A waterproof node construction structure and method for steel pipe column and bottom plate of coastal deep foundation pit
By setting up conical pits and multi-layer waterproof layers on the outer periphery of the deep foundation pit steel pipe column, combined with the waterproof coating layer covering, the leakage and corrosion problems in the construction of the deep foundation pit steel pipe column and the bottom plate waterproof node in the coastal environment are solved, and more effective is achieved waterproofing effect and construction quality.
Patent Information
- Application Number
- CN202011490606.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-16
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-12-16
AI Technical Summary
The existing deep foundation pit steel pipe columns and bottom plate waterproof node construction structures cannot effectively prevent the infiltration of highly corrosive fluids in the coastal environment, resulting in leakage and corrosion damage of foundation pits, affecting safety and economic benefits.
A conical pit with the bottom lower than the top of the steel pipe pile pile is used to set up a conical pit with the bottom of the steel pipe pile on the outer periphery of the foundation pit and the side walls of the steel pipe pile, including waterproof coils and sealants, extending the penetration path and forming a complete Enclosed waterproof structure, combined with the waterproof coating layer on the side wall of the foundation pit steel pipe column covers the surface to prevent corrosion and damage.
Effectively block the penetration of formation fluid into the foundation pit steel pipe column, prevent leakage and corrosion damage, improve waterproofing effect and construction quality, and avoid delayed construction period and economic losses.
Smart Images

Figure CN112575820B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, and in particular to a waterproof node construction structure and method for a steel pipe column and a bottom plate of a coastal deep foundation pit. Background Art
[0002] With the development of urban construction and the increase in population density, the development and utilization of underground space has received more and more attention. Various types of underground projects and large deep foundation pit projects have increased day by day. Efficient and economical deep foundation pit construction methods are particularly important. Figure 1 As shown, the main construction procedures of the waterproof construction structure are as follows: (1) construction of foundation pit retaining structure; (2) construction of steel pipe column piles 7 and foundation pit steel pipe column 1: insert the foundation pit steel pipe column 1 into the steel pipe column pile 7 to a certain depth; (3) alternating construction of support in the foundation pit and foundation pit excavation: until the excavation reaches the bottom elevation of the concrete cushion layer 6 (also called the bottom plate cushion layer); (4) breaking the pile head of the steel pipe column pile 7: make the pile top elevation of the steel pipe column pile 7 flush with the bottom of the foundation pit; (5) waterproof construction of the concrete cushion layer 6: waterproof coating is set at the contact position between the foundation pit steel pipe column 1 and the concrete cushion layer 6; (6) further waterproof node treatment: weld a water stop steel plate ring 4 on the foundation pit steel pipe column 1, brush a waterproof coating layer 3 on the foundation pit steel pipe column 1, and lay a waterproof layer 5 (also called waterproof membrane) on the concrete cushion layer 6; (7) pouring concrete of the foundation pit bottom plate 2; (8) other process operations such as the foundation pit side wall. The structural schematic diagram after construction is shown in the figure. Figure 1 shown.
[0003] Practice has proved that, after proper construction, the waterproof membrane laid on the bottom plate cushion layer in this scheme can effectively isolate the contact between the foundation pit bottom plate and the formation fluid, and prevent or slow down the penetration of the formation fluid into the bottom plate concrete; the waterproof coating layer and water-stop steel plate brushed around the foundation pit steel pipe column can effectively extend the length of the upward penetration path of the formation fluid along the contact surface between the foundation pit bottom plate and the foundation pit steel pipe column, and reduce the permeability coefficient of penetration along this path.
[0004] However, engineering practice shows that in coastal conditions, due to the high salt content of the formation water, it is corrosive to metals and concrete. Therefore, in addition to the above-mentioned penetration along the concrete of the foundation pit floor and the contact surface between the foundation pit steel pipe column and the foundation pit floor, there is still a third leakage mode, namely: the highly corrosive formation fluid penetrates into the contact surface between the bottom plate cushion and the top of the steel pipe column pile, corrodes and destroys the foundation pit steel pipe column, and finally corrodes upward to form a seepage channel, which leads to leakage of the foundation pit, making the waterproof node invalid, affecting the safety and quality of the foundation pit, and the repair of the leakage point will delay the construction period and reduce the economic benefits of the project. Analysis shows that the reasons for this leakage mode are as follows:
[0005] (1) Short permeation path: The formation fluid can contact the foundation pit steel pipe column by passing through the annular contact surface between the bottom plate cushion and the top of the steel pipe column pile. The length of the permeation path is equal to the width of the annular surface. Under normal circumstances, the width of the annular surface is generally only 5 cm to 10 cm.
