A quick-disassembly and assembly concrete structure assembly house and assembly method thereof
By adopting a concrete structure of transverse dense rib composite frame wall sheet, longitudinal dense rib composite frame wall sheet and dense rib composite floor slab at the construction site, combined with H-shaped steel and bolt sleeves, the problems of poor stiffness and safety risks of movable plate houses are solved. It realizes rapid disassembly and assembly of concrete houses with high rigidity, improving living quality.
Patent Information
- Application Number
- CN202011328305.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-11-20
- Filing Date
- 2020-11-24
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-11-24
AI Technical Summary
The existing construction site has poor rigidity, high safety risks, poor living environment, cumbersome installation process and low reuse rate, making it difficult to prevent heatstroke and cool down in summer and keep cold in winter.
Adopt horizontal dense rib composite frame wall sheet, longitudinal dense rib composite frame wall sheet and dense rib composite floor slab. Through integrated molding concrete frame beams, columns and thermally insulated concrete wall panels, combined with the structure of H-shaped steel and bolt sleeves, the rapid dismantling is achieved. and assemble the concrete structure with high stiffness.
The concrete structure assembled houses for rapid assembly and repeated dismantling have been achieved, which has improved the rigidity and living quality of the house and improved the living experience of workers on the construction site.
Smart Images

Figure CN112482581B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a quick-disassembly and assembly concrete structure assembly house and an assembly method thereof. Background Art
[0002] Prefabricated houses are usually built at construction sites for workers to live and use. However, the existing prefabricated houses at construction sites are basically simple houses surrounded by thin steel. Workers live in hot summers and have difficulty keeping warm in winter. In addition, the existing prefabricated houses have poor rigidity, pose safety risks, poor living environment, cumbersome installation process, low reuse rate, and poor housing quality.
[0003] Therefore, in view of the defects of the prefabricated houses in the prior art, there is a need for a quick-disassembly and assembly concrete structure assembled house and an assembly method thereof that can be quickly assembled and repeatedly disassembled for use while improving the rigidity of the house and the living quality. Summary of the invention
[0004] An object of the present invention is to provide a quick-disassembly concrete structure assembled house, the assembled house comprising transverse dense-rib composite frame wall pieces, longitudinal dense-rib composite frame wall pieces, and dense-rib composite floor slabs;
[0005] The longitudinal dense-rib composite frame wall piece comprises an integrally formed first upper concrete frame beam, a first lower concrete frame beam, a first concrete frame column, and a dense-rib thermal insulation concrete wall panel;
[0006] The transverse dense-rib composite frame wall piece includes an integrally formed second upper concrete frame beam, a second lower concrete frame beam, a second concrete frame column, and a dense-rib thermal insulation concrete wall panel;
[0007] The first upper concrete frame beam extends out of the first concrete frame column to form an upper cantilevered end, and the first lower concrete frame beam extends out of the first concrete frame column to form a lower cantilevered end;
[0008] The ribbed composite floor slab comprises two layers of first concrete panels, first connecting ribs are arranged vertically and horizontally between the two layers of first concrete panels, and lightweight thermal insulation material is compositely filled between the first connecting ribs.
[0009] Preferably, the first upper concrete frame beam of the longitudinal multi-rib composite frame wall is rigidly connected to the first concrete frame column; the first lower concrete frame beam is rigidly connected to the first concrete frame column;
[0010] The upper cantilevered end is pre-embedded with a first H-shaped steel, and the lower cantilevered end is pre-embedded with a second H-shaped steel.
[0011] Preferably, the web plane of the first H-shaped steel is parallel to the longitudinal multi-rib composite frame wall piece, and the flange of the first H-shaped steel is embedded in the concrete of the upper cantilever end; the web plane of the second H-shaped steel is parallel to the longitudinal multi-rib composite frame wall piece, and the flange of the second H-shaped steel is embedded in the concrete of the lower cantilever end;
[0012] A first construction hole is reserved at the position where the first H-shaped steel is embedded at the upper cantilever end, the height of the first construction hole is the same as the height of the web of the first H-shaped steel, and a first bolt hole is opened in the middle of the web of the first H-shaped steel;
[0013] A second construction hole is reserved at the position where the second H-shaped steel is embedded at the lower cantilevered end. The height of the second construction hole is the same as the height of the web of the second H-shaped steel. A second bolt hole is opened in the middle of the web of the second H-shaped steel.
