Moulds for installing tower segments
By designing a mold for installing tower blocks, the combination of loading components and templates is used to solve the problems of complex splicing of tower blocks and non-closing of potting joints, and the rapid and accurate splicing and filling of tower blocks is achieved. Effective closure of the sealing seam.
Patent Information
- Application Number
- CN201911297125.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-11-07
- Filing Date
- 2019-12-16
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2039-12-16
AI Technical Summary
In the prior art, the splicing method and equipment of concrete tower pieces are complex, and fast and accurate splicing cannot be guaranteed, and there is a risk of unsealing the potting joint and concrete slurry leaking.
A mold is designed for mounting tower pieces, including loading components and templates. The loading assembly is connected to the tower block through the first and second mounting positions, and the formwork is connected to the tower block through the third and fourth mounting positions, ensuring that the outer wall surface of the tower block is flush and forming an effective potting joint. .
Through the use of molds, the stability and reliability of the tower block connection are improved, the potting joints are ensured to be closed in the circumferential direction, and the concrete slurry leaks are prevented, and the reliability and safety of tower block splicing are improved.
Smart Images

Figure CN112780099B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of tower construction, and in particular to a mold for installing tower segments. Background Art
[0002] As the efficiency of wind turbine power generation increases, the length of blades is getting longer and longer, and the height and cross-sectional size of the wind turbine towers that match them are also increasing. Steel structure towers are difficult to meet the construction needs of large-section high towers due to their high cost and difficulty in transportation. Concrete towers can economically build large wind turbines, so they have received widespread attention. In related technologies, concrete towers are made up of multiple tower segments, but the splicing method of tower segments and the equipment used for splicing are relatively complicated, and it is impossible to ensure that the tower segments are spliced quickly and accurately, so there is room for improvement. Summary of the invention
[0003] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, one purpose of the present application is to provide a mold for installing tower segments, which can quickly and accurately realize the splicing of two tower segments and facilitate effective potting.
[0004] A mold for installing tower segments according to an embodiment of the present application includes: a loading component, wherein the two ends of the loading component respectively have a first mounting position and a second mounting position, wherein the first mounting position and the second mounting position are respectively used to connect with two adjacent tower segments so as to splice the two adjacent tower segments along the circumferential direction; a template, wherein the template has a mounting surface, wherein the mounting surface is suitable for fitting with the outer wall surfaces of the two adjacent tower segments, and the template has a third mounting position and a fourth mounting position respectively used to connect with the two adjacent tower segments, and the sides of the two adjacent tower segments facing each other are suitable for defining a circumferentially closed potting seam together with the mounting surface.
[0005] According to the mold for installing tower segments in the embodiment of the present application, two adjacent tower segments are connected by a loading assembly and a template, which can improve the stability and reliability of the connection between the two tower segments, and the installation position of the tower segments is more accurate by fitting the installation surface of the template with the two tower segments, ensuring that the grouting seams are closed along the circumferential direction, preventing leakage of concrete slurry during the pouring process, and improving the reliability and safety of splicing of tower segments.
[0006] According to some embodiments of the present application, the mold for installing tower segments, the loading assembly includes a jack and two bases, both ends of the jack are respectively connected to the two bases, the jack is used to load the two bases so that the two bases move toward each other, the first mounting position and the second mounting position are respectively arranged on the two bases, the template is installed between the two bases, and the jack is located on the side of the template away from the mounting surface.
[0007] According to some embodiments of the present application, the mold for installing tower segments includes multiple groups of loading assemblies, which are spaced apart along the length direction of the template and the spacing between any two adjacent groups of loading assemblies is h1, satisfying: 6m≤h1≤8m.
[0008] According to some embodiments of the present application, the mold for installing tower segments, the third installation position and the fourth installation position are both installation holes that pass through the template, and the template is connected to the tower segment via threaded fasteners that pass through the installation holes.
[0009] According to some embodiments of the present application, for installing a tower segment mold, the third mounting position and the fourth mounting position are both in multiple groups, and the multiple groups of the third mounting positions and the multiple groups of the fourth mounting positions are spaced apart and arranged along the length direction of the template, and the distance between any two adjacent groups of the third mounting positions or the fourth mounting positions is h2, satisfying: 2m≤h2≤3m.
[0010] According to some embodiments of the present application, for installing a tower segment mold, the distance from the third installation position to the first end of the template along the width direction is equal to the distance from the fourth installation position to the second end of the template along the width direction.
[0011] According to some embodiments of the present application, in the mold for installing tower segments, any group of the third installation positions has the same vertical height as the adjacent fourth installation positions.
[0012] According to some embodiments of the present application, the mold for installing tower segments further includes: a rubber pad, which is installed on the installation surface and is suitable for being clamped between the installation surface and the tower segment.
