A method for reducing roof pressure in gob-side tunneling by removing pressure from the roof

By cutting and unloading the top slab rock layer in the trough in front of the working face of the upper section of the tunnel along the air tunnel, deep hole energy gathering blasting or hydraulic fracturing to form a crack, the problem of high pressure on the roof slab of the tunnel along the air tunnel along the air tunnel is solved. , realizes the stability of the roof structure and the effective recycling of coal resources.

CN112922598BActive Publication Date: 2024-11-22ZHONGKUANG KECHUANG (BEIJING) COAL TECH CO LTD
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202110307502.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-23
Publication Date
2024-11-22
Estimated Expiration
2041-03-23

AI Technical Summary

Technical Problem

The coal body in the yielding state of the air tunnel is complicated and the roof pressure is high, resulting in excessive deformation or structural instability, difficult to maintain, and the existing technology is difficult to effectively reduce the roof pressure, affecting the recycling of coal resources.

Method used

By cutting and unloading the top slab rock layer in the trough in front of the working face of the upper section of the hollow tunnel, deep hole energy-generating blasting or hydraulic fracturing methods are used to form a crack to reduce the pressure of the top slab and change the support of the top slab Structure, reducing lateral pressure and rotation sinking angle.

Benefits of technology

It effectively reduces the lateral pressure of coal columns along the hollow tunnel and the tunnel guarding, reduces the deformation of the roof panel, improves the stability of excavation and maintenance, increases the recovery of coal resources, and has significant economic value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112922598B_ABST
    Figure CN112922598B_ABST
Patent Text Reader

Abstract

The present invention proposes a method for reducing the roof pressure of goaf-side tunneling by top cutting and pressure relief, comprising: a first step: analyzing the production geological conditions of the roof rock strata of the goaf-side tunneling working face; a second step: selecting a top cutting and pressure relief method; a third step: inspecting the pressure relief effect after the top cutting and pressure relief operation; a fourth step: calculating the roof pressure and analyzing the lateral support pressure; a fifth step: determining the position of the goaf-side tunnel and the width of the coal pillar according to the lateral support pressure distribution and the comparison of the roof pressure of the goaf-side tunnel at different positions in the fourth step; a sixth step: calculating the support strength and support method required for the goaf-side tunnel according to the rock stratum pressure above the coal pillar calculated in the fifth step and the width of the coal pillar determined to be left. By this means, the present invention has the advantage of cutting the deep part of the roof rock strata of the drift in the drift in front of the working face of the upper section of the goaf-side tunneling, thereby reducing the surrounding rock pressure and deformation of the goaf-side tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of coal mining, and in particular relates to a method for reducing roof pressure in goaf-side tunneling by removing pressure from the roof through cutting. Background Art

[0002] At present, goaf-side tunneling is to excavate tunnels at the edge of the goaf area of ​​the upper section working face or leaving narrow coal pillars. Taking advantage of the fact that the coal body within a certain range close to the goaf is in the lateral support pressure reduction zone, the goaf-side tunneling is arranged in the plastic stress zone of the coal body. This can reduce the roof pressure of the goaf-side tunneling, reduce the width of the coal pillar, and reduce the loss of coal resources, which has great social and economic value.

[0003] However, since the gob-side tunnel and the coal pillars protecting the tunnel are arranged in the yielded coal body, the force during the tunnel excavation is complex and the support is difficult. When the gob-side tunnel is affected by the leading pressure of the working face in the lower section, it will deform greatly and must be repeatedly opened and expanded for maintenance before it can be used normally. The gob-side tunnel is arranged under the conditions of large original rock stress, large key rock layer thickness, and roof rock layer that is not easy to break, which can easily cause excessive deformation of the gob-side tunnel excavation or instability of the roof rock layer structure and failure. Summary of the invention

[0004] The present invention proposes a method for reducing the roof pressure of a goaf-side tunneling by cutting the top to relieve pressure. The deep rock layer of the tunnel roof is cut in the tunnel in front of the working face of the upper section of the planned goaf-side tunneling, so as to achieve the purpose of reducing the surrounding rock pressure and deformation of the goaf-side tunneling.

