An underwater concrete floor leakage detection and repair device

By designing the underwater concrete base plate leakage detection and repair equipment with retractable units and mobile guide mechanisms, the problems of low automation and major safety hazards in the existing technology are solved, and efficient underwater leakage detection without divers in the water are achieved. Repairing improves construction efficiency and continuity.

CN113186999BActive Publication Date: 2024-11-19CCCC FOURTH HARBOR ENG INST CO LTD +4
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110480039.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-30
Publication Date
2024-11-19
Estimated Expiration
2041-04-30

AI Technical Summary

Technical Problem

The prior art has problems such as low degree of automation, large safety hazards, low repair efficiency, large equipment and large space in the detection and repair of underwater concrete base plate leakage, especially in the environment of high concentrations of sodium hypochlorite and other chemical agents. .

Method used

A kind of underwater concrete base plate leakage detection and repair equipment is designed, including fuselage, walking unit, chassis integration, power unit and multiple replaceable construction units. The fuselage movement in water is realized through the telescopic unit and the mobile guide mechanism. With the vertical and horizontal displacement of the construction unit, the power unit is driven and connected to the replaceable construction unit to complete the underwater leakage detection and repair operations.

Benefits of technology

It realizes underwater leakage detection and repair without divers in the water, improves construction efficiency and meets different types of underwater construction needs. The power units and replaceable construction units can be separately configured, and each is stored and used independently, improving the continuous construction. and degree of automation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113186999B_ABST
    Figure CN113186999B_ABST
Patent Text Reader

Abstract

The present invention provides an underwater concrete floor leakage detection and repair device, comprising a fuselage, a walking unit, a chassis integration, a power unit and a plurality of replaceable construction units, wherein the walking unit is arranged on the fuselage; the chassis integration comprises a frame, a retractable unit and a mobile guide mechanism, the retractable unit is provided with a first camera, and the retractable unit is installed on the mobile guide mechanism; the mobile guide mechanism is arranged at the top of the frame; a mounting platform is arranged in the frame, and a plurality of placement units for placing a plurality of replaceable construction units are arranged on the mounting platform; the power unit is transmission-connected with the retractable unit; each replaceable construction unit can be selectively connected to the retractable unit to be transmission-connected with the power unit, so that the power unit can drive the replaceable construction units to work respectively, and complete the operation process of underwater concrete floor leakage detection and repair. The present invention aims to solve the deficiencies of the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction engineering, and in particular relates to underwater concrete bottom plate leakage detection and repair equipment. Background Art

[0002] In order to prevent the change of temperature stress from damaging the concrete structure, expansion joints are often set at a certain distance along its length to release the temperature stress. The steel bar arrangement and concrete pouring at the expansion joint of the concrete hydraulic structure are discontinuous. The expansion joint is filled with fiberboard and potting glue is set on the surface. The expansion joint is equipped with an embedded rubber water stop to prevent leakage at the expansion joint. The water stop is embedded in the concrete on both sides of the expansion joint. The central circular hole of the water stop can well adapt to the relative pulling or squeezing of the concrete on both sides of the expansion joint. Figure 5 shown.

[0003] Since expansion joints are local weak points of concrete structures, defects such as bottom plate misalignment, distortion, uneven settlement, and deep cracks often occur in hydraulic structures such as locks, concrete canals, and reservoirs. These not only affect the basic functions of the structures such as water retention and storage, but also the leaking water hollows out the foundation, causing the bottom plate to fall off and the structure to be damaged by uneven force, which in turn causes major safety and quality accidents.

[0004] For the leakage of structures, small submersibles are generally used for downward inspection, but they have two obvious disadvantages. First, they cannot automatically remove surface aquatic organisms, which greatly affects or even makes underwater photography impossible, making it difficult to intuitively judge the misalignment or the approximate width of surface cracks; second, they have weak self-stabilization capabilities and are only applicable to completely static areas, not to waters with a certain flow rate. For the above-mentioned restricted environment, the usual method is to send divers to conduct underwater exploration and cleaning first, then carry underwater camera equipment to shoot concrete defects, and use a certain amount of sandbags to improve self-stabilization capabilities, but underwater manual operations have great safety hazards, especially for industrial plants that add high-concentration sodium hypochlorite and other chemical agents.

[0005] Due to the difficulty of underwater operation for divers and the low efficiency of underwater repair, dry construction methods are generally used to repair leaking locations of structures. That is, the upstream and downstream maintenance gates are closed and the water in the enclosed area is pumped out with a water pump. Repair workers use conventional cutting and grinding of concrete, installation of new waterstops and fiberboards, and formwork casting to repair expansion joints; drilling and grouting are used to repair deep cracks in the bottom plate. This method has several problems. First, it is difficult to ensure the sealing effect of the maintenance gate. Usually, there is still a certain amount of leakage after it is closed. Cutting machines and electric drills are live operations, and there are great risks in terms of electricity safety. Second, the damaged parts are often scattered, and there are no maintenance gates in many locations, which cannot form a dry construction environment. Third, starting the maintenance condition has a great impact on production. Dry construction requires a long construction time, and it is impossible to maintain the minimum load operation of industrial water circulation, shipping and other systems, which usually causes the entire operation body to be paralyzed for a long time. Fourth, it is necessary to carry a variety of equipment, such as cleaning equipment, cutting machines, hydraulic drills, grouting equipment, detection equipment, etc. These equipment need to occupy a certain storage space, which is not convenient for use and storage. Summary of the invention

[0006] The purpose of the present invention is to provide an underwater concrete floor leakage detection and repair device, aiming to solve the deficiencies of the prior art.

