A single-chamber high-pressure pre-drilled shear pressure gauge

By using double-layer metal armor to fix the rubber film and design the gap structure in the single-cavity side pressure probe, the problem of rubber film detachment and inaccurate measurement under high pressure is solved, the maximum pressure withstand and maintenance convenience is improved, and the more Accurate experimental data.

CN112796744BActive Publication Date: 2024-11-15SOUTHWESTERN ARCHITECTURAL DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110038022.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-12
Publication Date
2024-11-15
Estimated Expiration
2041-01-12

AI Technical Summary

Technical Problem

The existing single-cavity side pressure probes are prone to rubber film detachment under high pressure, and are costly to manufacture and maintain, and are inaccurate in measurement.

Method used

A single-cavity high-pressure pre-drilling shearing side pressure meter including a jacking device, a side pressure meter probe and a pipeline system is used. The probe consists of a core rod, a liner, a rubber film and a double-layer metal armor. The rubber film is made of silicon Made of rubber, the double-layer metal armor is fixed by threaded connections and press rings to ensure that it does not break off under high pressure, and prevents soil from entering and extruding the rubber film through the gap structure.

Benefits of technology

The maximum pressure under pressure of the measurement chamber is increased, manufacturing and maintenance costs are reduced, and the accuracy of experimental data and the durability of the rubber film is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112796744B_ABST
    Figure CN112796744B_ABST
Patent Text Reader

Abstract

The invention belongs to the field of geological exploration technology, and discloses a single-chamber high-pressure pre-drilling shear lateral pressure meter, including a jacking device, a lateral pressure meter probe, a control system and a pipeline system. The lateral pressure meter probe includes a core rod, an inner sleeve and a rubber membrane. The upper end of the core rod is provided with a first shoulder and a second shoulder in sequence, and the lower end of the core rod is provided with an annular pressure cap. The inner sleeve is sleeved on the outer side of the core rod between the second shoulder and the annular pressure sleeve, and both ends of the inner sleeve are provided with a pressure ring for pressing the rubber membrane. A fixing nut is provided on the lower side of the annular pressure cap. A double-layer metal armor is sleeved on the outer periphery of the core rod, and the upper end of the double-layer metal armor is fixedly connected to the first shoulder, and the lower end of the double-layer metal armor is fitted with the fixing nut. The pipeline system includes a liquid inlet pipeline, and the liquid pipeline is connected to the gap between the inner sleeve and the core rod. A liquid inlet through hole is provided in the middle of the inner sleeve. The invention can prevent the two ends of the rubber membrane from extending axially outward after high pressure is added to the measuring chamber, and prevent the rubber membrane from being pierced or cut by rocks in a harder soil layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological exploration, in particular to a single-chamber high-pressure pre-drilling shear lateral pressure instrument. Background Art

[0002] The pressure test is one of the widely used in-situ test methods in geotechnical engineering and is frequently used in deep stratum exploration. Its basic principle is to use a drill rod to form a borehole in the test stratum, place a cylindrical pressure gauge in the borehole at the designed elevation, and pressurize the pressure gauge to expand laterally. According to the test readings, the volume-pressure or stress-strain relationship curve of the lateral expansion of the borehole can be obtained, which can be used to estimate the bearing capacity of the foundation, determine the strength parameters, deformation parameters, and base bed coefficient of the soil, and estimate the foundation settlement, single pile bearing capacity and settlement.

[0003] my country did not start to develop lateral pressure equipment until the late 1970s, and did not gradually start the practice, promotion and engineering application of lateral pressure test until the 1980s. At present, lateral pressure instruments include pre-drilling type, self-drilling type and press-in type. Pre-drilling type is the main type both at home and abroad. The self-drilling lateral pressure instrument integrates the lateral pressure instrument equipment and the drilling rig. The lateral pressure instrument is installed on the drill rod, and the drill bit is installed at the end of the lateral pressure instrument. When drilling, the drill bit takes away the chopped soil from the hollow part of the lateral pressure instrument (drill rod) with mud, and the lateral pressure test is carried out after reaching the predetermined elevation.

