Digital construction of steel frame structures in large venues and AR detection methods for construction accuracy

Through BIM and AR technology, the accuracy and stability problems in the construction of special-shaped stone finishes in large venues have been solved, the optimized design of the base steel frame and the precise installation of stone panels have been realized, the efficiency and quality of the construction have been ensured, and the special-shaped stone has been solved. Difficulties and cost issues in construction.

CN112883461BActive Publication Date: 2024-11-01SHANGHAI BUILDING DECORATION ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110067643.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-19
Publication Date
2024-11-01
Estimated Expiration
2041-01-19

AI Technical Summary

Technical Problem

In the construction of special-shaped stone finishes in large venues, there are high requirements for stone processing and installation, complexity of base steel frame design and installation, and cost considerations, resulting in construction difficulties and quality control challenges.

Method used

BIM software is used for project modeling and optimization design, combined with AR technology for precise installation and inspection, through mechanical calculation and optimization of base steel frames, ensuring the precise connection and installation of stone panels and steel frames, and using total stations and AR equipment for Positioning and acceptance ensure the accuracy and stability of construction.

Benefits of technology

It realizes precise installation and construction control of large-scale hyperbolic stone finishes, improves construction efficiency and quality, ensures installation safety and economy, and ensures the stability and aesthetic effect of stone finishes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112883461B_ABST
    Figure CN112883461B_ABST
Patent Text Reader

Abstract

The present invention relates to the digital construction of steel frame structures in large venues and an AR detection method for construction accuracy. The special-shaped stone facing is an inverted trumpet-shaped structure fixed on a base steel frame, which is realized by splicing a plurality of hyperbolic stone panels. The digital construction method includes modeling, optimization, calculation to solve collisions, mechanical calculation, layout and block division, stone processing, steel frame installation, and stone installation steps. The digital construction method of the present invention makes full use of BIM technology, applies digital technology to specific special-shaped stone facing projects, and optimizes the simulation and actual installation implementation steps of the steel frame in a targeted manner. It has the advantages of accurate installation of the base steel frame, accurate stone processing, accurate hoisting and installation of stone panels, and the entire construction process is controllable and accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to building digitization, and in particular to a digital construction of steel frame structures in large venues and an AR detection method for construction accuracy. Background Art

[0002] In current engineering construction, especially in the design of large public projects, BIM construction technology is often used extensively. Through the application of BIM technology in public projects, the construction steps can be controlled, the construction parameters can be accurately predicted, and the construction quality can be guaranteed, which reduces the waste of materials and time. It can be said that building digitization is becoming a necessary condition for the development of the future construction industry.

[0003] For some large venues, especially important applications, stone facings will be involved. Stone facings give people a magnificent, tough and solemn visual effect. At present, common building stone facings are often flat stones. Flat stones are hung on the base frame and spliced ​​into a flat shape, or patterns and shapes are processed on the basis of flat stones and then dry-hung. In some special occasions, there are now special-shaped structures with curved stone shapes or hyperbolic stone shapes. The design of special-shaped structures can improve the liveliness of the building and make it more beautiful. In addition, large-scale curved shapes are realized by using stones, which requires higher requirements for stone processing and installation. First, the stone processing must be accurate in size to ensure that there are no gaps in the splicing after installation to achieve the sense of unity of the stone. Second, the stone installation must be accurate to ensure that there will be no ups and downs and large gaps during installation to ensure the construction quality and construction effect. Third, cost factors must be considered, including processing costs and transportation costs. For special-shaped stone veneer structures, accurate and solid base steel frame construction is the basis for stone hanging. If the accuracy and stability of stone veneer installation are to be achieved, the base steel frame must be manufactured and installed with accurate size and position, and the stability and reliability of the structure must be guaranteed. Summary of the invention

[0004] The purpose of the present invention is to overcome the construction difficulties of special-shaped stone facings in the above-mentioned prior art and provide a digital construction method for stone facings. The construction method of the present invention should be able to accurately divide and install large stone facings, accurately implement the design and construction of the base steel frame of the stone installation foundation, ensure the installation, production and installation construction of large hyperbolic stone facings are accurately controllable, and ensure the installation quality and installation effect.