[0014] Preferably, the second upper concrete frame beam of the transverse multi-rib composite frame wall is rigidly connected to the second concrete frame column; the second lower concrete frame beam is rigidly connected to the second concrete frame column;
[0015] A first bolt sleeve is pre-embedded at the connection between the second upper concrete frame beam and the second concrete frame column, and the first bolt sleeve is perpendicular to the transverse dense-rib composite frame wall piece; a second bolt sleeve is pre-embedded at the top of the second upper concrete frame beam, and the second bolt sleeve is located within the width range of the second concrete frame column, and the second bolt sleeve is parallel to the transverse dense-rib composite frame wall piece;
[0016] The portion of the bottom of the second concrete frame column that protrudes from the second lower concrete frame beam forms a protrusion, and the protrusion is pre-embedded with a third H-shaped steel.
[0017] Preferably, the web plane of the third H-shaped steel is parallel to the transverse multi-rib composite frame wall sheet, and the flange of the third H-shaped steel is pre-embedded in the concrete of the protruding portion;
[0018] A third construction hole is reserved at the position where the protruding part embeds the third H-shaped steel, and the width of the third construction hole is the same as the web height of the third H-shaped steel; a flat steel is welded to the bottom of the third H-shaped steel, and a third bolt hole is reserved on the flat steel.
[0019] Preferably, a third bolt sleeve is welded on the flange of the third H-shaped steel, the third bolt sleeve is perpendicular to the web of the third H-shaped steel, and is embedded in the concrete of the protruding part together with the third H-shaped steel.
[0020] Preferably, the ribbed thermal insulation concrete wall panel includes two layers of second concrete panels, second connecting ribs are arranged vertically and horizontally between the two layers of second concrete panels, lightweight thermal insulation material is compositely filled between the second connecting ribs, steel mesh or mesh cloth is arranged in the second concrete panel, and the thickness of the second concrete panel is not more than 50 mm.
[0021] Preferably, a steel mesh or mesh cloth is arranged inside the first concrete panel, and the thickness of the first concrete panel is not more than 50m.
[0022] Another aspect of the present invention is to provide a method for assembling a quick-disassembly and assembly concrete structure assembled house, the method comprising:
[0023] Step 1, single-storey house assembly:
[0024] The longitudinal dense-rib composite frame wall pieces and the transverse dense-rib composite frame wall pieces are spliced together to form a house wall;
[0025] The dense-ribbed composite floor slab is supported on the second upper concrete frame beam of the transverse dense-ribbed composite frame wall piece, and is fixed to the second upper concrete frame beam of the transverse dense-ribbed composite frame wall piece at the bottom of the dense-ribbed composite floor slab by angle steel and bolts;
[0026] Step 2, repeat step 1, assemble multiple single-story houses, stack the multiple houses into a multi-story house, and fix the second concrete frame column of the transverse dense-rib composite frame wall of the lower house to the protrusion of the second concrete frame column of the transverse dense-rib composite frame wall of the upper house.
[0027] Preferably, the upper cantilevered end of the longitudinal multi-rib composite frame wall piece is fixed to the connecting end of the second upper concrete frame beam and the second concrete frame column of the transverse multi-rib composite frame wall piece;
[0028] The lower cantilevered end of the longitudinal dense-rib composite frame wall piece is fixed to the protruding portion of the transverse dense-rib composite frame wall piece;
[0029] The second concrete frame column of the transverse dense-rib composite frame wall piece of the lower-story house is fixed to the protruding portion of the second concrete frame column of the transverse dense-rib composite frame wall piece of the upper-story house.
