Method for using a tunnel lining maintenance film covering trolley
By using coated trolleys and film rolls on tunnel lining maintenance laminated trolleys, the problem of difficulty in keeping concrete wet for a long time by spraying water, achieving more efficient maintenance effects and lower waste of water resources, and optimizing the production environment .
Patent Information
- Application Number
- CN202011618304.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-30
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-12-30
AI Technical Summary
Existing tunnel lining maintenance trolleys are difficult to keep the concrete surface wet for a long time by spraying water, resulting in waste of water resources and pollution of the production environment, and the water spray maintenance effect is poor.
A tunnel lining maintenance coating trolley is designed. The coating mechanism is driven by the coating trolley, and the coating film is pasted on the concrete surface using a film roll and a coating pressing stick, retaining moisture for a long time and preventing absorption or volatilization.
It effectively extends the wetting time of concrete surface, reduces waste of water resources, optimizes the production environment, and improves construction progress and quality.
Smart Images

Figure CN112627847B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the use of a tunnel lining maintenance trolley, in particular to a method for using the tunnel lining maintenance film coating trolley. Background Art
[0002] At present, during the tunnel construction process, the concrete surface of the tunnel lining needs to be cured after the tunnel lining construction is demoulded, and the concrete surface is usually cured by spraying water; the lining of the existing tunnel is cured by spraying water through a tunnel curing trolley. During the curing process of the tunnel curing trolley, water is evenly sprayed on the concrete surface through a nozzle, and the water on the concrete surface is quickly absorbed or volatilized after spraying. Sometimes after the water spraying curing, the surface of the concrete is still dry. In order to moisten the concrete surface, a large amount of water is sprayed, and a large amount of water flows to the ground, polluting the production environment. Since the amount of water attached to the concrete surface is small during the water spraying curing process, the concrete surface still cannot be guaranteed to be moist for a long time, and the surface water spraying curing of the concrete is difficult to achieve the expected effect. In view of the above reasons, a method for using a tunnel lining curing film covering trolley is proposed. Summary of the invention
[0003] The purpose of the present invention is to overcome the problem that the lining of the tunnel is maintained by water spraying through a tunnel maintenance trolley. The concrete surface is uniformly sprayed with water through a nozzle. The water on the concrete surface is quickly absorbed or volatilized after being sprayed. Sometimes, after water spraying and maintenance, the surface of the concrete is still dry. In order to moisten the concrete surface, a large amount of water is sprayed, and a large amount of water flows to the ground. Since the amount of water attached to the concrete surface during the water spraying maintenance is small, the concrete surface still cannot be guaranteed to be moist for a long time. The surface water spraying maintenance of the concrete is difficult to achieve the expected effect. Through reasonable design, a method for using a tunnel lining maintenance film coating trolley is provided. The lining coating and curing trolley of the present invention drives the coating mechanism through the coating trolley, and the coating roll is installed on the film roll plug-in shaft of the coating mechanism, and the coating is adhered to the surface of the inner wall of the lining concrete by the rolling of the coating pressing roller to carry out moisturizing and curing. After coating, the moisture emitted from the concrete after the tunnel lining is demoulded can be retained on the surface of the concrete for a long time, and the lining concrete can be moisturized and cured for a long time, thereby improving the curing effect, and the phenomenon of rapid absorption, volatilization and drying of the concrete surface will not occur; the waste of water resources is reduced, the production environment is optimized, and it can ensure that the inner wall of the lining concrete is moisturized during the curing period, thereby improving the construction progress and quality.
