A method, device and electronic equipment for generating engineering report
By copying the original engineering data of water conservancy and hydropower projects into the cache database, determining the target project section and generating target reports, the problem of independent preparation of reports by different project sections is solved, and the efficiency of data summary and report generation is achieved, and the efficiency of data summary and report generation is improved. The user's work efficiency is achieved and the data accuracy and security are ensured.
Patent Information
- Application Number
- CN202110308604.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-23
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-03-23
AI Technical Summary
In the water conservancy and hydropower industry, different engineering sections of the project need to independently prepare bid control prices and bid quotations, resulting in users requiring repetitive operations, which is time-consuming and labor-intensive.
By copying the original project data to the cache database, determining the project data of the target project segment, and generating target reports based on the data, reducing duplicate labor and improving work efficiency.
It realizes data summary of multiple project segment projects, reduces duplicate operations, improves user work efficiency, supports business characteristics processing in multiple regions, and ensures data accuracy and security.
Smart Images

Figure CN112907218B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a method, device and electronic equipment for generating an engineering report. Background Art
[0002] In the new construction, expansion, reconstruction and maintenance projects of the water conservancy and hydropower industry, the bidding of multiple engineering sections is involved. For each engineering section, a bidding control price and a bidding quotation need to be prepared. When bidding, in order to increase the chance of winning the bid, the bidding unit can bid for multiple engineering sections at the same time, but only one of the engineering sections is allowed to win the bid. However, the construction procedures of each engineering section in the same project are very similar. In the prior art, users need to establish different engineering section projects for different engineering sections, perform the work of itemizing, charging, and price adjustment for each engineering section project, and then open each engineering section project separately for report output, resulting in repetitive operations and time-consuming and labor-intensive. Summary of the invention
[0003] In view of this, an embodiment of the present invention provides a method, device and electronic device for generating an engineering report, which solves the problem in the prior art that users need to output reports for each engineering section project separately for different engineering sections, resulting in repetitive operations.
[0004] According to a first aspect, an embodiment of the present invention provides a method for generating an engineering report, the method comprising:
[0005] Copying original engineering data into a cache database, the original engineering data including engineering data of multiple engineering sections;
[0006] Determine a target engineering section, and determine engineering data of the target engineering section in the original engineering data;
[0007] The original engineering data is processed based on the engineering data of the target engineering section to generate a target report.
[0008] The engineering report generation method provided by the embodiment of the present invention obtains the target engineering section, determines the engineering data of the target engineering section from the original engineering data of all engineering sections according to the target engineering section, so as to summarize the target engineering data and generate a target report; thereby, for a project with multiple engineering sections in a project, duplication of work can be greatly reduced, user work efficiency can be improved, and multi-regional business feature processing of users can be supported, with scalability, and data accuracy and security can be guaranteed; by reading the engineering data in the database, data accuracy can be effectively guaranteed, the summary range can be repeatedly adjusted, and physical isolation is adopted, so that the original engineering files of users are not changed, and the integrity of the original data can be guaranteed.
[0009] In combination with the first aspect, in a first implementation of the first aspect, determining the engineering data of the target engineering section in the original engineering data includes:
[0010] Marking the engineering data corresponding to the target engineering section in the cache database, wherein the engineering data corresponds to the engineering section in a one-to-one manner;
[0011] The unmarked engineering data in the cache database is deleted to determine the engineering data of the target engineering section.
[0012] The engineering report generation method provided by the embodiment of the present invention processes data by deleting useless engineering section data, and deletes all engineering files under engineering sections that are not checked by the user, thereby achieving the purpose of aggregating local engineering section data.
[0013] In combination with the first aspect, in a second implementation of the first aspect, determining the engineering data of the target engineering section in the original engineering data includes:
[0014] Marking the original engineering data based on the target engineering section;
[0015] The marked original engineering data is copied to a cache database, target engineering data is determined, and marking information in the original engineering data is cleared.
[0016] In combination with the first aspect, in a third implementation manner of the first aspect, the original engineering data is processed based on the engineering data of the target engineering section to generate a target report, including:
[0017] Get the output format of the target report;
[0018] The engineering data of the target engineering section are summarized based on the output format to generate a target report.