[0030] The present invention provides a quick-disassembly and assembly concrete structure assembled house and an assembly method thereof, which adopts a concrete assembly method to replace a mobile house, and can realize quick assembly and repeated disassembly and use, while improving the rigidity of the house, enhancing the house performance, and improving the living quality, thereby improving the living experience of workers on the construction site.
[0031] It should be understood that the foregoing general description and the following detailed description are exemplary illustrations and explanations and should not be used as limitations on the content of the invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] With reference to the accompanying drawings, further objects, functions and advantages of the present invention will be clarified through the following description of embodiments of the present invention, in which:
[0033] Figure 1 The schematic diagram of the double-layered quick-disassembly and assembly concrete structure assembled house of the present invention is schematically shown.
[0034] Figure 2 The schematic diagram of the structure of the longitudinal multi-rib composite frame wall piece of the present invention is shown.
[0035] Figure 3 The schematic diagram of the structure of the transverse multi-rib composite frame wall piece of the present invention is shown.
[0036] Figure 4 A schematic diagram showing the structure of the upper cantilevered end formed by the first upper concrete frame beam extending out of the first concrete frame column and the mounting parts of the present invention is shown.
[0037] Figure 5 A schematic diagram showing the structure of the lower cantilevered end formed by the first lower concrete frame beam extending out of the first concrete frame column and the mounting parts of the present invention is shown.
[0038] Figure 6 A schematic diagram of the connection end and the mounting parts of the second upper concrete frame beam and the second concrete frame column of the present invention is shown.
[0039] Figure 7 A schematic diagram of the protruding structure of the second lower concrete frame beam protruding from the bottom of the second concrete frame column of the present invention and the mounting parts is shown.
[0040] Figure 8 A schematic cross-sectional view of a transverse multi-rib composite frame wall panel of the present invention is shown.
[0041] Fig. 9 A schematic structural diagram of a multi-rib composite floor is shown.
[0042] Fig.10 Shows Fig. 9 Schematic cross-section diagram of .
[0043] Fig.11 Shows Figure 1 Schematic diagram of the top view of the A node installation.
[0044] Fig.12 Shows Fig.11 1-1 schematic diagram in.
[0045] Fig.13 Shows Fig.11 Schematic diagram 2-2 in. DETAILED DESCRIPTION
[0046] By referring to the exemplary embodiments, the objects and functions of the present invention and the methods for achieving these objects and functions will be explained. However, the present invention is not limited to the exemplary embodiments disclosed below; it can be implemented in different forms. The essence of the description is only to help those skilled in the relevant art to comprehensively understand the specific details of the present invention.
[0047] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the accompanying drawings, the same reference numerals represent the same or similar components, or the same or similar steps.
[0048] In order to solve the defects of the existing prefabricated houses, the present invention provides a concrete structure assembly house that can be quickly disassembled and assembled. According to an embodiment of the present invention, Figure 1 The schematic diagram of the double-layered quick-assembly and disassembly concrete structure assembled house of the present invention is shown. In this embodiment, a double-layered house is taken as an example.
[0049] According to an embodiment of the present invention, a quick-disassembly concrete structure assembly house comprises a transverse dense-rib composite frame wall piece 2, a longitudinal dense-rib composite frame wall piece 1, and a dense-rib composite floor slab (the dense-rib composite floor slab is not shown in the figure). The longitudinal dense-rib composite frame wall piece 1 and the transverse dense-rib composite frame wall piece 2 are spliced together to form a house wall. The dense-rib composite floor slab is supported on the transverse dense-rib composite frame wall piece 2 to form a one-story house, and the two-story house is stacked into a two-story house.
[0050] like Figure 2 The structural schematic diagram of the longitudinal dense-rib composite frame wall piece of the present invention is shown, and the longitudinal dense-rib composite frame wall piece 1 includes an integrally formed first upper concrete frame beam 101, a first lower concrete frame beam 102, a first concrete frame column 103, and a dense-ribbed thermal insulation concrete wall panel.