[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a method for using a tunnel lining maintenance film coating trolley, wherein the tunnel lining maintenance film coating trolley is composed of a lining film coating maintenance trolley, a traveling wheel, a trolley track, a film coating trolley, a trolley driving device, a pull rope pulley, a pulling rope, a telescopic platform, a top platform, a lining concrete inner wall, a trolley crossbeam, an automatic lifting frame, a film coating reel frame, a film coating pressure rod, a film roll plug-in shaft, an airflow cleaning nozzle, a baffle, a trolley lifting support frame, a portal frame, and a trolley wheel; at least two portal frames are arranged at the front and rear ends of the lining film maintenance trolley, and the lower ends of the columns on both sides of the portal frames are respectively arranged with trolley lifting support frames; a bottom beam is arranged between both sides of the portal frames at the front and rear ends, and traveling wheels are respectively arranged between the two ends of the bottom beams on both sides and the ground; telescopic platforms are symmetrically arranged at the lower part and the middle part of both sides of the lining film maintenance trolley, Top platforms are symmetrically arranged on both sides of the top of the lining film curing trolley, and manual operation platforms are arranged on the top of the top platform and the telescopic platform respectively; a pair of arc-shaped trolley tracks are arranged on the outer side of the lining film curing trolley corresponding to the inner wall of the lining concrete, a trolley channel is arranged between the pair of trolley tracks and the inner wall of the lining concrete, a film coating trolley is arranged on the pair of trolley tracks respectively, a trolley crossbeam is arranged in the middle of the film coating trolley, and trolley wheels are arranged between the two ends of the film coating trolley and the pair of trolley tracks respectively; a trolley driving device is arranged in the middle of the upper part of the gantry, rope pulleys are arranged on both sides of the gantry, rope pulleys are arranged on both sides of the lower part of the gantry and the lower ends of the pair of trolley tracks respectively, a pulling rope is wound in the trolley driving device, and rope pulleys are arranged around the two ends of the pulling rope respectively, and the two ends of the pulling rope are respectively arranged around the rope pulley, the trolley track and the two ends of the film coating trolley;
[0005] A pair of film roll racks are symmetrically arranged at both ends of the trolley crossbeam of the film laminating trolley, a film roll plug-in shaft is arranged between the upper ends of the pair of film roll racks, and a film roll is arranged on the film roll plug-in shaft; a pair of plug-in holes are respectively reserved at the upper ends of the pair of film roll racks, and the film roll plug-in shaft is arranged in the pair of plug-in holes;
[0006] A film pressing rod is arranged behind the film roll plug-in shaft, and a pair of automatic lifting frames are arranged between the two ends of the film pressing rod and the trolley crossbeam; an airflow cleaning nozzle is arranged at the front end of the trolley crossbeam, and an air pressure pipe is arranged at the lower end of the pipe of the airflow cleaning nozzle, and a baffle is arranged between one side of the air pressure pipe and the film pressing rod; the airflow cleaning nozzle, the film roll plug-in shaft, and the upper end of the film pressing rod are arranged corresponding to the inner wall of the lining concrete respectively;
[0007] Before the first construction section of the lining concrete inner wall is covered with film for maintenance, the lining covering maintenance trolley runs by the running wheels to one end of the lining concrete inner wall that needs to be maintained and stops; the trolley drive device is started to pull the covering trolley by the pulling rope to run to the lower end of the right side of the trolley track and then stop, and the lining covering maintenance trolley is lifted and supported by the trolley lifting support frame; the film roll plug-in shaft is removed from the upper end of the film reel frame, and the film roll plug-in shaft is manually inserted into the film roll by the operator to install the film roll; after the film roll is installed, the two ends of the film roll plug-in shaft are manually re-inserted into the plug-in hole at the upper end of the film reel frame by the operator; after the film roll plug-in shaft is installed, the automatic lifting frame and the film pressing rod are lowered, and the film head of the film roll is manually pulled to bypass the upper end of the film pressing rod and the lower end of the lining concrete inner wall for bottom covering.
[0008] After the bottom end of the laminating roll is laminarized, the laminating pressing rod is extended through the automatic lifting frame, and the laminating pressing rod presses the back of the laminating film to make it fit the inner wall of the lining concrete for laminating. At the same time, the valve of the airflow cleaning nozzle is opened, and the trolley driving device is started to pull the laminating trolley upward along the trolley track through the pulling rope; during the movement of the laminating trolley, the airflow cleaning nozzle continuously cleans the dust on the surface of the inner wall of the lining concrete through airflow; at the same time, the film of the laminating roll on the film roll plug-in shaft is pulled out, and the laminating pressing rod rotates and presses the film to make it fit the inner wall of the lining concrete for laminating; the laminating trolley stops when it runs to the other end of the trolley track, and the length of the laminating head reserved at the bottom of the film is disconnected by manually pulling out the laminating, and the laminating head is manually fit to the lower end of the inner wall of the lining concrete to complete the laminating maintenance of the first construction section.
[0009] After the coating maintenance of the first construction section, the coating trolley returns to the starting end, lowers the lining coating maintenance trolley through the trolley lifting support frame, runs forward through the walking wheels to a width smaller than the width of the coating roll and the reserved lap width, then stops, repeats the above coating maintenance process of the first construction section, and continuously carries out coating maintenance construction on the inner wall of the rear section lining concrete through the coating trolley.