[0007] The present invention is achieved through the following technical solutions:

[0008] An underwater concrete floor leakage detection and repair device comprises a fuselage, a walking unit, a chassis assembly, a power unit and a plurality of replaceable construction units, wherein the walking unit is arranged on the fuselage and is used to drive the fuselage to move in any direction in the water;

[0009] The chassis integration includes a frame, a retractable unit and a mobile guide mechanism, the retractable unit is provided with a first camera, and the retractable unit is mounted on the mobile guide mechanism;

[0010] The mobile guide mechanism is arranged at the top of the interior of the frame, and is used to realize the longitudinal and lateral displacement of the telescopic unit at the top of the frame;

[0011] An installation platform is provided in the frame, and a plurality of placement units for placing a plurality of replaceable construction units are provided on the installation platform;

[0012] The power unit is transmission-connected to the telescopic unit;

[0013] Each replaceable construction unit can be selectively connected to the retractable unit to be transmission-connected with the power unit, so that the power unit can drive the replaceable construction units to work respectively, thereby completing the operation process of underwater concrete bottom plate leakage detection and repair.

[0014] Furthermore, the placement unit includes a placement hole opened on the mounting platform and a first docking mechanism arranged in the placement hole;

[0015] The telescopic unit includes a telescopic support arm and a second docking mechanism, the top end of the telescopic support arm is mounted on the moving guide mechanism and is transmission-connected to the power unit, and the second docking mechanism is sleeved on the outer side of the bottom end of the telescopic support arm;

[0016] The replaceable construction unit includes a matching docking mechanism and a construction mechanism. The matching docking mechanism is sleeved on the outside of the construction mechanism. The matching docking mechanism is suitable for docking with the first docking mechanism so that the construction mechanism is placed in the placement hole. The matching docking mechanism is suitable for docking with the second docking mechanism so that the construction mechanism is transmission-connected to the retractable support arm, so that the power unit can drive the construction mechanism.

[0017] Further, the placement hole includes a first placement hole and a second placement hole located below the first placement hole and connected to the first placement hole, the diameter of the first placement hole is greater than the diameter of the second placement hole, a plurality of first slide grooves are evenly opened on the inner wall of the first placement hole along its circumference, the groove length direction of each first slide groove is consistent with the radial direction of the first placement hole, the first docking mechanism includes a first driving mechanism and a plurality of first sleeve rods, the plurality of first sleeve rods correspond to the plurality of first slide grooves one by one, and each first sleeve rod is slidably arranged in the corresponding first slide groove;

[0018] The second docking mechanism includes a sleeve, a second driving mechanism and a plurality of second sleeve rods. The sleeve is sleeved on the outer side of the bottom end of the telescopic support arm, and a plurality of second slide grooves are evenly opened on its outer wall along its circumference. The groove length direction of each second slide groove is consistent with the radial direction of the sleeve. The plurality of second sleeve rods correspond to the plurality of second slide grooves one by one, and each second sleeve rod is slidably arranged in the corresponding second slide groove.

[0019] The mating mechanism includes a ring beam and a plurality of connecting rods. The ring beam is sleeved outside the construction mechanism. The diameter of the ring beam is smaller than the diameter of the first placement hole and larger than the diameter of the second placement hole and the sleeve. The plurality of connecting rods are arranged through the side wall of the ring beam and are evenly arranged along the circumference of the ring beam.

[0020] The plurality of connecting rods correspond to the plurality of first sleeve rods one by one, and the first driving mechanism is used to drive each first sleeve rod to slide along the corresponding first sliding groove, so that each first sleeve rod abuts against or separates from the ring beam, thereby causing one end of each connecting rod to be inserted into or separated from the corresponding first sleeve rod;

[0021] Multiple connecting rods and multiple second sleeve rods correspond one to one, and the second driving mechanism is used to drive each second sleeve rod to slide along the corresponding second sliding groove, so that each second sleeve rod abuts against or separates from the ring beam, thereby allowing one end of each connecting rod to be inserted into or detached from the corresponding second sleeve rod.

[0022] Furthermore, the second docking mechanism is rotatably arranged on the outer side of the bottom end of the telescopic arm, and the first camera is provided with a first lighting device.

[0023] Furthermore, the construction mechanism is any one of a cleaning end, a hydraulic cutting machine, a hydraulic drill, a grouting pipe, a sealing glue gun head, an acoustic wave detector, a laser rangefinder, and a clamping robot.

[0024] Furthermore, the front and rear ends of the fuselage are provided with a second camera and a second lighting device that can rotate 360 ​​degrees.

[0025] Furthermore, it also includes a control integration system, which is communicatively connected to the retractable unit, and the retractable unit is communicatively connected to a replaceable construction unit connected thereto.

[0026] Furthermore, the mobile guiding mechanism includes two longitudinal rails respectively arranged on opposite sides of the frame, transverse rails respectively slidably arranged on the two longitudinal rails at both ends, an arm chassis slidably arranged on the transverse rails, and a driving mechanism for driving the transverse rails and the arm chassis to move.

[0027] Furthermore, the walking unit includes a plurality of pairs of track wheels symmetrically arranged at the bottom of the frame and a plurality of propellers arranged on the fuselage, and the propellers can realize the forward, backward, turning, floating and diving of the fuselage.

