Through the high-precision connecting structure and overlapping platform of the prefabricated building frame system, environmental pollution, long construction period and poor quality problems in traditional cast-in-place construction are solved, and construction simplification and efficiency improvement are achieved.
Patent Information
- Application Number
- CN202110170983.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-08
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-02-08
AI Technical Summary
Traditional cast-in-place construction has problems such as environmental pollution, waste of water resources, noise pollution, long construction period and poor quality, and requires a large number of formwork and support parts to be erected, which is complex and time-consuming.
The prefabricated building frame system is adopted, and through the high-precision connecting structure and overlapping platform of prefabricated columns and prefabricated beams, the dependence on the support is reduced, the construction process is simplified, and the construction efficiency and accuracy are improved.
High-precision positioning of prefabricated beam joints and prefabricated columns is achieved, the construction process is simplified, the construction period and workload are reduced, and the construction quality and efficiency are improved.
Smart Images

Figure CN113152663B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to an assembled building frame system. Background Art
[0002] There are two construction methods in the field of building construction: traditional cast-in-place and prefabricated assembly. With the continuous improvement and development of construction technology, prefabricated assembly construction is becoming more and more widely used.
[0003] Traditional cast-in-place operations produce a lot of garbage, and the disposal of construction waste has always been a major problem that has plagued urban development; a large number of wet cast-in-place operations have serious environmental pollution, waste of water resources, dust pollution, noise pollution and other very serious problems, and the cast-in-place construction method also has disadvantages such as long construction period and poor construction quality.
[0004] Cast-in-place beams and columns require a large number of formworks and supports, which are complex to erect and take a long time to construct. Summary of the invention
[0005] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes an assembled building frame system, which does not require the installation of support members to support prefabricated panels during construction, is convenient and stable to construct, saves man-hours, and has high dimensional positioning accuracy between prefabricated beams and prefabricated columns during installation.
[0006] According to an embodiment of the present invention, the prefabricated building frame system includes: a plurality of prefabricated columns, a first connection structure is provided between the upper and lower prefabricated columns, and the columns are connected by the first connection structure, and the sides of the prefabricated columns are provided with prefabricated beam joints integrally cast with the prefabricated columns; prefabricated beams, one end of the prefabricated beams is butt-jointed with the prefabricated beam joints, a second connection structure is provided between the prefabricated beams and the prefabricated beam joints, the prefabricated beams are connected by the second connection structure, concrete is poured at the joints, a lap platform is provided on the long side of the prefabricated beams, and the plane of the lap platform is lower than the top surface of the prefabricated beams; prefabricated panels, the prefabricated panels are placed on the lap platform, and concrete is poured on the top surface of the prefabricated beams to connect the prefabricated panels to the prefabricated beams.
[0007] The prefabricated building frame system according to the embodiment of the present invention has at least the following technical effects: the prefabricated beam joints and the prefabricated columns are cast in one piece, and the relative position dimensions of the prefabricated beam joints and the prefabricated columns have high precision and low error; the prefabricated beam joints are connected to the prefabricated beams, the construction is simple and fast, and the position dimensions of the prefabricated beams are determined; the prefabricated panels are directly placed on the overlapping platform, and there is no need to set up supports to reduce workload and shorten construction period.
[0008] In some embodiments of the present invention, the first connection structure includes a plurality of connection steel bars embedded in the upper end of the prefabricated column and a connection hole arranged at the lower end of the prefabricated column, the connection steel bars extend out of the end face of the prefabricated column, and the connection hole is provided with a grouting hole for grouting.
[0009] In some embodiments of the present invention, the first connection structure includes two groups of first overlapping steel bars, which are respectively embedded at two ends of the prefabricated column and axially extend out of the end surface of the prefabricated column.
[0010] In some embodiments of the present invention, the second connection structure is a plurality of second lap steel bars, the second lap steel bars are embedded in the precast beam joint and the end of the precast beam, and the second lap steel bars extend out of the precast beam joint and the end face of the precast beam.
[0011] In some embodiments of the present invention, the second connection structure is a plurality of overlapping steel plates, the overlapping steel plates are pre-embedded in the precast beam joints and the ends of the precast beams, and the overlapping steel plates are laterally parallel and spaced apart and extend out of the precast beam joints and the end faces of the precast beams.