[0005] The technical solution of the present invention is implemented as follows: a method for reducing the roof pressure of a roadway along the goaf by removing the pressure through the roof, comprising:

[0006] Step 1: Analyze the production geological conditions of the top rock layer of the working face where goaf-side tunneling is required;

[0007] Step 2: Select the top cutting and pressure relief method according to the analysis results of the production geological conditions in the first step;

[0008] Step 3: Perform the top cutting and pressure relief operation according to the method selected in the second step and inspect the pressure relief effect after the top cutting and pressure relief operation;

[0009] Step 4: After the roof is cut and pressure is relieved in step 3, the roof pressure is calculated and the lateral support pressure is analyzed;

[0010] Step 5: According to the lateral support pressure distribution in step 4 and the comparison of roof pressures of gob-side tunnels at different positions, determine the position of gob-side tunnels and the width of coal pillars;

[0011] Step 6: Based on the rock pressure above the coal pillar calculated in the fifth step and the width of the coal pillar to be retained, calculate the support strength and support method required for the gob-side tunnel.

[0012] A cutting line is arranged on the roof of the tunnel in front of the upper section working face, and holes are drilled on the tunnel roof along the cutting line. Deep hole concentrated energy blasting or hydraulic fracturing is used to split the deep rock layer of the roof into cracks above the coal wall of the lower section parallel to the center line of the tunnel. The deep rock layer of the roof is divided into two parts along the splitting crack, one part is supported by the coal body of the upper section working face, and the other side is supported by the coal wall of the lower section, so that the tunnel roof remains balanced.

[0013] When the upper section working face is pushed through, the deep roof rock layer at the edge of the goaf area of ​​the upper section working face will break and collapse along the cleavage cracks under the pressure of the overlying rock layer, reducing the length of the cantilever beam, increasing the height of the roof falling, and forming a short arm beam structure on the goaf side, reducing the lateral support pressure and the rotation and sinking angle of the roof.

[0014] As a preferred embodiment, the analysis of production geological conditions in the first step includes but is not limited to:

[0015] Testing and analysis of mechanical properties of tunnel roof rock and coal seams;

[0016] Detection of rock formation status of tunnel roof;

[0017] Working face pressure step analysis;

[0018] Formation stress testing;

[0019] The tunnel roof rock layer characteristics test and analysis, tunnel roof rock layer status detection and analysis of the roof rock layer structure and key layer status;

[0020] The working face pressure step distance is used to analyze the possible hanging length of the goaf;

[0021] The formation stress test can analyze and determine the top cutting and pressure relief method.

[0022] Before implementing goaf-side tunneling, it is necessary to test the geomechanical properties of the roof rock layer of the goaf-side tunneling working face. The geomechanical properties analysis is divided into 4 parts: ① Testing and analysis of the mechanical properties of the tunnel roof rock layer and coal seam; ② Detection of the state of the tunnel roof rock layer; ③ Testing of the working face pressure step distance and the width of the coal wall plastic zone; ④ Testing of formation stress.

[0023] Among them, the mechanical test of the roof rock layer adopts the method of drilling and coring, and the key rock layer positions and mechanical properties of the roof rock layer are analyzed based on the coring core samples;

[0024] The roof rock state detection uses a rock detector to analyze the state of the roof rock and the development of cracks;

[0025] Conduct geostress testing and analyze the magnitude and direction of the maximum principal stress.

[0026] As a preferred embodiment, the tunnel roof rock stratum mechanical test is conducted by coring with a drill hole, and the key rock stratum positions and mechanical properties of the roof rock stratum are analyzed based on the coring core samples;

[0027] The roof rock state detection uses a rock detector to analyze the state of the roof rock and the development of cracks;

[0028] Conduct formation stress tests and analyze the magnitude and direction of the maximum principal stress.

[0029] As a preferred implementation, the methods of top cutting and pressure relief include but are not limited to deep hole concentrated energy blasting or hydraulic fracturing.

[0030] There are two existing methods of top cutting and pressure relief: ① deep hole concentrated energy blasting; ② hydraulic fracturing.