[0028] Furthermore, a telescopic joint is provided on the track wheel, the top end of the telescopic joint is connected to the frame, the track wheel can rotate around the axis, and a plurality of gyroscopes are installed on the body.

[0029] Compared with the prior art, the present invention has the following beneficial effects: it has a plurality of replaceable construction units to meet different types of underwater construction requirements, and can realize functions such as underwater leakage detection, underwater leakage repair and acceptance after repair; the power unit and the plurality of replaceable construction units are configured detachably from each other, so that they can be stored and used independently, and when the replaceable construction unit is docked with the retractable unit, it forms power transmission with the power unit, so that the power unit provides construction driving force for each replaceable construction unit, and each replaceable construction unit stably cooperates with each other for construction, so that in the process of underwater concrete bottom plate leakage detection and repair, each replaceable construction unit cooperates with each other to complete the continuous underwater concrete bottom plate leakage detection and repair construction process, improves construction efficiency, and thus does not require divers to go into the water for construction; the replaceable construction unit is realized on the installation platform, and the retractable unit can be longitudinally and transversely displaced on the frame under the drive of the mobile guide mechanism, so that the retractable unit can be moved to the corresponding replaceable construction unit, which is convenient for connecting different replaceable construction units; at the same time, a walking unit is arranged on the fuselage to realize the movement of the fuselage in any direction underwater. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a structural schematic diagram of the underwater concrete bottom plate leakage detection and repairing equipment of the present invention;

[0031] Figure 2 It is a side view of the underwater concrete floor leakage detection and repairing device of the present invention;

[0032] Figure 3 It is a schematic diagram of the connection between the first docking mechanism and the matching docking mechanism in the underwater concrete bottom plate leakage detection and repairing device of the present invention;

[0033] Figure 4 It is a schematic diagram of the connection between the second docking mechanism and the matching docking mechanism in the underwater concrete bottom plate leakage detection and repairing equipment of the present invention;

[0034] Figure 5 This is a structural schematic diagram of an existing expansion joint.

[0035] In the figure, 1-fuselage, 11-second camera, 2-walking unit, 21-track wheel, 22-thruster, 23-retractable joint, 3-chassis integration, 31-frame, 32-retractable support arm, 33-second docking mechanism, 331-sleeve, 332-second sleeve rod, 34-movable guide mechanism, 341-longitudinal rail, 342-transverse rail, 343-support arm chassis, 35-installation platform, 351-first placement hole, 352-second placement hole, 36-first camera, 37-first docking mechanism, 371-first sleeve rod, 4-replaceable construction unit, 41-cooperating docking mechanism, 411-ring beam, 412-connecting rod, 42-construction mechanism, 5-waterstop, 6-potting glue, 7-fiberboard. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0037] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0040] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0041] See also Figure 1 and Figure 2 , Figure 1 The structure diagram of the underwater concrete floor leakage detection and repairing device of the present invention is as follows: Figure 2 The side view of the underwater concrete floor leakage detection and repair device of the present invention. The underwater concrete floor leakage detection and repair device comprises a fuselage 1, a walking unit 2, a chassis integration 3, a power unit and a plurality of replaceable construction units 4, wherein the walking unit 2 is arranged on the fuselage 1 and is used to drive the fuselage 1 to move in any direction in the water; the chassis integration 3 is arranged at the bottom of the fuselage 1, and the power unit can be connected with each replaceable construction unit 4 to drive each replaceable construction unit 4 to work respectively, so as to complete the operation process of underwater concrete floor leakage detection and repair.

[0042] Specifically, the chassis integration 3 includes a frame 31, a retractable unit and a mobile guide mechanism 34. The retractable unit is provided with a first camera 36, ​​and the retractable unit is installed on the mobile guide mechanism 34; the mobile guide mechanism 34 is arranged at the top of the frame 31, and is used to realize the longitudinal and lateral displacement of the retractable unit at the top of the frame 31; an installation platform 35 is provided in the frame 31, and a plurality of placement units for placing a plurality of replaceable construction units 4 are provided on the installation platform 35; the power unit is transmission-connected with the retractable unit; each replaceable construction unit 4 can be selectively connected to the retractable unit to be transmission-connected with the power unit, so that the power unit can drive the replaceable construction unit 4 to work respectively, so as to complete the operation process of underwater concrete floor leakage detection and repair. The frame 31 is a frame structure, and a mounting platform 35 is installed in the frame 31, which can be used to detachably place multiple replaceable construction units 4 on the mounting platform 35, so as to be fixedly suspended in the frame 31. A material rack is installed on the mounting platform 35, and the material rack has multiple compartments. The compartments can be used to store construction materials such as water stop strips, fiberboards, and grouting pipes. The compartment doors of the compartments are installed on the compartments through cabinet door rebounders. The power unit can drive the telescopic unit to extend or contract. When it contracts, it can stop above the mounting platform 35, that is, above the replaceable construction unit 4. The telescopic unit is driven to move by the mobile guide mechanism 34, so that the telescopic unit can be moved to the top of any replaceable construction unit 4, so that it can be connected to any replaceable construction unit 4 according to construction needs. In one embodiment, the mobile guide mechanism 34 includes two longitudinal rails 341 respectively arranged on opposite sides of the frame 31, transverse rails 342 respectively slidably arranged on the two longitudinal rails 341 at both ends, an arm chassis 343 slidably arranged on the transverse rails 342, and a driving mechanism for driving the transverse rails 342 and the arm chassis 343 to move. The longitudinal movement of the telescopic unit is achieved by the transverse rail 342 moving on the two longitudinal rails 341, and the lateral movement of the telescopic unit is achieved by the arm chassis 343 moving on the transverse rail 342. The first camera 36 can shoot the underwater environment where the replaceable construction unit 4 is located, monitor the replacement process of the replaceable construction unit 4 and the underwater construction process, and ensure the smooth completion of the underwater construction, as well as the replacement and placement of each replaceable construction unit 4 on the installation platform 35.