[0051] The first upper concrete frame beam 101 extends out of the first concrete frame column 103 to form an upper cantilevered end 104 , and the first lower concrete frame beam 102 extends out of the first concrete frame column 103 to form a lower cantilevered end 106 .
[0052] The first upper concrete frame beam 101 of the longitudinal multi-rib composite frame wall 1 is rigidly connected to the first concrete frame column 103, and the first lower concrete frame beam 102 is rigidly connected to the first concrete frame column 103. For example, the rigid connection is achieved by integral molding.
[0053] A first construction hole 105 is formed at the upper cantilever end 104 , and a second construction hole 107 is formed at the lower cantilever end 106 , so as to facilitate the construction when assembling the wall pieces.
[0054] like Figure 4The schematic diagram of the structure of the upper cantilever end formed by the first upper concrete frame beam extending out of the first concrete frame column and the mounting parts of the present invention is shown, Figure 5 The schematic diagram of the structure and mounting parts of the lower cantilever end formed by the first lower concrete frame beam extending out of the first concrete frame column of the present invention is shown. The upper cantilever end is pre-embedded with a first H-shaped steel 110, and the lower cantilever end is pre-embedded with a second H-shaped steel 113. The web plane of the first H-shaped steel 110 is parallel to the longitudinal multi-rib composite frame wall sheet 1, and the flange of the first H-shaped steel 110 is pre-embedded in the concrete of the upper cantilever end 104.
[0055] A first construction hole 105 is reserved at the position where the first H-shaped steel 110 is embedded in the upper cantilever end 104 . The height of the first construction hole 105 is the same as the height of the web of the first H-shaped steel 110 . A first bolt hole 1101 is opened in the middle of the web 110 of the first H-shaped steel.
[0056] The upper cantilever end 104 also includes a double connection angle steel, the higher of which is a first connection angle steel 108 and a second connection angle steel 109. A first angle steel connection hole 1081 is provided on one connection side of the first connection angle steel 108, and a second angle steel connection hole 1082 is provided on the other connection side.
[0057] A third angle steel connection hole 1091 is formed on one connection side of the second connection angle steel 109, and a fourth angle steel connection hole (not shown in the figure) is formed on the other connection side. The double connection angle steel is fixed to both sides of the web of the first H-shaped steel 110 by passing bolts through the second angle steel connection hole 1082, the first bolt hole 1011, and the fourth angle steel connection hole.
[0058] When the longitudinal dense-rib composite frame wall piece 1 and the transverse dense-rib composite frame wall piece 2 are assembled, double-connected angle steels are used for assembly, and the construction is carried out through the first construction hole.
[0059] The web plane of the second H-shaped steel 113 is parallel to the longitudinal multi-rib composite frame wall piece 1 , and the flange of the second H-shaped steel 113 is pre-embedded in the concrete of the lower cantilever end 106 .
[0060] A second construction hole 107 is reserved at the position where the second H-shaped steel 113 is embedded at the lower cantilever end 106 . The height of the second construction hole 107 is the same as the web height of the second H-shaped steel 113 . A second bolt hole 1131 is opened in the middle of the second H-shaped steel web 113 .
[0061] The lower cantilever end 106 also includes a double connection angle steel, the higher of which is a third connection angle steel 111 and a fourth connection angle steel 112. A fifth angle steel connection hole 1111 is provided on one connection side of the third connection angle steel 111, and a sixth angle steel connection hole 1112 is provided on the other connection side.
[0062] A seventh angle steel connection hole 1121 is provided on one connection side of the fourth connection angle steel 112, and an eighth angle steel connection hole (not shown in the figure) is provided on the other connection side. The double connection angle steel is fixed to both sides of the web of the second H-shaped steel 113 by passing bolts through the sixth angle steel connection hole 1112, the second bolt hole 1131, and the eighth angle steel connection hole.
[0063] When the longitudinal dense-rib composite frame wall piece 1 and the transverse dense-rib composite frame wall piece 2 are assembled, double-connected angle steels are used for assembly, and the construction is carried out through the first construction hole.