[0004] Existing single-chamber lateral pressure gauge probes, such as the probe in patent CN200971493, have a rubber membrane with its upper end pressed parallel to the upper tube boot and the outer drill rod, and its lower end pressed parallel to the lower tube boot and the outer drill rod. This structure can only ensure sealing when the pressure in the measuring chamber is low. When the pressure in the measuring chamber is too high, the force on the rubber membrane increases, the deformation increases, the rubber membrane is pulled out from between the boot and the outer drill rod, and the rubber membrane detaches. The maximum bearing pressure of this measuring chamber is 6MPa. In addition, its structure leads to high manufacturing, installation and subsequent maintenance costs, which is time-consuming. Another example is the probe in patent CN108756865A. In the initial state, the outer layer bonded steel sheets are combined into a complete ring. When pressurized, the rubber membrane expands, pushing the steel sheet to expand perpendicular to the hole wall. At this time, a larger gap appears between the outer layer bonded steel sheets in the initial state, and the rubber membrane easily flows out of the gap, resulting in inaccurate measurement. Summary of the invention

[0005] The present invention is intended to provide a single-chamber high-pressure pre-drilled shear lateral pressure meter to solve the problem that the rubber mold of the existing lateral pressure meter probe is prone to detachment.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a single-chamber high-pressure pre-drilled shear pressure gauge, comprising a jacking device, a pressure gauge probe, a control system and a pipeline system, wherein the pressure gauge probe comprises a core rod, an inner sleeve and a rubber membrane, wherein the upper end of the core rod is provided with a first shoulder and a second shoulder in sequence, and the lower end of the core rod is threadedly connected with an annular pressure cap, the inner sleeve is sleeved on the outer side of the core rod between the second shoulder and the annular pressure cap, and both ends of the inner sleeve are integrally extended with a pressure ring, and the pressure ring presses the two ends of the rubber membrane tightly against the second shoulder and the annular pressure cap respectively. On the annular pressure cap, a fixing nut threadedly connected to the core rod is provided on the lower side of the annular pressure cap, and a double-layer metal armor is sleeved on the outer periphery of the core rod. The upper end of the double-layer metal armor is fixedly connected to the first shoulder, and the lower end of the double-layer metal armor is fitted with the fixing nut, and the rubber membrane corresponding to the outer side of the pressure ring is tightly pressed against the double-layer metal armor; the pipeline system includes a liquid inlet pipeline, which axially penetrates the first shoulder and the second shoulder, and is connected to the gap between the inner sleeve and the core rod, and a plurality of liquid inlet through holes are circumferentially distributed in the middle part of the inner sleeve.

[0007] During installation, put the inner sleeve into the rubber membrane, turn both ends of the rubber membrane inward into the inner sleeve, and then press the core rod into the inner sleeve. The pressure ring at the upper end of the inner sleeve presses the upper end of the rubber membrane between the inner sleeve and the second shoulder. The annular pressure cap is sleeved on the core rod, and the inner sleeve is pressed against the fixing nut threadedly connected to the core rod of the pressure reducer. At the same time, the pressure ring at the lower end of the inner sleeve presses the lower end of the rubber membrane between the inner sleeve and the annular pressure cap. A double-layer metal armor is sleeved into the outermost layer, and the upper end of the double-layer metal armor is fixed to the second shoulder. The lower end of the double-layer metal armor is freely sleeved on the outside of the annular pressure cap and the fixing nut. The double-layer metal armor presses the upper and lower ends of the rubber membrane.

[0008] The above technical solution has the following beneficial effects:

[0009] Compared with the prior art, the pressure ring and the double-layer metal armor of the present invention press and fix the two ends of the rubber membrane. When the pressure in the measuring chamber is too high, the force on the rubber membrane increases, and the deformation increases, the rubber membrane will not detach, thereby increasing the maximum bearing pressure of the measuring chamber. The outer layer of the double-layer metal armor does not need to be bonded with a steel sheet, which is convenient for processing, manufacturing, disassembly and maintenance, and has better protection for the rubber membrane. The upper end is directly connected to the core rod through a threaded connection, and the lower end can move axially freely to meet the expansion and deformation process. When excessive pressure is added, the two ends of the rubber membrane will not extend outward along the axial direction, and will not have relative displacement with the probe during direct shear, so the measured experimental data is more accurate.

[0010] Preferably, the double-layer metal armor comprises an inner metal sleeve and an outer metal sleeve which are connected to each other, and a plurality of gaps are distributed in the middle of the inner metal sleeve and the outer metal sleeve at intervals along the axial direction, and the gaps of the inner metal sleeve and the outer metal sleeve are staggered with each other.

[0011] Through the above technical scheme, the gap can make the double-layer metal armor expand with the expansion of the rubber membrane, and in the expansion process, the gap of the inner metal tube sleeve is enlarged, and the gap of the inner metal tube sleeve and the gap of the outer metal tube sleeve are just offset to prevent soil from entering the measuring device to damage the rubber membrane, and at the same time prevent the rubber membrane from squeezing out of the double-layer protective armor; the ports at both ends of the inner metal tube sleeve and the outer metal tube sleeve are not cut, and are closed rings, which can prevent the rubber membrane from expanding outward at both ends axially during the pressurization of the measuring chamber.