[0031] The construction cost of deep hole concentrated energy blasting to cut the roof and relieve pressure is high, but the cutting direction can be manually controlled to make the cutting direction parallel to the roadway, achieving the ideal cutting and pressure relief effect;

[0032] Although hydraulic fracturing and top cutting and pressure relief has a low construction cost, before the construction of top cutting and pressure relief, the direction of the maximum principal stress of the stratum where the trench is located must be tested. If the maximum principal stress is parallel to the direction of the trench, hydraulic fracturing can achieve the ideal effect.

[0033] As a preferred embodiment, during the roof cutting and pressure relief operation in the third step, the roof of the goaf is cut down along the coal wall of the lower section, and the roof cutting line is parallel to the center line of the drift and close to the coal wall when the drilling arrangement conditions are met;

[0034] The borehole is inclined toward the upper part of the coal wall, and the lower boundary of the top cutting is above the coal wall in the lower section. The position of the pre-splitting top cutting line is determined according to the roof rock structure and the layout of the roadway;

[0035] The upper and lower boundaries of the cutting top are determined according to the location, properties and residual expansion coefficient of the key rock formations.

[0036] In order to ensure that after the upper section working face is pushed through, the roof of the goaf is cut off along the coal wall of the lower section as much as possible, the roof cutting line should be parallel to the center line of the drift and as close to the coal wall as possible while meeting the drilling arrangement conditions.

[0037] The drill hole is inclined upwards towards the coal wall, and the lower boundary of the top cutting is above the coal wall in the lower section. The position of the pre-splitting top cutting line is determined according to the roof rock structure and the layout of the roadway.

[0038] The upper and lower boundaries of the cutting top are determined according to the location, properties and residual expansion coefficient of the key rock formations.

[0039] As a preferred implementation, the upper boundary is calculated using the following formula:

[0040]

[0041] Among them, H is the upper boundary height required for cutting the top;

[0042] h is the mining height of the working face;

[0043] k' p It is the expansion coefficient of falling gangue.

[0044] As a preferred embodiment, the lower boundary is located above the upper section drift support system.

[0045] Ensure that after the roof rock layer of the goaf area near the lower section of the coal wall collapses, the falling gangue will fill the goaf under the condition of residual expansion coefficient, and the overlying roof rock layer will be borne by the gangue in the goaf, so as to minimize the lateral concentrated stress above the coal wall in the lower section of the goaf edge.

[0046] The lower boundary must be above the upper section drift support system to ensure the stability of the top plate of the construction drift during coal mining in the upper section.

[0047] After adopting the above technical solution, the beneficial effects of the present invention are:

[0048] Through the pressure relief of cutting the roof, a structural weak surface is formed in the deep part of the roof rock layer on the side of the goaf of the goaf roadway and the coal pillars protecting the roadway. After the working face is pushed through, the roof rock layer at the edge of the goaf is cut off and falls along the structural weak surface of the cutting roof under the action of the mine pressure, which increases the falling height, reduces the hanging length of the roof, and reduces the rotation pressure of the roof. The falling gangue helps to fill the goaf, timely support the roof pressure of the overlying rock layer, greatly reduce the lateral pressure above the goaf roadway and the coal pillars protecting the roadway, make the roadway close to the original rock stress zone, and facilitate the excavation and maintenance of the goaf roadway. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0050] Figure 1 This is a schematic diagram of the structure of tunneling along the goaf using the method of the present invention;

[0051] Figure 2 for Figure 1 Schematic diagram of the cross section of AA;

[0052] Figure 3 for Figure 1 Schematic cross-section of the middle BB;

[0053] Figure 4It is a schematic diagram of pressure distribution in gob-side tunneling without top cutting and pressure relief;

[0054] Figure 5 Schematic diagram of pressure distribution along goaf tunneling after adopting top cutting pressure relief technology.