[0019] In combination with the third implementation manner of the first aspect, in the fourth implementation manner of the first aspect, the engineering data of the target engineering section is summarized based on the output format to generate a target report, including:
[0020] Establishing a target storage structure based on the output format;
[0021] The engineering data of the target engineering section are aggregated into the target storage structure, and a target report is determined.
[0022] In combination with the fourth implementation manner of the first aspect, in the fifth implementation manner of the first aspect, the engineering data of the target engineering section is aggregated into the target storage structure, and a target report is determined, including:
[0023] Summarize the engineering data of the target engineering section, and determine whether the summarization is abnormal according to the summarization status indicator;
[0024] When the summary is normal, the summary result of the engineering data of the target engineering section is stored in the target storage structure, and the target report is determined;
[0025] When the summary is abnormal, an abnormal prompt message is issued.
[0026] The engineering report generation method provided by the embodiment of the present invention ensures the security of the summary process and the accuracy of the summary results by monitoring abnormal situations.
[0027] In combination with the third implementation of the first aspect, in a sixth implementation of the first aspect, obtaining an output format of a target report includes:
[0028] Get the output format of the target report;
[0029] The target engineering section is combined with the output format to determine the target engineering model so as to record the target engineering section.
[0030] The engineering report generation method provided by the embodiment of the present invention adopts a cache mechanism for dynamic report aggregation, memorizes the scope of each aggregation through the engineering model, and performs real-time aggregation of data according to the engineering section scope selected by the user.
[0031] According to a second aspect, an embodiment of the present invention further provides a device for generating an engineering report, the device comprising:
[0032] A first processing module, used to copy original engineering data into a cache database, wherein the original engineering data includes engineering data of multiple engineering sections;
[0033] A second processing module is used to determine a target engineering section and determine engineering data of the target engineering section in the original engineering data;
[0034] The third processing module is used to process the original engineering data based on the engineering data of the target engineering section to generate a target report.
[0035] According to the third aspect, an embodiment of the present invention provides an electronic device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the engineering report generating method described in the first aspect or any one of the embodiments of the first aspect by executing the computer instructions.
[0036] According to the fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, which stores computer instructions, and the computer instructions are used to enable the computer to execute the engineering report generation method described in the first aspect or any one of the embodiments of the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0038] Figure 1 is a schematic diagram of a project engineering section according to an embodiment of the present invention;
[0039] Figure 2 is a flow chart of a method for generating an engineering report according to an embodiment of the present invention;
[0040] Figure 3 is another flow chart of a method for generating an engineering report according to an embodiment of the present invention;
[0041] Figure 4 is another specific flow chart of the method for generating an engineering report according to an embodiment of the present invention;
[0042] Figure 5 is a structural block diagram of an engineering report generating device according to an embodiment of the present invention;
[0043] Figure 6 It is a schematic diagram of the hardware structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0045] It should be noted that the electronic device in the embodiment of the present invention may be an electronic whiteboard or an intelligent interactive device, such as a mobile phone, a tablet, etc., and no limitation is imposed on them herein.
[0046] According to an embodiment of the present invention, an embodiment of an engineering report generation method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0047] Taking the water conservancy and hydropower project as an example, there are group projects in one section of the project, such as the reinforcement and risk reduction of multiple reservoirs in a region; water management of multiple sections of a river basin, such as Figure 1 As shown: When bidding for such a multi-project bidding section project, it is generally divided into nine project bidding sections, and each project bidding section is bid separately. Therefore, when preparing the bidding control price, the bidding unit needs to prepare nine bidding control prices and bid quotations. When outputting the report, it is necessary to open each project bidding section and output them separately. This processing method brings a lot of repetitive work to users. For example, each project needs to adjust the fee and the price of manpower, materials and machines separately, which is time-consuming and labor-intensive, and the user experience is not very good.
[0048] In this embodiment, a method for generating an engineering report is provided, which can be used for the above-mentioned electronic device. Figure 2 is a flow chart of a method for generating an engineering report according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:
[0049] S11, copying the original engineering data into a cache database, the original engineering data including engineering data of multiple engineering sections.
[0050] In this embodiment, for the new construction, expansion, reconstruction and maintenance projects of water conservancy, hydropower and water conservation projects in the water conservancy and hydropower industry, it is often necessary to output quotations for multiple engineering sections of a single engineering project separately, so as to quickly form the bidding documents for each section and pre-process the overall engineering documents.
