Testing of blast furnace hot metal sampling device
By designing the tank body, fixed sleeve, heat pipe and blast furnace molten iron sampling device for detecting whitening, the problems of slag coating and poor segregation of samples in the existing technology are solved, and the molten iron is less likely to stick and cooled quickly after sampling, improving The accuracy of the detection.
Patent Information
- Application Number
- CN202110264804.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-11
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-03-11
AI Technical Summary
The existing blast furnace molten iron sampling device uses a disposable sampler to enter the molten iron into the built-in mold through negative pressure, which causes the sample to be easily coated with slag and the surface of the sample is not whitened, which affects the segregation degree difference between the sample residue and elements.
A blast furnace molten iron sampling device is designed that includes a tank body, a fixed sleeve, a heat pipe and a white mouth. Exhaust holes are provided on both sides of the tank mouth. The heat pipe runs through the tank mouth. Screw holes are provided inside the white mouth. The fixed sleeve can Disassemble the structure to quickly cool down and avoid adhesion through heat pipes.
It effectively avoids sample adhesion, extends the service life, improves the convenience of sample removal and detection, ensures the whitening of the sample surface, and improves the accuracy of elemental analysis.
Smart Images

Figure CN112881087B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of detecting blast furnace molten iron, in particular to a blast furnace molten iron sampling device. Background Art
[0002] Testing blast furnace iron is to take samples of the melted iron in the blast furnace and then cool it down, and then perform density testing, quality testing and content testing on the cooled iron. With the rapid development of modern industry, factories need to test the blast furnace iron after sampling in order to improve the quality requirements of the iron, so it is necessary to test the blast furnace iron.
[0003] Existing methods for testing blast furnace molten iron on the market all use disposable samplers, which are inserted into the iron solution. Through negative pressure, the molten iron enters the built-in mold, which makes it easy for slag to be included in the sample, and the sample surface does not whiten, affecting the poor segregation degree of the sample residue and elements.
[0004] In view of the above problems, it is urgent to carry out innovative design based on the original detection of blast furnace molten iron. For this purpose, we propose a sampling device for detecting blast furnace molten iron. Summary of the invention
[0005] The purpose of the present invention is to provide a sampling device for detecting blast furnace molten iron, so as to solve the problem proposed in the above background technology that blast furnace molten iron is detected by using a disposable sampler, which is inserted into the iron solution. Through negative pressure, the molten iron enters the built-in mold, which makes it easy for slag to be included in the sample, and the surface of the sample is not whitened, which affects the poor segregation degree of the residual elements in the sample.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a sampling device for detecting molten iron in a blast furnace, comprising a tank body and a fixed sleeve, a tank mouth is arranged on the top of the tank body, and exhaust holes are arranged on both sides of the tank mouth, a heat dissipation pipe is installed inside the tank mouth, and a whitening is fixed above the heat dissipation pipe, and screw holes are arranged inside the whitening, the fixed sleeve is installed above the whitening, and screws are installed above the fixed sleeve, a first module is installed inside the fixed sleeve, and a second module is attached to the right side of the first module.
[0007] Preferably, the tank mouth and the tank body are integrated, and are connected by a slope, and the outer wall of the tank mouth and the upper surface of the tank body have an inclination angle of 45°, and the tank body is made of 310S austenitic nickel-chromium stainless steel, with an outer diameter of 53mm, an inner diameter of 35mm, a wall thickness of 8mm, and a height of 28mm.
[0008] Preferably, the exhaust holes are integrated with the tank opening, and a total of four groups of exhaust holes are arranged along the slope of the tank opening.
[0009] Preferably, the whitening is fixedly connected to the heat dissipation pipe, and the heat dissipation pipe is through-connected to the tank mouth, and the whitening forms a fixed structure between the heat dissipation pipe, the tank mouth and the tank body, and the cross-section of the whitening and the heat dissipation pipe is a "T"-shaped structure.
[0010] Preferably, the fixing sleeve 7 forms a detachable structure with the whitening through the cooperation of screws and screw holes, and the bottom area of the fixing sleeve is equal to the upper surface area of the whitening, and the surface is in contact with each other.
[0011] Preferably, the first module and the fixing sleeve are movably connected, and the first module forms a fixed structure with the second module through the fixing sleeve, and the outer dimensions of the second module and the first module match the inner dimensions of the fixing sleeve.
[0012] Compared with the prior art, the present invention has the following beneficial effects:
[0013] 1. The blast furnace molten iron sampling device is provided with a fixed sleeve and a second module. By setting the fixed sleeve above the whitening and the second module on the right side of the first module, the first module can be placed inside the fixed sleeve, and then the second module can be placed on the right side of the first module. The first module and the second module can be limited by the fixed sleeve to avoid movement. This design is to prevent the molten iron from sticking after pouring, have a long service life, and easily take out the cast sample for inspection after cooling.
