A voltage optimization method for flexible interconnected power distribution system

By constructing a distributed robust chance-constrained voltage optimization model based on Wasserstein distance, OLTC, CB and flexible interconnection devices are optimized before and within the day, solving the voltage fluctuation problem caused by source and load uncertainty in the distribution network, and realizing voltage optimization and System security is taken into consideration.

CN113178868BActive Publication Date: 2024-10-15NANJING INST OF TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110544065.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-19
Publication Date
2024-10-15
Estimated Expiration
2041-05-19

AI Technical Summary

Technical Problem

Existing technologies are difficult to effectively deal with the voltage fluctuation problem caused by source and load uncertainty in the distribution network. Traditional methods have slow response speed and high cost, and dispatch models based on deterministic or uncertainty have problems of conservatism and difficulty in application.

Method used

By establishing an uncertainty probability set based on Wasserstein distance, a distributed robust chance-constrained voltage optimization model is constructed. Minimum network loss and minimum voltage deviation are set as goals. Combined with chance constraints, OLTC, CB and Action decisions for flexible interconnected devices.

Benefits of technology

It realizes the voltage optimization of the power distribution system at multiple time scales, reduces the risk of voltage over-limit, takes into account both robustness and economy, adapts to complex scenarios with strong source and load uncertainty, and significantly improves the optimization effect and solution efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113178868B_ABST
    Figure CN113178868B_ABST
Patent Text Reader

Abstract

The present invention provides a voltage optimization method for a flexible interconnected distribution system, and establishes a voltage optimization model based on distributed robust chance constraints, wherein an uncertain probability set is constructed for random variables through Wasserstein distance; and for the objective function and constraints in the model, the present invention sets the objective function with minimum network loss and minimum voltage deviation as the goal, and simultaneously sets power balance constraints, substation export power constraints, CB and OLTC operation constraints, and flexible interconnection device operation constraints as hard constraints, and sets node voltage and branch power as chance constraints of the model; thereby constructing a voltage optimization model. Since the constructed model is difficult to solve directly, the present invention solves it through a mixed integer random second-order cone programming algorithm. The optimization model of the present invention and its solution method can effectively deal with source-load uncertainty, thereby ensuring the safe operation of the distribution system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of electric power dispatching, and in particular relates to a day-ahead and day-intraday two-stage voltage optimization method in a flexible interconnected distribution system taking source-load uncertainty into account. Background Art

[0002] The output of distributed generation (DG) and the load demand of electrical equipment are highly uncertain, that is, the dual uncertainty of source and load, which easily causes the voltage over-limit problem of distribution network. Traditional distribution network suppresses voltage fluctuation by setting OLTC (on-load tap changer) and CB (capacitor bank), but both OLTC and CB belong to reactive regulation, with slow response speed. At the same time, they are also limited by their discrete characteristics, and it is difficult to deal with voltage fluctuation problems with high precision and high frequency. To this end, a flexible interconnection technology that interconnects multiple feeders in the distribution network through a flexible interconnection device to achieve flexible closed-loop operation of the distribution network has been proposed. The flexible interconnection device can achieve continuous and rapid voltage control through active and reactive four-quadrant regulation; however, the cost of using the flexible interconnection device for a long time to continuously and intensively regulate voltage is too high. Therefore, it is necessary to further study how to combine the flexible interconnection device with reactive compensation equipment such as OLTC and CB, and to solve the voltage regulation optimization problem of the flexible interconnection distribution system caused by the strong uncertainty of source and load on a long time scale by providing a coordinated scheduling scheme between the two.

[0003] There are two solutions to the voltage optimization problem of the above-mentioned flexible interconnected distribution system in the prior art. One of them is based on a deterministic scheduling model, which can effectively reduce the impact of source-load uncertainty on system operation; however, with the increase of DG and load scale in today's distribution network, the uncertainty of source-load increases, so this scheduling model based on determinism is becoming more and more difficult to deal with. The other idea is a scheduling model based on uncertainty, and the existing uncertainty scheduling models include robust optimization models and opportunity constraint programming models; the robust optimization model pursues the optimal solution of the objective function in the worst case, so that the solution or decision meets all constraints, but because of this characteristic, the control strategy obtained by the robust optimization model is generally too conservative, which increases the restrictions on electricity consumption in production and life, which is not conducive to economic development; while the opportunity constraint programming model assumes that the random variable obeys a certain probability distribution, so that the probability of the decision satisfying the constraint is calculated in the optimization process, and the decision is allowed to break through the constraint as long as the probability is not lower than the specified confidence level; however, in the actual distribution system, for a large number of complex scenarios, it is difficult to obtain the exact probability distribution function of the uncertain variable, which makes it difficult to apply the opportunity constraint programming model in practice. Summary of the invention

[0004] In view of the shortcomings in the prior art, the present invention provides a voltage optimization method for a flexible interconnected distribution system, focusing on how to establish or find a suitable uncertainty scheduling model to achieve voltage optimization of the flexible interconnected distribution system at multiple time scales, thereby coping with the dual uncertainty of source and load and ensuring the safe operation of the distribution network.

[0005] The present invention achieves the above technical objectives through the following technical means.

[0006] A method for optimizing voltage of a flexible interconnected power distribution system comprises the following steps:

[0007] Step 1, establish the uncertainty probability set of source-load prediction error based on Wasserstein distance;

[0008] Step 2: Based on the distributed robust opportunity constraints, a voltage optimization model of the flexible interconnected distribution system is established, wherein the minimum network loss and the minimum voltage deviation are taken as the goals to set the objective function; the node voltage and branch power are set as opportunity constraints;

[0009] The voltage optimization model established above is used to make voltage optimization decisions for the flexible interconnected distribution system, where the input of the model is the source-load output value, which includes the source-load prediction value and the source-load prediction error, and the model output is the action decision plan of each voltage control device.