[0051] Specifically, the original engineering data is copied to the cache database, and the cache database created is copied to the cache database of the original engineering data of all engineering sections. The original engineering data includes the overall engineering data of the project and the engineering data of each section, and the overall engineering data of the project includes the engineering data of each section. As an example, the overall engineering data of the project is a summary of the engineering data of each section.
[0052] In this embodiment, the overall project engineering data and the engineering data of each bid section are mutually associated and have an associated relationship. As an example, the associated relationship can be pre-established when the original engineering data is created, or it can be created in the process of copying the original engineering data. By establishing an associated relationship, the overall project engineering data and the engineering data of each bid section can be linked. For example, when the engineering data of a certain bid section changes, the overall project engineering data will be automatically updated.
[0053] S12, determining a target engineering section, and determining engineering data of the target engineering section in the original engineering data.
[0054] The target engineering section of the target project is obtained, wherein the target engineering section can be directly obtained by the electronic device from the outside world, or can be obtained by using the data acquisition device in the electronic device. There is no restriction on the way in which the electronic device obtains the target engineering section, and it is only necessary to ensure that the electronic device can obtain the target engineering section. It should be noted that this embodiment is described by taking the project of the water conservancy and hydropower industry as an example, and can also be adapted to other industries, as long as the report output of the engineering section of the bidding process can be carried out.
[0055] Among them, the original engineering data of the project and engineering section are encrypted and stored through the data platform GSP format database. After the target engineering section is determined in the previous step, the engineering data corresponding to the target engineering section can be determined in the original engineering data of all engineering sections. There is only one project and multiple engineering sections. The engineering section can be selected. After selecting the engineering section, the relevant data are all defaulted according to the selected engineering section. It should be noted that the storage of engineering data in this embodiment is encrypted and stored through the data platform GSP format database to ensure the security of the data. In actual applications, other databases can also be selected for storage according to actual needs. This embodiment is not limited to this.
[0056] S13, processing the original engineering data based on the engineering data of the target engineering section to generate a target report.
[0057] After the user selects the target engineering section, the target engineering data can be determined accordingly. In order to output the target report, the target engineering data can be directly processed. For example, for multiple engineering sections of the current target project, the user selects engineering section 1 as the target engineering section, and the target engineering data corresponding to the target engineering section can be determined. By summarizing the target engineering data, the cost of engineering section 1 can be generated, which can be directly printed or exported to Excel. It can support the user's multi-regional business characteristics and has scalability. For bidding users, multiple engineering sections can be built in a large project, and prices can be unified, fees and prices can be adjusted. When outputting reports, by selecting different engineering sections (using the "summary range" function to output by engineering section), the work content of bidding users can be simplified, repetitive operations can be reduced, and work efficiency can be improved. The function is simple and easy to use, convenient and fast.
[0058] The engineering report generation method provided in this embodiment obtains the target engineering section, determines the engineering data of the target engineering section from the original engineering data of all engineering sections according to the target engineering section, so as to summarize the target engineering data and generate a target report; thus, for a project with multiple engineering sections in one project, duplication of work can be greatly reduced, user work efficiency can be improved, and multi-regional business feature processing of users can be supported, with scalability to ensure data accuracy and security; by reading the engineering data in the database, data accuracy can be effectively guaranteed, the summary range can be repeatedly adjusted, and physical isolation is adopted so as not to change the original engineering files of users and ensure the integrity of the original data.
[0059] In this embodiment, a method for generating an engineering report is provided, which can be used for the above-mentioned electronic device. Figure 3 is a flow chart of a method for generating an engineering report according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:
[0060] S21, copying the original engineering data into a cache database, the original engineering data including engineering data of multiple engineering sections.
[0061] In the platform to which the engineering report generation method of this embodiment is applied, the output of each engineering section can be performed through the "summary range" function, and the target engineering section can be determined based on the user's selection.
[0062] For more details, please see Figure 2 S11 of the illustrated embodiment will not be described in detail here.
[0063] S22, determining a target engineering section, and determining engineering data of the target engineering section in the original engineering data.
[0064] Specifically, the above S22 may include the following steps:
[0065] (1) Mark the engineering data corresponding to the target engineering section in the cache database, and the engineering data corresponds to the engineering section one by one.