[0006] (2) There are defects in the anti-corrosion treatment of the surface of the foundation pit steel pipe column: the surface of the foundation pit steel pipe column is often painted with anti-corrosion paint, but during the storage and lifting process of the foundation pit steel pipe column, the anti-corrosion coating will inevitably be damaged due to bumps. Summary of the invention
[0007] The purpose of the present invention is to overcome the problem that the existing construction structure of the waterproof node between the steel pipe column and the bottom plate of the foundation pit cannot be applied to the coastal environment, and to provide a construction structure of the waterproof node between the steel pipe column and the bottom plate of a coastal deep foundation pit, comprising a foundation pit steel pipe column, a stratum and a steel pipe column pile; the bottom of the steel pipe column pile is inserted into the stratum; the bottom of the foundation pit steel pipe column is inserted into the steel pipe column pile; the top of the stratum is provided with a conical pit with a bottom lower than the top of the steel pipe column pile along the outer periphery of the foundation pit steel pipe column; the slope of the conical pit and the top of the stratum are paved with a concrete cushion layer; the side wall of the steel pipe column pile located above the bottom of the conical pit is provided with a roughened section; the top of the concrete cushion layer, the roughened section and the top of the steel pipe column pile are paved with a waterproof layer; the side wall of the foundation pit steel pipe column is provided with a waterproof coating layer and a water-stop steel plate ring; the top of the waterproof layer and the outside of the waterproof coating layer are provided with a foundation pit bottom plate.
[0008] Furthermore, the waterproof layer includes waterproof membrane and sealant; at least the top of the steel pipe column pile and the roughened section are provided with the sealant; the waterproof membrane is laid on the sealant; there are multiple waterproof membranes, and the multiple waterproof membranes are connected by the sealant.
[0009] Furthermore, the waterproof coiled material on the top of the steel pipe column pile is in a circular ring shape; the joint between the inner end of the circular ring waterproof coiled material and the waterproof coating layer, the joint between the outer end of the circular ring waterproof coiled material and the waterproof coiled material of the roughened section, and the joint between the waterproof coiled material of the roughened section and the waterproof coiled material on the top of the concrete cushion layer are all provided with the sealant and bonded into an integral structure by the sealant. The joints are connected into an integral structure by the sealant, so that the waterproof layer forms a more effective fully enclosed waterproof structural system, and the waterproof effect is better.
[0010] Furthermore, the bottom of the conical pit is lower than the bottom of the roughening section; and the top of the roughening section is flush with or lower than the top of the conical pit.
[0011] Furthermore, the water stop steel plate ring is horizontally arranged at a position where the foundation pit steel pipe column is located at half the height of the foundation pit bottom plate.
[0012] Furthermore, the conical pit is conical, the depth of the conical pit is 0.5 to 1.5 meters, and the slope ratio of the conical pit is 1:0.5 to 1:2.
[0013] The beneficial effects of the construction structure of the present invention are as follows: by setting a conical pit with a bottom lower than the top of the steel pipe column pile along the periphery of the foundation pit steel pipe column, the penetration path of the formation fluid can be extended, and at least two layers of waterproof layers are formed in the leakage path, which can effectively prevent the formation fluid from penetrating through the top of the steel pipe column pile to the foundation pit steel pipe column. The waterproof layer in the conical pit is pressed by the foundation pit bottom plate, so that the waterproof layer and the side wall of the steel pipe column column are closely attached, further ensuring the construction quality and waterproof effect of the waterproof layer. By setting a waterproof coating layer on the side wall of the foundation pit steel pipe column, the damaged part of the original anti-corrosion coating on the surface of the foundation pit steel pipe column can be covered, preventing the foundation pit steel pipe column from being corroded and damaged, and ensuring the waterproof stability of the foundation pit steel pipe column. The construction structure of the present invention is very suitable for the construction of waterproof nodes between deep foundation pit steel pipe columns and bottom plates under coastal conditions with high salt content of formation water, effectively eliminating all nodes where leakage may occur, and avoiding delays in construction period and economic losses caused by repairing leakage points.
