A high-strength steel structure building and construction method
By using screw connection devices and concrete cladding technology in steel structure buildings, steel structure connections are reinforced, combined with the casting method of detachable aluminum formwork, the problems of unstable connections and low construction efficiency of steel structure buildings are solved, and a higher level of construction is achieved connection stability and construction efficiency.
Patent Information
- Application Number
- CN202011178225.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-29
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-10-29
AI Technical Summary
The connections of existing steel structure buildings are not stable enough, and are prone to safety accidents due to environmental impact, and the construction efficiency is low.
The steel structure support rib plate is used to connect to the steel mesh through a screw connection device, and is coated with concrete to reinforce the connection. At the same time, the detachable aluminum formwork is used for casting to reduce environmental impact and construction waste generation.
It improves the connection stability and strength of steel structure buildings, reduces the impact of the environment on the steel structure, and improves construction efficiency and environmental protection.
Smart Images

Figure CN112502317B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of green building construction, and in particular to a high-strength steel structure building and a construction method. Background Art
[0002] Steel structure is one of the main types of building structures. The structure is mainly composed of beams, steel columns, steel trusses and other components made of steel and steel plates, and adopts silanization, pure manganese phosphating, water washing and drying, galvanizing and other rust prevention processes. Each component or part is connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in large factories, factories, field management, super high-rise buildings and other fields. The commonly used steel structure connectors are not stable enough due to environmental influences, which is prone to safety accidents.
[0003] In view of this, the inventor of this case conducted in-depth research on the above-mentioned issues, which led to the emergence of this case. Summary of the invention
[0004] One object of the present invention is to provide a high-strength steel structure building with reduced environmental impact and stable connection.
[0005] A second object of the present invention is to provide an environmentally friendly and efficient construction method for a high-strength steel structure building.
[0006] In order to achieve the above object, the present invention adopts such technical solution:
[0007] A high-strength steel structure building comprises a foundation and a steel structure outer wall on the foundation, wherein the steel structure outer wall comprises a steel structure support rib plate vertically arranged in the wall, two steel meshes located on both sides of the steel structure support rib plate and connected to the steel structure support rib plate, and concrete covering the steel structure support rib plate and the steel mesh; the steel mesh is parallel to the steel structure support rib plate; the steel structure support rib plate and the steel mesh are connected together by a plurality of connecting devices, wherein the connecting device comprises a screw connecting the steel structure support rib plate and the steel mesh, a first support limit block located between the support rib plate and the steel mesh, and a second support limit block located outside the steel mesh and locking the steel mesh; the first support limit block and the second support limit block have internal threads that cooperate with the screw.
[0008] The steel structure supporting rib plate has a plurality of through holes for concrete to pass through.
[0009] The steel structure support rib has a plurality of first mounting holes arranged in a vertical direction for mounting screws; the steel mesh has a plurality of second mounting holes arranged in a vertical direction for mounting screws; each of the first mounting holes is arranged in a one-to-one correspondence with each of the second mounting holes.
[0010] The present invention also comprises two aluminum templates arranged outside the steel mesh; the aluminum templates are provided with third mounting holes matched with the screw rods, and the aluminum templates and the steel mesh are detachably connected together.
[0011] The aluminum template has a plurality of pouring holes for pouring concrete, and the plurality of pouring holes are distributed on the aluminum template along a vertical direction.
[0012] The aluminum template also has a gate plate that can slide in the vertical direction to uniformly open and close the casting holes, a sliding groove connected to the gate plate for sliding the gate plate, and a driving device that drives the gate plate to slide to open or close the casting holes; the gate plate is formed with a plurality of corresponding holes that correspond one to one with the casting holes.
[0013] The driving device comprises a threaded seat arranged on the gate plate, an adjusting screw matched with the threaded seat, and a driving motor driving the adjusting screw; the threaded seat comprises an adjusting nut matched with the adjusting screw.