[0043] Please refer to Figure 3 and Figure 4 , Figure 3 It is a schematic diagram of the connection between the first docking mechanism and the matching docking mechanism in the underwater concrete bottom plate leakage detection and repairing device of the present invention, Figure 4The schematic diagram of the connection between the second docking mechanism and the matching docking mechanism in the underwater concrete floor leakage detection and repair device of the present invention. After the retractable unit is connected to the replaceable construction unit 4, its extension can extend the replaceable construction unit 4 to the outside of the frame 31. When the replaceable construction unit 4 is connected to the retractable unit, the power unit and the replaceable construction unit 4 are connected and driven through the retractable unit, so that the power unit can drive the replaceable construction unit 4 to operate. In this way, as different construction stages are advanced, different replaceable construction units 4 are continuously replaced, and each replaceable construction unit 4 stably cooperates with each other for construction, so that in the process of underwater concrete floor leakage detection and repair, each replaceable construction unit 4 cooperates with each other to complete the continuous underwater concrete floor leakage detection and repair construction process, improve the construction efficiency, and thus do not need divers to go into the water for construction. At the same time, the mobile guide mechanism 34 can drive the retractable unit to move horizontally and vertically within the range of the fuselage 1, thereby driving the replaceable construction unit 4 to move horizontally and vertically within the range of the fuselage 1, realizing the precise positioning of the construction operation point, and there is no need to frequently drive the walking unit 2 to adjust the position of the present invention. In one embodiment, the placement unit includes a placement hole opened on the installation platform 35 and a first docking mechanism 37 arranged in the placement hole; the retractable unit includes a retractable support arm 32 and a second docking mechanism 33, the top end of the retractable support arm 32 is installed on the movable guide mechanism 34 and is transmission connected to the power unit, and the second docking mechanism 33 is sleeved on the outer side of the bottom end of the retractable support arm 32; the replaceable construction unit 4 includes a matching docking mechanism 41 and a construction mechanism 42, the matching docking mechanism 41 is sleeved on the outer side of the construction mechanism 42, the matching docking mechanism 41 is suitable for docking with the first docking mechanism 37, so that the construction mechanism 42 is placed in the placement hole, and the matching docking mechanism 41 is suitable for docking with the second docking mechanism 33, so that the construction mechanism 42 is transmission connected to the retractable support arm 32, so that the power unit can drive the construction mechanism 42. That is, the docking mechanism 41 can cooperate with the first docking mechanism 37 and the second docking mechanism 33. When the docking mechanism 41 cooperates with the first docking mechanism 37, the construction mechanism 42 is fixed in the placement hole, so that the construction mechanism 42 is stored on the installation platform 35; when the docking mechanism 41 cooperates with the second docking mechanism 33, the construction mechanism 42 is connected to the telescopic arm 32, so that the construction mechanism 42 is connected to the power unit in a transmission manner to provide working power for the construction mechanism 42. That is to say, a drive circuit is provided in the telescopic arm 32, and the power unit is connected to the drive circuit in the telescopic arm 32. When the construction mechanism 42 is connected to the telescopic arm 32, the power unit is connected to the construction mechanism 42 in a transmission manner through the drive circuit, so that the power unit can drive the construction mechanism 42. The connection method of the construction mechanism 42 and the telescopic arm 32 can adopt the existing connection method, and it is only necessary to ensure the sealing of the connection between the two to prevent water from penetrating. In one embodiment, the bottom end of the telescopic arm 32 is provided with a rotating mechanism that allows the construction mechanism 42 to rotate in any direction.