[0014] The present invention also provides a method for constructing a waterproof node between a steel pipe column and a bottom plate in a coastal deep foundation pit, comprising the following steps:
[0015] Step 1: insert the bottom of the steel pipe column pile into the stratum below the bottom plate of the foundation pit to be constructed, insert the bottom of the foundation pit steel pipe column into the steel pipe column pile, and excavate the foundation pit to the horizontal bottom elevation of the concrete cushion layer to be constructed;
[0016] Step 2: performing secondary excavation on the foundation pit at the periphery of the foundation pit steel pipe column, so that the foundation pit forms a conical pit at the periphery of the steel pipe column pile, the bottom of which is lower than the top of the steel pipe column pile;
[0017] Step 3: laying a concrete cushion layer on the slope of the conical pit and the bottom of the foundation pit;
[0018] Step 4: Lay a waterproof layer on the top of the concrete cushion layer and on the side walls and top of the steel pipe column piles located above the conical pit; apply a waterproof coating layer on the side walls of the steel pipe columns in the foundation pit;
[0019] Step 5: construct the foundation pit bottom plate on top of the waterproof layer.
[0020] Furthermore, after the second excavation of the foundation pit in step 2, the portion of the steel pipe column pile located above the bottom elevation of the concrete cushion layer is removed, and the side wall of the steel pipe column pile located above the conical pit is roughened, so that the side wall of the steel pipe column pile located above the conical pit forms a roughened section; the waterproof layer laid on the side wall of the steel pipe column pile located above the conical pit in step 4 is laid on the roughened section. By roughening the steel pipe column pile, it can be better connected with the waterproof layer to ensure the waterproof effect.
[0021] Furthermore, in the step three, the top of the concrete cushion layer at the bottom of the conical pit is in the same horizontal plane as the bottom of the roughening section; and the concrete cushion layer on the slope of the conical pit is smoothed.
[0022] Furthermore, the step one also includes welding a water-stop steel plate ring on the foundation pit steel pipe column, and the welding height of the water-stop steel plate ring is half of the thickness of the foundation pit bottom plate to be constructed on the top of the steel pipe column pile.
[0023] The construction method of the present invention has the following beneficial effects: by setting a conical pit with a bottom lower than the top of the steel pipe column pile along the periphery of the foundation pit steel pipe column, the penetration path of the formation fluid can be extended, and a waterproof layer is laid on the side wall and top of the concrete cushion layer and the steel pipe column pile, so that the penetration path of the formation fluid contains at least two layers of waterproof layers, and the concrete cushion layer is separated from the top of the steel pipe column pile, and the highly corrosive formation fluid cannot penetrate and contact the foundation pit steel pipe column, and cannot form a seepage channel. The waterproof layer in the conical pit is pressed by the foundation pit bottom plate, so that the waterproof layer and the side wall of the steel pipe column column are closely attached, further ensuring the construction quality and waterproof effect of the waterproof layer. By setting a waterproof coating layer on the side wall of the foundation pit steel pipe column, the damaged part of the original anti-corrosion coating on the surface of the foundation pit steel pipe column can be covered, so as to prevent the foundation pit steel pipe column from being corroded and damaged, and ensure the waterproof stability of the foundation pit steel pipe column. The construction method of the present invention is very suitable for the construction of waterproof nodes between steel pipe columns and bottom plates in deep foundation pits under coastal conditions with high salt content in stratum water bodies, effectively eliminating all nodes where leakage may occur and avoiding construction delays and economic losses caused by repairing leakage points. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a cross-sectional structural diagram of the existing foundation pit steel pipe column and bottom plate waterproof node construction structure.
[0025] Figure 2 It is a schematic cross-sectional structure diagram of the waterproof node construction structure of the steel pipe column and the bottom plate of the coastal deep foundation pit of the present invention.