[0010] Furthermore, the voltage optimization model optimizes the flexible interconnected distribution system in two stages, day-ahead and day-intraday, wherein the day-ahead optimization output is the action gear of the CB and OLTC, while the day-ahead optimization output is the output value of the flexible interconnected device.

[0011] Furthermore, in step 1, let p and P N are the true probability distribution and empirical probability distribution of the source load prediction error, respectively, then P N The Wasserstein distance W(P N ,P)=inf[∫d(ξ N ,ξ)∏(dξ N , dξ)]; construct the Wasserstein ball D = {P|W(P N , P)≤r(N)}, then D is the uncertain probability set of source load prediction error, where ξ is a random variable, ξ N is the Nth sampling point of the random variable, inf(~) is the infimum function, ∏(~) is the boundary distribution, d(ξ N ,ξ)=‖ξ N -ξ‖ is the random variable ξ and its sampling point ξ N The distance function between .

[0012] Furthermore, the opportunity constraint in step 2 is Where P r is the probability that the node voltage and branch power do not exceed the limit, U i,t is the voltage of node i during period t, P n,t is the active power of branch n in period t. The superscript “~” indicates that this variable is a random variable. i,min and U i,max are the lower and upper limits of the voltage at node i, respectively, P n,max is the upper limit of the power on branch n, and 1-ε is the confidence level.

[0013] Furthermore, the objective function is Where f1 and f2 are the objective functions of minimizing network loss and voltage deviation, respectively. n,t is the current of branch n during period t, r n is the resistance of branch n, N is the total number of branches, M is the total number of nodes, and are the maximum values ​​of network loss and voltage deviation of this model respectively, and α is the weight coefficient.

[0014] Furthermore, in the voltage optimization model, in addition to the chance constraint, the constraints also include:

[0015] Power balance constraints in distribution systems

[0016] Substation export power constraints

[0017] Operational constraints of CB and OLTC

[0018] Operational constraints of flexible interconnect devices

[0019] Where: Ω n represents the set of all branches in the distribution system, P ij,t and Q ij,t are the active power and reactive power of branch ij in period t, P jh,t and Q jh,t are the active power and reactive power of branch jh in period t, P j,t and Q j,t are the active power and reactive power injected into node j during period t, r ij 、x ij are the resistance and reactance of branch ij, I ij,t is the current of branch ij during period t, Q n,t is the reactive power of branch n during period t, k n,tis the voltage transformation ratio of the OLTC on branch n in period t. If there is no OLTC on this branch, the value is 1. n is the reactance of branch n, is the active power at the substation outlet during period t, and are the lower limit and upper limit of active power respectively, is the reactive power at the substation outlet during period t, and are the lower limit and upper limit of reactive power respectively, H i,t and K n,t are the adjustable gears of CB and OLTC, ΔQ c,i,t and ΔV o,i,t are the regulation steps of CB and OLTC, Q c,i,t and V o,i,t are the reactive power injected by CB and OLTC respectively, H max The maximum adjustable gear position of CB, K min and K max are the lower and upper limits of the adjustable gear of OLTC, N c_max and N o_max are the maximum allowed number of operations for CB and OLTC, N VSC is the number of flexible DC converters in this embodiment, and are the active power and reactive power of the kth flexible DC converter in period t, respectively. The positive and negative directions are defined as the direction from the converter to the feeder is positive. is the loss of the kth flexible DC converter in period t, A k and are the loss coefficient and rated capacity of the kth flexible DC converter respectively.

[0020] Furthermore, it also includes step 3: solving the voltage optimization model through a mixed integer random second-order cone programming algorithm, wherein the model is divided into two parts, a deterministic model and a random model, according to the type of input variables. When the input variable is a source-load prediction value, the deterministic model is applied for solution, and when the input variable is a source-load prediction error, the random model is applied for solution.

[0021] Furthermore, the step 3 comprises the following steps:

[0022] Step 3.1, set the parameter V i,t 、V j,t and L n,t And parameters and

[0023] And order

[0024] So the objective function is transformed into

[0025] Among them U j,t is the voltage of node j at time period t;

[0026] Step 3.2: For the mixed integer variables in the CB and OLTC operation constraints, a set of binary variables b n,k,t Indicates the operating position K of OLTC n,t :

[0027] in is the total number of OLTC taps connected to branch n,

[0028] And introduce auxiliary variables Characterize the positive and negative number of CB groups connected to node i in period t, and introduce auxiliary variables Characterizes the positive or negative number of taps of branch n connected to OLTC during period t:

[0029]

[0030] Step 3.3, perform a second-order cone transformation on the power balance constraint of the distribution system:

[0031] Where L ij,t =(I ij,t ) 2 ;

[0032] Step 3.4, convexly relax the operation constraints of the flexible interconnection device:

[0033]

[0034] Step 3.5, through the expectation μ0 and standard deviation Σ0 of the source-load prediction error, the chance constraint is approximately transformed:

[0035]

[0036] where μ s =e T μ0,Σ s =e T (diag(Σ0)), γ1 and γ2 are conservative coefficients, a i is the vector coefficient of the ith node, e is the identity matrix, ε 1,i is the confidence level of the ith node voltage, ε 2,i is the power confidence level of the i-th branch.

[0037] Furthermore, the voltage confidence level ε 1,iand power confidence level ε 2,i Both are set to 0.95.

[0038] Furthermore, after transforming the objective function and the constraint conditions in the voltage optimization model, the model is solved using the MOSEK software package.