[0055] In the figure, 1-mining working face; 2-mining tunnel; 3-working face cut; 4-goaf; 5-drill hole; 6-coal pillar; 7-tunnel to be excavated; 8-working face of tunnel excavation along the goaf; 9-roof rock layer. DETAILED DESCRIPTION

[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0057] like Figure 1 to Figure 5 As shown, a method for reducing roof pressure in gob-side tunneling by top cutting and pressure relief includes:

[0058] Step 1: Analyze the production geological conditions of the top rock layer of the working face where goaf-side tunneling is required;

[0059] Step 2: Select the top cutting and pressure relief method according to the analysis results of the production geological conditions in the first step;

[0060] Step 3: Perform the top cutting and pressure relief operation according to the method selected in the second step and inspect the pressure relief effect after the top cutting and pressure relief operation;

[0061] Step 4: After the roof is cut and pressure is relieved in step 3, the roof pressure is calculated and the lateral support pressure is analyzed;

[0062] Step 5: According to the lateral support pressure distribution in step 4 and the comparison of roof pressures of gob-side tunnels at different positions, determine the position of gob-side tunnels and the width of coal pillars;

[0063] Step 6: Based on the rock pressure above the coal pillar calculated in the fifth step and the width of the coal pillar to be retained, calculate the support strength and support method required for the gob-side tunnel.

[0064] A cutting line is arranged on the roof of the tunnel in front of the upper section working face, and holes are drilled on the tunnel roof along the cutting line. Deep hole concentrated energy blasting or hydraulic fracturing is used to split the deep rock layer of the roof into cracks above the coal wall of the lower section parallel to the center line of the tunnel. The deep rock layer of the roof is divided into two parts along the splitting crack, one part is supported by the coal body of the upper section working face, and the other side is supported by the coal wall of the lower section, so that the tunnel roof remains balanced.

[0065] When the upper section working face is pushed through, the deep roof rock layer at the edge of the goaf area of ​​the upper section working face will break and collapse along the cleavage cracks under the pressure of the overlying rock layer, reducing the length of the cantilever beam, increasing the height of the roof falling, and forming a short arm beam structure on the goaf side, reducing the lateral support pressure and the rotation and sinking angle of the roof.

[0066] As a preferred embodiment, the analysis of production geological conditions in the first step includes but is not limited to:

[0067] Testing and analysis of mechanical properties of tunnel roof rock and coal seams;

[0068] Detection of rock formation status of tunnel roof;

[0069] Working face pressure step analysis;

[0070] Formation stress testing;

[0071] The tunnel roof rock layer characteristics test and analysis, tunnel roof rock layer status detection and analysis of the roof rock layer structure and key layer status;

[0072] The working face pressure step distance is used to analyze the possible hanging length of the goaf;

[0073] The formation stress test can analyze and determine the top cutting and pressure relief method.

[0074] Before implementing goaf-side tunneling, it is necessary to test the geomechanical properties of the roof rock layer of the goaf-side tunneling working face. The geomechanical properties analysis is divided into 4 parts: ① Testing and analysis of the mechanical properties of the tunnel roof rock layer and coal seam; ② Detection of the state of the tunnel roof rock layer; ③ Testing of the working face pressure step distance and the width of the coal wall plastic zone; ④ Testing of formation stress.

[0075] Among them, the mechanical test of the roof rock layer adopts the method of drilling and coring, and the key rock layer positions and mechanical properties of the roof rock layer are analyzed based on the coring core samples;

[0076] The roof rock state detection uses a rock detector to analyze the state of the roof rock and the development of cracks;

[0077] Conduct geostress testing and analyze the magnitude and direction of the maximum principal stress.

[0078] The tunnel roof stratum mechanical test is conducted by coring with a core sample, and the key stratum positions and mechanical properties of the roof stratum are analyzed based on the coring core sample;

[0079] The roof rock state detection uses a rock detector to analyze the state of the roof rock and the development of cracks;

[0080] Conduct formation stress tests and analyze the magnitude and direction of the maximum principal stress.

[0081] The methods of top cutting and pressure relief include but are not limited to deep hole concentrated energy blasting or hydraulic fracturing.

[0082] There are two existing methods of top cutting and pressure relief: ① deep hole concentrated energy blasting; ② hydraulic fracturing.