[0012] In some embodiments of the present invention, a first protrusion is provided at the end of the prefabricated beam joint, a second protrusion is correspondingly provided at the end of the prefabricated beam, and the overlapping steel plates are arranged transversely and parallelly at intervals on the ends of the first protrusion and the second protrusion.
[0013] In some embodiments of the present invention, a positioning device is provided between the prefabricated panel and the overlapping platform, and the positioning device includes a positioning ridge and a positioning groove. The positioning ridge is parallel to the long side of the prefabricated beam and is arranged on the overlapping platform. The positioning groove is correspondingly opened on one side of the prefabricated panel. The prefabricated panel is placed on the overlapping platform, and the positioning ridge and the positioning groove are wedged with each other.
[0014] In some embodiments of the present invention, a positioning device is provided between the prefabricated panel and the overlapping platform, the positioning device includes positioning ribs and positioning holes, a plurality of positioning ribs are vertically provided on the overlapping platform, a corresponding number of positioning holes are provided on one side where the prefabricated panel and the prefabricated beam are overlapped, the positioning ribs pass through the positioning holes, so that the prefabricated panel can be placed on the overlapping platform.
[0015] In some embodiments of the present invention, a plurality of reinforcing ribs are embedded in the top surface of the precast beam, the height of the reinforcing ribs is higher than that of the precast board, a steel mesh is laid on the precast board, the steel mesh is overlapped with the reinforcing ribs, and a layer of post-cast concrete is poured above the precast beam and the precast board, and the post-cast concrete layer covers the steel mesh and the reinforcing ribs.
[0016] In some embodiments of the present invention, the upper surface of the prefabricated panel is provided with a rough surface or a corrugated surface.
[0017] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0019] Figure 1 It is a structural schematic diagram of an embodiment of the present invention;
[0020] Figure 2 A partial enlarged view of a connection node in an embodiment of the present invention;
[0021] Figure 3 A schematic diagram of the connection structure of the connecting steel bar and the connection hole of the present invention;
[0022] Figure 4 This is a schematic diagram of the connection structure of the prefabricated column and the prefabricated beam of the present invention;
[0023] Figure 5 This is a schematic diagram of the structure of the present invention using overlapping steel plates for connection;
[0024] Figure 6 A schematic diagram of the structure of the present invention with a first protrusion and a second protrusion;
[0025] Figure 7 It is a schematic diagram of the matching structure of the positioning convex strip and the positioning groove of the present invention;
[0026] Figure 8 It is a schematic diagram of the matching structure of the positioning rib and the positioning hole of the present invention;
[0027] Fig. 9 It is a schematic structural diagram of the post-cast concrete layer of the present invention.
[0028] Reference numerals:
[0029] Prefabricated column 100, first connection structure 110, connection steel bar 111, connection hole 112, pouring hole 113, first lap steel bar 114;
[0030] Precast beam joint 120, first protrusion 121, second protrusion 122, second connection structure 130, second lap steel bar 131, lap steel plate 132;
[0031] Prefabricated beam 200, overlapping platform 210, positioning convex strip 211, positioning groove 212, positioning rib 213, positioning hole 214, reinforcing rib 220;
[0032] Precast panel 300 , steel mesh 310 , and post-cast concrete layer 320 . DETAILED DESCRIPTION
[0033] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0034] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0035] In the description of the present invention, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood as not including the number itself, and "above", "below", "within" etc. are understood as including the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0036] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention in combination with the specific content of the technical solution.
[0037] Reference Figure 1 and Figure 2 As shown, the prefabricated building frame system according to an embodiment of the present invention includes: a plurality of prefabricated columns 100, a first connection structure 110 is provided between the upper and lower prefabricated columns 100, and the columns are connected by the first connection structure 110, and the side of the prefabricated column 100 is provided with a prefabricated beam joint 120 integrally cast with the prefabricated column 100; a prefabricated beam 200, one end of the prefabricated beam 200 is butt-jointed with the prefabricated beam joint 120, a second connection structure 130 is provided between the prefabricated beam 200 and the prefabricated beam joint 120, and the prefabricated beam 200 and the prefabricated beam joint 120 are connected by the second connection structure 130, concrete is poured at the connection, a lap platform 210 is provided on the long side of the prefabricated beam 200, and the plane of the lap platform 210 is lower than the top surface of the prefabricated beam 200; a prefabricated board 300, the prefabricated board 300 is placed on the lap platform 210, and concrete is poured on the top surface of the prefabricated beam 200 to connect the prefabricated board 300 with the prefabricated beam 200.