[0012] Preferably, the upper end of the double-layer metal armor is fixedly connected to the first shoulder by a countersunk screw.

[0013] Through the above technical solution, the connection between the double-layer metal armor and the core rod is made firm.

[0014] Preferably, the rubber film is made of silicone rubber, and the thickness of the rubber film is 3.5 mm.

[0015] Through the above technical solution, the rubber membrane has good durability.

[0016] Preferably, the jacking device comprises a drill rod, a piston cylinder and a piston rod matched with the piston cylinder, the drill rod is threadedly connected to the piston rod, and the piston rod is threadedly connected to the core rod.

[0017] Through the above technical solution, the jacking device adopts a piston cylinder, the pressure source can be provided evenly and continuously, and the linear relationship between deformation and pressure can be more accurate.

[0018] Preferably, the lower end of the fixing nut has a taper.

[0019] The above technical solution can prevent the probe from being stuck by rocks or other foreign objects when it is placed in the soil layer. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of the structure of a piezometer probe of a single-chamber high-pressure pre-drilled shear piezometer provided in an embodiment of the present invention;

[0021] Figure 2 This is a cross-sectional view of the double-layer metal armor of the lateral pressure gauge probe in the unexpanded state;

[0022] Figure 3 This is a cross-sectional view of the double-layer metal armor of the lateral pressure gauge probe in its expanded state. DETAILED DESCRIPTION

[0023] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments:

[0024] The reference numerals in the drawings of the specification include: liquid inlet pipeline 1, core rod 2, countersunk screw 3, double-layer metal armor 4, inner sleeve 5, rubber membrane 6, liquid inlet through hole 7, annular pressure cap 8, and fixing nut 9.

[0025] like Figure 1 , Figure 2 and Figure 3 As shown, a single-chamber high-pressure pre-drilled shear pressure gauge includes a jacking device, a pressure gauge probe, a control system and a pipeline system. The pressure gauge probe includes a core rod 2, an inner sleeve 5 and a rubber membrane 6. The upper end of the core rod 2 is integrally formed with a first shaft shoulder and a second shaft shoulder. The diameter of the first shaft shoulder is larger than the diameter of the second shaft shoulder. The lower end of the core rod 2 is provided with an annular pressure cap 8. The upper diameter of the annular pressure cap 8 is smaller than the diameter of its lower part. The inner sleeve 5 is sleeved on the outer side of the core rod 2 between the second shaft shoulder and the annular pressure sleeve, and both ends of the inner sleeve 5 are integrally extended with pressure rings. The pressure ring presses the two ends of the rubber membrane 6 against the second shoulder and the upper part of the annular pressure cap 8 respectively. The rubber membrane is made of silicone rubber. The thickness of the rubber membrane is 3.5 mm. A fixing nut 9 threadedly connected to the core rod 2 is provided on the lower side of the annular pressure cap 8. The lower end of the fixing nut 9 has a taper. A double-layer metal armor 4 is sleeved on the outer periphery of the core rod 2. The upper end of the double-layer metal armor 4 is fixedly connected to the first shoulder by a countersunk screw 3. The lower end of the double-layer metal armor 4 is fitted with the fixing nut 9, and the rubber membrane 6 corresponding to the outer side of the pressure ring is pressed against the double-layer metal armor 4.

[0026] The pipeline system includes a liquid inlet pipeline 1, which penetrates the first shaft shoulder and the second shaft shoulder in the axial direction, and is connected to the gap between the inner sleeve 5 and the core rod 2. The inner sleeve 5 has four liquid inlet holes 7 distributed circumferentially in the middle. The jacking device includes a drill pipe, a piston cylinder and a piston rod matched with the piston cylinder. The piston rod is threadedly connected to the core rod 2, and the drill pipe is threadedly connected to the piston rod. The control system includes an industrial computer and a pressure source. The piston cylinder and the liquid inlet pipeline 1 are connected to the pressure source pipeline, and a control valve and a plurality of pressure sensors are arranged on the pipeline. The industrial computer is used to control the pressure source and the opening and closing of the control valve. The control system, the valves on the pipeline and the pressure sensors are all existing technologies and will not be described here.

[0027] The double-layer metal armor 4 includes an inner metal tube sleeve and an outer metal tube sleeve which are connected to each other. Ten gaps are distributed in the middle of the inner metal tube sleeve and the outer metal tube sleeve at intervals along the axial direction, and the gaps of the inner metal tube sleeve and the outer metal tube sleeve are staggered and not connected to each other.