[0026] Figure 3 for Figure 2 Schematic diagram of the construction process of the structure under construction.
[0027] In the figure: 1- foundation pit steel pipe column; 2- foundation pit bottom plate; 3- waterproof coating layer; 4- water-stop steel plate ring; 5- waterproof layer; 6- concrete cushion layer; 7- steel pipe column pile; 7.1- roughening section; 8- stratum; 9- conical pit. DETAILED DESCRIPTION
[0028] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0029] like Figure 2 The construction structure of the waterproof node between the steel pipe column and the bottom plate of the coastal deep foundation pit shown in the figure includes a foundation pit steel pipe column 1, a stratum 8, a foundation pit bottom plate 2 and a steel pipe column pile 7; the top of the steel pipe column pile 7 is arranged in the foundation pit bottom plate 2, and the bottom of the steel pipe column pile 7 is inserted into the stratum 8; the bottom of the foundation pit steel pipe column 1 is inserted into the steel pipe column pile 7, and the top of the foundation pit steel pipe column 1 extends above the top of the foundation pit bottom plate 2. It should be noted that the foundation pit steel pipe column 1 and the steel pipe column pile 7 of this embodiment can be made on site or prefabricated in advance. The prefabricated foundation pit steel pipe column 1 and the steel pipe column pile 7 can be assembled and installed with a water stop steel plate ring 4 when leaving the factory; if the foundation pit steel pipe column 1 and the steel pipe column pile 7 are assembled on site, the water stop steel plate ring 4 can also be lifted and prefabricated on the foundation pit steel pipe column 1. The water stop steel plate ring 4 of this embodiment is preferably arranged horizontally at a position where the foundation pit steel pipe column 1 is located at half the height of the foundation pit bottom plate 2.
[0030] The construction structure of this embodiment is characterized in that: a conical pit 9 with a bottom lower than the top of the steel pipe column pile 7 is provided at the top of the stratum 8 along the outer periphery of the foundation pit steel pipe column 1. The conical pit 9 is preferably conical, and of course it can also be square cone. The depth of the conical pit 9 is 0.5 to 1.5 meters, and the slope ratio of the conical pit 9 is 1:0.5 to 1:2. The specific depth and slope of the conical pit 9 are determined by the properties of the stratum 8. For example, when the salt content in the stratum fluid is high, the depth of the conical pit 9 is preferably 1.5 meters, and the slope ratio of the conical pit 9 is preferably 1:2. For another example, when the salt content in the stratum fluid is low, the depth of the conical pit 9 is preferably 0.5 meters, and the slope ratio of the conical pit 9 is 1:0.5. A concrete cushion layer 6 is laid on the slope surface of the conical pit 9 and the top of the stratum 8; a roughened section 7.1 is provided on the side wall of the steel pipe column pile 7 located above the bottom of the conical pit 9; a waterproof layer 5 is laid on the top of the concrete cushion layer 6, the roughened section 7.1 of the steel pipe column pile 7 and the top; a waterproof coating layer 3 and a water-stop steel plate ring 4 are provided on the side wall of the foundation pit steel pipe column 1; a foundation pit bottom plate 2 is provided on the top of the waterproof layer 5 and on the outside of the waterproof coating layer 3.
[0031] The waterproof layer 5 of this embodiment includes waterproof rolls and sealant; at least the top of the steel pipe column pile 7 and the roughened section 7.1 are provided with sealant; waterproof rolls are laid on the sealant; there are multiple waterproof rolls, and the multiple waterproof rolls are connected by sealant. For example, the roughened section 7.1 can be first coated with sealant, and then covered with multiple waterproof rolls, and the joints between the waterproof rolls are connected with sealant.
[0032] The waterproofing coiled material on the top of the steel pipe column pile 7 is in a circular shape; the joints between the inner end of the circular waterproofing coiled material and the waterproof coating layer 3, the joints between the outer end of the circular waterproofing coiled material and the waterproofing coiled material of the roughened section 7.1, and the joints between the waterproofing coiled material of the roughened section 7.1 and the waterproofing coiled material on the top of the concrete cushion layer 6 are all provided with sealant and bonded into an integral structure by the sealant. The above-mentioned joints are sealed by the sealant, completely blocking the possible penetration path of the formation fluid, especially compared with Figure 1 For the traditional construction structure shown, the possible infiltration path at the top of the steel pipe column pile 7 is completely blocked, and at the same time, the path for the formation fluid to penetrate into the foundation pit steel pipe column 1 is also extended, so the waterproof effect is better, the structural life is longer, and the waterproofing is more lasting.
