor (13) is driven to make the fixed frame (7) slide along the first side (5) and the second side (6) to the soil placing positioning piece, and finally the soil placing work is carried out, and the construction is cyclically carried out; Step 4, disassembly; first vertically disengage the steel frame platform (2) from the hook (16) below the S-shaped positioning piece (14) and move it to a safe position, and then disengage the S-shaped positioning piece (14) from the steel pipe pile (1) to complete the disassembly work.
9. The construction method for the efficient soil taking device in a steel pipe pile according to claim 8, characterized in that: In step 3, when the second motor (13) drives the drill bucket (3) to move between the soil taking platform (201) and the soil placing platform (202), the drill bucket telescopic device (4) retracts to the initial position.