[0083] The construction cost of deep hole concentrated energy blasting to cut the roof and relieve pressure is high, but the cutting direction can be manually controlled to make the cutting direction parallel to the roadway, achieving the ideal cutting and pressure relief effect;

[0084] Although hydraulic fracturing and top cutting and pressure relief has a low construction cost, before the construction of top cutting and pressure relief, the direction of the maximum principal stress of the stratum where the trench is located must be tested. If the maximum principal stress is parallel to the direction of the trench, hydraulic fracturing can achieve the ideal effect.

[0085] During the roof cutting and pressure relief operation in the third step, the roof of the goaf is cut down along the coal wall of the lower section, and the roof cutting line is parallel to the center line of the drift and close to the coal wall when the drilling arrangement conditions are met;

[0086] The borehole is inclined toward the upper part of the coal wall, and the lower boundary of the top cutting is above the coal wall in the lower section. The position of the pre-splitting top cutting line is determined according to the roof rock structure and the layout of the roadway;

[0087] The upper and lower boundaries of the cutting top are determined according to the location, properties and residual expansion coefficient of the key rock formations.

[0088] In order to ensure that after the upper section working face is pushed through, the roof of the goaf is cut off along the coal wall of the lower section as much as possible, the roof cutting line should be parallel to the center line of the drift and as close to the coal wall as possible while meeting the drilling arrangement conditions.

[0089] The drill hole is inclined upwards towards the coal wall, and the lower boundary of the top cutting is above the coal wall in the lower section. The position of the pre-splitting top cutting line is determined according to the roof rock structure and the layout of the roadway.

[0090] The upper and lower boundaries of the cutting top are determined according to the location, properties and residual expansion coefficient of the key rock formations.

[0091] As a preferred implementation, the upper boundary is calculated using the following formula:

[0092]

[0093] Among them, H is the upper boundary height required for cutting the top;

[0094] h is the mining height of the working face;

[0095] k' p It is the expansion coefficient of falling gangue.

[0096] As a preferred embodiment, the lower boundary is located above the upper section drift support system.

[0097] Ensure that after the roof rock layer of the goaf area near the lower section of the coal wall collapses, the falling gangue will fill the goaf under the condition of residual expansion coefficient, and the overlying roof rock layer will be borne by the gangue in the goaf, so as to minimize the lateral concentrated stress above the coal wall in the lower section of the goaf edge.

[0098] The lower boundary must be above the upper section drift support system to ensure the stability of the top plate of the construction drift during coal mining in the upper section.

[0099] 1) Hydraulic fracturing

[0100] ① The drilling holes are arranged on the pre-crack line of the roof, and the drilling hole spacing is 5-10m, which is determined according to the hydraulic fracturing experiment;

[0101] ② Fracturing point arrangement: The bottom of the hole is the first fracturing point, and the distance between fracturing points is 3-8m;

[0102] ③High-pressure water pressure

[0103] ④Effect inspection

[0104] A) Normal pressure

[0105] During the construction process, the high-pressure water pump pressure is close.

[0106] B) Fracking sound

[0107] There was a sound of rock splitting during the construction process.

[0108] C) Drilling to see the cracks

[0109] There are obvious regeneration cracks using a peep instrument.

[0110] 2) Deep hole focused energy blasting

[0111] ① The drilling holes are arranged on the pre-crack line of the roof, and the drilling spacing is 1.5-3m, which is determined according to the blasting test;

[0112] ②Charge of the shaped tube: Fill the blasting shaped tube with emulsion explosives for standby use;

[0113] ③ Installation of shaped energy tube: Insert the shaped energy tube filled with explosives into the drilled hole one section at a time, fix it with positioning wire, install detonator and detonating cord, and then use a certain length of gun mud to seal the hole.

[0114] ④ Blasting

[0115] The detonator busbar is connected to the blaster and then blasted. The detonator ignites the explosives and the detonating cord at the same time. The detonating cord ignites the explosives at the bottom of the hole. After the explosives explode, tensile stress concentration is generated on the borehole wall at the two grooved parts, splitting along the direction of the borehole line.

[0116] ⑤Effect inspection

[0117] (a) After drilling and blasting, an inspection hole is constructed between the two drill holes on the drill hole connection line. The angle of the inspection hole is consistent with the angle of the blasting hole.