[0010] Beneficial effect: The lining coating and curing trolley of the present invention drives the coating mechanism through the coating trolley, and the coating roll is installed on the film roll plug-in shaft of the coating mechanism, and the coating is adhered to the surface of the inner wall of the lining concrete by the rolling of the coating pressure roller for moisturizing and curing. After coating, the moisture emitted from the concrete after the tunnel lining is demoulded can be retained on the surface of the concrete for a long time, and the lining concrete can be moisturized and cured for a long time, thereby improving the curing effect, and the concrete surface will not be rapidly absorbed or volatilized or dried; it reduces the waste of water resources, optimizes the production environment, can ensure that the inner wall of the lining concrete is moisturized during curing, and improves the construction progress and quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The present invention will be further described below in conjunction with the accompanying drawings:
[0012] Figure 1 It is a schematic diagram of the general assembly structure;
[0013] Figure 2 yes Figure 1 A side view schematic diagram of the structure;
[0014] Figure 3 yes Figure 1 Schematic diagram of the film laminating trolley structure;
[0015] Figure 1 , 2 , 3: lining coating maintenance trolley 1, walking wheel 2, trolley track 3, coating trolley 4, trolley driving device 5, pull rope pulley 6, pulling rope 7, telescopic platform 8, top platform 9, lining concrete inner wall 10, trolley cross beam 11, automatic lifting frame 12, coating reel frame 13, coating pressure rod 14, film roll plug-in shaft 15, airflow cleaning nozzle 16, baffle 17, trolley lifting support frame 18, portal frame 19, small wheel 20. DETAILED DESCRIPTION
[0016] The present invention is further described in detail below in conjunction with embodiments and specific implementation modes:
[0017] Example 1
[0018] At least two portal frames 19 are arranged at the front and rear ends of the lining film curing trolley 1, and trolley lifting support frames 18 are arranged at the lower ends of the columns on both sides of the portal frames 19; a bottom beam is arranged between the two sides of the portal frames 19 at the front and rear ends, and walking wheels 2 are arranged between the two ends of the bottom beams on both sides and the ground; telescopic platforms 8 are symmetrically arranged at the lower and middle parts of both sides of the lining film curing trolley 1, and top platforms 9 are symmetrically arranged on both sides of the top of the lining film curing trolley 1, and the tops of the top platforms 9 and the telescopic platforms 8 are respectively arranged as manual operation platforms; a pair of arc-shaped trolley tracks 3 are arranged on the outer side of the lining film curing trolley 1 corresponding to the inner wall 10 of the lining concrete, and the pair of trolley tracks 3 are connected to the lining concrete. A trolley passage is set between the inner walls 10 of the soil, and a film-covering trolley 4 is respectively set on a pair of trolley tracks 3, a trolley crossbeam 11 is set in the middle of the film-covering trolley 4, and trolley wheels 20 are respectively set between the two ends of the film-covering trolley 4 and the pair of trolley tracks 3; a trolley driving device 5 is set in the middle of the upper part of the gantry 19, and rope pulleys 6 are respectively set on both sides of the gantry 19, and rope pulleys 6 are respectively set on both sides of the lower side of the gantry 19 and the lower ends of the pair of trolley tracks 3, and a pulling rope 7 is wound in the trolley driving device 5, and rope pulleys 6 are respectively arranged around the two ends of the pulling rope 7, and the two ends of the pulling rope 7 are respectively arranged around the rope pulley 6, the trolley track 3 and the two ends of the film-covering trolley 4.