[0014] 2. The blast furnace molten iron sampling device is provided with a heat dissipation pipe 4. By setting the heat dissipation pipe 4 inside the tank mouth 2, the white cast iron 5 can be inserted into the inside of the tank body 1 from the top of the tank mouth 2 through the heat dissipation pipe 4 to contact with cooling water, so that the white cast iron 5 can be quickly cooled down, completing the cooling effect and diffusing the heat.
[0015] 3. The blast furnace molten iron sampling device is provided with screw holes and screws. By means of the screw holes arranged inside the whitening and the screws arranged above the fixing sleeve, the fixing sleeve can be placed above the whitening, the screw holes are aligned, the screws are inserted from above the fixing sleeve and rotated to lock the fixing sleeve and the whitening, so that the staff can disassemble the fixing sleeve conveniently for maintenance and replacement. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a front view structural schematic diagram of the present invention;
[0017] Figure 2 It is a schematic diagram of the three-dimensional structure of the heat dissipation pipe of the present invention;
[0018] Figure 3 It is a schematic diagram of the top view of the fixing sleeve of the present invention.
[0019] In the figure: 1. Can body; 2. Can mouth; 3. Exhaust hole; 4. Heat dissipation pipe; 5. Whitening; 6. Screw hole; 7. Fixing sleeve; 8. Screw; 9. First module; 10. Second module. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] See also Figure 1-3The present invention provides a technical solution: a sampling device for detecting molten iron in a blast furnace, comprising a tank body 1 and a fixing sleeve 7, a tank mouth 2 is arranged above the tank body 1, and exhaust holes 3 are arranged on both sides of the tank mouth 2, the tank mouth 2 and the tank body 1 are of an integrated structure, and the tank mouth 2 and the tank body 1 are connected by a slope, and the outer wall of the tank mouth 2 and the upper end surface of the tank body 1 are inclined at an angle of 45°, and the tank body 1 is made of 310S austenitic nickel-chromium stainless steel, with an outer diameter of 53mm, an inner diameter of 35mm, a wall thickness of 8mm, and a height of 28mm, and the tank mouth 2 has a wall thickness of 3mm and is made of red copper, the first-order tank has a diameter of 70mm and a height of 10mm, and the tank mouth 2 is arranged above the tank body 1, so that the upper end area of the tank body 1 can be reduced, water can be poured into the interior of the tank body 1, and the tank body 1 is easy to connect, and there is a gap between the exhaust hole 3 and the tank mouth 2. The tank body 1 is provided with a body, and there are four groups of exhaust holes 3 along the slope of the tank mouth 2. Through the exhaust holes 3 arranged on both sides of the tank mouth 2, when the internal temperature of the tank body 1 is too high, steam can be discharged through the exhaust holes 3 for heat dissipation, thereby effectively avoiding the situation that the internal temperature of the tank body 1 is too high and the pressure is too high and cannot be released. A heat dissipation pipe 4 is installed inside the tank mouth 2, and a whitening 5 is fixed on the top of the heat dissipation pipe 4, and a screw hole 6 is arranged inside the whitening 5. The whitening 5 and the heat dissipation pipe 4 are fixedly connected, and the heat dissipation pipe 4 and the tank mouth 2 are through-connected, and the whitening 5 forms a fixed structure through the heat dissipation pipe 4 and the tank mouth 2 and the tank body 1, and the cross section of the whitening 5 and the heat dissipation pipe 4 is a "T"-shaped structure, and the whitening 5 is made of copper, with an upper end face diameter of 74mm, a height of 18mm, and a surface finish of ≤1.6μm, through the heat dissipation pipe 4 arranged inside the tank mouth 2, the whitening 5 can be inserted into the inside of the tank body 1 from the top of the tank mouth 2 through the heat dissipation pipe 4 to contact the cooling water, and then the whitening 5 can be quickly cooled down to complete the cooling effect and diffuse the heat. The fixing sleeve 7 is installed on the top of the whitening 5, and a screw 8 is installed on the top of the fixing sleeve 7. The fixing sleeve 7 forms a detachable structure with the whitening 5 through the cooperation of the screw 8 and the screw hole 6, and the bottom area of the fixing sleeve 7 is equal to the upper end surface area of the whitening 5, and the surface fits, and the fixing sleeve 7 is a cylindrical barrel, made of red copper, with an outer diameter of 74mm, an inner diameter of 54mm, a wall thickness of 10mm, and a height of 15mm, and is machined. Through the screw hole 6 arranged inside the whitening 5 and the screw 8 arranged above the fixing sleeve 7, the fixing sleeve 7 can be placed above the whitening 5 and aligned with the screw hole 6, and the screw 8 is inserted from the top of the fixing sleeve 7 and rotated to The fixed sleeve 7 is locked with the whitening 5, so that the staff can disassemble the fixed sleeve 7 and repair and replace it. The first module 9 is installed inside the fixed sleeve 7, and the second module 10 is attached to the right side of the first module 9. The first module 9 and the fixed sleeve 7 are movably connected, and the first module 9 forms a fixed structure with the whitening 5 through the fixed sleeve 7 and the second module 10, and the external dimensions of the second module 10 and the first module 9 are consistent with the internal dimensions of the fixed sleeve 7. By setting the fixed sleeve 7 above the whitening 5 and the second module 10 on the right side of the first module 9, the first module 9 can be placed inside the fixed sleeve 7, and then the second module 10 can be placed on the right side of the first module 9. The first module 9 and the second module 10 can be limited by the fixed sleeve 7 to avoid movement. This design is to prevent adhesion after the molten iron is poured, have a long service life, and easily take out the casting sample for testing after cooling. .