[0014] The aluminum formwork also has a leak-proof part for sealing the casting hole; the leak-proof part includes a leak-proof hard tube; the leak-proof hard tube has an inlet and an outlet connected to the inlet; the leak-proof part also has a closing head arranged at the outlet and closing the outlet; the closing head includes an elastic tube; the elastic tube has a closed inner hole, one end of which is connected to the leak-proof hard tube; the leak-proof part also has a shell that cooperates with the casting hole; the leak-proof hard tube and the closing head are arranged in the shell and connected to the shell; the leak-proof hard tube gradually becomes thinner from the inlet toward the outlet.
[0015] A construction method for a high-strength steel structure building comprises the following steps:
[0016] S1: A plurality of steel structure columns are fixedly installed on the foundation, and a steel structure support rib plate is fixedly connected between two steel structure columns;
[0017] S2: The steel mesh is arranged on both sides of the steel structure support rib plate and fixedly connected together by a connecting device; the edge of the steel mesh is welded to the steel structure column by welding;
[0018] S3: Install the aluminum formwork to connect the aluminum formwork, steel structure columns and foundation together to form a space for accommodating the steel structure support ribs and steel mesh;
[0019] S4: pouring concrete into the accommodating space through a pouring pipe to form a wall surface;
[0020] S5: Wait for the concrete to solidify and remove the aluminum formwork.
[0021] In step S4, the casting pipe used has a plurality of casting heads that match the casting holes one by one; each of the casting heads is provided with a valve for opening or closing the casting head.
[0022] The step of pouring concrete in step S4 includes:
[0023] S41: The driving device drives the gate to slide and open the pouring hole, and connects a plurality of pouring heads matched one by one to the pouring holes;
[0024] S42: Open the pouring head at the bottom, pour concrete until the pouring hole is covered, and then close the pouring head; then repeat the action, pouring from bottom to top in sequence;
[0025] S43: Close after pouring until the concrete covers the steel mesh and steel structure supporting ribs;
[0026] S44: Pull out the pouring head, and the driving device drives the gate to slide and close the pouring hole.
[0027] After adopting the above technical scheme, a high-strength steel structure building of the present invention, in the actual implementation process, connects the steel mesh and the steel structure support rib plate through a connecting device, which is convenient for the connection and adjustment of the steel structure; by pouring concrete, the concrete covers the steel structure therein, and after the concrete solidifies, the connection of the steel structure can be reinforced. At the same time, the concrete separates the steel structure from the external environment, reduces the impact of the environment on the steel structure, and thus improves the strength of the steel structure building; compared with traditional steel structure buildings, it reduces the impact of the environment and has the advantage of stable connection.
[0028] The invention discloses a construction method for a high-strength steel structure building. In actual implementation, an aluminum formwork is used for casting. The repeated use of the aluminum formwork can effectively reduce the generation of construction waste. At the same time, the aluminum formwork is light in weight and convenient for construction and installation, which effectively improves the construction efficiency and protects the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the assembly structure of the steel structure support rib plate, steel mesh, steel structure column and aluminum formwork of the present invention;
[0030] Figure 2 This is a schematic structural diagram of the aluminum formwork and the pouring pipe of the present invention from a first perspective;
[0031] Figure 3 This is a schematic diagram of the closed state of the leakage-proof member of the present invention;
[0032] Figure 4 This is a schematic diagram of the leakage prevention member of the present invention in an open state;
[0033] In the figure:
[0034] Steel structure support rib plate 1; steel mesh 2; first support limit block 3; second support limit block 4; steel structure column 5; aluminum template 6; gate plate 61; sliding groove 62; leak-proof hard pipe 631; elastic pipe 632; shell 633; inner hole 6321; casting pipe 7; casting head 71; DETAILED DESCRIPTION
[0035] In order to further explain the technical solution of the present invention, it is described in detail below through specific embodiments.