[0013] According to some embodiments of the present application, the rubber pad includes a first pad block and a second pad block, the first pad block is suitable for being clamped between the third mounting position and the first of the two adjacent tower segments, and the second pad block is suitable for being clamped between the fourth mounting position and the second of the two adjacent tower segments.
[0014] According to some embodiments of the present application, in a mold for installing a tower segment, the template extends along the length direction of the tower segment, and the length of the template is the same as the length of the tower segment.
[0015] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0017] Figure 1 is a schematic diagram of the structure of a tower according to an embodiment of the present application;
[0018] Figure 2 yes Figure 1 Cross-sectional view along AA;
[0019] Figure 3 is a schematic diagram of the connection between the mold and two adjacent tower segments according to an embodiment of the present application;
[0020] Figure 4 It is a schematic diagram (stereoscopic diagram) of the connection between the mold and two adjacent tower segments according to an embodiment of the present application.
[0021] Reference numerals:
[0022] Tower 1000,
[0023] Mold 100,
[0024] Loading assembly 1, jack 11, base 12, template 2, mounting surface 21, first cushion block 31, second cushion block 32, threaded fastener 4,
[0025] Concrete tower section 200 , tower segment 201 , and potting joint 202 . DETAILED DESCRIPTION
[0026] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.
[0027] Reference below Figure 3A mold 100 for installing tower segments 201 according to an embodiment of the present application is described. The mold 100 is used to fix two adjacent tower segments 201 together, and during specific installation, the outer walls of the two tower segments 201 can be kept flush, and the two tower segments 201 can be stably connected to ensure that the potting seam 202 between the two tower segments 201 is effectively closed, prevent leakage during the potting process, and improve the stability and reliability of the splicing of the tower segments 201.
[0028] like Figure 3 As shown, the mold 100 for installing the tower segment 201 according to the embodiment of the present application includes: a loading component 1 and a template 2.
[0029] It should be noted that the tower includes a plurality of concrete tower sections 200, and the plurality of concrete tower sections 200 are sequentially arranged. Figure 1 As shown, a plurality of concrete tower sections 200 may be lifted one by one to form an intermediate support section of the tower.
[0030] like Figure 2 As shown, the concrete tower section 200 includes a plurality of tower segments 201 connected in sequence along the circumferential direction, that is, the concrete tower section 200 is composed of a plurality of tower segments 201 spliced in sequence along the circumferential direction. The mold 100 of the present application is used to splice and install two adjacent tower segments 201 of the concrete tower section 200 so that the two tower segments 201 are effectively encapsulated as one.
[0031] like Figure 3 As shown, the loading assembly 1 includes a first mounting position and a second mounting position, and the first mounting position and the second mounting position are respectively used to connect to two adjacent tower segments 201. Figure 3 As shown, two adjacent tower segments 201 are spliced along the circumferential direction, and the loading assembly 1 connects the two tower segments 201 as a whole, and the loading assembly 1 can load the first of the two adjacent tower segments 201 through the first installation position, and can load the second of the two adjacent tower segments 201 through the second installation position. In this way, the connection stability between the two tower segments 201 can be adjusted by adjusting the loading force of the loading assembly 1, thereby ensuring that the two tower segments 201 can be stably and reliably connected.
[0032] The template 2 has a third mounting position and a fourth mounting position, which are respectively used to connect to two adjacent tower segments 201, and the two adjacent tower segments 201 can be connected and fixed by the template 2. Thus, both the loading assembly 1 and the template 2 can connect the two adjacent tower segments 201 to improve the stability and reliability of the connection between the two adjacent tower segments 201.
[0033] Among them, Figure 3As shown, the template 2 has a mounting surface 21, and the mounting surface 21 is suitable for fitting with the outer wall surfaces of two adjacent tower segments 201, so that the outer wall surfaces of the two tower segments 201 remain flush, thereby achieving the installation and positioning of the tower segments 201, and further connecting the two tower segments 201 more accurately, ensuring that a complete concrete tower section 200 can be formed after multiple tower segments 201 are connected in sequence along the circumferential direction.
[0034] The template 2 is suitable for forming a vertical seam with two adjacent tower segments 201, such as Figure 3 As shown, the mounting surface 21 faces two tower segments 201, and the sides of two adjacent tower segments 201 facing each other and the mounting surface 21 together define a circumferentially closed potting joint 202. Concrete slurry is then poured into the potting joint 202 to achieve potting connection of the two tower segments 201, and during the potting process, the two tower segments 201 are always stably connected through the loading assembly 1 and the template 2, that is, the potting joint 202 is always in a circumferentially closed state, and the structural dimensional accuracy of the potting joint 202 is high. In this way, leakage of the poured concrete slurry can be prevented, the potting process can be ensured to be carried out reliably, and the rapid connection of the two tower segments 201 can be achieved.