[0044] Furthermore, in one embodiment, the placement hole includes a first placement hole 351 and a second placement hole 352 located below the first placement hole 351 and connected to the first placement hole 351, the diameter of the first placement hole 351 is larger than the diameter of the second placement hole 352, and a plurality of first slide grooves are evenly opened on the inner wall of the first placement hole 351 along its circumference, and the groove length direction of each first slide groove is consistent with the radial direction of the first placement hole 351, and the first docking mechanism 37 includes a first driving mechanism and a plurality of first sleeve rods 371, and the plurality of first sleeve rods 371 correspond to the plurality of first slide grooves one by one, and each first sleeve rod 371 is slidably set in the corresponding first slide groove; the second docking mechanism 33 includes a sleeve 331, a second driving mechanism and a plurality of second sleeve rods 332, the sleeve 331 is sleeved on the outer side of the bottom end of the telescopic support arm 32, and a plurality of second slide grooves are evenly opened on its outer wall along its circumference, and the groove length direction of each second slide groove is consistent with the radial direction of the first placement hole 351. In the radial direction consistent with the sleeve 331, the plurality of second sleeve rods 332 correspond one-to-one with the plurality of second sliding grooves, and each second sleeve rod 332 is slidably arranged in the corresponding second sliding groove; the matching docking mechanism 41 includes a ring beam 411 and a plurality of connecting rods 412, the ring beam 411 is sleeved on the outside of the construction mechanism 42, the diameter of the ring beam 411 is smaller than the diameter of the first placement hole 351, and larger than the diameter of the second placement hole 352 and the sleeve 331, and the plurality of connecting rods 412 are penetrated and arranged on the side wall of the ring beam 411, and are evenly arranged along the circumference of the ring beam 411; the plurality of connecting rods 412 correspond one-to-one with the plurality of first sleeve rods 371, and the first driving mechanism is used to drive each first sleeve rod 371 to slide along the corresponding first sliding groove, so that each first sleeve rod 371 abuts against or separates from the ring beam 411, so that one end of each connecting rod 412 is inserted into or separated from the corresponding first sleeve rod 371; the plurality of connecting rods 412 Corresponding one to one with multiple second sleeve rods 332, the second driving mechanism is used to drive each second sleeve rod 332 to slide along the corresponding second sliding groove, so that each second sleeve rod 332 abuts against or separates from the ring beam 411, so that one end of each connecting rod 412 is inserted into or detached from the corresponding second sleeve rod 332. When the replaceable construction is stored in the placement unit, the ring beam 411 is placed in the first placement hole 351. Since the diameter of the ring beam 411 is larger than the diameter of the second placement hole 352, the ring beam 411 is located above the second placement hole 352 at this time, and the construction mechanism 42 is suspended in the second placement hole 352. The multiple connecting rods 412 on the ring beam 411 correspond to the positions of the multiple first sleeve rods 371 respectively, and the two ends of the connecting rod 412 extend out of the ring beam 411 respectively, and then the first sleeve rod 371 is driven to slide in the direction of the ring beam 411, so that the first sleeve rod 371 abuts against the ring beam 411, and the connecting rod 412 is inserted into the corresponding first sleeve rod 371, and the ring beam 411 is fixed in the first placement hole 351 through the cooperation of the connecting rod 412 and the first sleeve rod 371, so that the replaceable construction unit 4 is fixedly placed in the placement unit.When the retractable unit needs to be connected to the replaceable construction unit 4, the retractable arm 32 is retracted so that its bottom end is located above the mounting platform 35, and the retractable arm 32 is moved to the corresponding replaceable construction unit 4 by the movable guide mechanism 34, and the retractable arm 32 is extended so that the sleeve 331 extends into the ring beam 411, and the plurality of second sleeve rods 332 respectively correspond to the positions of the plurality of connecting rods 412, and then the second sleeve rod 332 is driven to slide in the direction of the ring beam 411, so that the second sleeve rod 332 abuts against the ring beam 411, The connecting rod 412 is inserted into the corresponding second sleeve rod 332, and the ring beam 411 is fixed on the sleeve through the cooperation between the connecting rod 412 and the second sleeve rod 332, so that the replaceable construction unit 4 is fixed on the telescopic unit, and then the first sleeve rod 371 is driven to slide in the direction away from the ring beam 411, so that the first sleeve rod 371 is separated from the ring beam 411, and the first sleeve rod 371 is separated from the corresponding connecting rod 412. At this time, the telescopic unit can drive the replaceable construction unit 4 to detach from the placement unit.

[0045] In one embodiment, the second docking mechanism 33 is rotatably disposed on the outer side of the bottom end of the telescopic arm 32, and a first camera 36 and a first lighting device are disposed on the second docking mechanism 33. The device facilitates adjustment of the position of the second docking mechanism 33, and illuminates the shooting range of the first camera 36 through the first lighting device, so that the replacement process of the replaceable construction unit 4 and the underwater construction process can be more clearly monitored.