[0066] The system pops up a window for users to select the engineering section they want to summarize. After the user selects the target engineering section, the user's selection mark is stored in the engineering database as cache memory. When the target engineering section is determined, its corresponding engineering data can also be uniquely determined. Therefore, there is a one-to-one corresponding relationship between the engineering data and the engineering section. The system's function buttons are obvious, which is convenient for users to find and understand. The execution is convenient and quick, which saves users a lot of repetitive operations and greatly improves the work efficiency of bidding users.
[0067] (2) Delete the unmarked engineering data in the cache database and determine the engineering data of the target engineering section.
[0068] After the marked engineering data is determined, the unmarked engineering data in the cache database is deleted to determine the target engineering data. The unmarked engineering data means that the user has not selected it and the data is not needed for this operation, so it can be deleted directly for the sake of aggregation.
[0069] S23, processing the original engineering data based on the engineering data of the target engineering section to generate a target report.
[0070] Specifically, the above S23 may include the following steps:
[0071] S231, obtaining the output format of the target report.
[0072] In some optional implementations of this embodiment, the above S231 may include the following steps:
[0073] (1) Obtain the output format of the target report.
[0074] The output format of the target report can be determined by direct settings by the user, or it can be directly obtained from the outside through the electronic device, or it can be the output format collected by the data collection device in the electronic device. There is no restriction on the way the electronic device obtains the output format, it only needs to ensure that the electronic device can obtain the output format.
[0075] (2) Combine the target engineering section with the output format to determine the target engineering model so as to record the target engineering section.
[0076] In this embodiment, the target engineering section is combined with the output format to determine the target engineering model in order to record the target engineering section. For example, the engineering data of the project and engineering section are encrypted and stored in the GSP format database of the data platform, and the background report format (output format) is stored in the rpt custom report format. The data and format are stored separately and physically stored after double encryption, which is safe and reliable. The data of the project and engineering section are stored in the GSP along with the engineering model. Here, only the report format and the user-selected status are stored as memory in the engineering model, so that when the user opens the project again, it is still the last status.
[0077] S232, summarizing the engineering data of the target engineering section based on the output format and generating a target report.
[0078] In some optional implementations of this embodiment, the above S232 may include the following steps:
[0079] (1) Establish the target storage structure based on the output format.
[0080] Based on the output format, a target storage structure is established. For the project cost, the key cost information of each project section is collected into the "cost index table". The cost information of the project section is aggregated into the "project structure" table on the project and stored in the cost information field to establish a corresponding target storage structure, where the cost information of each project section has a corresponding record in the project structure. It should be noted that this embodiment is only used as an example to illustrate the above storage table, and is not limited to this.
[0081] (2) Summarize the engineering data of the target engineering section into the target storage structure and determine the target report.
[0082] Specifically, in some optional implementations of this embodiment, the above-mentioned aggregating the engineering data of the target engineering section into the target storage structure and determining the target report also includes the following steps:
[0083] a. Summarize the engineering data of the target engineering section and determine whether the summary is abnormal based on the summary status indicator.
[0084] In the process of summarizing the engineering data of the target engineering section, the summary status mark can be marked in real time. The summary status mark can be used to determine whether the summary is abnormal.
[0085] b. When the summary is normal, the summary results of the engineering data of the target engineering section are stored in the target storage structure and the target report is determined.
[0086] When no abnormalities occur during the summary process, the summary results of the engineering data of the target engineering section can be directly stored in the target storage structure to determine the target report. The report summary adopts the infinite memory loading mode to ensure efficient report loading, no jamming, and timely presentation of data.
[0087] c. When the summary is abnormal, an abnormal prompt message will be issued.
[0088] When an aggregation anomaly is detected, the aggregation result will be incorrect, and a pop-up window will be displayed to let the user know that the data is incorrect and to perform the operation again (an anomaly prevention mechanism, which is generally not used for low-probability events).
[0089] The present embodiment provides a method for generating an engineering report, which ensures the security of the summary process and the accuracy of the summary results by monitoring abnormal situations; utilizes a cache mechanism for dynamic summary of the report, memorizes the scope of each summary through the engineering model, and summarizes the data in real time according to the scope of the engineering section selected by the user.