[0005] In order to achieve the above invention purpose, the technical solution provided by the present invention is as follows:

[0006] A digital construction and construction accuracy AR detection method for a steel frame structure in a large venue, characterized in that the special-shaped stone facing is an inverted trumpet-shaped structure fixed on a base steel frame, and is realized by splicing a plurality of hyperbolic stone panels, characterized in that the digital construction method comprises the following steps:

[0007] The first step is to use BIM software to model the project of the large venue. First, the civil engineering drawings are used, and then the point cloud model scanned on site is combined with the decoration design drawings to establish the decoration model of the project, including the steel frame model and the panel model.

[0008] The second step is to optimize the decoration model, superimpose the electromechanical pipeline model in the large venue with the decoration model, find the collision point of the model, and optimize and adjust the steel frame model and panel model to achieve space avoidance;

[0009] The third step is to use the steel frame model to perform mechanical calculations on the base steel frame to find out the unfavorable points to optimize the strength and stiffness of the steel frame. The unfavorable points are structural areas or structural points with poor mechanical properties. The optimization of the steel frame is mainly achieved by adjusting the thickness of the steel pipe.

[0010] The fourth step is to determine the connection method between the base steel frame and the stone panel, simulate the process of the connection construction between the stone panel and the base steel frame, select the appropriate connection scheme, and clarify the optimal scheme. The factors of the optimal scheme include safety, adjustability and economy;

[0011] The fifth step is to lay out the lines before installing the base steel frame, import the positioning information in the decoration model into the total station in batches, conduct accurate three-dimensional measurement of the site, provide a benchmark for on-site installation, materialize the installation point data in the decoration model, and accurately locate, mark and fix the site;

[0012] The sixth step is to install the steel frame. Use the determined location points for installation. After the installation is completed, perform accuracy verification. Use the previous steel frame model to import it into the AR device. Define the positioning points in the AR software. Each point can generate a corresponding QR code. Each large area requires at least one QR code. Affix the QR code to the positioning point on site to complete the consistency between the AR model space and the actual space positioning. Use AR to display the steel frame model, and use the camera to capture the actual steel frame structure. Automatically match the steel frame model and the physical steel frame image to determine the degree of correspondence between the actual steel frame and the designed steel frame, thereby determining the installation accuracy of the steel frame. If there is a mismatch, feedback the problem and export the rectification order until the physical steel frame is consistent with the model design steel frame.

[0013] The seventh step is to hang the panels on the steel frame on site. Each panel has a corresponding number and is installed at fixed points using a total station, step by step from bottom to top until all panels are installed.

[0014] In the digital construction and construction accuracy AR detection method of the steel frame structure in a large venue of the present invention, an eighth step is also included, namely, inspection and acceptance of the stone facing. After all the stone facings are installed, AR equipment is used to verify and accept them. The generated theoretical panel model is input into the AR equipment. When a deviation occurs, an alarm signal appears and the location of the deviation is marked.

[0015] In the digital construction and construction accuracy AR detection method of the steel frame structure in a large venue of the present invention, the special-shaped stone veneer is spliced ​​by multiple hyperbolic stones, single curved stones and flat stones, and the whole presents an inverted trumpet shape with four corners. Hyperbolic stones are used at the corner positions, single curved stones are used at the arc positions, and flat stones are used at the plane positions.

[0016] In the digital construction and construction accuracy AR detection method of a steel frame structure in a large venue of the present invention, the base steel frame is composed of a main keel, a transverse keel and a hanger, the main keel is formed by shaping and bending a galvanized square tube, and the transverse keel is made on-site with an aluminum alloy round tube as a secondary keel, and is processed by a bending machine according to the arc length and parameters in the BIM model.