[0039] The beneficial effects of the present invention are:

[0040] (1) The voltage optimization model of the flexible interconnected distribution system of the present invention aims at the source-load uncertainty problem existing in the distribution system. Through two-stage optimization, day-ahead and day-intraday, the action plans of CB and OLTC are set respectively on the day-ahead, and the output control plan of the flexible interconnected device is given on the day-ahead, thereby reducing the risk of voltage over-limit in the distribution system and ensuring the safe operation of the distribution system. Compared with other existing optimization models, the voltage optimization model of the present invention takes into account both the robustness and economy of the distribution system. In particular, when the source-load uncertainty is stronger, the optimization effect of the model of the present invention is more significant, thereby being more able to adapt to the trend of increasing complexity of the current distribution network.

[0041] (2) The present invention solves the constructed voltage optimization model through the MISSCOP algorithm, and performs corresponding transformation processing on the objective function and the constraint conditions, so that the model can be solved. Compared with the solution using the genetic algorithm, it not only has a significant speed advantage, but also has certain advantages in the performance of the solution result. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is an operation logic diagram of the voltage optimization model of the flexible interconnected power distribution system of the present invention;

[0043] Figure 2 This is a schematic diagram of the flexible interconnected power distribution system architecture;

[0044] Figure 3 A structural diagram of a power distribution system for testing the optimization effect of the model of the present invention;

[0045] Figure 4 It is the voltage over-limit risk diagram when the deterministic optimal dispatch model is adopted;

[0046] Figure 5 It is the voltage over-limit risk diagram when the robust optimization scheduling model is adopted;

[0047] Figure 6 Voltage over-limit risk diagram for the chance constrained scheduling model;

[0048] Figure 7 A voltage over-limit risk diagram when the voltage optimization model of the present invention is adopted;

[0049] Figure 8This is a diagram showing the power loss when the voltage optimization model of the present invention is solved by different algorithms;

[0050] Fig. 9 This is a diagram of voltage deviation when the voltage optimization model of the present invention is solved by different algorithms. DETAILED DESCRIPTION

[0051] Embodiments of the present invention are described in detail below, examples of the illustrated embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0052] 1. Optimization Principle

[0053] 1. Model selection: In view of the source-load uncertainty problem in the flexible interconnected distribution system, the present invention adopts distributed robust chance constraints (DRCC) to establish a voltage optimization model. The DRCC model consists of three parts: an uncertain probability set, an objective function, and constraints. The uncertain probability set is the uncertain probability set of random variables in the model. The objective function is the goal pursued by the model solution operation, such as pursuing the minimum of a certain parameter. The constraints are the restrictions that the parameters in the model need to meet. The principle of DRCC is to find the solution of the worst probability distribution in the uncertain probability set of random variables. Therefore, DRCC combines the advantages of both robust optimization and chance constrained programming, so that the optimization scheme takes into account both robustness and economy.

[0054] 2. Establishment of probability set: In the field of voltage optimization of power distribution system to which the present invention is applied, the random variable is the source-load prediction error, which includes the prediction error of power supply output power and the prediction error of load demand power. For the establishment of probability set in DRCC model, the probability set of uncertain variables can be constructed by moment-based method, but this method only sets uncertainty for the first moment and second moment information characterizing random parameters, so it has a certain degree of conservatism. The present invention uses the method of constructing Wasserstein sphere based on Wasserstein distance to establish probability set. This method can achieve flexible control of the conservatism of optimization scheme by adjusting the radius of Wasserstein sphere.

[0055] 3. Objective function and constraints: The present invention takes the minimum network loss and minimum voltage deviation of the distribution system as the goal to construct the objective function. As for the constraints, in addition to the hard constraints that the distribution system itself must comply with at the physical level and must not be violated, such as the upper and lower limits of the substation's export power, and the phase balance between the powers in the distribution network; the present invention adds node voltage and branch power as opportunity constraints, allowing the constraints to be broken under certain conditions, thereby improving the economy of the optimization scheme while ensuring system safety in response to source-load uncertainty.

[0056] 4. Solution method: After completing the construction of the voltage optimization model, the next step is to provide a solution method for the constructed model. Because the flexible interconnected distribution system targeted by the present invention includes traditional reactive power compensation equipment and flexible interconnection devices, the characteristics of both are discrete and continuous, and furthermore, the objective function and constraint conditions take into account the randomness of the source-load prediction error, which together determine that the DRCC voltage optimization model constructed by the present invention is a random mixed integer nonlinear programming model, which is difficult to solve directly.

[0057] In the traditional method, the DRCC model is converted into a deterministic second-order cone programming (SOCP) model through convex relaxation and linearization. This method can achieve a high solution rate and ensure the optimality of the solution found, but this method is not applicable to the solution of random models. While heuristic intelligent algorithms such as particle swarm optimization and genetic algorithm can find the optimal solution through multiple iterations, their solution speed is slow and they are prone to fall into the dilemma of local optimality.

[0058] In view of the above-mentioned solution difficulties, the present invention adopts a mixed integer stochastic second-order cone programming (MISSOCP) method, which converts the current DRCC model into two parts: a random model and a deterministic model, wherein only the random model involves chance constraints; then the chance constraints are approximately transformed, the objective function is linearized by a second-order cone transformation, the nonlinear hard constraints are also linearized, and the mixed integer variables are processed by introducing binary variables and positive and negative auxiliary variables; the above transformation processing enables the model to be solved.

[0059] 2. Optimization plan

[0060] According to the above optimization principle, the voltage optimization scheme of the flexible interconnected power distribution system of the present invention includes the following steps:

[0061] Step 1: Establish an uncertain probability set of source-load prediction error based on Wasserstein distance.