[0038] The precast columns 100, precast beams 200 and precast panels 300 are all precast from concrete. When the precast beam joints 120 and the precast columns 100 are integrally cast and formed, their relative positions are already determined. During on-site assembly construction, the installation positions of each precast column 100 are first determined. The upper and lower precast columns 100 are connected by a first connection structure 110, and then concrete is poured or grouting is performed at the connection nodes to fix them. Thus, the corresponding positions of the precast beam joints 120 on each precast column 100 are also determined. Two adjacent precast columns 100 are connected by precast beams 200. The precast beams 200 are erected, and the two ends are aligned with the corresponding precast beam joints 120. The precast beams 200 are connected to the precast beam joints 120 by the second connection structure 130, and concrete is poured at the connection points. The construction is simple and the construction accuracy is guaranteed.
[0039] When installing the precast panel 300, the precast panel 300 is placed on the overlapping platform 210 on the overlapped precast beam 200 and fixed to ensure that the installation dimensions between the precast panel 300 and the precast beam 200 are accurate, and then concrete is poured to connect the precast panel 300 and the precast beam 200.
[0040] Reference Figure 3 As shown, in some embodiments of the present invention, the first connection structure 110 includes a plurality of connecting steel bars 111 embedded in the upper end of the prefabricated column 100 and a connecting hole 112 arranged at the lower end of the prefabricated column 100, the connecting steel bars 111 extend out of the end face of the prefabricated column 100, and the connecting hole 112 is provided with a grouting hole 113 for grouting.
[0041] When installing the prefabricated column 100, align the connection hole 112 at the lower end of the prefabricated column 100 with the connection steel bar 111 of the prefabricated column 100 installed in the lower layer, insert the connection steel bar 111 into the connection hole 112, and then use the grouting equipment to pour the grouting material from the pouring hole 113 to fill the gap.
[0042] Reference Figure 4 As shown, in some embodiments of the present invention, the first connection structure 110 includes two groups of first lap steel bars 114, which are respectively embedded at both ends of the prefabricated column 100 and axially extend out of the end surface of the prefabricated column 100.
[0043] When installing the prefabricated column 100, the first lapped steel bars 114 at the lower end of the prefabricated column 100 are overlapped with the first lapped steel bars 114 at the upper end of the prefabricated column 100 installed in the lower layer, and after being firmly tied, the concrete is poured on site by supporting the formwork.
[0044] Reference Figure 4As shown, in some embodiments of the present invention, the second connection structure 130 is a plurality of second lap steel bars 131, the ends of the precast beam joint 120 and the precast beam 200 are both pre-embedded with second lap steel bars 131, and the second lap steel bars 131 extend out of the end faces of the precast beam joint 120 and the precast beam 200.
[0045] The precast beam 200 and the precast beam joint 120 are connected by the second lap steel bars 131. When the precast beam 200 is erected, the second lap steel bars 131 between the end of the precast beam 200 and the precast beam joint 120 are overlapped with each other, tied firmly, and then concrete is poured at the connection node.
[0046] Reference Figure 5 As shown, in some embodiments of the present invention, the second connection structure 130 is a plurality of overlapping steel plates 132, and the ends of the prefabricated beam joint 120 and the prefabricated beam 200 are both pre-embedded with overlapping steel plates 132, and the overlapping steel plates 132 are distributed in parallel and spaced apart transversely and extend out of the end faces of the prefabricated beam joint 120 and the prefabricated beam 200.
[0047] The precast beam 200 and the precast beam joint 120 are connected by a lap steel plate 132. When the precast beam 200 is erected, the lap steel plates 132 between the end of the precast beam 200 and the precast beam joint 120 are staggered and overlapped, and then formwork is supported and concrete is poured at the connection node.