[0017] In the digital construction and construction accuracy AR detection method of the steel frame structure in a large venue of the present invention, the main keel is made of a standardized galvanized square tube. The main keel is designed to be a truss structure, and the truss structure is used as a transfer layer.

[0018] In a digital construction and construction accuracy AR detection method for a steel frame structure in a large venue of the present invention, the main keel and the secondary keel are fixedly connected by an adapter, the adapter and the main keel are connected by stainless steel bolts, and the secondary keel and the adapter are connected and fixed by a clamp connector.

[0019] In the digital construction and construction accuracy AR detection method of the steel frame structure in a large venue of the present invention, the upper end of the hanger is welded and fixed to the rear embedded plate or steel beam on the building, and the lower end of the hanger is fixed to the main keel through a connecting rod.

[0020] In the digital construction and construction accuracy AR detection method of the steel frame structure in a large venue of the present invention, the main model collision situations include the collision between the hanging keel and the electromechanical pipeline, the collision between the HVAC outlet being too low and the main stone keel, and the actual installation position of the electromechanical pipeline not matching the theoretical position.

[0021] Based on the above technical solution, the digital construction method of the present invention is applied in the production and construction of hyperbolic stone facings in large venues and has achieved the following technical effects:

[0022] 1. The digital construction method of the present invention uses BIM technology to first make a decoration model. After optimizing the design of the decoration model, the base steel frame is simulated and calculated by mechanical simulation calculation, so as to determine that the stability and reliability of the base steel frame are closer to or higher than the actual needs, ensuring the safety of the project construction and subsequent use, and providing the stability of the stone veneer from the base.

[0023] 2. The digital construction method of the present invention is specifically for layout and division of the stone veneer of the panel model. Special software and specific part-checking applications are used to ensure that each piece of stone after division has clear specification parameters and installation position parameters. Then, through a one-time parameter output, each hyperbolic panel that makes up the stone veneer is accurately defined, so as to achieve scientific layout, precise and reliable processing, and economic efficiency.

[0024] 3. The digital construction method of the present invention makes full use of digital technology when installing the base steel frame. The position points are determined and marked so that the installation position and installation form of each position are accurate, ensuring the installation quality and accuracy of the steel frame. The steel frame is then installed in place by hoisting. After the installation is completed, AR equipment is used for digital acceptance inspection to ensure that the base steel frame is installed accurately.

[0025] 4. The digital construction method of the present invention is carried out according to the model parameters when each piece of stone is hoisted and installed. Due to accurate processing and certain position information, the installation process is smooth and feasible. The construction of the entire inverted trumpet-shaped stone veneer model is completed through the installation process from bottom to top, with high construction efficiency and guaranteed quality.

[0026] 5. After the installation of the entire stone veneer is completed, the digital construction method of the present invention uses AR equipment to conduct acceptance inspection again. If any problems are found, rectification is proposed in time to ensure that the installation and construction quality meets the design requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a flow chart of the digital construction of steel frame structures in large venues and the AR detection method for construction accuracy of the present invention.

[0028] Figure 2 It is a schematic diagram of the modeling structure of the special-shaped stone facing in an embodiment of the present invention.

[0029] Figure 3 It is a schematic diagram of the overall installation of the base steel frame in an embodiment of the present invention.

[0030] Figure 4 It is a schematic diagram of the installation cross section of the base steel frame in an embodiment of the present invention.

[0031] Figure 5It is a schematic diagram of the connection between the block stone and the base steel frame in an embodiment of the present invention.

[0032] Figure 6 Schematic diagram of the state of the stone veneer assembly process in the embodiment of the present invention. DETAILED DESCRIPTION

[0033] Below we further elaborate on the digital construction process of special-shaped stone facings in large venues of the present invention in combination with the accompanying drawings and specific embodiments, in order to more clearly understand its digital design, structural composition and construction process, but this does not limit the protection scope of the present invention.