[0062] Step 2: Based on the uncertain probability set established in step 1, taking into account the opportunity constraints of both node voltage and branch power, a voltage optimization model based on DRCC (distributed robust chance constraints) is constructed for the flexible interconnected distribution system.

[0063] Step 3: According to the DRCC voltage optimization model constructed in step 2, the objective function and constraints in the model are transformed based on the MISSOCP (mixed integer stochastic second-order cone programming) algorithm so that the model can be solved.

[0064] Therefore, through the voltage optimization model established above and its solution method, voltage optimization decisions are made for the flexible interconnected distribution system, and the action decision plans of the corresponding voltage control equipment (traditional reactive compensation equipment such as CB, OLTC and flexible interconnection devices) in each period of a day are solved according to the source and load output values ​​of the input model; and when the voltage optimization model is used, it is divided into long time scales and short time scales for optimization, respectively targeting the two stages of the day before and the day after the distribution system.

[0065] The above-mentioned "day-ahead" and "intraday" are terms in the field of electricity. In electricity, one day is used as the calculation scale, and one day is divided into 24 time periods. The day of electricity consumption is "intraday", and before that is "day-ahead"; the voltage optimization model of the present invention makes voltage optimization decisions for the two stages of day-ahead and day-intraday respectively, wherein day-ahead optimization is predictive regulation under long-term scale. Through model prediction, the gear action of traditional reactive compensation equipment such as OLTC (on-load tap-changing transformer) and CB (capacitor bank) at various times of the day is set in advance, while intraday optimization is used to make up for the shortcomings of day-ahead optimization. Through optimization of short time scales such as 15 minutes, the output of the flexible interconnection device is dynamically adjusted to cope with temporary fluctuations of the day. 3. Specific embodiments

[0067] like Figure 2 The schematic diagram of the flexible interconnected power distribution system architecture shown in the figure shows that the multi-terminal back-to-back flexible direct current system (VSC-MTDC) used interconnects multiple feeders through multiple flexible direct current converters and a common DC bus; in this power distribution system, the power sources include wind power generation and photovoltaic power generation, and each power generation equipment outputs power to the distribution network through its own substation, and each distribution network is also connected to a variety of different power-consuming equipment. For the above-mentioned power distribution system, the voltage optimization of the present invention is as follows:

[0068] Step 1: Establish an uncertain probability set

[0069] The uncertain probability set of source-charge prediction error is regarded as a ball in the probability space, so its radius is calculated by the Wasserstein distance. The specific process is as follows:

[0070] Step 1.1, in the flexible interconnected power distribution system of this embodiment, the prediction errors of wind power, photovoltaic power and load are taken as random variables, that is, the source-load prediction error in this embodiment is the prediction error of wind power, photovoltaic power and load:

[0071]

[0072] in and They are the prediction error, predicted value and actual value of wind power output in period t respectively; and are the prediction error, predicted value and actual value of the photovoltaic output power in period t respectively; and They are respectively the prediction error, predicted value and actual value of the load demand power in period t.

[0073] Step 1.2: To simplify the solution, the above wind power prediction error is Photoelectric prediction error and load forecast error Do the sum processing to predict the error with source load As an equivalent alternative:

[0074]

[0075] Step 1.3: Substitute the source load prediction error As a random variable ξ, let ξ N is the Nth sampling point of the random variable, and P and P N are the true probability distribution and empirical probability distribution of the random variable respectively; then according to the definition of Wasserstein distance, the empirical probability distribution P is obtained N The Wasserstein distance W(P N , P):

[0076] W(P N ,P)=inf[∫d(ξ N ,ξ)∏(dξ N ,dξ)] (3)

[0077] Where inf(~) is the lower bound function; ∏(~) is the boundary distribution, that is, P N The joint probability distribution of and P; d(ξ N ,ξ)=‖ξ N -ξ‖, is the random variable ξ and its sampling point ξ N The distance function between .

[0078] Step 1.4, construct the Wasserstein sphere based on the Wasserstein distance:

[0079] D={P|W(P N ,P)≤r(N)} (4)

[0080] Where D is the empirical probability distribution P N The Wasserstein sphere with a center of π(N) and a radius of r(N) is the uncertainty probability set of the source-charge prediction error established by the present invention.

[0081] Step 2: Build a DRCC voltage optimization model

[0082] Step 2.1, with the goal of minimizing network loss and voltage deviation, construct the objective function:

[0083]

[0084] Where f1 and f2 are the objective functions of minimizing network loss and voltage deviation respectively; n,t is the current of branch n during period t; r n is the resistance of branch n; N is the total number of branches; U i,t is the voltage of node i in period t; M is the total number of nodes; and are the maximum values ​​of network loss and voltage deviation of this model, respectively, and are fixed values, and their specific values ​​can be obtained through multiple simulation tests; α is the weight coefficient, which is a manually set value used to allocate the weights of the two objective functions. In addition, the voltages involved in the present invention are all per-unit values.

[0085] Step 2.2, set the power balance constraints of the distribution system:

[0086]

[0087] Where Ω n represents the set of all branches in the power distribution system, and assumes that branch n is any one of them; the indices i, j, and h all represent arbitrary nodes, so the indices ij and jh represent the branch between node i and node j, and the branch between node j and node h, respectively, and branches ij and jh both belong to branch n; P ij,t and Q ij,t are the active power and reactive power of branch ij in period t respectively; P jh,t and Q jh,t are the active power and reactive power of branch jh in period t respectively; P j,t and Q j,t are the active power and reactive power injected into node j during period t respectively; I ij,t is the current of branch ij during period t; k n,tis the voltage transformation ratio of the OLTC on branch n in period t. If there is no OLTC on this branch, the value is 1; r ij 、x ij are the resistance and reactance of branch ij respectively; x n is the reactance of branch n; P n,t and Q n,t are the active power and reactive power of branch n in period t respectively.