[0019] A pair of film roll frames 13 are symmetrically arranged at both ends of the trolley cross beam 11 of the film laminating trolley 4, a film roll plug-in shaft 15 is arranged between the upper ends of the pair of film roll frames 13, and a film roll is arranged on the film roll plug-in shaft 15; a pair of plug-in holes are respectively reserved at the upper ends of the pair of film roll frames 13, and the film roll plug-in shaft 15 is arranged in the pair of plug-in holes;
[0020] A film pressing roller 14 is arranged behind the film roll plug-in shaft 15, and a pair of automatic lifting frames 12 are arranged between the two ends of the film pressing roller 14 and the trolley cross beam 11; the front end of the trolley cross beam 11 is arranged with an airflow cleaning nozzle 16, and an air pressure pipe is arranged at the lower end of the pipe of the airflow cleaning nozzle 16, and a baffle 17 is arranged between one side of the air pressure pipe and the film pressing roller 14; the upper ends of the airflow cleaning nozzle 16, the film roll plug-in shaft 15, and the film pressing roller 14 are arranged corresponding to the inner wall 10 of the lining concrete respectively;
[0021] Before the first construction section of the lining concrete inner wall 10 is coated and maintained, the lining coating maintenance trolley 1 runs to one end of the lining concrete inner wall 10 that needs to be maintained through the walking wheels 2 and stops; the trolley driving device 5 is started to pull the coating trolley 4 through the pulling rope 7 to run to the lower end of the right side of the trolley track 3 and then stop, and the lining coating maintenance trolley 1 is lifted and supported by the trolley lifting support frame 18; the film roll plug-in shaft 15 is removed from the upper end of the coating reel frame 13, and the film roll plug-in shaft 15 is manually inserted into the coating reel by the operator to install the coating reel; after the coating reel is installed, the two ends of the film roll plug-in shaft 15 are manually re-inserted into the plug-in holes at the upper end of the coating reel frame 13 by the operator; after the film roll plug-in shaft 15 is installed, the automatic lifting frame 12 and the coating pressure rod 14 are lowered, and the coating head of the coating reel is manually pulled around the upper end of the coating pressure rod 14 and the lower end of the lining concrete inner wall 10 is coated at the bottom.
[0022] Example 2
[0023] After the bottom end of the film roll is coated, the film pressing rod 14 is extended through the automatic lifting frame 12, and the film pressing rod 14 presses the back of the film to fit the inner wall 10 of the lining concrete for coating. At the same time, the valve of the airflow cleaning nozzle 16 is opened, the trolley driving device 5 is started, and the coating trolley 4 is pulled upward along the trolley track 3 through the pulling rope 7; during the movement of the coating trolley 4, the airflow cleaning nozzle 16 continuously cleans the dust on the surface of the inner wall 10 of the lining concrete through the airflow; at the same time, the film of the film roll on the film roll plug-in shaft 15 is pulled out, and the film pressing rod 14 rotates, presses the film to fit the inner wall 10 of the lining concrete for coating; the coating trolley 4 stops when it runs to the other end of the trolley track 3, and the length of the coating head reserved at the bottom of the film is disconnected by manually pulling out the coating, and the coating head completes the coating maintenance of the first construction section after manually fitting the lower end of the inner wall 10 of the lining concrete.
[0024] Example 3
[0025] After the coating maintenance of the first construction section, the coating trolley 4 returns to the starting end, lowers the lining coating maintenance trolley 1 through the trolley lifting support frame 18, runs forward to a width smaller than the coating roll and a reserved lap width through the walking wheels 2, and then stops, repeating the above coating maintenance process of the first construction section, and continuously performing coating maintenance construction on the rear section lining concrete inner wall 10 through the coating trolley 4.
Claims
1. A method for using a tunnel lining maintenance film coating trolley, wherein the tunnel lining maintenance film coating trolley is composed of a lining film coating maintenance trolley (1), a walking wheel (2), a trolley track (3), a film coating trolley (4), a trolley driving device (5), a pull rope pulley (6), a pulling rope (7), a telescopic platform (8), a top platform (9), a lining concrete inner wall (10), a trolley crossbeam (11), an automatic lifting frame (12), a film coating reel frame (13), a film coating pressure rod (14), a film reel plug-in shaft (15), an airflow cleaning nozzle (16), a baffle (17), a trolley lifting support frame (18), a gantry frame (19), and a trolley wheel (20); characterized in that: At least two portal frames (19) are arranged at the front and rear ends of the lining film curing trolley (1), and trolley lifting support frames (18) are arranged at the lower ends of the columns on both sides of the portal frames (19); a bottom beam is arranged between the two sides of the portal frames (19) at the front and rear ends, and walking wheels (2) are arranged between the two ends of the bottom beams on both sides and the ground; telescopic platforms (8) are symmetrically arranged at the lower and middle parts of both sides of the lining film curing trolley (1), and top platforms (9) are symmetrically arranged at both sides of the top of the lining film curing trolley (1), and the tops of the top platforms (9) and the telescopic platforms (8) are respectively arranged as manual operation platforms; a pair of arc-shaped