[0034] Please look first Figure 1 , Figure 1 It is a flow chart of the digital construction and AR detection method for the construction accuracy of the steel frame structure in a large venue of the present invention. As can be seen from the figure, the present invention is a digital construction and AR detection method for the construction accuracy of the steel frame structure in a large venue, which is specifically applied to stone facings with hyperbolic stone shapes. The special-shaped stone facing is an inverted trumpet-shaped structure fixed on the base steel frame, which is realized by splicing multiple hyperbolic stone panels. For this stone facing, the highest point of the decorative stone is the stone ceiling, and it has the largest continuous arc length in the space, and the maximum arch height is all special-shaped stone, and the wall and top surface are also continuous arc surfaces. There are about 1,700 stone panels in the embodiment, of which the area of ​​hyperbolic stone reaches 800 square meters. If these complex decorative surfaces and stones are accurately installed in place and the safety and reliability of subsequent use are guaranteed, the steel frame structure of the base is particularly important. The steel frame structure design and construction method include the following steps:

[0035] The first step is to use BIM software to model the project of the large venue. First, the civil engineering drawings are used, and then the point cloud model generated by the on-site scanning is combined with the decoration design drawings to establish the decoration model of the project. The established decoration model includes a steel frame model and a panel model. The key point of digital operation is to scan and model again according to the on-site construction situation after the civil engineering is completed, and then the theoretical model is superimposed and compared with the actual model to establish the decoration model. The model established in the embodiment is as follows Figure 2 As shown in the figure, the overall outline of the decorative model is a trumpet-shaped structure that is small at the bottom and gradually extends and increases upward, embodying the vitality and vigor of a new bud growing upward and growing stronger.

[0036] The second step is to optimize the decoration model, superimpose the electromechanical pipeline model in the large venue with the decoration model, find out the model collision points, optimize and adjust the steel frame model and panel model to achieve space avoidance. The main model collision situations include the collision between the hanging keel and the electromechanical pipeline, the collision between the HVAC outlet being too low and the main stone keel, and the actual installation position of the electromechanical pipeline not matching the theoretical position. The space avoidance is mainly achieved by adjusting the size of the steel frame model.

[0037] The third step is to use the steel frame model to perform mechanical calculations on the base steel frame to find out the unfavorable points to optimize the strength and rigidity of the steel frame. The unfavorable points are structural areas or structural points with poor mechanical properties. The optimization of the steel frame is mainly achieved by adjusting the thickness of the steel pipe. Through digital simulation and calculation, the thickness of the steel pipe in some positions is adjusted, and the rigidity of some keels is increased, thereby increasing the overall stability. According to the calculation, the main keel selects a 100×50×5mm rectangular tube, which is evenly arranged according to the 1.1-meter spacing of the stone joints, and the suspension rod selects a 50×50×5mm solution, which is arranged along the main keel direction.

[0038] The fourth step is to determine the connection method between the base steel frame and the stone panel, simulate the process of connecting the stone panel and the base steel frame, select a suitable connection scheme, and clarify the optimal scheme. The factors of the optimal scheme include safety, adjustability and economy. The scheme selected in the embodiment is Figure 5 As shown, the molded decorative panel of the special-shaped stone veneer is a thin-sheet stone 5 composite honeycomb aluminum panel 4. In addition to the adhesive, a connecting reinforcement back bolt 6 is provided between the thin-sheet stone 5 and the honeycomb aluminum panel 4. The thin-sheet stone composite honeycomb aluminum panel is connected to the rear circular secondary keel 2 through the rear clamp to achieve its adjustability in the front, back, left and right directions, ensuring installation accuracy and safety.

[0039] The fifth step is to lay out the lines before installing the base steel frame, import the positioning information in the decoration model into the total station in batches, conduct accurate three-dimensional measurement of the site, provide a benchmark for on-site installation, materialize the installation point data in the decoration model, accurately locate, mark and fix the site, and convert the virtual space into points, lines and positioning surfaces in the physical space, thereby ensuring the accuracy of the overall steel frame construction and installation.