[0088] Step 2.3, set the export power constraint of the substation:

[0089]

[0090] in is the active power at the substation outlet during period t, and They are the lower limit and upper limit of active power respectively; is the reactive power at the substation outlet during period t, and They are the lower limit and upper limit of reactive power respectively.

[0091] Step 2.4, set the operation constraints of CB and OLTC:

[0092]

[0093]

[0094] Among them, H i,t and K n,t are the adjustable gears of CB and OLTC respectively; ΔQ c,i,t and ΔV o,i,t are the regulation steps of CB and OLTC respectively; Q c,i,t and V o,i,t are the reactive power injected by CB and OLTC respectively; H max K is the maximum adjustable gear position of CB; min and K max are the lower and upper limits of the adjustable gear of OLTC respectively; N c_max and N o_max They are the maximum allowed number of operations for CB and OLTC respectively.

[0095] Step 2.5: Set opportunity constraints

[0096] The constraints established in steps 2.2-2.4 are all control variable constraints of the flexible interconnected power distribution system. Such constraints can never be violated at the physical level, that is, formulas (6)-(9) are all hard constraints. There is another type of constraint in the flexible interconnected power distribution system, which is the state variable constraint. The state variable constraint is a soft constraint that allows slight violations in a short period of time, thereby improving the flexibility and economy of the power distribution system; therefore, the present invention uses the node voltage and branch power as opportunity constraints, and the constraint formula is as follows:

[0097]

[0098] Where D is the uncertain probability set established in step 1; P r is the probability that the node voltage and branch power do not exceed the limit; the superscript “~” indicates that this variable is a random variable; U i,min and U i,max are the lower and upper limits of the voltage at node i respectively; P n,max is the upper limit of the power on branch n; 1-ε is the confidence level, which ranges from 0 to 1. When the confidence level is 1, the chance constraint is essentially equal to the constraint in the conventional deterministic method, that is, the constraint is not allowed to exceed the limit under any circumstances.

[0099] Step 2.6, Operational constraints of the flexible interconnection device

[0100] like Figure 2 In the flexible interconnected distribution system architecture shown, the VSC-MTDC itself does not generate active power, but is only responsible for power transfer between feeders. Therefore, the sum of the active power output and loss of each flexible DC converter is zero; at the same time, the reactive power output of each flexible DC converter is independent of each other and only needs to meet the constraints of their respective capacities. In summary, the operating constraints of the flexible interconnected device are:

[0101]

[0102] Where N VSC is the number of flexible DC converters in this embodiment; and are respectively the active power and reactive power of the kth flexible DC converter in period t, and the positive and negative directions are defined as the direction from the converter to the feeder is positive; A is the loss of the kth flexible DC converter in period t; k and are the loss coefficient and rated capacity of the kth flexible DC converter, respectively, and are constant values. The above formula (11) is also a hard constraint.

[0103] The above is the entire process of building the DRCC voltage optimization model in step 2. When the above model is actually applied, it is optimized in two stages: day-ahead and day-intraday. The day-ahead optimization is used to solve the optimal action plan of OLTC and CB, so as to set it in advance before the electricity consumption day; while the day-intraday optimization is based on the OLTC and CB action plan determined by the day-ahead optimization, and according to the changes that occur on the electricity consumption day, the optimal output plan of the flexible interconnection device is solved, so that the voltage is always in the optimal state.

[0104] Step 3: Model solution method

[0105] The DRCC voltage optimization model constructed in the above step 2 includes an objective function and five constraints, among which the objective function, power balance constraint, flexible interconnection device operation constraint, and opportunity constraint are all nonlinear and need to be transformed; the operation constraints of CB and OLTC contain mixed integer variables, which also need to be transformed; and the export power constraint of the substation itself is linear and can be used directly.

[0106] Step 3.1 Linear transformation of objective function

[0107] The input variables of the DRCC voltage optimization model of the present invention are the output values ​​of the source and load, that is, the power generation of the power supply in the distribution system and the demand of the load; the source and load output values ​​include the source and load prediction value and the source and load prediction error, wherein the source and load prediction value is a certain value, and the source and load prediction error is a random value. Therefore, according to the different inputs, the DRCC voltage optimization model of the present invention can be divided into two parts: a deterministic model and a random model.

[0108] For the deterministic model, let the parameter V i,t 、V j,t and L n,t , and order:

[0109]

[0110] Among them U j,t The meaning of U i,t Similarly, represents the voltage of node j during period t;

[0111] For the random model, let the parameter and And order:

[0112]

[0113] Therefore, according to the standard form of MISSOCP, the objective function of formula (5) is transformed from nonlinear to linear and expanded into the form of a deterministic part plus a random part:

[0114]

[0115] In the above formula, for the random model part, since the input variable is the source load prediction error, and the source load prediction error is a random variable, the value calculated by the source load prediction error is also a random variable. For random variables, the superscript "~" is used to distinguish them. In formula (14), E(~) is the expected value of the random variable.