[0033] The bottom of the conical pit 9 is lower than the bottom of the roughening section 7.1, that is, the height difference between the bottom of the conical pit 9 and the bottom of the roughening section 7.1 is the thickness of the concrete cushion layer 6. After the concrete cushion layer 6 is laid on the slope of the conical pit 9, the bottom of the concrete cushion layer 6 and the bottom of the roughening section 7.1 are at the same level. The top of the roughening section 7.1 is flush with or lower than the top of the conical pit 9. In this embodiment, the top of the roughening section 7.1 is preferably flush with the top of the conical pit 9, that is, after the upper end of the steel pipe column pile 7 is broken, the side wall of the steel pipe column pile 7 located above the conical pit 9 is roughened, so that the side wall of the steel pipe column pile 7 located above the conical pit 9 forms the roughening section 7.1, and the top of the steel pipe column pile 7, that is, the top of the roughening section 7.1 and the bottom elevation of the concrete cushion layer 6 are at the same level.
[0034] The method for constructing a waterproof node between a steel pipe column 1 and a bottom plate in a coastal deep foundation pit of this embodiment comprises the following steps:
[0035] Step 1: Insert the bottom of the steel pipe column pile 7 into the stratum 8 below the planned foundation pit floor 2, insert the bottom of the foundation pit steel pipe column 1 into the steel pipe column pile 7, and excavate the foundation pit to the horizontal bottom elevation of the planned concrete cushion 6. Weld the water stop steel plate ring 4 on the foundation pit steel pipe column 1, and the welding height of the water stop steel plate ring 4 is half the thickness of the foundation pit floor 2 to be constructed at the top of the steel pipe column pile 7.
[0036] Step 2: The foundation pit is excavated for the second time on the periphery of the foundation pit steel pipe column 1, so that the foundation pit forms a conical pit 9 on the periphery of the steel pipe column pile 7, the bottom of which is lower than the top of the steel pipe column pile 7. The depth of the conical pit 9 is 0.5 to 1.5 meters, and the slope ratio of the conical pit 9 is 1:0.5 to 1:2 according to the different properties of the stratum 8.
[0037] The portion of the steel pipe column pile 7 located above the bottom elevation of the concrete cushion layer 6 is broken, and the side wall of the steel pipe column pile 7 located above the conical pit 9 is roughened, so that the side wall of the steel pipe column pile 7 located above the conical pit 9 forms a roughened section 7.1; it should be noted that the breaking of the steel pipe column pile 7 can be carried out after step one and before step two, that is, after the foundation pit is excavated to the horizontal bottom elevation of the concrete cushion layer 6 to be constructed, the top of the steel pipe column pile 7 can be broken to make the top of the steel pipe column pile 7 flush with the horizontal bottom elevation of the concrete cushion layer 6 to be constructed; then the secondary excavation in step two is carried out to form the conical pit 9, and then the side wall of the steel pipe column pile 7 located above the conical pit 9 is roughened.
[0038] Step 3: Lay a concrete cushion layer 6 on the slope of the conical pit 9 and the bottom of the foundation pit; the top of the concrete cushion layer 6 at the bottom of the conical pit 9 is at the same level as the bottom of the roughened section 7.1; smooth the concrete cushion layer 6 on the slope of the conical pit 9.