[0064] like Figure 3 The structural schematic diagram of the transverse dense-rib composite frame wall piece of the present invention is shown, and the transverse dense-rib composite frame wall piece 2 includes an integrally formed second upper concrete frame beam 201, a second lower concrete frame beam 202, a second concrete frame column 203, and a dense-ribbed thermal insulation concrete wall panel 207.
[0065] The connecting end 204 between the second upper concrete frame beam and the second concrete frame column has a pre-embedded bolt sleeve (described in detail below), and the bottom of the second concrete frame column 203 protrudes from the second lower concrete frame beam 202 to form a protrusion 205, and the protrusion 205 has a third construction hole 206.
[0066] like Figure 6 The schematic diagram of the connection end and the mounting piece of the second upper concrete frame beam and the second concrete frame column of the present invention is shown, Figure 7 The schematic diagram of the protruding structure of the second lower concrete frame beam protruding from the bottom of the second concrete frame column of the present invention and the mounting parts is shown. According to an embodiment of the present invention, the second upper concrete frame beam 201 of the transverse multi-rib composite frame wall sheet 2 is rigidly connected to the second concrete frame column 203; the second lower concrete frame beam 202 is rigidly connected to the second concrete frame column 203. For example, the rigid connection can be achieved by integral molding.
[0067] The first bolt sleeve 208 is embedded at the connection between the second upper concrete frame beam 201 and the second concrete frame column 103. In the embodiment, the first bolt sleeve 208 is embedded in four holes 2041 at the connection end 204 of the second upper concrete frame beam and the second concrete frame column, and the first bolt sleeve 208 is perpendicular to the transverse dense-rib composite frame wall piece 2.
[0068] A second bolt sleeve 209 is embedded in the top of the second upper concrete frame beam 201. In the embodiment, the second bolt sleeve 209 is embedded in two holes 2042 at the top of the second upper concrete frame beam 201. The second bolt sleeve 209 is located within the width of the second concrete frame column 203. The second bolt sleeve 209 is parallel to the transverse dense-rib composite frame wall piece 2.
[0069] The portion of the bottom of the second concrete frame column 203 that protrudes from the second lower concrete frame beam 202 forms a protruding portion 205 , and a third H-shaped steel 211 is embedded in the protruding portion.
[0070] The web plane of the third H-shaped steel 211 is parallel to the transverse multi-rib composite frame wall piece 2 , and the flange of the third H-shaped steel 211 is embedded in the concrete of the protruding portion 205 .
[0071] A third construction hole 206 is reserved at the position where the protrusion 205 embeds the third H-shaped steel, and the width of the third construction hole 206 is the same as the web height of the third H-shaped steel 211; a flat steel 212 is welded to the bottom of the third H-shaped steel 211, and a third bolt hole 2121 is reserved on the flat steel.
[0072] The third bolt sleeve 210 is welded on the flange of the third H-shaped steel 211, and is perpendicular to the web of the third H-shaped steel 211, and is pre-buried in the concrete of the protruding portion 205 together with the third H-shaped steel 211. In the embodiment, the third bolt sleeve 210 is buried in two holes 2051 of the protruding portion 205.
[0073] like Figure 8 The cross-sectional schematic diagram of the transverse multi-rib composite frame wall of the present invention is shown in FIG. Fig. 9 The structural diagram of the multi-rib composite floor is shown in FIG. Fig.10 Shows Fig. 9 Schematic cross-section diagram of .
[0074] like Figure 8 As shown, a dense-ribbed thermal insulation concrete wall panel 207 is arranged in an area surrounded by a second upper concrete frame beam 201, a second lower concrete frame beam 202, and a second concrete frame column 203 integrally formed with the transverse dense-ribbed composite frame wall piece 2.
[0075] The ribbed thermal insulation concrete wall panel 207 includes two layers of second concrete panels (not shown in the figure), second connecting ribs 2072 are arranged vertically and horizontally between the two layers of second concrete panels, and lightweight thermal insulation material 2071 is compositely filled between the second connecting ribs 2072. A steel mesh or mesh cloth is arranged inside the second concrete panel, and the thickness of the second concrete panel is not more than 50 mm.