[0040] The sixth step is to install the steel frame. Use the determined location points for installation. The structure after installation is as follows: Figure 3 and Figure 4As shown in the figure, the main steel frame is composed of a main keel 1 and a secondary keel 2, and six black thick columns supporting the whole are provided at the edge of the structure as supporting cylinders 0. The main keel 1 is connected to the bottom of the suspension rod 3, and the bent secondary keel 2 is connected to the processed special-shaped stone facing, which includes a honeycomb aluminum plate 4 and a thin stone 5. After the installation is completed, the accuracy is checked, and the previous steel frame model is imported into the AR device. The positioning points are clearly defined in the AR software. Each point can generate a corresponding QR code. Each large area requires at least one QR code. The QR code is affixed to the positioning point on site, and the AR model space is consistent with the actual space positioning. The steel frame model is displayed by AR, and the actual steel frame structure is collected by the camera. The steel frame model and the physical steel frame image are automatically matched to determine the degree of correspondence between the actual steel frame and the designed steel frame, thereby determining the installation accuracy of the steel frame. If there is a mismatch, the problem is fed back and the rectification order is exported until the physical steel frame is consistent with the model design steel frame.

[0041] The seventh step is to hang the panels on the steel frame on site. Each panel has a corresponding number and is installed at fixed points using a total station, step by step from bottom to top until all panels are installed.

[0042] In the digital construction and construction accuracy AR detection method of the steel frame structure in a large venue of the present invention, the special-shaped stone facing is composed of multiple hyperbolic stones, single-curved stones and flat stones, and the whole presents an inverted trumpet shape with four corners. The corner position uses hyperbolic stones, the arc position uses single-curved stones, and the flat position uses flat stones. Figure 5 As shown in the figure, the shaped decorative panel of the special-shaped stone veneer is called a thin-sheet stone composite honeycomb aluminum panel, the surface of which is a special-shaped thin-sheet stone 5, a glass fiber reinforcement cloth is arranged behind the thin-sheet stone 5, and the back is a honeycomb aluminum panel 4 carved into the same contact surface, an adhesive layer is arranged between the thin-sheet stone 5 and the honeycomb aluminum panel 4, and a stainless steel bolt is used as a reinforcing back bolt 6 to further fix the thin-sheet stone 5 and the honeycomb aluminum panel 4. After the special-shaped stone veneer is connected to the secondary keel 2, it needs to be connected tightly and cannot be made wrong to cause falling, so a safety rope is added to prevent falling, which is the attached Figure 5 The anti-support member 7 in.

[0043] In the digital construction and construction accuracy AR detection method of a steel frame structure in a large venue of the present invention, the base steel frame is connected by a main keel 1, a transverse keel and a suspension rod 3 to form a main frame. The main keel 1 is formed by shaping and bending a galvanized square tube, and the transverse keel is made on-site with an aluminum alloy round tube as a secondary keel 2, and is processed by a round bending machine according to the arc length and parameters in the BIM model. The main keel 1 is made of a shaped galvanized square tube, and the main keel 1 is made into a truss structure. The introduction of the truss scheme can increase the span and top space, reduce the number of suspension rods 3 to avoid the air duct, and can also increase the deflection, so that the truss structure formed by the main keel 1 can also serve as a conversion layer. In order to further increase the reliability and safety of the installation, while the main keel 1 adopts a truss structure, a truss secondary frame is also added between the main keels 1. The main keel 1 and the secondary keel 2 are fixedly connected by an adapter, the adapter is connected to the main keel 1 by stainless steel bolts, and the secondary keel 2 is connected and fixed to the adapter by a clamp connector. The upper end of the suspension rod 3 is welded and fixed to the rear embedded plate or steel beam on the building, and the lower end of the suspension rod 3 is fixed to the main keel 1 through a connecting rod.