[0116] Step 3.2 Mixed Integer Variable Processing

[0117] Since the operating constraints of CB and OLTC set in step 2.4 contain mixed integer variables, in order to facilitate the subsequent solution, the action gears of CB and OLTC are:

[0118] 1) The present invention utilizes a set of binary variables b n,k,t Indicates the operating position K of OLTC n,t :

[0119]

[0120] in is the total number of OLTC taps connected to branch n;

[0121] 2) By introducing auxiliary variables Characterize the positive and negative changes in the number of CB groups connected to node i in period t and introduce auxiliary variables Characterize the positive and negative changes in the number of taps connected to the OLTC of branch n during period t. The positive and negative changes refer to the changes in the positive direction and the changes in the negative direction. Then, the CB and OLTC operation constraints in formulas (8) and (9) are transformed into:

[0122]

[0123]

[0124] Step 3.3, according to the parameters set in step 3.1, perform a second-order cone transformation on the power balance constraint of formula (6):

[0125]

[0126] Where L ij,t The meaning of L n,t Similarly, the parameters set for the linear transformation, and L ij,t =(I ij,t ) 2 ;

[0127] Step 3.4, convexly relax the operation constraints of the flexible interconnection device in formula (11):

[0128]

[0129] Step 3.5 Chance Constrained Approximate Transformation

[0130] Assuming μ0 and Σ0 are the expectation and standard deviation of the source load prediction error, we have:

[0131]

[0132] Where γ1 and γ2 are conservative coefficients, a is a vector coefficient, b is a limit, and ε is a confidence level. According to formula (20), the chance constraint in formula (10) can be converted into the following equivalent deterministic linear constraint:

[0133]

[0134] Among them, μ s =e T μ0; Σ s =e T (diag(Σ0)); In the above formula, e is the unit matrix, a i Represents the vector coefficient of the i-th node, which is a manually set value; ε 1,i represents the confidence level of the voltage at the i-th node; ε 2,i represents the power confidence level of the i-th branch, ε 1,i , ε 2,i Both are set to 0.95.

[0135] Step 3.6 Model solution

[0136] After completing the transformation processing of the objective function and each constraint condition through steps 3.1-3.5, the model of the present invention can be solved by using the MOSEK software package, which is a software for solving large-scale mathematical optimization problems and belongs to the prior art.

[0137] Among them, when the input variable is the source load prediction value, the variable is a deterministic variable, and the deterministic model is used for solution. Its constraints include: power balance constraint, i.e., formula (6) and its transformation formula (18); substation export power constraint, i.e., formula (7); CB and OLTC operation constraints, i.e., formulas (8), (9) and their transformation formulas (15), (16), (17); and flexible interconnection device operation constraints, i.e., formula (11) and its transformation formula (19). The objective function of the deterministic model is:

[0138]

[0139] When the input variable is the source load prediction error, the variable is a random variable and is solved using a random model. Its constraints include the above-mentioned power balance constraints, substation export power constraints, CB and OLTC operation constraints, and flexible interconnection device operation constraints, as well as chance constraints, namely, formula (10) and its transformation formula (21). The objective function of the random model is:

[0140]

[0141] IV. Model Application

[0142] Through the above steps 1 to 3, the establishment of the DRCC voltage optimization model of the flexible interconnected distribution system of the present invention and the transformation of the objective function and constraints therein are completed, so that the DRCC voltage optimization model of the present invention can be solved by existing data processing software, and thus applied to the flexible interconnected distribution system to solve the voltage optimization problem.

[0143] like Figure 1 The figure shows the operation process flow chart of the DRCC voltage optimization model of the present invention for day-ahead optimization, in which a day is divided into 24 hours, and one hour is a period. First, according to the source load prediction value of period t, the deterministic model is applied to solve the action gears of CB and OLTC and their corresponding target values, and the target values ​​include network loss and voltage deviation; then, according to the probability set of the source load prediction error of period t, the random model is applied to solve the action gears of CB and OLTC and their corresponding target values ​​under the condition of meeting the set confidence level; by looping the above process, the CB and OLTC action gears and their target values ​​of 24 periods are solved in turn and the results are output. It should also be noted that the CB and OLTC action gears and their target values ​​of each period finally output are the sum of the results solved by the deterministic model and the random model respectively.

[0144] For intraday optimization, during the operation of the DRCC voltage optimization model of the present invention, except that the output control quantity is different from the day-ahead optimization (the intraday optimization output is the output of the flexible interconnection device and its target value), the rest of the operation process is the same as the day-ahead optimization, so it will not be repeated here.

[0145] V. Comparative Test

[0146] like Figure 3The schematic diagram of the structure of the flexible interconnected distribution system shown in the figure shows that 33 nodes are provided in this distribution system, and 4 feeders are flexibly interconnected through the VSC-MTDC device. The substation export power range is 0-8MW (power reverse transmission is not allowed), the line capacity is 8MVA, the system rated voltage is 10kV, and the per-unit value setting range of each node voltage is 0.93-1.07pu; the rated capacity of the VSC-MTDC converter is 2MVA, and the loss coefficient is 0.02; the CB is set at 12 nodes, the capacity is 4*0.05Mvar, and the maximum number of operations allowed per day is 6 times; the OLTC gear is ±8*12.5%, and the maximum number of operations allowed per day is 6 times; the confidence level is set to 0.95. The letters PV in the figure represent wind power and WT represent photovoltaic power. The effect of the voltage optimization model of the present invention is tested and verified by the above-mentioned distribution system.

[0147] a) Comparison with other models

[0148] Considering that the DG day-ahead prediction error is within 20% and the intraday prediction error is within 5%, in the experiment, the DG day-ahead prediction error is taken as 5%, 10%, 15% and 20% respectively, and the intraday prediction error is taken as 2% and 5% respectively; thus, a horizontal comparison test is carried out through the following four schemes.

[0149] Solution 1: Use the day-ahead and intraday two-stage deterministic optimization scheduling model to jointly optimize OLTC, CB and VSC-MTDC.

[0150] Solution 2: Use the day-ahead and intraday two-stage robust optimization scheduling model to jointly optimize OLTC, CB and VSC-MTDC.

[0151] Solution 3: Use the day-ahead and intraday two-stage chance-constrained programming scheduling model to jointly optimize OLTC, CB and VSC-MTDC.