[0036] like Figure 1-4 As shown, a high-strength steel structure building includes a foundation and a steel structure outer wall on the foundation, the steel structure outer wall includes a steel structure support rib plate 1 vertically arranged in the wall, two steel meshes 2 located on both sides of the steel structure support rib plate 1 and connected to the steel structure support rib plate 1, and concrete covering the steel structure support rib plate 1 and the steel mesh 2; the steel mesh 2 is parallel to the steel structure support rib plate 1; the steel structure support rib plate 1 and the steel mesh 2 are connected together by multiple connecting devices, the connecting device includes a screw connecting the steel structure support rib plate 1 and the steel mesh 2, a first support limit block 3 located between the support rib plate and the steel mesh 2, and a second support limit block 4 located on the outside of the steel mesh 2 to lock the steel mesh 2; the first support limit block 3 and the second support limit block 4 have internal threads that cooperate with the screw. In the actual implementation process, the steel mesh and the steel structure support ribs are connected by a connecting device to facilitate the connection and adjustment of the steel structure; by pouring concrete, the concrete wraps the steel structure inside, and after the concrete solidifies, the connection of the steel structure can be strengthened. At the same time, the concrete separates the steel structure from the external environment, reducing the impact of the environment on the steel structure, thereby improving the strength of the steel structure building; compared with traditional steel structure buildings, it reduces the impact of the environment and has the advantage of stable connection.
[0037] Preferably, the steel structure support rib plate 1 has a plurality of through holes for concrete to pass through. After the concrete enters the first through hole and solidifies, the steel structure support rib plate is fixed in the concrete, and the concrete entering the first through hole strengthens the connection between the steel structure support rib plate and the concrete.
[0038] Preferably, the steel structure support rib 1 has a plurality of first mounting holes arranged along the vertical direction for mounting screws; the steel mesh 2 has a plurality of second mounting holes arranged along the vertical direction for mounting screws; each first mounting hole is arranged in one-to-one correspondence with each second mounting hole; the installation connection between the screw and the steel mesh is convenient.
[0039] Preferably, the present invention further comprises two aluminum templates 6 arranged outside the steel mesh 2; the aluminum templates 6 are provided with third mounting holes matched with the screw rods, and the aluminum templates 6 and the steel mesh 2 are detachably connected together. The loading and unloading of the aluminum templates is convenient, and the construction efficiency is improved; the aluminum templates can be reused, and the generation of construction waste is reduced.
[0040] Preferably, the aluminum template 6 has a plurality of pouring holes for pouring concrete, and the plurality of pouring holes are distributed in the vertical direction on the aluminum template 6. By providing a plurality of pouring holes in the vertical direction, the installation of the pouring pipe is facilitated, and at the same time, the corresponding pouring holes are opened according to the plane where the concrete is located during pouring, so as to avoid the pressure required to be output by the pouring head becoming larger due to the pouring holes being below the plane where the concrete is located, thereby reducing the pouring efficiency.
[0041] Preferably, the aluminum template 6 also has a gate plate 61 that can slide in the vertical direction to open and close the pouring holes, a sliding groove 62 connected to the gate plate 61 for sliding the gate plate 61, and a driving device that drives the gate plate 61 to slide to open or close the pouring holes; the gate plate 61 is formed with a plurality of corresponding holes corresponding to the pouring holes. Through the cooperation between the gate plate and the sliding groove, the gate plate can slide in the sliding groove, and the gate plate is driven by the driving device to open or close the pouring hole, which is simple, convenient and fast to operate.
[0042] Preferably, the driving device includes a threaded seat disposed on the gate plate 61, an adjusting screw matched with the threaded seat, and a driving motor driving the adjusting screw; the threaded seat includes an adjusting nut matched with the adjusting screw. The driving motor drives the adjusting screw to rotate, and drives the gate plate to slide to open or close the casting hole through the matching of the screw and the threaded seat.