[0039] Step 4: Lay a waterproof layer 5 on the top of the concrete cushion 6 and the side wall and top of the steel pipe column pile 7 located above the conical pit 9; apply a waterproof coating layer 3 on the side wall of the foundation pit steel pipe column 1; wherein, the waterproof layer 5 laid on the side wall of the steel pipe column pile 7 located above the conical pit 9 is laid on the roughened section 7.1. The construction of the waterproof layer 5 includes the construction of waterproof coiled material and sealant, and the waterproof coiled material on the top of the steel pipe column pile 7 is in a circular ring shape; the joints between the inner end of the circular waterproof coiled material and the waterproof coating layer 3 on the side wall of the foundation pit steel pipe column 1, the joints between the outer end of the circular waterproof coiled material and the waterproof coiled material of the roughened section 7.1, and the joints between the waterproof coiled material of the roughened section 7.1 and the waterproof coiled material on the top of the concrete cushion 6 are all provided with sealant and are sealed and bonded by the sealant to form a waterproof structural system with better sealing and waterproofing effect.
[0040] Step 5: construct the foundation pit floor 2 on top of the waterproof layer 5.
[0041] The specific construction process is as follows: Figure 3 As shown, Figure 3 The construction step one shown in the middle a area includes: the bottom of the steel pipe column pile 7 is inserted into the stratum 8, the foundation pit steel pipe column 1 is partially inserted into the steel pipe column pile 7, the internal support and excavation of the foundation pit are alternately constructed, and the foundation pit needs to be dewatered during the foundation pit excavation process until the excavation reaches the bottom elevation of the concrete cushion layer 6.
[0042] Figure 3The second construction step shown in the middle b area includes: excavating a conical pit 9 at the top of the stratum 8 with the central axis of the foundation pit steel pipe column 1 as the axis; and breaking the part of the steel pipe column pile 7 above the stratum 8, and then roughening the side of the steel pipe column pile 7 above the conical pit 9, so that the side wall of the steel pipe column pile 7 located above the stratum 8 forms a roughened section 7.1; and then welding the water stop steel plate ring 4 to the foundation pit steel pipe column 1, and the welding height is half of the thickness of the foundation pit bottom plate 2 to be constructed on the top of the steel pipe column pile 7.
[0043] Figure 3 Construction step three shown in area c includes: after the construction of step two is completed, a concrete cushion layer 6 is laid on the top of the conical pit 9 and the stratum 8; wherein the top of the concrete cushion layer 6 at the bottom of the conical pit 9 is kept at the same horizontal plane as the bottom of the roughening section 7.1, and the concrete cushion layer 6 on the slope of the conical pit 9 is smoothed.
[0044] Figure 3 The construction step 4 shown in the middle d area includes: after the construction of step 3 is completed, a waterproof layer 5 is laid on the concrete cushion layer 6, the top of the steel pipe column pile 7 and the roughened section 7.1, wherein the top of the steel pipe column pile 7 and the roughened section 7.1 are first coated with sealant, and then waterproof membrane is laid. Then a waterproof coating layer 3 is applied to the side wall of the foundation pit steel pipe column 1. Furthermore, sealant is applied at the joints between the waterproof membrane on the top of the steel pipe column pile 7 and the waterproof coating layer 3 on the side wall of the foundation pit steel pipe column 1, the joints between the waterproof membrane on the top of the steel pipe column pile 7 and the waterproof membrane of the roughened section 7.1, and the joints between the waterproof membrane of the roughened section 7.1 and the waterproof membrane on the top of the concrete cushion layer 6.
[0045] Figure 3 The construction step 5 shown in the middle e area includes: after the construction of step 4 is completed, the foundation pit bottom plate 2 is constructed above the waterproof layer 5. The height of the foundation pit bottom plate 2 is less than or equal to the height of the waterproof coating layer 3.
