A kind of net sprayed concrete structure between piles of retaining pile foundation pit and construction method
By arranging steel bars A at an angle in the retaining pile foundation pit and coordinating the reinforcing bars and positioning mechanism, the problem of the steel mesh falling off during construction was solved, the construction efficiency and concrete quality were improved, and cracking was reduced.
Patent Information
- Application Number
- CN202110509476.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-11
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-05-11
AI Technical Summary
During the spray concrete construction of the mesh between piles in the retaining pile foundation pit, the steel mesh is easy to fall off, resulting in concrete cracking and low construction efficiency.
Use inclined steel bars A to be implanted into the pile body, and install reinforcing bars and steel mesh pieces on them, which are fixed with a positioning mechanism to ensure that the steel mesh pieces do not fall off during the concrete construction process.
It effectively prevents the steel mesh from falling off, improves construction efficiency, controls the thickness and quality of concrete, and reduces concrete cracking.
Smart Images

Figure CN113106984B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete construction between retaining piles, and more specifically to a construction method of a mesh shotcrete structure between retaining pile foundation pit piles. Background Art
[0002] In the conventional method of spraying concrete with supporting pile mesh, generally after the pile construction is completed, along with the excavation of the earthwork, the reinforcement is planted, the steel mesh is hung, and the transverse reinforcement and vertical reinforcement are installed. After the steel mesh is installed, the concrete is sprayed. The concrete of this method often has the quality problem of cracking. At the same time, because the embedded reinforcement is vertically embedded in the pile body horizontally, the steel mesh is hung on the horizontal embedded reinforcement. When the steel mesh is tied, the transverse reinforcement of the steel mesh is easy to fall off, reducing the construction efficiency. How to improve the construction speed of the steel mesh installation and reduce the cracking of the mesh sprayed concrete surface has always been a problem considered by technical personnel in this field. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a mesh sprayed concrete structure between piles of a retaining pile foundation pit and a construction method, which can effectively prevent the sprayed concrete from cracking and prevent the reinforcing bars and steel mesh from falling off during the concrete construction process.
[0004] The solution adopted by the present invention to solve the technical problem is:
[0005] A mesh shotcrete structure between piles of a retaining pile foundation pit comprises a steel mesh structure, concrete sprayed on the steel mesh structure, the steel mesh structure is arranged obliquely and has a plurality of steel bars A with one end respectively implanted in a pile body, reinforcing bars installed on the plurality of steel bars A, a steel mesh installed on a side of the reinforcing bars away from the steel bars A, and a positioning mechanism installed on a side of the steel mesh away from the reinforcing bars.
[0006] A plurality of steel bars A are respectively implanted into the pile bodies of a plurality of retaining piles, wherein the steel bars A on the pile body of each retaining pile are arranged along the axial direction of the pile body of the retaining pile and are on the same plane and on the outer surface of the pile body; thereby forming a support structure to support the reinforcing bars and the steel mesh, and the inclined setting will effectively prevent the reinforcing bars and the steel mesh from falling off during the concrete construction process; the positioning mechanism cooperates with the reinforcing bars to effectively fix the steel mesh.
[0007] In some possible implementations, in order to effectively install the reinforcing bars and the steel mesh on the steel bars A without slipping, the angle formed by the steel bars A and the axis of the pile body is a, 30°≤a≤60°.
[0008] In some possible implementations, the reinforcing bars include a plurality of reinforcing vertical bars arranged along the axial direction of the pile body and connected to the steel bar A, and a plurality of reinforcing transverse bars perpendicular to the plurality of reinforcing vertical bars and connected to the steel bar A.
[0009] In some possible implementations, in order to make the concrete between two adjacent retaining piles form a whole, the length of the reinforcing transverse reinforcement is the circumference of the foundation pit.
[0010] In some possible implementations, the distance between the two adjacent reinforcing transverse ribs along their axial direction is 1 m; and the distance between the two adjacent reinforcing vertical ribs along their axial direction is 1 m.