[0043] Preferably, the aluminum formwork also has a leak-proof part for blocking the pouring hole; the leak-proof part includes a leak-proof hard tube 631; the leak-proof hard tube 631 has an inlet and an outlet connected to the inlet; the leak-proof part also has a closing head arranged at the outlet and closing the outlet; the closing head includes an elastic tube 632; the elastic tube has a closed inner hole 6321, and one end of the inner hole 6321 is connected to the leak-proof hard tube 631; the leak-proof part also has a shell 633 that matches the pouring hole; the leak-proof hard tube 631 and the closing head are arranged in the shell 633 and connected together with the shell 633; the leak-proof hard tube 631 gradually tapers from the inlet to the outlet. In the actual implementation process, the leak-proof part closes the inner hole through the elastic contraction of the elastic tube. When the pouring tube is connected to the pouring hole, the pouring tube extends into the elastic tube through the leak-proof hard tube to open the inner hole, and then opens the pouring hole for pouring. When the pouring tube is removed, the elastic tube returns to the contracted state to close the inner hole; the elastic tube is made of rubber material.
[0044] A construction method for a high-strength steel structure building comprises the following steps:
[0045] S1: A plurality of steel structure columns 5 are fixedly installed on the foundation, and a steel structure support rib plate 1 is fixedly connected between two steel structure columns 5;
[0046] S2: The steel mesh 2 is arranged on both sides of the steel structure support rib plate 1 and fixedly connected together by a connecting device; the edge of the steel mesh 2 is welded to the steel structure column 5 by welding;
[0047] S3: installing the aluminum formwork 6, so that the aluminum formwork 6, the steel structure column and the foundation are connected together to form an accommodation space for accommodating the steel structure support rib plate 1 and the steel mesh 2;
[0048] S4: pouring concrete into the accommodating space through the pouring pipe 7 to form a wall surface;
[0049] S5: Wait for the concrete to solidify and remove the aluminum formwork 6.
[0050] In the actual implementation process, aluminum formwork is used for pouring. The repeated use of aluminum formwork can effectively reduce the generation of construction waste. At the same time, the aluminum formwork is light in weight and convenient for construction and installation, which effectively improves construction efficiency and protects the environment.
[0051] Preferably, in step S4, the casting pipe 7 used has a plurality of casting heads 71 that match the casting holes one by one; each casting head is provided with a valve for opening or closing the casting head. In the actual installation process, the casting holes are matched with the casting heads one by one, and pouring concrete through the casting pipe effectively improves the construction efficiency and speeds up the construction process.
[0052] Preferably, the step of pouring concrete in step S4 includes:
[0053] S41: The driving device drives the gate plate 61 to slide and open the pouring hole, and connects a plurality of one-to-one matching pouring heads 71 to the pouring holes;
[0054] S42: Open the pouring head 71 at the bottom, pour concrete until the pouring hole is covered, and then close the pouring head 71; then repeat the action, pouring from bottom to top in sequence;
[0055] S43: After pouring until the concrete covers the steel mesh 2 and the steel structure supporting rib plate 1, close;
[0056] S44: Pull out the pouring head 71, and the driving device drives the gate 61 to slide and close the pouring hole.
[0057] When pouring concrete, pouring from bottom to top can avoid excessive pouring from the pouring port at the top, which can prevent air from being discharged and form bubbles, and prevent the quality of the cast wall from deteriorating. At the same time, open the corresponding pouring holes according to the plane where the concrete is located during pouring, so as to avoid the pressure required to be output by the pouring head increasing due to the pouring holes being below the plane of the concrete, thereby reducing the pouring efficiency.
[0058] The product form of the present invention is not limited to the illustrations and embodiments of this case. Any appropriate changes or modifications made by anyone with similar ideas should be deemed to be within the patent scope of the present invention.
Claims
1. A high-strength steel structure building, characterized in that: It includes a foundation and a steel structure outer wall on the foundation, wherein the steel structure outer wall includes a steel structure support rib plate vertically arranged in the wall, two steel meshes located on both sides of the steel structure support rib plate and connected to the steel structure support rib plate, and concrete covering the steel structure support rib plate and the steel mesh; the steel mesh is parallel to the steel structure support rib plate; the steel structure support rib plate and the steel mesh are connected together by a plurality of connecting devices, wherein the connecting device includes a screw connecting the steel structure support rib plate and the steel mesh, a first support limit block located between the support rib plate and the steel mesh, and A second support limit block is located on the outside of the steel mesh and locks the steel mesh; the first support limit block and the second support limit block have internal threads that cooperate with the screw; the steel structure support rib plate has a plurality of first mounting holes arranged in the vertical direction for installing the screw; the steel mesh has a plurality of second mounting holes arranged in the vertical direction for installing the screw; each of the first mounting holes is arranged in a one-to-one correspondence with each of the second mounting holes; it also includes two aluminum templates arranged on the outside of the steel mesh; the aluminum template is provided with a third mounting hole that cooperates with the screw, and the aluminum template and the steel mesh can be detachably connected together.