[0022] Working principle: The use process of the blast furnace molten iron sampling device is as follows: first, the tank mouth 2 is set above the tank body 1, so that the upper end area of the tank body 1 can be reduced, water can be poured into the interior of the tank body 1, and the tank body 1 can be easily connected. The exhaust holes 3 are set on both sides of the tank mouth 2, so that when the internal temperature of the tank body 1 is too high, steam can be discharged through the exhaust holes 3 for heat dissipation, thereby effectively avoiding the situation where the internal temperature of the tank body 1 is too high and the pressure cannot be released. The heat dissipation pipe 4 is set inside the tank mouth 2, so that the whitening 5 can be inserted into the interior of the tank body 1 from above the tank mouth 2 through the heat dissipation pipe 4 to contact with cooling water, and then the whitening 5 can be quickly cooled, completing the cooling effect and diffusing the heat. 5 and the screw 8 arranged on the top of the fixing sleeve 7, so that the fixing sleeve 7 can be placed on the top of the whitening 5 and aligned with the screw hole 6, the screw 8 is inserted from the top of the fixing sleeve 7 and rotated to lock the fixing sleeve 7 and the whitening 5, so that it is convenient for the staff to disassemble the fixing sleeve 7, which is convenient for maintenance and replacement. By the fixing sleeve 7 arranged on the top of the whitening 5 and the second module 10 arranged on the right side of the first module 9, the first module 9 can be placed inside the fixing sleeve 7, and then the second module 10 can be placed on the right side of the first module 9. The first module 9 and the second module 10 can be limited by the fixing sleeve 7 to avoid movement. This design is to prevent adhesion after molten iron is poured, have a long service life, and easily take out the casting sample for detection after cooling.
[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A sampling device for detecting molten iron in a blast furnace, comprising a tank body (1) and a fixing sleeve (7), characterized in that: A can mouth (2) is arranged above the can body (1), and exhaust holes (3) are arranged on both sides of the can mouth (2), a heat dissipation pipe (4) is installed inside the can mouth (2), a whitening (5) is fixed above the heat dissipation pipe (4), and a screw hole (6) is arranged inside the whitening (5), the fixing sleeve (7) is installed above the whitening (5), and a screw (8) is installed above the fixing sleeve (7), a first module (9) is installed inside the fixing sleeve (7), and a second module (10) is attached to the right side of the first module (9); The tank mouth (2) and the tank body (1) are of an integrated structure, and the tank mouth (2) and the tank body (1) are connected by a slope, and the inclination angle between the outer wall of the tank mouth (2) and the upper end surface of the tank body (1) is 45°; The exhaust holes (3) are integrated with the tank opening (2), and a total of four groups of exhaust holes (3) are arranged along the slope of the tank opening (2); The whitening (5) and the heat dissipation pipe (4) are fixedly connected, and the heat dissipation pipe (4) and the tank mouth (2) are through-connected, and the whitening (5) forms a fixed structure with the tank body (1) through the heat dissipation pipe (4) and the tank mouth (2); The fixing sleeve (7) forms a detachable structure with the whitening (5) through the cooperation of the screw (8) and the screw hole (6), and the bottom area of the fixing sleeve (7) is equal to the upper surface area of the whitening (5), and the surface is in contact with each other; The first module (9) and the fixing sleeve (7) are movably connected, and the first module (9) forms a fixed structure with the second module (10) through the fixing sleeve (7), and the external dimensions of the second module (10) and the first module (9) are consistent with the internal dimensions of the fixing sleeve (7).
Citation Information
Patent Citations
Blast furnace iron melt sampling die
CN201532321U
Novel sampling device for detecting blast furnace molten iron
CN214502996U
Sampling white cast moulding die of simultaneously assaying multiple elements in pig iron
CN2145999Y