[0046] Furthermore, the construction mechanism 42 is any one of a cleaning end head, a hydraulic cutting machine, a hydraulic drill, a grouting pipe, a sealing glue gun head, an acoustic wave detector, a laser rangefinder, and a clamping manipulator, and the cleaning end head includes a cleaning brush and nozzles arranged on both sides of the cleaning brush. Each construction mechanism 42 is integrated with a sensor for collecting its working data, such as a pressure sensor on the cleaning end head, the grouting pipe, and the sealing glue gun head, and an angle sensor on the hydraulic cutting machine and the hydraulic drill. The power unit provides working power for the construction mechanism 42. According to the type of the construction mechanism 42, the power unit includes an oil cylinder, a pressure pump, a power supply device, a grouting material storage tank, a sealing glue storage tank, and a flushing water storage tank. A hydraulic oil pipe, a flushing water pipe, a first delivery pipe, a second delivery pipe and an electric wire are provided in the retractable arm 32. The oil cylinder is connected to the hydraulic oil pipe, the power supply device is connected to the electric wire, and there are three pressure pumps, namely the first pressure pump, the second pressure pump and the third pressure pump. The first pressure pump is respectively connected to the flushing water storage tank and the flushing water pipe, the second pressure pump is respectively connected to the grouting material storage tank and the first delivery pipe, and the third pressure pump is respectively connected to the potting glue storage tank and the second delivery pipe.When the cleaning end is connected to the telescopic arm 32, the nozzle is connected to the flushing water pipe, and the first pressure pump has two modes of forward and reverse rotation. When the first pressure pump is rotated forward, the water in the flushing water storage tank can be sprayed from the nozzle to the dirty parts of the concrete; when the first pressure pump is reversed, the external turbid water can be sucked into the flushing water storage tank, so that before visual observation, the surface aquatic organisms, silt and other impurities of the structure can be removed through the cleaning end; when the hydraulic cutting machine is connected to the telescopic arm 32, the hydraulic cutting machine is connected to the hydraulic oil pipe, and the cylinder provides power to the hydraulic cutting machine through the hydraulic oil pipe. The hydraulic cutting machine can efficiently cut and process loose concrete defective parts underwater; when the hydraulic drill is connected to the telescopic arm 32, the hydraulic drill is connected to the hydraulic oil pipe, and the cylinder provides power to the hydraulic drill through the hydraulic oil pipe. The hydraulic drill can efficiently drill holes in the concrete base plate, roughen the surface and perform other construction operations underwater; when the grouting pipe is connected to the telescopic arm 32, the grouting pipe and the first The delivery pipe is connected, the second pressure pump is started, and the slurry in the grouting material storage tank is injected into the expansion joint through the grouting pipe; when the potting glue gun head is connected to the telescopic support arm 32, the potting glue gun head is connected to the second delivery pipe, the third pressure pump is started, and the potting glue in the potting glue storage tank is injected into the expansion joint surface through the potting glue gun head; when the sound wave detector is connected to the telescopic support arm 32, the sound wave detector is connected to the electric wire, and the sound wave detector can perform an all-round scan of the concrete in a certain area; when the laser rangefinder is connected to the telescopic support arm 32, the laser rangefinder is connected to the electric wire, and the laser rangefinder can measure the height difference of the concrete bottom plate and the relative distance between the part to be repaired and other structures; when the clamping manipulator is connected to the telescopic support arm 32, the clamping manipulator is connected to the hydraulic oil pipe, and the oil cylinder provides power to the clamping manipulator through the hydraulic oil pipe, and the fiberboard, water stop needle, grouting pipe, expansion bolt, nut and other accessories can be clamped by the clamping manipulator, and they are inserted, hit or screwed into the part to be installed.

[0047] In order to obtain the image of the surrounding environment during the underwater swimming and walking of the present invention, in one embodiment, the front and rear ends of the fuselage 1 are both provided with a second camera 11 and a second lighting device that can rotate 360 ​​degrees.

[0048] In one embodiment, the present invention further includes a control integration system, which is used to control the operation of the present invention, such as the control integration system is in communication connection with the retractable unit, and the retractable unit is in communication connection with the replaceable construction unit 4 connected thereto. The replaceable construction unit 4 is controlled to operate by the control integration system. The control integration system controls the power transmission between the power unit and the replaceable construction unit 4 to control the start or shut down of the replaceable construction unit 4. The control integration system provides an accurate visual construction operation window, and the control integration system may include a controller, a control panel, and a display screen. The control panel is provided with an operating handle and a plurality of command buttons, and the display screen is used to display the real-time monitoring images of the first underwater camera and the second underwater camera, and display the data of the gyroscope at the same time.

[0049] The walking unit 2 is used to drive the fuselage 1 to move in any direction in the water. In one embodiment, the walking unit 2 includes a plurality of pairs of track wheels 21 symmetrically arranged at the bottom of the frame 31 and a plurality of propellers 22 arranged on the fuselage 1. The propellers 22 can realize the forward, backward, turning, floating and diving of the fuselage 1. The track wheels 21 are used to walk on the concrete bottom plate. The plurality of propellers 22 form a pair of two. The two propellers 22 in each pair are respectively arranged on both sides of the fuselage 1. According to the orientation of the propellers 22, they are divided into two categories, one is horizontal orientation and the other is vertical orientation. By controlling the power of different propellers 22, the forward, backward, turning, floating and diving of the fuselage 1 can be realized, so that the fuselage 1 can move in any direction in the water. In one embodiment, a retractable joint 23 is provided on the track wheel 21, the top of which is connected to the frame 31, the track wheel 21 can rotate around the axis, and a plurality of gyroscopes are installed on the fuselage 1. Since the concrete bottom plates on both sides of the expansion joint may be misaligned, the track wheel 21 is provided with a retractable joint 23. According to the misalignment of the concrete bottom plates on both sides of the expansion joint, the length of the retractable joint 23 is adjusted to ensure that the present invention can move smoothly along the misaligned expansion joints with different elevations. The fuselage 1 is equipped with multiple gyroscopes to monitor the stability of the equipment underwater. When the deviation of the data detected by each gyroscope exceeds a certain value, the retractable joint 23 is adjusted accordingly to ensure that the present invention is always in a balanced and stable state during the construction process.

[0050] The working process of the present invention is as follows:

[0051] (1) Visual observation

[0052] At the initial stage of leakage, the present invention is placed in water to visually observe the key observation area. If the observation area is blocked by surface aquatic organisms, silt, etc., the cleaning end can be connected to the retractable arm 32, and the surface aquatic organisms and silt can be cleaned by the nozzle and the cleaning brush to achieve a neat and observable base surface. Then the laser rangefinder is connected to the retractable arm 32, and the misalignment and distortion of the bottom plate at the expansion joint is directly measured by the laser rangefinder to obtain the length and width of the crack at the expansion joint.