[0152] Solution 4: The voltage optimization model of the present invention is adopted to jointly optimize OLTC, CB and VSC-MTDC in two stages: day-ahead and day-intraday.

[0153] The test results are shown in Table 1-2 and Figure 4-7 shown.

[0154] Table 1 and Table 2 respectively show the voltage deviation and network loss conditions under four optimization schemes under different prediction error conditions. From the horizontal comparison of the data in Table 1 and Table 2, it can be seen that when the source load prediction error is small, the deterministic optimization model of Scheme 1 can achieve better optimization effect, but as the error increases, the optimization effect of the optimization model of Scheme 4 of the present invention gradually exceeds that of other schemes.

[0155] Table 1: Voltage deviation

[0156]

[0157] Table 2: Network loss

[0158]

[0159] Figures 4 to 7 This is a surface diagram of the voltage over-limit risk index of 33 nodes in the distribution system at different time periods under the optimization of four schemes for the case where the day-ahead prediction error is 20% and the intraday prediction error is 5%. It can be seen from the figure that when the prediction error is large, that is, when the source-load fluctuation is strong, the DRCC voltage optimization model of the present invention can reduce the risk of voltage over-limit compared with the other three optimization models, and the probability of its voltage over-limit risk index being 0 is 98.2%.

[0160] b) Impact of confidence level

[0161] As shown in Table 3, the robustness and economy of the DRCC voltage optimization model of the present invention at different confidence levels. It can be seen from Table 3 that the robustness of the model needs to sacrifice a certain degree of economy to ensure, but compared with the change in robustness, the change in economy is smaller. Therefore, in the DRCC voltage optimization model of the present invention, a suitable confidence level can be set to achieve a better balance between robustness and economy.

[0162] Table 3: Impact of confidence level

[0163]

[0164] c) Comparison with other solution methods

[0165] The present invention adopts the MISSCOP algorithm to solve the model, but the DRCC voltage optimization model of the present invention can also be solved by a genetic algorithm. For this purpose, a comparative test between the two is performed, and the test results are shown in Table 4 and Figure 8-9 shown.

[0166] in Figure 8 The comparison of network power loss when the DRCC voltage model of the present invention is solved by using the MISSCOP algorithm and the genetic algorithm respectively; Fig. 9 Table 4 is a comparison of the voltage deviation when the two algorithms are used for solving the problem; Table 5 is a horizontal comparison of the two algorithms in terms of network deviation, voltage deviation and solution time. Figure 8 and Fig. 9 It can be seen intuitively that the MISSCOP algorithm adopted in the present invention has a significant advantage in the time required for solving the model compared to the genetic algorithm because it does not require iterative calculation. At the same time, the solution results also have certain advantages in network loss and voltage deviation.

[0167] Table 4: Comparison of solution algorithms

[0168] Optimization Algorithm Network loss (MWh) Voltage deviation (pu) time Genetic Algorithms 3.139 0.34 7min MISSOCP 2.987 0.32 2.3s

[0169] In summary, the present invention establishes a voltage optimization model of a flexible interconnected distribution system based on distributed robust chance constraints (DRCC), wherein for the random variables of the model, i.e., the source-load prediction error, the present invention constructs an uncertain probability set through the Wasserstein distance; and for the objective function and constraints in the model, the present invention sets the objective function with the minimum network loss and the minimum voltage deviation as the goal, and simultaneously sets the power balance constraint, the substation export power constraint, the CB and OLTC operation constraint, and the flexible interconnection device operation constraint as the hard constraint, and sets the node voltage and branch power as the opportunity constraint of the model. Thus, a DRCC voltage optimization model is constructed; through this model, the voltage control scheme of the flexible interconnected distribution system is optimized in two stages, day-ahead and intraday, wherein the day-ahead optimization is to determine the action gear of reactive compensation equipment such as OLTC and CB, and the intraday optimization is to give the output value of the flexible interconnection device, so that through the above optimization, while ensuring the safe operation of the distribution system, the economy of the distribution system is also taken into account.

[0170] The above-mentioned DRCC voltage optimization model cannot be solved directly because it belongs to a random mixed integer nonlinear programming model. Therefore, the present invention also provides a solution method. Specifically, based on the MISSCOP algorithm, the voltage optimization model is divided into two parts: a deterministic model and a random model, and the objective function and constraints are converted accordingly so that it can be solved by existing software. Compared with the solution using a genetic algorithm, the model is solved by the MISSCOP-based solution method provided by the present invention. In addition to having a significant advantage in solution speed, it also has certain advantages in the performance of the solution result.

[0171] In the description of the present invention, it should be understood that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0172] The present invention is not limited to the above-mentioned embodiments. Any obvious improvement, substitution or deformation that can be made by those skilled in the art without departing from the essential content of the present invention belongs to the protection scope of the present invention.