2. A high-strength steel structure building according to claim 1, characterized in that: The steel structure supporting rib plate has a plurality of through holes for concrete to pass through.
3. A high-strength steel structure building according to claim 1, characterized in that: The aluminum template has a plurality of pouring holes for pouring concrete, and the plurality of pouring holes are distributed on the aluminum template along a vertical direction.
4. A high-strength steel structure building according to claim 3, characterized in that: The aluminum template also has a gate plate that can slide in the vertical direction to uniformly open and close the casting holes, a sliding groove connected to the gate plate for sliding the gate plate, and a driving device that drives the gate plate to slide to open or close the casting holes; the gate plate is formed with a plurality of corresponding holes that correspond one to one with the casting holes.
5. A high-strength steel structure building according to claim 4, characterized in that: The driving device comprises a threaded seat arranged on the gate plate, an adjusting screw matched with the threaded seat, and a driving motor driving the adjusting screw; the threaded seat comprises an adjusting nut matched with the adjusting screw.
6. The high-strength steel structure building according to claim 3, characterized in that: The aluminum formwork also has a leak-proof part for sealing the casting hole; the leak-proof part includes a leak-proof hard tube; the leak-proof hard tube has an inlet and an outlet connected to the inlet; the leak-proof part also has a closing head arranged at the outlet and closing the outlet; the closing head includes an elastic tube; the elastic tube has a closed inner hole, one end of which is connected to the leak-proof hard tube; the leak-proof part also has a shell that cooperates with the casting hole; the leak-proof hard tube and the closing head are arranged in the shell and connected to the shell; the leak-proof hard tube gradually becomes thinner from the inlet toward the outlet.
7. A construction method for a high-strength steel structure building according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1: A plurality of steel structure columns are fixedly installed on the foundation, and a steel structure support rib plate is fixedly connected between two steel structure columns; S2: The steel mesh is arranged on both sides of the steel structure support rib plate and fixedly connected together by a connecting device; the edge of the steel mesh is welded to the steel structure column by welding; S3: Install the aluminum formwork to connect the aluminum formwork, steel structure columns and foundation together to form a space for accommodating the steel structure support ribs and steel mesh; S4: pouring concrete into the accommodating space through a pouring pipe to form a wall surface; S5: Wait for the concrete to solidify and remove the aluminum formwork.
8. The construction method of a high-strength steel structure building according to claim 7, characterized in that: In step S4, the casting pipe used has a plurality of casting heads that match the casting holes one by one; each of the casting heads is provided with a valve for opening or closing the casting head.
9. The construction method of a high-strength steel structure building according to claim 7, characterized in that: The step of pouring concrete in step S4 includes: S41: The driving device drives the gate to slide and open the pouring hole, and connects a plurality of pouring heads matched one by one to the pouring holes; S42: Open the pouring head at the bottom, pour concrete until the pouring hole is covered, and then close the pouring head; then repeat the action, pouring from bottom to top in sequence; S43: Close after pouring until the concrete covers the steel mesh and steel structure supporting ribs; S44: Pull out the pouring head, and the driving device drives the gate to slide and close the pouring hole.
Citation Information
Patent Citations
Shear wall with 'profile steel column-steel beam-steel support' embedded between steel tube concrete columns and manufacturing method
CN102704595A
Double-shutoff valve device applicable to press pouring of reinforced concrete
CN103542114A
Check valve and pipeline with same
CN109469750A
Steel structure plant adapting to terrain
CN110043077A
Concrete construction aluminum template structural mounting system and construction method
CN110725542A