[0011] In some possible implementations, the positioning mechanism is a steel bar B, the axial direction of the steel bar B is perpendicular to the axial direction of the pile body, and the distance between two adjacent steel bars B is 2m.
[0012] In some possible implementations, the horizontal projection of the exposed portion of the steel bar A is consistent with the thickness of the concrete.
[0013] on the other hand;
[0014] A construction method for a retaining pile foundation pit inter-pile sprayed concrete structure specifically comprises the following steps:
[0015] Steel bar A embedded;
[0016] Installation of reinforcement ribs;
[0017] Steel mesh installation;
[0018] Pressed rib installation;
[0019] Shotcrete.
[0020] In some possible implementations, the embedding of the steel bars A specifically refers to: embedding multiple steel bars A in the same pile body, the multiple steel bars A are arranged at equal intervals along the axial direction of the pile body, and the interval is 1m; the axes of the multiple steel bars A on the same pile body are in the same plane.
[0021] In some possible implementations, in order to effectively realize the installation of reinforcing ribs, steel meshes, and compression ribs, welding or binding connections are used during the installation of reinforcing ribs, steel meshes, and compression ribs.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] The present invention installs reinforcement by tilting the reinforcement A, which effectively avoids the reinforcement and reinforcement mesh installed on the reinforcement A from falling off, thereby affecting the construction efficiency.
[0024] The present invention makes the exposed length of the steel bar A consistent with the thickness of the concrete structure, so that it is convenient to effectively control the thickness of the concrete during the construction process. When the embedded steel bar is not visible during the spraying of concrete, the thickness required by the design is reached, and the quality is easier to control. During the inspection and acceptance, it is only necessary to check whether the embedded steel bar is exposed, which is convenient and quick.
[0025] The present invention uses the interaction between the reinforcing ribs and the compression ribs to effectively fix the steel mesh between the two, and effectively prevents the steel mesh from being greatly moved by the impact force of the spraying during the spraying of concrete, thereby affecting the quality of the concrete.
[0026] The present invention effectively prevents concrete cracking under the joint action of reinforcing bars, steel mesh and compression bars. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings mentioned in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0028] Figure 1 is a top view of the concrete structure of the present invention;
[0029] Figure 2 for Figure 1 Sectional view at AA in the middle;
[0030] Figure 3 is a side view of the present invention;
[0031] Among them: 1. Pile body; 2. Steel bar A; 3. Strengthening transverse bars; 4. Strengthening vertical bars; 5. Steel mesh; 6. Compression bars. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention. Therefore, the detailed description of the embodiments of the present invention provided below is not intended to limit the scope of the claimed invention, but merely represents the selected embodiments of the present invention.
[0033] In the description of the present invention, it is necessary to understand that the terms indicating orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0034] In the drawings of the present invention, it is necessary to understand that different technical features that are not mutually replaceable are shown in the same drawing only for the purpose of simplifying the description of the drawings and reducing the number of drawings, rather than indicating or implying that the embodiments described with reference to the drawings include all the technical features in the drawings. Therefore, it cannot be understood as a limitation of the present invention.
[0035] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral body; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. The "first", "second" and similar words mentioned in this application do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, "one" or "one" and other similar words do not indicate a quantity restriction, but indicate the existence of at least one. In the implementation of this application, "and / or" describes the association relationship of the associated objects, indicating that there can be three relationships, for example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In the description of the embodiments of the present application, unless otherwise specified, the meaning of "multiple" refers to two or more. For example, multiple positioning columns refer to two or more positioning columns. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0036] The present invention is described in detail below.
[0037] like Figure 1-Figure 3 As shown;
[0038] A mesh shotcrete structure between piles of a retaining pile foundation pit comprises a steel mesh structure, concrete sprayed on the steel mesh structure, the steel mesh structure is inclined and one end of which is respectively embedded in a pile body 1, reinforcing bars installed on the steel bars A2, a steel mesh 5 installed on the side of the reinforcing bars away from the steel bars A2, and a positioning mechanism installed on the side of the steel mesh 5 away from the reinforcing bars.