[0076] like Fig. 9 and Fig.10 As shown, the ribbed composite floor 3 includes two first concrete panels (not shown in the figure), first connecting ribs 302 are arranged vertically and horizontally between the two first concrete panels, and lightweight thermal insulation material 301 is compositely filled between the first connecting ribs 302. A steel mesh or mesh cloth is arranged inside the first concrete panel, and the thickness of the first concrete panel is not more than 50m.
[0077] The following is an explanation of the assembly method of a concrete structure assembly house with rapid disassembly and assembly provided by the present invention. Figure 1 The assembly process of node A in the figure is taken as an example. The assembly methods of other nodes are the same and will not be repeated here.
[0078] like Fig.11 Shown Figure 1 A node installation top view diagram, Fig.12 Shown Fig.11 The 1-1 diagram in the figure, Fig.13 Shown Fig.11 Schematic diagram 2-2 in.
[0079] A method for assembling a quick-disassembly and assembly concrete structure assembled house comprises:
[0080] Step 1, single-storey house assembly:
[0081] The longitudinal dense rib composite frame wall piece 1 and the transverse dense rib composite frame wall piece 2 are spliced together to form a house wall.
[0082] The dense-ribbed composite floor is supported on the second upper concrete frame beam 201 of the transverse dense-ribbed composite frame wall 2, and is fixed to the second upper concrete frame beam 201 of the transverse dense-ribbed composite frame wall by angle steel and bolts at the bottom of the dense-ribbed composite floor.
[0083] Step 2, repeat step 1, assemble multiple single-story houses, stack the multiple houses into a multi-story house, and fix the second concrete frame column of the transverse dense-rib composite frame wall of the lower house to the protrusion of the second concrete frame column 203 of the transverse dense-rib composite frame wall of the upper house.
[0084] The above assembly process includes:
[0085] (1) Assemble the upper nodes of the longitudinal multi-rib composite frame wall piece 1 and the transverse multi-rib composite frame wall piece 2. The upper cantilevered end of the longitudinal multi-rib composite frame wall piece is fixed to the connecting end of the second upper concrete frame beam and the second concrete frame column of the transverse multi-rib composite frame wall panel.
[0086] The construction is carried out through the first construction hole 105 , and the first H-shaped steel 110 is embedded in the upper cantilever end 104 of the first upper concrete frame beam 101 of the longitudinal multi-rib composite frame wall piece 1 . The first H-shaped steel 110 fixes the first connecting angle steel 108 and the second connecting angle steel 109 .
[0087] The longitudinal dense-ribbed composite frame wall piece 1 and the transverse dense-ribbed composite frame wall piece 2 are fixed by bolts penetrating through the first angle steel connecting hole 1081 of the first connecting angle steel 108 and the first bolt sleeve 208 embedded in the transverse dense-ribbed composite frame wall piece 1, and bolts penetrating through the third angle steel connecting hole 1091 of the second connecting angle steel 109 and the first bolt sleeve 208 embedded in the transverse dense-ribbed composite frame wall piece 1.
[0088] (2) Assemble the lower nodes of the longitudinal dense-rib composite frame wall piece 1 and the transverse dense-rib composite frame wall piece 2. The lower cantilevered end of the longitudinal dense-rib composite frame wall piece is fixed to the protruding part of the transverse dense-rib composite frame wall panel.
[0089] Construction is carried out through the second construction hole 107 , and the lower cantilever end 106 of the first lower side concrete frame beam 102 of the longitudinal multi-rib composite frame wall piece 1 is pre-embedded with a second H-shaped steel 113 , a third connecting angle steel 111 and a fourth connecting angle steel 112 .
[0090] The longitudinal dense-ribbed composite frame wall piece 1 and the transverse dense-ribbed composite frame wall piece 2 are fixed by bolts passing through the fifth angle steel connecting hole 1111 of the third connecting angle steel 111 and the third bolt sleeve 210 embedded in the transverse dense-ribbed composite frame wall piece 1, and bolts passing through the seventh angle steel connecting hole 1121 of the fourth connecting angle steel 112 and the third bolt sleeve 210 embedded in the transverse dense-ribbed composite frame wall piece 1.