trolley tracks (3) are arranged on the outer side of the lining film curing trolley (1) corresponding to the inner wall (10) of the lining concrete, and the pair of trolley tracks (3) are aligned with the inner wall (10) of the lining concrete. A trolley channel is set between the two trolley tracks (3), a film coating trolley (4) is respectively set on the pair of trolley tracks (3), a trolley crossbeam (11) is set in the middle of the film coating trolley (4), and trolley wheels (20) are respectively set between the two ends of the film coating trolley (4) and the pair of trolley tracks (3); a trolley driving device (5) is set in the middle of the upper part of the gantry (19), rope pulleys (6) are respectively set on both sides of the gantry (19), and rope pulleys (6) are respectively set on both sides of the lower side of the gantry (19) and the lower ends of the pair of trolley tracks (3), a pulling rope (7) is wound in the trolley driving device (5), and rope pulleys (6) are respectively arranged around the two ends of the pulling rope (7), and the two ends of the pulling rope (7) are respectively arranged around the rope pulleys (6), the trolley tracks (3) and the two ends of the film coating trolley (4) are fixedly set; A pair of film roll frames (13) are symmetrically arranged at both ends of the trolley crossbeam (11) of the film laminating trolley (4); a film roll plug-in shaft (15) is arranged between the upper ends of the pair of film roll frames (13); and a film roll is arranged on the film roll plug-in shaft (15); a pair of plug-in holes are respectively reserved at the upper ends of the pair of film roll frames (13); and the film roll plug-in shaft (15) is arranged in the pair of plug-in holes; A film pressing rod (14) is arranged behind the film roll plug-in shaft (15), and a pair of automatic lifting frames (12) are arranged between the two ends of the film pressing rod (14) and the trolley cross beam (11); the front end of the trolley cross beam (11) is arranged with an airflow cleaning nozzle (16), the lower end of the pipeline of the airflow cleaning nozzle (16) is arranged with an air pressure pipeline, and a baffle (17) is arranged between one side of the air pressure pipeline and the film pressing rod (14); the airflow cleaning nozzle (16), the film roll plug-in shaft (15), and the upper end of the film pressing rod (14) are arranged corresponding to the inner wall (10) of the lining concrete respectively; Before the first construction section of the lining concrete inner wall (10) is covered with a film for maintenance, the lining film covering maintenance trolley (1) is moved to one end of the lining concrete inner wall (10) to be maintained by the running wheels (2) and stops; the trolley driving device (5) is started to pull the film covering trolley (4) to the lower end of the right side of the trolley track (3) by the pulling rope (7) and then stops; the lining film covering maintenance trolley (1) is lifted and supported by the trolley lifting support frame (18); the film roll plug-in shaft is removed from the upper end of the film covering reel frame (13); (15), the operator manually inserts the film roll plug-in shaft (15) into the film roll to install the film roll; after the film roll is installed, the operator manually re-inserts the two ends of the film roll plug-in shaft (15) into the plug-in holes at the upper end of the film roll frame (13); after the film roll plug-in shaft (15) is installed, the automatic lifting frame (12) and the film pressing rod (14) are lowered, and the film head of the film roll is manually pulled around the upper end of the film pressing rod (14) and the lower end of the lining concrete inner wall (10) to perform bottom film coating.
2. The method for using the tunnel lining maintenance coating trolley according to claim 1, characterized in that: After the bottom end of the film roll is coated, the film pressing rod (14) is extended through the automatic lifting frame (12), and the film pressing rod (14) presses the back of the film to fit the inner wall (10) of the lining concrete to perform the film coating. At the same time, the valve of the airflow cleaning nozzle (16) is opened, and the trolley driving device (5) is started to pull the film coating trolley (4) along the trolley track (3) upward through the pulling rope (7); during the movement of the film coating trolley (4), the airflow cleaning nozzle (16) presses the lining concrete with airflow. The dust on the surface of the inner wall (10) of the soil is continuously cleaned; at the same time, the film of the film roll on the film roll plug-in shaft (15) is pulled out, and the film pressing roller (14) rotates and presses the film to continuously adhere to the inner wall (10) of the lining concrete for filming; the filming trolley (4) stops when it runs to the other end of the trolley track (3), and the length of the film head reserved at the lower part is disconnected by manually pulling out the film, and the film head is manually adhered to the lower end of the inner wall (10) of the lining concrete to complete the filming maintenance of the first construction section.
3. The method for using the tunnel lining maintenance coating trolley according to claim 1 is characterized in that: After the coating maintenance of the first construction section, the coating trolley (4) returns to the starting end, the lining coating maintenance trolley (1) is lowered by the trolley lifting support frame (18), and the running wheels (2) move forward to a width smaller than the width of the coating roll and a reserved lap joint width before stopping, and the above coating maintenance process of the first construction section is repeated, and the coating maintenance construction of the rear section lining concrete inner wall (10) is continuously carried out by the coating trolley (4).