[0039] A plurality of steel bars A2 are respectively implanted into the pile bodies 1 of a plurality of retaining piles, wherein the steel bars A2 on the pile body 1 of each retaining pile are arranged along the axial direction of the pile body 1 of the retaining pile, and are on the same plane and located on the outer surface of the pile body 1; thereby forming a support structure to support the reinforcing bars and the steel mesh 5, and the inclined setting will effectively prevent the reinforcing bars and the steel mesh 5 from falling off during the concrete construction process; the positioning mechanism cooperates with the reinforcing bars to effectively fix the steel mesh 5.
[0040] In some possible implementations, in order to effectively install the reinforcing bar and the steel mesh 5 on the steel bar A2 without slipping, the angle formed by the steel bar A2 and the axis of the pile body 1 is a, 30°≤a≤60°.
[0041] In some possible implementations, the reinforcing bars include a plurality of reinforcing vertical bars 4 axially arranged along the pile body 1 and connected to the steel bars A2 , and a plurality of reinforcing transverse bars 3 perpendicular to the plurality of reinforcing vertical bars 4 and connected to the steel bars A2 .
[0042] In some possible implementations, in order to make the concrete between two adjacent retaining piles form a whole, the length of the reinforcing transverse reinforcement 3 is the circumference of the foundation pit.
[0043] In some possible implementations, the distance between the two adjacent reinforcing transverse ribs 3 along the axial direction thereof is 1 m; and the distance between the two adjacent reinforcing vertical ribs 4 along the axial direction thereof is 1 m.
[0044] In some possible implementations, such as Figure 3 As shown, the positioning mechanism is a steel bar B, the axial direction of the steel bar B is perpendicular to the axial direction of the pile body 1, and the distance between two adjacent steel bars B is 2m.
[0045] In some possible implementations, the horizontal projection of the exposed portion of the steel bar A2 is consistent with the thickness of the concrete.
[0046] The horizontal projection of the exposed part of the embedded reinforcement is consistent with the concrete thickness required by the design. This makes it easy to control the thickness of the shotcrete. When the embedded reinforcement is not visible during shotcrete spraying, the thickness required by the design is reached, and the quality is easier to control. During inspection and acceptance, it is only necessary to check whether the embedded reinforcement is exposed, which is convenient and quick.
[0047] on the other hand;
[0048] A construction method for a retaining pile foundation pit inter-pile sprayed concrete structure specifically comprises the following steps:
[0049] Steel bar A2 planting: After the construction of the retaining piles is completed, the steel bar A2 planting work is carried out along with the earth excavation.
[0050] Wherein the planting angle is different from the conventional horizontal implantation perpendicular to the pile body 1, the inclination angle is a;
[0051] Preferably, a is 30 °;
[0052] At the same time, the depth of the implant hole and the length of the implanted reinforcement are calculated during the processing to ensure that the horizontal projection of the exposed implanted reinforcement is consistent with the thickness of the sprayed concrete required by the design.
[0053] The inclined setting realizes the planting of reinforcement, which mainly makes the reinforcement and the steel mesh less likely to fall off when they are installed and hung on the planting reinforcement, thereby improving the construction efficiency.
[0054] Installation of reinforcing ribs; installation of reinforcing transverse ribs 3 and reinforcing vertical ribs 4. The embedding depth of reinforcing transverse ribs 3 and reinforcing vertical ribs 4 is 16mm, with a spacing of 1000mm*1000mm. The reinforcing ribs play a role in positioning and strengthening the overall stability of the steel mesh 5.
[0055] The steel mesh 5 is installed; the steel mesh 5 includes transverse steel bars and vertical steel bars with a diameter of 8mm, and the spacing between them is 150mm. The steel mesh 5 is fixed by connecting with the reinforcing ribs, and the connection here can be welding or binding connection;.