[0035] According to the mold 100 for installing tower segments 201 in the embodiment of the present application, two adjacent tower segments 201 are connected via a loading assembly 1 and a template 2, which can improve the stability and reliability of the connection between the two tower segments 201, and the installation surface 21 of the template 2 fits with the two tower segments 201, so that the installation position of the tower segment 201 is more accurate, ensuring that the grouting seam 202 is closed along the circumferential direction, preventing leakage of concrete slurry during the grouting process, and improving the reliability and safety of the splicing of the tower segments 201.
[0036] In some embodiments, Figure 3 As shown, the loading assembly 1 includes a jack 11 and two bases 12, both ends of the jack 11 are connected to the two bases 12, and the first mounting position and the second mounting position are respectively provided on the two bases 12, that is, the loading assembly 1 is fixedly connected to two adjacent tower segments 201 through the two bases 12. The base 12 can be connected to the tower segment 201 by bolts, so that the loading assembly 1 and the tower segment 201 are detachable, which is convenient for installation and disassembly, so that the mold 100 can be flexibly used to connect different tower segments 201.
[0037] It should be noted that the jack 11 is disposed between the two bases 12, and the jack 11 can be used to load the two bases 12 so that the two bases 12 move toward or away from each other. In this way, when connecting two tower segments 201, the jack 11 drives the two bases 12 to move toward each other so that the two adjacent tower segments 201 are stably connected; after the two tower segments 201 are connected, the bolts are removed to separate the loading assembly 1 from the tower segment 201, and the disassembly and assembly process is simple and practical.
[0038] The template 2 is installed between two bases 12, and the jack 11 is located on the side of the template 2 away from the installation surface 21. Figure 3 As shown, the template 2 is installed between the jack 11 and the tower segment 201. When connecting two adjacent tower segments 201, the two tower segments 201 can be initially positioned and connected by the template 2, and then the two tower segments 201 can be reinforced by the loading assembly 1, and the loading force of the jack 11 can be adjusted to make the connection between the two tower segments 201 more stable, thereby ensuring the sealing of the potting seam 202 along the circumferential direction.
[0039] In some embodiments, Figure 4 As shown, there are multiple groups of loading components, and the multiple groups of loading components are arranged at intervals along the length direction of the template, and the spacing between any two adjacent groups of loading components in the multiple groups of loading components is h1, satisfying: 6m≤h1≤8m. For example, h1=6.5m, or h1=7m, or h1=7.5m, thus, the spacing between two adjacent jacks 11 is h1, and thus, the spacing between two adjacent jacks 11 is set within the above range, so that the two tower segments 201 can be reinforced at multiple positions of the connection by the loading components, improve the stability of the connection between the two tower segments 201, prevent the mold 100 from affecting other operations outside the concrete tower section 200, and improve the rationality of the structural design of the mold 100.
[0040] In some embodiments, the third mounting position and the fourth mounting position are mounting holes that penetrate the template 2, and the template 2 is connected to the tower segment 201 through the threaded fasteners 4 that penetrate the mounting holes, so that the two tower segments 201 are stably connected through the template 2. The template 2 is connected to the tower segment 201 through the threaded fasteners 4, which facilitates the installation and removal of the template 2 and the tower segment 201, so that the mold 100 can be used for different tower segments 201.
[0041] Among them, the third installation position and the fourth installation position are multiple groups, and the multiple groups of third installation positions and the multiple groups of fourth installation positions are arranged spaced apart along the length direction of the template 2, that is, Figure 4As shown, two adjacent tower segments 201 are connected to the template 2 through a plurality of threaded fasteners, and the distance between any two adjacent sets of third mounting positions or fourth mounting positions is h2, that is, Figure 4 As shown, the spacing between two adjacent threaded fasteners along the length direction of the template 2 is h2, satisfying: 2m≤h2≤3m, such as h2=2.2m, or h2=2.5m, or h2=2.8m. Setting the spacing between two adjacent threaded fasteners along the length direction of the template 2 within the above range can ensure that the template 2 can connect the two tower segments 201 more stably.
[0042] like Figure 3 As shown, the distance from the third mounting position to the first end of the template 2 along the width direction is equal to the distance from the fourth mounting position to the second end of the template 2 along the width direction, that is, the spacing from the positions of the two mounting holes of the template 2 to the two ends of the template 2 is equal, so that the connection stress at both ends of the template 2 is more uniform, and there will be no situation where the stress at one end of the template 2 is large and the stress at the other end is small, thereby ensuring that the structural stability of the two ends of the template 2 is relatively balanced, and improving the safety of the use of the template 2.
[0043] like Figure 3 As shown, the mold 100 further includes a rubber pad.