[0090] In this embodiment, a method for generating an engineering report is provided, which can be used for the above-mentioned electronic device. Figure 4 is a flow chart of a method for generating an engineering report according to an embodiment of the present invention. Figure 4 As shown, the process includes the following steps:
[0091] S31, copying the original engineering data into a cache database, the original engineering data including engineering data of multiple engineering sections.
[0092] For details, please see Figure 3 S21 of the illustrated embodiment will not be described in detail here.
[0093] S32, determining a target engineering section, and determining engineering data of the target engineering section in the original engineering data.
[0094] Specifically, the above S32 may include the following steps:
[0095] S321, marking the original engineering data based on the target engineering section.
[0096] After determining the target engineering section, the engineering data corresponding to the corresponding engineering section in the original engineering data is directly marked.
[0097] S322, copy the marked original engineering data to the cache database, determine the target engineering data, and clear the marking information in the original engineering data.
[0098] The marked original engineering data is copied to the cache database, the target engineering data is determined, and then the corresponding marking information in the original engineering data is cleared to facilitate subsequent calculations.
[0099] S33, processing the original engineering data based on the engineering data of the target engineering section to generate a target report.
[0100] For details, please see Figure 3 S23 of the illustrated embodiment will not be described in detail here.
[0101] The engineering report generation method provided in this embodiment obtains the target section engineering section, determines the target engineering data from the original engineering data of all sections engineering sections according to the target section engineering section, so as to summarize the target engineering data and generate a target report; thereby, for a project with multiple sections engineering section projects in one project, duplication of work can be greatly reduced, user work efficiency can be improved, and data accuracy and security can be ensured; the dynamic summary of the report adopts a caching mechanism, and the scope of each summary is memorized through the engineering model, and real-time data summary is performed according to the scope of the section engineering section selected by the user.
[0102] In the present embodiment, a device for generating an engineering report is also provided, and the device is used to implement the above-mentioned embodiment and preferred implementation mode, and the descriptions that have been made are not repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware is also possible and conceived.
[0103] This embodiment provides a device for generating a project report, such as Figure 5 As shown, including:
[0104] A first processing module 41 is used to copy the original engineering data into a cache database, where the original engineering data includes engineering data of multiple engineering sections;
[0105] The second processing module 42 is used to determine the target engineering section and determine the engineering data of the target engineering section in the original engineering data;
[0106] The third processing module 43 is used to process the original engineering data based on the engineering data of the target engineering section to generate a target report
[0107] The engineering report generation device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0108] The engineering report generation device provided in this embodiment obtains the target engineering section, determines the engineering data of the target engineering section from the original engineering data of all engineering sections according to the target engineering section, so as to summarize the target engineering data and generate a target report; thus, for a project with multiple engineering sections in one project, duplication of work can be greatly reduced, user work efficiency can be improved, and multi-regional business feature processing of users can be supported, with scalability to ensure data accuracy and security; by reading the engineering data in the database, data accuracy can be effectively guaranteed, the summary range can be repeatedly adjusted, and physical isolation is adopted so as not to change the original engineering files of users and ensure the integrity of the original data.
[0109] The further functional description of each of the above modules is the same as that of the above corresponding embodiments and will not be repeated here.
[0110] The embodiment of the present invention also provides an electronic device having the above Figure 5 The engineering report generating device shown.
[0111] See also Figure 6 , Figure 6 is a schematic diagram of the structure of an electronic device provided by an optional embodiment of the present invention, such as Figure 6 As shown, the electronic device may include: at least one processor 61, such as a CPU (Central Processing Unit), at least one communication interface 63, a memory 64, and at least one communication bus 62. The communication bus 62 is used to realize the connection and communication between these components. The communication interface 63 may include a display screen (Display), a keyboard (Keyboard), and the optional communication interface 63 may also include a standard wired interface and a wireless interface. The memory 64 may be a high-speed RAM memory (Random Access Memory) or a non-volatile memory (non-volatile memory), such as at least one disk storage. The memory 64 may optionally be at least one storage device located away from the aforementioned processor 61. The processor 61 may be combined with Figure 5 In the described device, the memory 64 stores an application program, and the processor 61 calls the program code stored in the memory 64 to execute any of the above method steps.