[0053] (2) Nondestructive testing

[0054] For areas where deep cracks need to be nondestructively tested, the sonic detector is connected to the retractable arm 32, and the sonic detector is turned on to perform a two-dimensional cross-sectional scan of the concrete in the area at a certain sampling interval. After collecting the two-dimensional data of each cross section, it is synthesized into a three-dimensional image of the area, which can intuitively understand the status of the internal defects of the concrete. During the scanning process, the coordinate information of each signal is synchronously recorded, which can facilitate the rapid location of concrete defects during subsequent leakage repairs.

[0055] (3) Expansion joint leakage repair

[0056] The main cause of leakage at the expansion joint is that the concrete base plates on both sides of the expansion joint are misaligned or pulled apart, causing the buried waterstop to tear, or the waterstop itself is twisted or misplaced during the concrete construction and pouring process, so the waterstop in the expansion joint cannot play its anti-seepage function. The underwater leakage repair work mainly includes: chiseling out defective concrete, installing new waterstop, installing fiberboard in the expansion joint, injecting sealant on the surface of the expansion joint, underwater formwork, underwater grouting or pouring fine stone concrete to fill the misaligned position.

[0057] By connecting a hydraulic cutter to the retractable arm 32, the concrete around the expansion joint is chiseled and cut by the hydraulic cutter, and then the retractable arm 32 is connected to a cleaning end head, and the base surface is cleaned by the cleaning end head, and then the retractable arm 32 is connected to a clamping manipulator, and the water stop stored on the platform of the frame 31 is picked up by the clamping manipulator, and the installation is fixed to the intended installation position, and the fiberboard in the expansion joint is installed by the clamping manipulator. After the land crane lifts the template to the position to be repaired in the water, the expansion bolt is driven into the concrete below the bolt rod hole of the template by the clamping manipulator, and the nut is screwed on to fix the template. The grouting pipe is replaced on the retractable arm 32, and the grouting pipe can be used to grout or pour fine stone concrete in the template. After the demolding conditions are met, the clamping manipulator is replaced on the retractable arm 32, and the nut is removed, and then the hydraulic cutter is replaced on the retractable arm 32, and the protruding part of the screw rod is cut off by the hydraulic cutter, and the land crane lifts the underwater template. A sealing glue gun head is replaced on the telescopic support arm 32, and sealing glue is injected into the surface layer of the expansion joint through the sealing glue gun head to complete the repair work of the underwater expansion joint.

[0058] (4) Repair of floor cracks

[0059] When the concrete floor is hollowed out, twisted and deformed, or there are concrete defects due to poor construction quality control, the concrete will be further aggravated after being loaded, which can lead to a large number of serious cracks in the floor. The crack repair method is usually to drill holes on both sides of the crack, penetrate the crack from the outside to the inside of the crack, insert a grouting nozzle slightly smaller than the aperture, and perform pressure grouting on the crack. The crack can be non-destructively tested by an acoustic wave detector, and the repair personnel determine the key parameters such as the drilling position, size, hole depth, and drilling angle according to the severity of the crack. The crack coordinate information is recorded during the non-destructive testing process. During the repair stage, the location of the crack to be repaired can be quickly found according to the previously recorded coordinate information and the underwater camera. Then, a hydraulic drill is connected to the retractable arm 32, and underwater drilling is performed by the hydraulic drill. Then, a grouting pipe is replaced on the retractable arm 32, and the grouting nozzle is automatically driven in and slurry is injected. The grouting time, pressure and other parameter information and the overflow of slurry on the crack can be displayed on the onshore operation screen, which is convenient for better grouting control. After the slurry solidifies, the sonic detector is replaced on the telescopic arm 32, and the original defective part can be non-destructively tested again by the sonic detector to obtain the repair effect of the concrete defect and complete the acceptance work of the underwater concrete crack repair.

[0060] Compared with the prior art, the present invention has the following beneficial effects: it has a plurality of replaceable construction units 4, which can meet the requirements of different types of underwater construction, and can realize the functions of underwater leakage detection, underwater leakage repair and acceptance after repair; the power unit and the plurality of replaceable construction units 4 can be configured to be separated from each other, so that they can be stored and used independently, and the replaceable construction units 4 can be used to replace the construction units 4. When docked with the retractable unit, power transmission is formed with the power unit, so that the power unit provides construction driving force for each replaceable construction unit 4, and each replaceable construction unit 4 stably cooperates with each other in construction, so that in the process of underwater concrete floor leakage detection and repair, each replaceable construction unit 4 cooperates with each other to complete the continuous underwater concrete floor leakage detection and repair construction process, improves construction efficiency, and thus does not require divers to go into the water for construction; the replaceable construction unit 4 is placed on the installation platform 35, and the retractable unit can be moved longitudinally and laterally on the frame 31 under the drive of the mobile guide mechanism 34, so that the retractable unit can be moved to the corresponding replaceable construction unit 4, which is convenient for connecting different replaceable construction units 4; at the same time, a walking unit 2 is set on the fuselage 1 to realize the movement of the fuselage 1 in any direction underwater.