[0044] The rubber pad is installed on the installation surface 21 and is suitable for being clamped between the installation surface 21 and the tower segment 201. The rubber pad is an elastic member. In this way, the rubber pad is installed between the template 2 and the tower segment 201 to play a role in buffering and vibration reduction, thereby avoiding rigid contact between the template 2 and the tower segment 201 during the connection of the tower segment 201, preventing the structure of the template 2 or the tower segment 201 from being damaged and deformed too much, and improving the safety of the use of the mold 100.
[0045] like Figure 3 As shown, the rubber pad includes a first pad block 31 and a second pad block 32 .
[0046] The first cushion block 31 is suitable for being sandwiched between the third installation position and the first of two adjacent tower segments 201 , and the second cushion block 32 is suitable for being sandwiched between the fourth installation position and the second of two adjacent tower segments 201 .
[0047] Thus, the first cushion block 31 and the second cushion block 32 are respectively sandwiched between the two installation positions of the template 2 and the two tower segments 201, so that the first cushion block 31 and the second cushion block 32 can be removed and installed separately without affecting each other, which is convenient for removal and installation. When one of the first cushion block 31 and the second cushion block 32 is damaged, it only needs to be replaced separately, and the cost of maintenance and replacement is low.
[0048] The template 2 extends along the length direction of the tower segment 201, and the length of the template 2 is the same as the length of the tower segment 201. In this way, after the two tower segments 201 are spliced, the template 2 and the two tower segments 201 define a potting seam 202, so that the connection between the two tower segments 201 can be reinforced by potting, thereby effectively improving the stability of the connection of the tower segments 201, making the structure of the concrete tower section 200 more reliable.
[0049] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0050] In the description of this application, "first feature" or "second feature" may include one or more of the features.
[0051] In the description of the present application, “plurality” means two or more.
[0052] In the description of the present application, a first feature being “on” or “under” a second feature may include that the first and second features are directly in contact with each other, or may include that the first and second features are not in direct contact with each other but are in contact with each other via another feature therebetween.
[0053] In the description of the present application, “above”, “over” and “above” a first feature to a second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature.
[0054] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0055] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.
Claims
1. A mold for installing tower segments, characterized in that: include: A loading assembly, wherein two ends of the loading assembly are respectively provided with a first mounting position and a second mounting position, wherein the first mounting position and the second mounting position are respectively used to be connected to two adjacent tower segments to splice the two adjacent tower segments along the circumferential direction; A template, wherein the template has a mounting surface, the mounting surface is suitable for being fitted with the outer wall surfaces of two adjacent tower segments, and the template has a third mounting position and a fourth mounting position respectively used to be connected with the two adjacent tower segments, and the sides of the two adjacent tower segments facing each other are suitable for defining a circumferentially closed potting seam together with the mounting surface; The loading assembly includes a jack and two bases, the two ends of the jack are respectively connected to the two bases, the jack is used to load the two bases so that the two bases move toward each other, the first installation position and the second installation position are respectively provided at the two bases, the template is installed between the two bases, and the jack is located at a side of the template away from the installation surface; There are multiple groups of loading components, which are arranged at intervals along the length direction of the template and the spacing between any two adjacent groups of loading components is h1, satisfying: 6m≤h1≤8m; The third installation position and the fourth installation position are both installation holes that penetrate the template, and the template is connected to the tower segment via threaded fasteners that penetrate the installation holes; The third mounting positions and the fourth mounting positions are both in multiple groups, and the multiple groups of the third mounting positions and the multiple groups of the fourth mounting positions are arranged spaced apart along the length direction of the template, and the distance between any two adjacent groups of the third mounting positions or the fourth mounting positions is h2, satisfying: 2m≤h2≤3m.
2. The mold for installing tower segments according to claim 1, characterized in that: The distance from the third installation position to the first end of the template along the width direction is equal to the distance from the fourth installation position to the second end of the template along the width direction.
3. The mold for installing tower segments according to claim 1, characterized in that: Any group of the third installation positions has the same vertical height as the adjacent fourth installation positions.
4. The mold for installing tower segments according to claim 1, characterized in that: Also includes: A rubber pad is installed on the installation surface and is suitable for being sandwiched between the installation surface and the tower segment.
5. The mold for installing tower segments according to claim 4, characterized in that: The rubber pad includes a first pad block and a second pad block, wherein the first pad block is suitable for being clamped between the third mounting position and the first of the two adjacent tower turrets, and the second pad block is suitable for being clamped between the fourth mounting position and the second of the two adjacent tower turrets.
6. The mold for installing tower segments according to claim 4, characterized in that: The template extends along the length direction of the tower segment, and the length of the template is the same as the length of the tower segment.
Citation Information
Patent Citations
Die for mounting tower pieces
CN211818474U