[0046] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A waterproof node construction structure of a steel pipe column and a bottom plate of a coastal deep foundation pit, comprising a foundation pit steel pipe column, a stratum and a steel pipe column pile; the bottom of the steel pipe column pile is inserted into the stratum; the bottom of the foundation pit steel pipe column is inserted into the steel pipe column pile; Features: A conical pit whose bottom is lower than the top of the steel pipe column pile is provided at the top of the stratum along the outer periphery of the foundation pit steel pipe column; a concrete cushion layer is laid on the slope of the conical pit and the top of the stratum; a roughened section is provided on the side wall of the steel pipe column pile located above the bottom of the conical pit; a waterproof layer is laid on the top of the concrete cushion layer, the roughened section and the top of the steel pipe column pile; a waterproof coating layer and a water-stop steel plate ring are provided on the side wall of the foundation pit steel pipe column; a foundation pit bottom plate is provided on the top of the waterproof layer and the outside of the waterproof coating layer; the bottom of the conical pit is lower than the bottom of the roughened section; the top of the roughened section is flush with or lower than the top of the conical pit; The waterproof layer includes waterproof coiled material and sealant; at least the top of the steel pipe column pile and the roughened section are provided with the sealant; the waterproof coiled material is laid on the sealant; there are multiple waterproof coiled materials, and the multiple waterproof coiled materials are connected by the sealant; The waterproof membrane at the top of the steel pipe column pile is in a circular shape; the joint between the inner end of the circular waterproof membrane and the waterproof coating layer, the joint between the outer end of the circular waterproof membrane and the waterproof membrane of the roughened section, and the joint between the waterproof membrane of the roughened section and the waterproof membrane on the top of the concrete cushion layer are all provided with the sealant and bonded into an integral structure by the sealant.
2. A waterproof node construction structure of a steel pipe column and bottom plate for a coastal deep foundation pit according to claim 1, Features: The water stop steel plate ring is horizontally arranged at a position where the foundation pit steel pipe column is located at half the height of the foundation pit bottom plate.
3. A waterproof node construction structure for a coastal deep foundation pit steel pipe column and bottom plate according to claim 1, Features: The conical pit is conical in shape, the depth of the conical pit is 0.5 to 1.5 meters, and the slope ratio of the conical pit is 1:0.5 to 1:
2.
4. A construction method for the waterproof node construction structure of the steel pipe column and bottom plate of a coastal deep foundation pit as claimed in claim 1, Features: The following steps are involved: Step 1: insert the bottom of the steel pipe column pile into the stratum below the bottom plate of the foundation pit to be constructed, insert the bottom of the foundation pit steel pipe column into the steel pipe column pile, and excavate the foundation pit to the horizontal bottom elevation of the concrete cushion layer to be constructed; Step 2: performing secondary excavation on the foundation pit at the periphery of the foundation pit steel pipe column, so that the foundation pit forms a conical pit at the periphery of the steel pipe column pile, the bottom of which is lower than the top of the steel pipe column pile; Step 3: laying a concrete cushion layer on the slope of the conical pit and the bottom of the foundation pit; Step 4: Lay a waterproof layer on the top of the concrete cushion layer and on the side walls and top of the steel pipe column piles located above the conical pit; apply a waterproof coating layer on the side walls of the steel pipe columns in the foundation pit; Step 5: construct the foundation pit bottom plate on top of the waterproof layer.
5. A method for constructing waterproof nodes between steel pipe columns and bottom plates in a coastal deep foundation pit according to claim 4, Features: After the secondary excavation of the foundation pit in the step 2, the portion of the steel pipe column pile located above the bottom elevation of the concrete cushion layer is broken, and the side wall of the steel pipe column pile located above the conical pit is roughened to form a roughened section on the side wall of the steel pipe column pile located above the conical pit; the waterproof layer laid on the side wall of the steel pipe column pile located above the conical pit in the step 4 is laid on the roughened section.
6. A method for constructing waterproof nodes between steel pipe columns and bottom plates in a coastal deep foundation pit according to claim 5, Features: In the step three, the top of the concrete cushion layer at the bottom of the conical pit is in the same horizontal plane as the bottom of the roughening section; and the concrete cushion layer on the slope of the conical pit is smoothed.
7. A method for constructing waterproof nodes between steel pipe columns and bottom plates in a coastal deep foundation pit according to claim 5, Features: The step one also includes welding a water-stop steel plate ring on the foundation pit steel pipe column, and the welding height of the water-stop steel plate ring is half the thickness of the foundation pit bottom plate to be constructed on the top of the steel pipe column pile.
Citation Information
Patent Citations
Obliquely and mutually supported underground water-resistant structure and construction method thereof
CN102561408A
Method for constructing waterproof connection structure of foundation pit anti-floating pile and structure base plate
CN106884436A
Waterproof construction method for lattice column pile and main structure joint
CN110206073A
Wear concrete base plate watertightness node under steel stand
CN207228171U
Water stop ring device of latticed column pile
CN211006779U