[0112] The communication bus 62 may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus. The communication bus 62 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 6 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0113] Among them, the memory 64 may include a volatile memory (English: volatile memory), such as a random access memory (English: random-access memory, abbreviated: RAM); the memory may also include a non-volatile memory (English: non-volatile memory), such as a flash memory (English: flash memory), a hard disk drive (English: hard disk drive, abbreviated: HDD) or a solid-state drive (English: solid-state drive, abbreviated: SSD); the memory 64 may also include a combination of the above types of memory.
[0114] The processor 61 may be a central processing unit (CPU), a network processor (NP), or a combination of a CPU and a NP.
[0115] The processor 61 may further include a hardware chip. The hardware chip may be an application-specific integrated circuit (ASIC), a programmable logic device (PLD), or a combination thereof. The PLD may be a complex programmable logic device (CPLD), a field-programmable gate array (FPGA), a generic array logic (GAL), or any combination thereof.
[0116] Optionally, the memory 64 is also used to store program instructions. The processor 61 can call the program instructions to implement the present application Figures 2 to 4 The engineering report generation method shown in the embodiment.
[0117] The embodiment of the present invention also provides a non-transitory computer storage medium, which stores computer executable instructions, and the computer executable instructions can execute the engineering report generation method in any of the above method embodiments. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory (Flash Memory), a hard disk (HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above types of memory.
[0118] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for generating an engineering report, characterized in that: include: Copying original engineering data into a cache database, the original engineering data including engineering data of multiple engineering sections; Determine a target engineering section, and determine engineering data of the target engineering section in the original engineering data; Get the output format of the target report; Summarize the engineering data of the target engineering section based on the output format to generate a target report; The engineering data of the target engineering section is summarized based on the output format to generate a target report, including: Establishing a target storage structure based on the output format; Summarizing the engineering data of the target engineering section into the target storage structure and determining a target report; Wherein, determining the engineering data of the target engineering section in the original engineering data includes: Marking the engineering data corresponding to the target engineering section in the cache database, wherein the engineering data corresponds to the engineering section one by one, wherein a system pop-up window is provided for the user to select the engineering section to be summarized, and after the user selects the target engineering section, the user's selection mark is stored in the engineering database as a cache memory; The unmarked engineering data in the cache database is deleted, and the engineering data of the target engineering section is determined, wherein the unmarked engineering data represents data not selected by the user.
2. The method according to claim 1, characterized in that Summarizing the engineering data of the target engineering section into the target storage structure and determining the target report, including: Summarize the engineering data of the target engineering section, and determine whether the summarization is abnormal according to the summarization status indicator; When the summary is normal, the summary result of the engineering data of the target engineering section is stored in the target storage structure, and the target report is determined; When the summary is abnormal, an abnormal prompt message is issued.
3. The method according to claim 1, characterized in that: Get the output format of the target report, including: Get the output format of the target report; The target engineering section is combined with the output format to determine the target engineering model so as to record the target engineering section.
4. A device for generating an engineering report, characterized in that: include: A first processing module, used to copy original engineering data into a cache database, wherein the original engineering data includes engineering data of multiple engineering sections; A second processing module is used to determine a target engineering section and determine engineering data of the target engineering section in the original engineering data; The acquisition module is used to obtain the output format of the target report; A third processing module is used to summarize the engineering data of the target engineering section based on the output format to generate a target report; The third processing module is further used to establish a target storage structure based on the output format; summarize the engineering data of the target engineering section into the target storage structure, and determine a target report; Among them, the second processing module is also used to mark the engineering data corresponding to the target engineering section in the cache database, delete the unmarked engineering data in the cache database, and determine the engineering data of the target engineering section, wherein the engineering data corresponds to the engineering section one by one, and the system pops up a box for the user to select the engineering section to be summarized. After the user selects the target engineering section, the user's selection mark is stored in the engineering database as cache memory; the unmarked engineering data represents data that the user has not selected.
5. A non-transitory computer-readable storage medium, characterized in that: The non-transitory computer-readable storage medium stores computer instructions, and when the computer instructions are executed by a processor, the engineering report generation method as described in any one of claims 1-3 is implemented.
6. An electronic device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the engineering report generation method as described in any one of claims 1 to 3 by executing the computer instructions.