[0056] The compression bar 6 is installed; the compression bar 6 is installed on the side of the steel mesh 5 away from the reinforcement bar, and is welded to the steel bar A2 and the steel mesh 5 respectively. The compression bar 6 mainly fixes the steel mesh 5 to prevent the steel mesh 5 from being greatly moved by the impact force of the spraying during the spraying of concrete, thereby affecting the quality of the concrete. If necessary, vertical compression bars 6 are installed, and the spacing is the same as the spacing of the support piles;
[0057] Preferably, the ribs 6 are 16 mm thick steel bars.
[0058] Shotcrete; preferably, the concrete is graded C20.
[0059] In some possible implementations, the embedding of the steel bars A2 specifically refers to: embedding multiple steel bars A2 in the same pile body 1, and the multiple steel bars A2 are arranged at equal intervals along the axial direction of the pile body 1, with a spacing of 1m; the axes of the multiple steel bars A2 on the same pile body 1 are in the same plane.
[0060] In some possible implementations, in order to effectively realize the installation of the reinforcing ribs, the steel mesh 5 and the compression ribs 6, welding or binding connections are adopted during the installation of the reinforcing ribs, the steel mesh 5 and the compression ribs 6.
[0061] The present invention prevents the installed steel mesh from falling off during the installation of steel bars. When spraying concrete, the steel mesh 5 is greatly moved by the impact force of the spraying. At the same time, it is easy to control the thickness of the sprayed concrete and avoid uneven thickness of the mesh sprayed concrete surface layer. At the same time, due to the reinforcement, steel mesh and compression ribs 6, a good anti-cracking effect is played, which effectively reduces the cracking of concrete.
[0062] The present invention is not limited to the above-mentioned specific embodiments, but extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.
Claims
1. A construction method for a retaining pile foundation pit inter-pile net shotcrete structure, based on the retaining pile foundation pit inter-pile net shotcrete structure, characterized in that: The inter-pile net sprayed concrete structure based on the retaining pile foundation pit includes a steel mesh structure and concrete sprayed on the steel mesh structure; it is characterized in that the steel mesh structure is arranged obliquely and has a plurality of steel bars A with one end respectively embedded in the pile body, reinforcing bars installed on the plurality of steel bars A, a steel mesh installed on the side of the reinforcing bars away from the steel bars A, and a positioning mechanism installed on the side of the steel mesh away from the reinforcing bars; the angle formed by the steel bars A and the axis of the pile body is a, 30°≤a≤60°; the reinforcing bars include a plurality of reinforcing vertical bars arranged along the axial direction of the pile body and connected to the steel bars A, and a plurality of reinforcing transverse bars perpendicular to the plurality of reinforcing vertical bars and connected to the steel bars A; the length of the reinforcing transverse bars is the circumference of the foundation pit; the spacing between two adjacent reinforcing transverse bars along their axial direction is 1m; the spacing between two adjacent reinforcing vertical bars along their axial direction is 1m; the positioning mechanism is a steel bar B, the axial direction of the steel bar B is perpendicular to the axial direction of the pile body, and the spacing between two adjacent steel bars B is 2m; the horizontal projection of the exposed part of the steel bar A is consistent with the thickness of the concrete; The specific steps include: Steel bar A planting; the steel bar A planting specifically refers to: multiple steel bars A are planted in the same pile body, and the multiple steel bars A are evenly spaced along the axial direction of the pile body, with a spacing of 1m; the axes of the multiple steel bars A on the same pile body are in the same plane; Reinforcement installation; Steel mesh installation; Reinforcement installation; Shotcrete.
2. The construction method of a retaining pile foundation pit between piles according to claim 1 is characterized in that: During the installation of reinforcement bars, steel mesh and compression bars, welding or binding connections are used.
Citation Information
Patent Citations
Pile-to-pile net shotcrete supporting construction method
CN108999196A
Adopt fixed reinforcing bar of inflation formula to net suspended net ejector anchor envelope between stake of piece
CN206467667U
Fixing structure for reinforcing meshes between high-strength prestressed pipe piles
CN209742390U
Screen-shotcreting concrete structure between support piles
CN215594040U
Earth retaining work structure and ground excavation method
JP2001107361A