[0118] (b) Rinse the inspection hole and clean out the debris in the hole;

[0119] (c) Use a borehole peep instrument to check the pre-cracking effect of the top plate of the inspection hole. If the effect is good, use the construction parameters. If not, adjust the construction parameters until a satisfactory effect is achieved.

[0120] (4) Roof pressure calculation and lateral support pressure analysis

[0121] After the roof is cut and pressure is relieved, the suspended roof of the goaf area near the coal wall in the lower section changes from a cantilever beam structure to a short arm beam structure. The lateral support pressure above the coal pillar is analyzed, and the roof pressure of the goaf roadway roof at different positions away from the goaf is calculated.

[0122] Selection of gob-side tunnel location and calculation of coal pillar width: Determine the gob-side tunnel location and coal pillar width based on the lateral support pressure distribution and comparison of gob-side tunnel roof pressures at different locations.

[0123] Tunnel support strength and support method: Based on the calculated rock pressure above the coal pillar and the width of the coal pillar to be retained, calculate the support strength and support method required for the tunnel along the goaf.

[0124] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings.

[0125] An embodiment of a method for tunneling along a goaf with top cutting and pressure relief according to the present invention comprises the following steps:

[0126] (1) Analysis of production geological conditions

[0127] Before implementing goaf-side tunneling, it is necessary to drill and coring the top rock layer of the goaf-side tunneling working face. Depending on the changes in stratum conditions, the drilling spacing is 200m-500m.

[0128] Core samples are used to test parameters such as the unidirectional compressive strength, tensile strength, shear strength, elastic modulus, cohesion, Poisson's ratio, internal friction angle, and water softening coefficient of each rock layer.

[0129] Use rock detector to test and analyze the status of roof rock and crack development;

[0130] The working face pressure step distance and the width of the coal wall plastic zone can be used to analyze the length of the hanging roof;

[0131] Select the top cutting pressure relief method according to the angle between the maximum horizontal principal stress direction and the working face groove direction

[0132] (2) Selection of cutting top pressure relief method

[0133] If the maximum horizontal principal stress is parallel to the working face slot or the angle is small, hydraulic fracturing is selected, referring to Example 1;

[0134] Otherwise, use the deep hole concentrated energy blasting method, refer to Example 2.

[0135] (3) Top cutting pressure relief and effect inspection

[0136] In order to ensure that the roof is cut down along the coal wall as much as possible after the upper section working face is pushed through, the roof cutting line should be parallel to the center line of the drift and as close to the coal wall as possible while meeting the drilling arrangement conditions;

[0137] The borehole is inclined upwards towards the coal wall;

[0138] The lowest hydraulic fracturing point or blasting point is located above the coal wall and the position of the pre-crack cutting top line is determined according to the roof rock structure and tunnel layout.

[0139] The upper and lower boundaries of the cutting top are determined according to the location, properties and residual expansion coefficient of the key rock formations.

[0140] The upper boundary is calculated as follows:

[0141]

[0142] Among them, H is the upper boundary height required for cutting the top;

[0143] h is the mining height of the working face;

[0144] k' p It is the expansion coefficient of falling gangue.

[0145] Ensure that after the rock layer near the coal wall roof collapses, the falling gangue fills the goaf under the condition of residual expansion coefficient, and the overlying roof rock layer is borne by the gangue in the goaf, so as to minimize the lateral concentrated stress at the edge of the goaf.

[0146] The lower boundary must be above the upper section drift support system to ensure the stability of the top plate of the construction drift during coal mining in the upper section.

[0147] Embodiment 1 (hydraulic fracturing):

[0148] The 3112 working face of a certain mine mined the 3# coal seam, which was buried at a depth of about 600m and had an average thickness of about 5.3m. The full-height fully mechanized mining face was mined in one go.

[0149] Previously, the coal pillar protecting the tunnel was 50m high. In order to save coal resources, the technology of cutting the top and unloading the pressure to drive the tunnel along the goaf was adopted.

[0150] After coring, rock formation detection, and ground stress direction testing, hydraulic fracturing technology was used to cut the top and relieve pressure to drive the tunnel along the empty space.