[0061] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Therefore, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. An underwater concrete floor leakage detection and repair equipment, It is characterized in that It includes a fuselage, a walking unit, a chassis integration, a power unit and a plurality of replaceable construction units, wherein the walking unit is arranged on the fuselage and is used to drive the fuselage to move in any direction in the water; The chassis integration includes a frame, a retractable unit and a mobile guiding mechanism, the retractable unit is provided with a first camera, and the retractable unit is mounted on the mobile guiding mechanism; The mobile guide mechanism is arranged at the top of the frame, and is used to realize the longitudinal and lateral displacement of the telescopic unit at the top of the frame; the mobile guide mechanism includes two longitudinal rails respectively arranged on opposite sides of the frame, transverse rails respectively arranged on the two longitudinal rails at both ends, a support arm chassis slidably arranged on the transverse rails, and a driving mechanism for driving the transverse rails and the support arm chassis to move; The frame is provided with a mounting platform, and the mounting platform is provided with a plurality of placement units for placing a plurality of replaceable construction units; the placement units include a placement hole opened on the mounting platform and a first docking mechanism arranged in the placement hole; The retractable unit comprises a retractable arm and a second docking mechanism, the top end of the retractable arm is mounted on the moving guide mechanism and is transmission-connected to the power unit, and the second docking mechanism is sleeved on the outer side of the bottom end of the retractable arm; The replaceable construction unit includes a matching docking mechanism and a construction mechanism, the matching docking mechanism is sleeved on the outside of the construction mechanism, the matching docking mechanism is suitable for docking with the first docking mechanism, so that the construction mechanism is placed in the placement hole, and the matching docking mechanism is suitable for docking with the second docking mechanism, so that the construction mechanism is transmission-connected to the telescopic support arm, so that the power unit can drive the construction mechanism; The power unit is transmission-connected with the retractable unit; Each of the replaceable construction units can be selectively connected to the retractable unit to be transmission-connected with the power unit, so that the power unit can drive the replaceable construction units to work respectively to complete the underwater concrete floor leakage detection and repair operation process.

2. The underwater concrete floor leakage detection and repairing equipment according to claim 1, It is characterized in that The placement hole comprises a first placement hole and a second placement hole located below the first placement hole and connected to the first placement hole, the diameter of the first placement hole is larger than the diameter of the second placement hole, a plurality of first slide grooves are evenly opened on the inner wall of the first placement hole along its circumference, the groove length direction of each of the first slide grooves is consistent with the radial direction of the first placement hole, the first docking mechanism comprises a first driving mechanism and a plurality of first sleeve rods, the plurality of first sleeve rods correspond to the plurality of first slide grooves one by one, and each of the first sleeve rods is slidably arranged in the corresponding first slide groove; The second docking mechanism includes a sleeve, a second driving mechanism and a plurality of second sleeve rods. The sleeve is sleeved on the outer side of the bottom end of the telescopic support arm, and a plurality of second slide grooves are evenly opened on its outer wall along its circumference. The groove length direction of each second slide groove is consistent with the radial direction of the sleeve. The plurality of second sleeve rods correspond to the plurality of second slide grooves one by one, and each second sleeve rod is slidably arranged in the corresponding second slide groove. The mating mechanism comprises a ring beam and a plurality of connecting rods, the ring beam is sleeved outside the construction mechanism, the diameter of the ring beam is smaller than the diameter of the first placement hole, and larger than the diameter of the second placement hole and the sleeve, and the plurality of connecting rods are penetrated and arranged on the side wall of the ring beam and are evenly arranged along the circumference of the ring beam; The plurality of connecting rods correspond to the plurality of first sleeve rods one by one, and the first driving mechanism is used to drive each first sleeve rod to slide along the corresponding first sliding groove, so that each first sleeve rod abuts against or separates from the ring beam, thereby allowing one end of each connecting rod to be inserted into or separated from the corresponding first sleeve rod; The multiple connecting rods and the multiple second sleeve rods correspond one to one, and the second driving mechanism is used to drive each second sleeve rod to slide along the corresponding second sliding groove, so that each second sleeve rod abuts against or separates from the ring beam, thereby allowing one end of each connecting rod to be inserted into or detached from the corresponding second sleeve rod.

3. The underwater concrete floor leakage detection and repairing equipment according to claim 1, It is characterized in that The second docking mechanism is rotatably arranged on the outer side of the bottom end of the telescopic support arm, and the first camera is provided with a first lighting device.

4. The underwater concrete floor leakage detection and repairing equipment according to claim 1, It is characterized in that The construction mechanism is any one of a cleaning end, a hydraulic cutting machine, a hydraulic drill, a grouting pipe, a sealing glue gun head, a sonic detector, a laser rangefinder, and a clamping manipulator.

5. The underwater concrete floor leakage detection and repairing equipment according to claim 1, It is characterized in that The front and rear ends of the fuselage are both provided with a second camera and a second lighting device which can rotate 360 ​​degrees.

6. The underwater concrete floor leakage detection and repairing equipment according to claim 1, It is characterized in that It also includes a control integration system, which is communicatively connected to the telescopic unit, and the telescopic unit is communicatively connected to the replaceable construction unit connected thereto.

7. The underwater concrete floor leakage detection and repairing equipment according to claim 1, It is characterized in that The walking unit comprises a plurality of pairs of track wheels symmetrically arranged at the bottom of the frame and a plurality of propellers arranged on the fuselage, and the propellers can realize the forward, backward, turning, floating and diving of the fuselage.

8. The underwater concrete floor leakage detection and repairing device according to claim 7, It is characterized in that The track wheel is provided with a telescopic joint, the top end of the telescopic joint is connected to the frame, the track wheel can rotate around the axis, and a plurality of gyroscopes are arranged on the machine body.