[0044] In the digital construction and construction accuracy AR detection method of the steel frame structure in a large venue of the present invention, after the base steel frame is installed, the special-shaped decorative stone is installed on the base steel frame. The installation process is shown as follows Figure 6 As shown, after the installation of the stone veneer is completed, the eighth step is also included, which is the inspection and acceptance of the stone veneer. After all the stone veneers are installed, the AR device is used for verification and acceptance. The generated theoretical panel model is input into the AR device. When a deviation occurs, an alarm signal appears and the location of the deviation is marked.

[0045] Undoubtedly, the above is only one implementation method of the installation of special-shaped stone facings in large venues of the present invention, and there may be other structural types and implementation steps. In short, the protection scope of the present invention also includes other obvious changes and substitutions for those skilled in the art.

Claims

1. The digital construction accuracy AR detection method of steel frame structure in large venues is characterized by: The special-shaped stone facing is an inverted trumpet-shaped structure fixed on the base steel frame, which is realized by splicing multiple hyperbolic stone panels. The method includes the following steps: the first step is to use BIM software to model the project of the large venue, first use the civil engineering drawings, then combine the point cloud model scanned on site, and combine the decoration design drawings to establish the decoration model of the project, which includes a steel frame model and a panel model; the second step is to optimize the decoration model, superimpose the electromechanical pipeline model in the large venue with the decoration model, find the model collision point, and optimize and adjust the steel frame model and the panel model to achieve space avoidance; the third step is to use the steel frame model to perform mechanical calculations on the base steel frame, find out the unfavorable points to optimize The strength and rigidity of the steel frame are disadvantageous in the structural area or structural point where the mechanical properties are insufficient. The optimization of the steel frame is mainly achieved by adjusting the thickness and specifications of the steel pipe; the fourth step is to determine the connection method between the base steel frame and the stone panel, simulate the process of the connection construction between the stone panel and the base steel frame, select a suitable connection scheme, and clarify the optimal scheme. The factors of the optimal scheme include safety, adjustability and economy; the fifth step is to lay out the lines before installing the base steel frame, import the positioning information in the decoration model into the total station in batches, conduct accurate three-dimensional measurement of the site, provide a benchmark for on-site installation, materialize the installation point data in the decoration model, and accurately locate, mark and fix the site; The sixth step is to install the steel frame. The steel frame is installed at the determined location points. After the installation is completed, the AR device is used to check the accuracy. The previous steel frame model is imported into the AR device. The positioning points are clearly defined in the AR software. Each point can generate a corresponding QR code. Each large area requires at least one QR code. The QR code is affixed to the positioning point on site to complete the consistency between the AR model space and the actual space positioning. The steel frame model is displayed using the AR device, and the actual steel frame structure is captured using the camera. The steel frame model and the physical steel frame image are automatically matched to determine the degree of correspondence between the actual steel frame and the designed steel frame, thereby determining the installation accuracy of the steel frame. If there is a mismatch, feedback the problem and export the rectification order until the physical steel frame is consistent with the model design steel frame. The special-shaped stone facing is made of multiple pieces of hyperbolic stones, single-curved stones and flat stones, and the overall shape is an inverted trumpet with four corners. The corner position uses hyperbolic stones, the curved position uses single-curved stones, and the flat position uses flat stones. The base steel frame is composed of a main keel, a transverse keel and a suspension rod. The main keel is formed by shaping and bending a galvanized square tube. The transverse keel is made on-site from an aluminum alloy round tube as a secondary keel and is processed by a round bending machine according to the arc length and parameters in the BIM model. The main keel is made of a shaped galvanized square tube, and the main keel adopts a truss structure, which also serves as a transfer layer; The main keel and the secondary keel are fixedly connected via an adapter, the adapter and the main keel are connected by stainless steel bolts, and the secondary keel and the adapter are connected and fixed by a clamp connector; The upper end of the suspension rod is welded and fixed to the rear embedded plate or steel beam on the building, and the lower end of the suspension rod is fixed to the main keel through a connecting rod; The main model collision situations in the second step include the collision between the hanging keel and the electromechanical pipeline, the collision between the HVAC outlet being too low and the main stone keel, and the actual installation position of the electromechanical pipeline not matching the theoretical position.