[0151] Drilling parameters:

[0152] The top cutting drilling holes are arranged in the 3110 air inlet chute, the top cutting line is 1.0m away from the coal wall, the drilling inclination is 79°, the drilling diameter is 75mm, the hole depth is 40m, and the hole spacing is 8m.

[0153] Hydraulic fracturing parameters:

[0154] Fracturing pressure: hydraulic fracturing pressure is 25MPa~30MPa;

[0155] Fracturing point arrangement: Four fracturing points are arranged in each hole. The fracturing points are set in intact rock formations. The first fracturing point is at a hole depth of 38m, the second fracturing point is at a hole depth of 33m, the third fracturing point is at a hole depth of 27m, and the fourth fracturing point is at a hole depth of 20m.

[0156] Fracturing time: The hydraulic fracturing time is 10min to 15min.

[0157] Effect inspection: A rock detector was used to peek into the borehole after fracturing. Comparing the video with that before fracturing, it can be seen that there are obvious new cracks near each fracturing point in the borehole, indicating a good hydraulic fracturing effect.

[0158] Coal pillar width: After calculation and analysis, after top cutting and pressure relief, the coal pillar width is 5m

[0159] Tunnel support method: anchor net cable joint support, anchor row spacing 900mm, two side anchor height 600mm, rectangular layout, top anchor cable two or three intervals, row spacing 900mm. Ladder beams are welded with 18mm diameter steel bars, 100mm wide, top plate ladder beam length 2600mm, two side ladder beams 2000mm; metal mesh is woven with 10# iron wire, specifications 1000mm*3000mm, mesh 50mm*50mm, connection is overlapped, length 150mm.

[0160] The method of cutting the roof to relieve pressure and digging along the empty space was adopted. After optimization of the tunnel support design, the width of the coal pillar protecting the tunnel was reduced from 50m to 5m. An additional 330 tons of coal was recovered per meter of tunnel. The project recovered nearly 300,000 tons of coal, with an economic value of more than 100 million yuan.

[0161] Embodiment 2 (pre-splitting blasting):

[0162] A certain mine is mining the 4# coal seam, which has a burial depth of about 650m and an average thickness of about 4.8-6.8m, using top coal caving and fully mechanized mining technology.

[0163] Previously, the coal pillar protecting the tunnel was 30m high. In order to save coal resources, the technology of cutting the top and unloading the pressure and driving the tunnel along the goaf was adopted.

[0164] After coring, detecting the rock formation status and testing the direction of ground stress, deep hole concentrated energy blasting was used to cut the top and relieve pressure while excavating tunnels along the empty space.

[0165] The drilling parameters are as follows: the top cutting drilling hole is arranged in the air inlet chute of the 10301 working face, the top cutting line is 1.0m away from the coal wall, the drilling inclination angle is 80°, the drilling diameter is 75mm, the drilling length is 45m and the hole spacing is 2.5m.

[0166] Charge and blasting parameters: According to Article 359 of the 2016 version of the Coal Mine Safety Regulations, "(V) When blasting deep holes, the length of the mud seal shall not be less than 1 / 3 of the hole depth." The borehole is 45m long, of which 15-45m is charged, 0-15m is sealed, the diameter of the charge roll is φ46mm, and the charge per hole for drilling and blasting is 54kg.

[0167] Coal pillar width: After calculation and analysis, the coal pillar width is 10m

[0168] Tunnel support method: The tunnel adopts anchor mesh cable joint support. The top anchor rod row spacing is 900mm, the spacing is 800mm, there are 7 top anchor rods in total, the anchor rods on both sides are 350mm away from the two sides of the coal wall, and the tray specification is 150mm*150mm*8mm; there are 4 side anchor rods on each side, the anchor height is 400mm, and the top anchor rod is 700mm away from the roof; the top anchor cable row spacing is 900mm, the spacing is 1800mm, and the "2-3-2-3-2" arrangement is adopted; the ladder beam is welded with 18mm diameter steel bars, the width is 100mm, the top plate ladder beam is 5100mm long, and the two-side ladder beam is 2800mm; the metal mesh is woven with 10# iron wire, the specification is 1505mm*8500mm, the mesh is 50mm*50mm, the connection is overlapped, and the length is 150mm.