[0091] (3) The dense-ribbed composite floor slab is supported on the second upper concrete frame beam 201 of the transverse dense-ribbed composite frame wall 2, and is fixed to the second upper concrete frame beam 201 of the transverse dense-ribbed composite frame wall 2 at the bottom of the dense-ribbed composite floor slab by angle steel and bolts.
[0092] (4) Assemble the second concrete frame column 203 of the upper transverse multi-rib composite frame wall piece 2 and the second concrete frame column 203' of the lower transverse multi-rib composite frame wall piece 2. The second concrete frame column of the transverse multi-rib composite frame wall piece of the lower house is fixed to the protruding part of the second concrete frame column 203 of the transverse multi-rib composite frame wall piece of the upper house.
[0093] The construction is carried out through the third construction hole 206, and the upper transverse dense-rib composite frame wall piece is fixed to the lower transverse dense-rib composite frame wall piece by bolts penetrating the third bolt hole 2121 reserved on the flat steel 212 of the upper second concrete frame column 203 and the second bolt sleeve 209 welded to the lower second concrete frame column 203' and the third H-shaped steel 211.
[0094] After assembly, the multi-ribbed composite floor slab 3 is supported in the gap between the second upper concrete frame beam 201 ′ of the lower transverse multi-ribbed composite frame wall piece 2 and the second lower concrete frame beam 202 of the upper transverse multi-ribbed composite frame wall piece 2 .
[0095] The present invention provides a quick-disassembly and assembly concrete structure assembled house and an assembly method thereof, which adopts a concrete assembly method to replace a mobile house, and can realize quick assembly and repeated disassembly and use, while improving the rigidity of the house, enhancing the house performance, and improving the living quality, thereby improving the living experience of workers on the construction site.
[0096] Other embodiments of the present invention will be readily apparent to those skilled in the art from the description and practice of the invention disclosed herein. The description and embodiments are to be considered exemplary only, and the true scope and spirit of the present invention are to be limited by the claims.
Claims
1. A quick-disassembly and assembly concrete structure assembly house, characterized in that: The assembled house comprises transverse dense-rib composite frame wall pieces, longitudinal dense-rib composite frame wall pieces, and dense-rib composite floor slabs; The longitudinal dense-rib composite frame wall piece comprises an integrally formed first upper concrete frame beam, a first lower concrete frame beam, a first concrete frame column, and a dense-rib thermal insulation concrete wall panel; The transverse dense-rib composite frame wall piece includes an integrally formed second upper concrete frame beam, a second lower concrete frame beam, a second concrete frame column, and a dense-rib thermal insulation concrete wall panel; The first upper concrete frame beam extends out of the first concrete frame column to form an upper cantilevered end, and the first lower concrete frame beam extends out of the first concrete frame column to form a lower cantilevered end; The ribbed composite floor slab comprises two layers of first concrete panels, first connecting ribs are arranged vertically and horizontally between the two layers of first concrete panels, and lightweight thermal insulation material is compositely filled between the first connecting ribs; The first upper concrete frame beam of the longitudinal multi-rib composite frame wall is rigidly connected to the first concrete frame column; the first lower concrete frame beam is rigidly connected to the first concrete frame column; The upper cantilever end is pre-embedded with a first H-shaped steel, and the lower cantilever end is pre-embedded with a second H-shaped steel; The web plane of the first H-shaped steel is parallel to the longitudinal multi-rib composite frame wall piece, and the flange of the first H-shaped steel is embedded in the concrete of the upper cantilever end; the web plane of the second H-shaped steel is parallel to the longitudinal multi-rib composite frame wall piece, and the flange of the second H-shaped steel is embedded in the concrete of the lower cantilever end; A first construction hole is reserved at the position where the first H-shaped steel is embedded at the upper cantilever end, the height of the first construction hole is the same as the height of the web of the first H-shaped steel, and a first bolt hole is opened in the middle of the web of the first H-shaped steel; A second construction hole is