Claims

1. A voltage optimization method for a flexible interconnected power distribution system, characterized in that The steps include: Step 1, establish the uncertainty probability set of source-load prediction error based on Wasserstein distance; Step 2: Based on the distributed robust opportunity constraints, a voltage optimization model of the flexible interconnected distribution system is established, wherein the minimum network loss and the minimum voltage deviation are taken as the goals to set the objective function; the node voltage and branch power are set as opportunity constraints; In the voltage optimization model, in addition to the chance constraint, the constraints also include: Power balance constraints in distribution systems Substation export power constraints Operational constraints of CB and OLTC Operational constraints of flexible interconnect devices Where: Ω n represents the set of all branches in the distribution system, P ij,t and Q ij,t are the active power and reactive power of branch ij in period t, P jh,t and Q jh,t are the active power and reactive power of branch jh in period t, P j,t and Q j,t are the active power and reactive power injected into node j during period t, r ij 、x ij are the resistance and reactance of branch ij, I ij,t is the current of branch ij during period t, Q n,t is the reactive power of branch n during period t, k n,t is the voltage transformation ratio of the OLTC on branch n in period t. If there is no OLTC on this branch, the value is 1. n is the reactance of branch n, is the active power at the substation outlet during period t, and are the lower limit and upper limit of active power respectively, is the reactive power at the substation outlet during period t, and are the lower limit and upper limit of reactive power respectively, H i,t and K n,t are the adjustable gears of CB and OLTC, ΔQ c,i,t and ΔV o,i,t are the regulation steps of CB and OLTC, Q c,i,t and V o,i,t are the reactive power injected by CB and OLTC respectively, H max The maximum adjustable gear position of CB, K min and K max are the lower and upper limits of the adjustable gear of OLTC, N c_max and N o_max are the maximum allowed number of operations for CB and OLTC, N VSC is the number of flexible DC converters in this embodiment, and are the active power and reactive power of the kth flexible DC converter in period t, respectively. The positive and negative directions are defined as the direction from the converter to the feeder is positive. is the loss of the kth flexible DC converter in period t, A k and are the loss coefficient and rated capacity of the kth flexible DC converter respectively; the voltage optimization model optimizes the flexible interconnected distribution system in two stages, day-ahead and day-in, wherein the day-ahead optimization is used to solve and output the action gears of CB and OLTC before the electricity consumption day; the day-in-day optimization is to solve and output the output value of the flexible interconnected device according to the changes in the electricity consumption day based on the CB and OLTC action plans determined by the day-ahead optimization; Step 3, solving the voltage optimization model by using a mixed integer random second-order cone programming algorithm, wherein the model is divided into a deterministic model and a random model according to the type of input variables. When the input variable is a source-load prediction value, the deterministic model is applied to solve it, and when the input variable is a source-load prediction error, the random model is applied to solve it; The voltage optimization model established above is used to make voltage optimization decisions for the flexible interconnected distribution system, where the input of the model is the source-load output value, which includes the source-load prediction value and the source-load prediction error, and the model output is the action decision plan of each voltage control device.

2. The voltage optimization method of the flexible interconnection distribution system according to claim 1 is characterized in that: In step 1, let p and P N are the true probability distribution and empirical probability distribution of the source load prediction error respectively, then P N The Wasserstein distance W(P N ,P)=inf[∫d(ξ N ,ξ)∏(dξ N , dξ)]; construct the Wasserstein ball D = {P|W(P N , P)≤r(N)}, where D is the empirical probability distribution P N is the Wasserstein sphere with a center and radius r(N), which is the uncertain probability set of the source load prediction error established, ξ is a random variable, ξ N is the Nth sampling point of the random variable, inf(~) is the infimum function, ∏(~) is the boundary distribution, d(ξ N ,ξ)=‖ξ N -ξ‖ is the random variable ξ and its sampling point ξ N The distance function between .

3. The voltage optimization method of the flexible interconnection distribution system according to claim 2 is characterized in that: The opportunity constraint in step 2 is: Where P r is the probability that the node voltage and branch power do not exceed the limit, U i,t is the voltage of node i during period t, P n,t is the active power of branch n in period t. The superscript "~" indicates that this variable is a random variable. U i,min and U i,max are the lower and upper limits of the voltage at node i, respectively, P n,max is the upper limit of the power on branch n, and 1-ε is the confidence level.

4. The voltage optimization method of the flexible interconnection distribution system according to claim 3 is characterized in that: The objective function is Where f1 and f2 are the objective functions of minimizing network loss and voltage deviation, respectively. n,t is the current of branch n during period t, r n is the resistance of branch n, N is the total number of branches, M is the total number of nodes, and are the maximum values ​​of network loss and voltage deviation of this model respectively, and α is the weight coefficient.

5. The voltage optimization method of the flexible interconnection distribution system according to claim 4 is characterized in that The step 3 comprises the following steps: Step 3.1, set the parameter V i,t 、V j,t and L n,t And parameters and And order So the objective function is transformed into Among them U j,t is the voltage of node j at time period t; Step 3.2: For the mixed integer variables in the CB and OLTC operation constraints, a set of binary variables b n,k,t Indicates the operating position K of OLTC n,t : in is the total number of OLTC taps connected to branch n, And introduce auxiliary variables Characterize the positive and negative number of CB groups connected to node i in period t, and introduce auxiliary variables Characterizes the positive or negative number of taps of branch n connected to OLTC during period t: Step 3.3, perform a second-order cone transformation on the power balance constraint of the distribution system: Where L ij,t =(I ij,t ) 2 ; Step 3.4, convexly relax the operating constraints of the flexible interconnection device: Step 3.5, through the expectation μ0 and standard deviation Σ0 of the source-load prediction error, the chance constraint is approximately transformed: where μ s =e T μ0,Σ s =e T (diag(Σ0)), γ1 and γ2 are conservative coefficients, a i is the vector coefficient of the ith node, e is the identity matrix, ε 1,i is the confidence level of the ith node voltage, ε 2,i is the power confidence level of the i-th branch.

6. The voltage optimization method for a flexible interconnected power distribution system according to claim 5, characterized in that: The voltage confidence level ε 1,i and power confidence level ε 2,i Both are set to 0.

95.

7. The voltage optimization method for a flexible interconnected power distribution system according to claim 5, characterized in that: After the objective function and constraint conditions in the voltage optimization model are transformed in step 3, the model is solved using the MOSEK software package.

Citation Information

Patent Citations

  • Clean energy power planning method based on Wasserstein distance and distribution robust optimization

    CN110797919A

  • Low-voltage governance method based on two-stage scheduling

    CN112039057A