[0169] The method of cutting the roof to relieve pressure and digging along the empty space was adopted. After optimization of the tunnel support design, the width of the coal pillar protecting the tunnel was reduced from 30m to 10m. An additional 160 tons of coal was recovered per meter of tunnel. The project recovered nearly 200,000 tons of coal, with an economic value of nearly 100 million yuan.

[0170] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In the description of the present invention, unless otherwise specified and limited, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a mechanical connection or an electrical connection, or it can be the internal communication of two elements, it can be a direct connection, or it can be an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0171] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for reducing roof pressure in gob-side tunneling by removing pressure from the roof. It is characterized in that include: Step 1: Analyze the production geological conditions of the top rock layer of the working face where goaf-side tunneling is required; Step 2: Select the top cutting and pressure relief method according to the analysis results of the production geological conditions in the first step; Step 3: Perform the top cutting and pressure relief operation according to the method selected in the second step and inspect the pressure relief effect after the top cutting and pressure relief operation. During the top cutting and pressure relief operation, the top plate of the goaf is cut down along the coal wall of the lower section, and the top plate cutting line is parallel to the center line of the drift and close to the coal wall when the drilling arrangement conditions are met; The borehole is inclined toward the upper part of the coal wall, and the lower boundary of the top cutting is above the coal wall in the lower section. The position of the pre-splitting top cutting line is determined according to the roof rock structure and the layout of the roadway; Determine the upper and lower boundaries of the top cutting according to the location, properties and residual expansion coefficient of the key rock formations; The upper boundary is calculated using the following formula: Among them, H is the upper boundary height required for cutting the top; h is the mining height of the working face; k' p is the expansion coefficient of falling gangue; The lower boundary is located above the upper section drift support system; Step 4: After the roof is cut and pressure is relieved in step 3, the roof pressure is calculated and the lateral support pressure is analyzed; Step 5: According to the lateral support pressure distribution in step 4 and the comparison of roof pressures of gob-side tunnels at different positions, determine the position of gob-side tunnels and the width of coal pillars; Step 6: Based on the rock pressure above the coal pillar calculated in the fifth step and the width of the coal pillar to be retained, calculate the support strength and support method required for the gob-side tunnel.

2. A method for reducing roof pressure in gob-side tunneling by top cutting and pressure relief according to claim 1, It is characterized in that The analysis of production geological conditions in the first step includes but is not limited to: Testing and analysis of mechanical properties of tunnel roof rock and coal seams; Detection of rock formation status of tunnel roof; Working face pressure step analysis; Formation stress testing; The tunnel roof rock layer characteristics test and analysis, tunnel roof rock layer status detection and analysis of the roof rock layer structure and key layer status; The working face pressure step distance is used to analyze the possible hanging length of the goaf; The formation stress test can analyze and determine the top cutting and pressure relief method and the size of hydraulic fracturing.

3. A method for reducing roof pressure in gob-side tunneling by top cutting and pressure relief according to claim 2, It is characterized in that The tunnel roof stratum mechanical test is conducted by coring with a core sample, and the key stratum positions and mechanical properties of the roof stratum are analyzed based on the coring core sample; The roof rock state detection uses a rock detector to analyze the state of the roof rock and the development of cracks; Conduct formation stress tests and analyze the magnitude and direction of the maximum principal stress.

4. A method for reducing roof pressure in gob-side tunneling by top cutting and pressure relief according to claim 3, It is characterized in that The methods of top cutting and pressure relief include deep hole concentrated energy blasting or hydraulic fracturing.

Citation Information

Patent Citations

  • Coal mine rock stratum mobile control mining-filling-preserving coupled coordination mining method

    CN103437765A

  • Old empty water waterproof coal pillar setting-up method

    CN104329092A

  • Method for determining reasonable width of gob-side entrydriving narrow coal pillar

    CN104594899A

  • Method for determining rational width of setting-up coal pillar of island working face

    CN106761746A

  • Width setting and protection method of main downhill protection road coal pillar of large mining depth strong impact thick coal seam

    CN107165634A