reserved at the position where the second H-shaped steel is embedded at the lower cantilever end, the height of the second construction hole is the same as the height of the web of the second H-shaped steel, and a second bolt hole is opened in the middle of the web of the second H-shaped steel; The second upper concrete frame beam of the transverse multi-rib composite frame wall is rigidly connected to the second concrete frame column; the second lower concrete frame beam is rigidly connected to the second concrete frame column; A first bolt sleeve is pre-embedded at the connection between the second upper concrete frame beam and the second concrete frame column, and the first bolt sleeve is perpendicular to the transverse dense-rib composite frame wall piece; a second bolt sleeve is pre-embedded at the top of the second upper concrete frame beam, and the second bolt sleeve is located within the width range of the second concrete frame column, and the second bolt sleeve is parallel to the transverse dense-rib composite frame wall piece; The part of the bottom of the second concrete frame column protruding from the second lower concrete frame beam forms a protrusion, and the protrusion is pre-embedded with a third H-shaped steel; The web plane of the third H-shaped steel is parallel to the transverse multi-rib composite frame wall sheet, and the flange of the third H-shaped steel is pre-embedded in the concrete of the protruding part; A third construction hole is reserved at the position where the protruding part embeds the third H-shaped steel, and the width of the third construction hole is the same as the web height of the third H-shaped steel; a flat steel is welded to the bottom of the third H-shaped steel, and a third bolt hole is reserved on the flat steel; A third bolt sleeve is welded on the flange of the third H-shaped steel. The third bolt sleeve is perpendicular to the web of the third H-shaped steel and is pre-embedded in the concrete of the protruding part together with the third H-shaped steel.
2. The quick-disassembly and assembly concrete structure assembly house according to claim 1 is characterized in that: The ribbed thermal insulation concrete wall panel includes two layers of second concrete panels, second connecting ribs are arranged vertically and horizontally between the two layers of second concrete panels, lightweight thermal insulation material is compositely filled between the second connecting ribs, steel mesh or mesh cloth is arranged in the second concrete panels, and the thickness of the second concrete panels is not more than 50 mm.
3. The quick-disassembly and assembly concrete structure assembly house according to claim 1 is characterized in that: A steel mesh or mesh cloth is arranged inside the first concrete panel, and the thickness of the first concrete panel is not greater than 50m.
4. A method for assembling a quick-disassembly and assembly concrete structure assembly house, characterized in that: The method for the quick-disassembly and assembly concrete structure assembly house according to any one of claims 1 to 3 comprises: Step 1, single-storey house assembly: The longitudinal dense-rib composite frame wall pieces and the transverse dense-rib composite frame wall pieces are spliced together to form a house wall; The dense-ribbed composite floor slab is supported on the second upper concrete frame beam of the transverse dense-ribbed composite frame wall piece, and is fixed to the second upper concrete frame beam of the transverse dense-ribbed composite frame wall piece at the bottom of the dense-ribbed composite floor slab by angle steel and bolts; Step 2, repeat step 1, assemble multiple single-story houses, stack the multiple houses into a multi-story house, and fix the second concrete frame column of the transverse dense-rib composite frame wall of the lower house to the protrusion of the second concrete frame column of the transverse dense-rib composite frame wall of the upper house.
5. The method for assembling a quick-disassembly and assembly concrete structure assembly house according to claim 4, characterized in that: The upper cantilevered end of the longitudinal multi-rib composite frame wall piece is fixed to the connecting end of the second upper concrete frame beam and the second concrete frame column of the transverse multi-rib composite frame wall piece; The lower cantilevered end of the longitudinal dense-rib composite frame wall piece is fixed to the protruding portion of the transverse dense-rib composite frame wall piece; The second concrete frame column of the transverse dense-rib composite frame wall piece of the lower-story house is fixed to the protruding portion of the second concrete frame column of the transverse dense-rib composite frame wall piece of the upper-story house.