[0048] Reference Figure 6 As shown, in some embodiments of the present invention, a first protrusion 121 is provided at the end of the prefabricated beam joint 120, a second protrusion 122 is correspondingly provided at the end of the prefabricated beam 200, and the lap steel plates 132 are arranged horizontally and parallelly at intervals on the ends of the first protrusion 121 and the second protrusion 122.
[0049] When the precast beam 200 is butt-jointed with the precast beam joint 120, the precast beam 200 and the precast beam joint 120 are first placed horizontally, and then inserted from the outside to the inside so that the second protrusion 122 is aligned with the first protrusion 121, and the lap steel plates 132 between the precast beam 200 and the precast beam joint 120 can be staggered and overlapped, and concrete is poured at the connection node between the precast beam joint 120 and the precast beam 200. This structure allows the concrete bonding area to be larger and the node shear resistance to be stronger.
[0050] Reference Figure 7 As shown, in some embodiments of the present invention, a positioning device is provided between the prefabricated panel 300 and the overlapping platform 210, and the positioning device includes a positioning ridge 211 and a positioning groove 212. The positioning ridge 211 is parallel to the long side of the prefabricated beam 200 and is arranged on the overlapping platform 210. The positioning groove 212 is correspondingly opened on one side of the prefabricated panel 300. The prefabricated panel 300 is placed on the overlapping platform 210, and the positioning ridge 211 and the positioning groove 212 are wedged with each other.
[0051] When placing the prefabricated panel 300, the positioning groove 212 is aligned with the positioning ridge 211, and they are wedged together to assist in positioning, thereby improving construction efficiency and ensuring construction accuracy. After the prefabricated panel 300 is placed, the positioning ridge 211 restricts the positioning groove 212 from moving, thereby preventing the prefabricated panel 300 from being moved by external force and falling.
[0052] Reference Figure 8 As shown, in some embodiments of the present invention, a positioning device is provided between the precast panel 300 and the overlapping platform 210, and the positioning device includes positioning ribs 213 and positioning holes 214. A plurality of positioning ribs 213 are vertically provided on the overlapping platform 210, and a corresponding number of positioning holes 214 are provided on one side where the precast panel 300 and the precast beam 200 overlap. The positioning ribs 213 pass through the positioning holes 214, so that the precast panel 300 can be placed on the overlapping platform 210.
[0053] When placing the prefabricated board 300, after the positioning ribs 213 are passed through the positioning holes 214, the prefabricated board 300 is placed on the overlapping platform 210, and the positioning ribs 213 cooperate with the positioning holes 214 to achieve positioning, thereby ensuring the accuracy of the construction dimensions; after the prefabricated board 300 is placed, the positioning ribs 213 restrict the positioning holes 214 from moving, thereby preventing the prefabricated board 300 from being moved by external forces and thus falling.
[0054] Reference Fig. 9 As shown, in some embodiments of the present invention, a plurality of reinforcing ribs 220 are embedded in the top surface of the precast beam 200, the height of the reinforcing ribs 220 is higher than the precast plate 300, a steel mesh 310 is laid on the precast plate 300, the steel mesh 310 overlaps the reinforcing ribs 220, and a post-cast concrete layer 320 is poured on the precast beam 200 and the precast plate 300, and the post-cast concrete layer 320 covers the steel mesh 310 and the reinforcing ribs 220.
[0055] Pouring another layer of post-cast concrete layer 320 on top of the precast slab 300 and the precast beam 200 can improve the bearing capacity of the overall connection structure and make the building structure more solid. After the post-cast concrete layer 320 solidifies, the steel mesh 310 is in the post-cast concrete layer 320, which plays a role in bearing tension and resisting shear force; the reinforcing ribs 220 can improve the internal tensile and shear resistance of the post-cast concrete layer 320 above the precast beam 200.
[0056] In some embodiments of the present invention, the upper surface of the precast panel 300 is provided with a rough surface or a corrugated surface. Compared with the smooth surface, the rough surface can make the bonding between the post-cast concrete layer 320 and the precast panel 300 stronger; and the corrugated surface allows the concrete to cover and fill all the valleys, so that a better shear structure is formed between the precast panel 300 and the post-cast concrete layer 320, thereby improving the overall force performance.