[0028] The specific implementation process is as follows: the inner sleeve 5 is placed in the rubber membrane 6, both ends of the rubber membrane 6 are turned inward into the inner sleeve 5, and then pressed into the core rod 2, the pressure ring at the upper end of the inner sleeve 5 presses the upper end of the rubber membrane 6 between the inner sleeve 5 and the second shoulder, the annular pressure cap 8 is sleeved on the core rod 2, and the inner sleeve 5 is pressed against by the fixing nut 9 threadedly connected to the side pressure device core rod 2. At the same time, the pressure ring at the lower end of the inner sleeve 5 presses the lower end of the rubber membrane 6 between the inner sleeve 5 and the annular pressure cap 8, and the double-layer metal armor 4 is sleeved into the outermost layer, and the upper end of the double-layer metal armor 4 is fixed to the second shoulder. The lower end of the double-layer metal armor 4 is freely sleeved on the outside of the annular pressure cap 8 and the fixing nut 9, and the double-layer metal armor 4 presses the upper and lower ends of the rubber membrane 6.

[0029] Side pressure test:

[0030] After drilling the set hole, the piezometer probe is placed at the test elevation, and pressure is applied to the measuring cavity of the piezometer probe. The pressure medium flows into the measuring cavity through the liquid inlet hole 7. The pressure drives the rubber membrane 6 to expand radially. The radial expansion of the rubber membrane 6 pushes the outer double-layer metal armor 4 to expand outward. The initial pressure can be collected when the expansion of the measuring cavity pushes the double-layer metal armor 4 to contact the hole wall and the disturbed soil is restored to a soil pressure value corresponding to a state close to the original state. Then, the pressure is gradually increased to the critical pressure and the ultimate pressure to obtain soil mechanics indicators such as the piezometric modulus.

[0031] Shear test:

[0032] After the lateral pressure test is completed, the pressure in the measuring chamber is maintained, and the pressure source provides pressure to the lower chamber of the piston cylinder in the expanded state, generating an upward thrust, and slowly increasing the pressure until the piston rod drives the lateral pressure probe to move axially, and the peak value of the shear stress is obtained. At this time, the hydraulic pressure of the piston cylinder is monitored online by the pressure sensor, and the next level of radial stress is applied, and then the corresponding vertical shear stress is applied, and this is repeated. Finally, a series of radial stress-radial deformation relationships, radial stress-shear stress, and shear stress-shear displacement relationships are formed by the software.

[0033] The above is only an embodiment of the present invention, and the common knowledge such as the known specific technical solutions and / or characteristics in the solution is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the technical solution of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A single-chamber high-pressure pre-drilled shear pressure gauge, comprising a lifting device, a pressure gauge probe, a control system and a piping system, characterized in that: The lateral pressure gauge probe comprises a core rod, an inner sleeve and a rubber membrane, the upper end of the core rod is provided with a first shoulder and a second shoulder in sequence, the lower end of the core rod is provided with an annular pressure cap, the inner sleeve is sleeved on the outer side of the core rod between the second shoulder and the annular pressure cap, and both ends of the inner sleeve are integrally extended with a pressure ring, the pressure ring presses the two ends of the rubber membrane on the second shoulder and the annular pressure cap respectively, the lower side of the annular pressure cap is provided with a fixing nut threadedly connected to the core rod, the outer periphery of the core rod is sleeved with a double-layer metal armor, the upper end of the double-layer metal armor is fixedly connected to the first shoulder, the lower end of the double-layer metal armor is fitted with the fixing nut, and the rubber membrane corresponding to the outer side of the pressure ring is pressed against the double-layer metal armor; the pipeline system comprises a liquid inlet pipeline, the liquid inlet pipeline axially passes through the first shoulder and the second shoulder, the liquid inlet pipeline is connected to the gap between the inner sleeve and the core rod, and a plurality of liquid inlet through holes are circumferentially distributed in the middle part of the inner sleeve; The double-layer metal armor comprises an inner metal tube sleeve and an outer metal tube sleeve which are connected to each other, and the middle parts of the inner metal tube sleeve and the outer metal tube sleeve are both provided with a plurality of gaps spaced apart along the axial direction, and the gaps of the inner metal tube sleeve and the outer metal tube sleeve are staggered with each other; The rubber film is made of silicone rubber, and the thickness of the rubber film is 3.5 mm; The jacking device comprises a drill rod, a piston cylinder and a piston rod matched with the piston cylinder. The drill rod is threadedly connected with the piston rod, and the piston rod is threadedly connected with the core rod.

2. A single-chamber high-pressure pre-drilled shear lateral pressure meter according to claim 1, characterized in that: The upper end of the double-layer metal armor is fixedly connected to the first shaft shoulder by means of a countersunk screw.

3. The single-chamber high-pressure pre-drilled shear pressure gauge according to claim 1, characterized in that: The lower end of the fixing nut has a taper.