[0057] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0058] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. An assembled building frame system, characterized in that: include: A plurality of prefabricated columns (100), wherein a first connection structure (110) is provided between the upper and lower prefabricated columns (100) and the prefabricated columns (100) are connected via the first connection structure (110), and the side surfaces of the prefabricated columns (100) are provided with prefabricated beam joints (120) integrally cast with the prefabricated columns (100); A precast beam (200), one end of the precast beam (200) being butt-jointed with the precast beam joint (120), a second connection structure (130) being provided between the precast beam (200) and the precast beam joint (120), and being connected via the second connection structure (130), concrete being poured at the connection, a lap joint platform (210) being provided on the long side of the precast beam (200), and a plane of the lap joint platform (210) being lower than a top surface of the precast beam (200); A precast plate (300), the precast plate (300) is placed on the overlap platform (210), and concrete is poured on the top surface of the precast beam (200) to connect the precast plate (300) with the precast beam (200); A positioning device is provided between the prefabricated board (300) and the overlapping platform (210), and the positioning device comprises a positioning convex strip (211) and a positioning groove (212). The positioning convex strip (211) is parallel to the long side of the prefabricated beam (200) and is arranged on the overlapping platform (210). The positioning groove (212) is correspondingly opened on one side of the prefabricated board (300). The prefabricated board (300) is placed on the overlapping platform (210), and the positioning convex strip (211) and the positioning groove (212) are wedged with each other.
2. The assembled building frame system according to claim 1, characterized in that: The first connection structure (110) comprises a plurality of connection steel bars (111) pre-buried in the upper end of the prefabricated column (100) and a connection hole (112) arranged at the lower end of the prefabricated column (100), the connection steel bars (111) extending out of the end surface of the prefabricated column (100), and the connection hole (112) is provided with a grouting hole (113) for grouting.
3. The assembled building frame system according to claim 1, characterized in that: The first connection structure (110) comprises two groups of first lap steel bars (114), the two groups of first lap steel bars (114) being respectively pre-buried at two ends of the prefabricated column (100) and axially extending out of the end surface of the prefabricated column (100).
4. The assembled building frame system according to claim 1, characterized in that: The second connection structure (130) is a plurality of second lap steel bars (131), and the ends of the precast beam joint (120) and the precast beam (200) are both pre-embedded with the second lap steel bars (131), and the second lap steel bars (131) extend out of the end faces of the precast beam joint (120) and the precast beam (200).
5. The assembled building frame system according to claim 1, characterized in that: The second connection structure (130) is a plurality of overlapping steel plates (132), and the ends of the prefabricated beam joint (120) and the prefabricated beam (200) are both pre-buried with the overlapping steel plates (132), and the overlapping steel plates (132) are laterally parallel and spaced apart and extend out of the end faces of the prefabricated beam joint (120) and the prefabricated beam (200).
6. The assembled building frame system according to claim 5, characterized in that: The end of the prefabricated beam joint (120) is provided with a first protrusion (121), the end of the prefabricated beam (200) is correspondingly provided with a second protrusion (122), and the overlapping steel plates (132) are arranged in parallel and spaced relation on the ends of the first protrusion (121) and the second protrusion (122) in a transverse manner.
7. The assembled building frame system according to claim 1, characterized in that: A positioning device is provided between the precast panel (300) and the overlapping platform (210), and the positioning device comprises positioning ribs (213) and positioning holes (214). A plurality of positioning ribs (213) are vertically provided on the overlapping platform (210), and a corresponding number of positioning holes (214) are provided on one side where the precast panel (300) overlaps with the precast beam (200). The positioning ribs (213) pass through the positioning holes (214), so that the precast panel (300) can be placed on the overlapping platform (210).
8. The assembled building frame system according to claim 1, characterized in that: A plurality of reinforcing ribs (220) are pre-buried on the top surface of the precast beam (200), the height of the reinforcing ribs (220) being higher than that of the precast plate (300), a steel mesh (310) is laid on the precast plate (300), the steel mesh (310) and the reinforcing ribs (220) are overlapped, and a post-cast concrete layer (320) is poured on the top of the precast beam (200) and the precast plate (300), the post-cast concrete layer (320) covering the steel mesh (310) and the reinforcing ribs (220).
9. The assembled building frame system according to claim 8, characterized in that: The upper surface of the prefabricated plate (300) is provided with a rough surface or a corrugated surface.