A system and method for dynamic on-site verification of relay protection device setting values

By using a digital real-time dynamic simulation system and a distributed protection mobile test device to calibrate relay protection devices at the power plant/substation site, the problems of unreliable calibration results and high cost in the existing technology are solved, and an efficient, Comprehensive and reliable calibration results reduce laboratory resource usage.

CN113267696BActive Publication Date: 2024-10-29SICHUAN HUANENG BAOXINGHE HYDROPOWER CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110562827.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-24
Publication Date
2024-10-29
Estimated Expiration
2041-05-24

AI Technical Summary

Technical Problem

The existing relay protection device fixed value calibration system has problems such as inconsistency of field equipment, inability to fully verify, and high cost when calibrated in the laboratory. This results in low reliability of the calibration results and the inability to discover hidden defects.

Method used

An on-site dynamic calibration system for the fixed value of relay protection devices is adopted, including a digital real-time dynamic simulation system and a distributed protection mobile test device. The calibration is carried out on-site at the power plant/substation and the integration of the distributed protection mobile test device is used. The power amplifier and signal conversion device are combined with a universal wheel and aluminum alloy structure to realize flexible movement and wiring of signals and power. It adopts a hot-swappable design and an integrated device for calibration.

Benefits of technology

It realizes on-site value verification of relay protection devices, improves the reliability and comprehensiveness of the verification, reduces costs, avoids the occupation of laboratory resources, and discovers hidden defects that are not easily discovered, and the device Miniature, high reliability and easy to use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113267696B_ABST
    Figure CN113267696B_ABST
Patent Text Reader

Abstract

The present invention discloses a system for on-site dynamic verification of the fixed value of a relay protection device, including a digital real-time dynamic simulation system, a distributed protection mobile test device connected to the digital real-time dynamic simulation system, a plurality of relay protection devices to be verified whose input ends are connected to the distributed protection mobile test device, and a circuit breaker correspondingly connected to each relay protection device; wherein the output end of the relay protection device and the output end of the circuit breaker are also connected to the digital real-time dynamic simulation system. The verification method of the present invention adopts a scheme for verifying the relay protection device on site at a power plant / substation. The relay protection device verified is the protection device actually used on site, which is completely close to reality, and the verification result is completely reliable; if there are some hidden defects that are not easy to be found on site, they can also be discovered in time, making the verification more systematic and comprehensive. Therefore, it is suitable for promotion and application.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of relay protection devices, and in particular to a system and method for dynamically checking the setting value of a relay protection device on site. Background Art

[0002] Relay protection devices are key devices that detect faults and anomalies in the power system and isolate or remove related equipment to ensure the safe and stable operation of the power system. At present, the number of unplanned equipment outages caused by problems in the relay protection profession itself is still relatively high. Damage to primary electrical equipment and expansion of accidents caused by incorrect protection action occur from time to time, which poses risks to the safe and stable operation of the power system and electrical equipment. The reason is that unreasonable setting of protection settings is an important factor causing incorrect relay protection action. Equipment outages caused by settings account for 21.9% of the total number of equipment outages caused by relay protection. To fundamentally solve the incorrect protection action caused by relay protection device settings, it is necessary to use analog quantities and switch quantities under equipment failure conditions to verify the protection action and circuit breaker action.

[0003] From the current situation, a few laboratories can use the relay protection device constant value verification system to verify these constant values ​​in the laboratory, that is, in the relevant laboratory, the constant values ​​are input into the same protection device as the on-site one, and the power plant / substation system parameters and primary equipment parameters are used to model in the simulation system, and then various faults are simulated to verify the action of the protection device. This verification method has the following problems: (1) In many cases, the laboratory cannot find the same relay protection device as the power plant / substation on-site, or there are differences in model, wiring method, software version, etc. with the on-site protection device, resulting in inconsistency with the on-site equipment and low reliability of the verification results; (2) It is impossible to actually verify the on-site equipment of the power plant / substation, and some hidden defects that are not easy to be found cannot be found, resulting in the inability to achieve systematic and comprehensive verification; (3) The constant value verification in the laboratory requires continuous occupation of laboratory equipment for a long time, and the verification cost is high. Summary of the invention

[0004] The purpose of the present invention is to provide a system and method for on-site dynamic verification of relay protection device settings, mainly to solve the problem that the existing verification system is inconvenient to install and use on site.

[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0006] A system for dynamically checking the setting of a relay protection device on site comprises a digital real-time dynamic simulation system, a distributed protection mobile test device connected to the digital real-time dynamic simulation system, a plurality of relay protection devices to be checked whose input ends are connected to the distributed protection mobile test device, and a circuit breaker correspondingly connected to each relay protection device; wherein the output ends of the relay protection devices and the output ends of the circuit breakers are also connected to the digital real-time dynamic simulation system.

[0007] Furthermore, the distributed protection mobile testing device includes an installation cabinet, a multi-layer working platform reserved inside the installation cabinet, a signal conversion device, an integrated power amplifier and a power supply unit arranged on the working platform from top to bottom, and a universal wheel arranged at the bottom of the installation cabinet; wherein, the installation cabinet is hollowed out at the front and back, and aluminum alloy plates with rectangular holes are installed on the left and right sides of the installation cabinet; the integrated power amplifier is communicatively connected with the signal conversion device.

[0008] Furthermore, the integrated power amplifier is provided with a switch quantity input and output interface, a control button and a display light at the front, and an analog quantity output interface and a cooling fan at the rear.

[0009] Furthermore, the connection wires of the analog output interface and the switch input and output interface of the integrated power amplifier are designed to be hot-swappable wires dedicated for relay protection testing.

[0010] Furthermore, the power supply unit comprises three parts: an air switch, a socket, and a wiring terminal. It adopts a three-phase AC power supply line and is equipped with a three-phase incoming line air switch. Each device is configured with a two-phase air switch. The power supply unit leads the AC power to each device through the socket and power cord.

[0011] Furthermore, a grounding copper busbar is provided at the lower part of the installation cabinet, and a plurality of circular holes are symmetrically punched on the grounding copper busbar. The grounding terminals of the signal conversion device, the integrated power amplifier and the power supply unit are connected to the grounding copper busbar by using a dedicated grounding wire.

[0012] Furthermore, four universal wheels are provided, and all four universal wheels are provided with a locking mechanism.

[0013] Furthermore, handrails are provided on the left and right sides of the top of the installation cabinet.

[0014] Based on the above-mentioned on-site dynamic verification system for setting values ​​of relay protection devices, the present invention also provides a verification method, comprising the following steps:

[0015] (S1) Modeling in a digital real-time dynamic simulation system according to actual electrical primary parameters;

[0016] (S2) performing open-loop simulations of different fault types and fault points in the modeled system; and determining whether the simulation results match;

[0017] (S3) If the simulation results do not match, analyze the cause and modify the configuration, and return to the previous step; if the simulation results match, proceed to the next step;

[0018] (S4) connecting the relay protection device to be verified, using the digital real-time dynamic simulation system to simulate the normal operation of the system when it is unloaded and with different loads, recording the voltage and current analog sampling values ​​of the protection device when the system is unloaded and with different loads, and comparing them with the voltage and current values ​​calculated by the digital real-time dynamic simulation system, so that the error is less than a set value;

[0019] (S5) using the digital real-time dynamic simulation system to simulate the output signals of the switching quantities of the verification system, so as to check the correct displacement of the corresponding input quantities of the protection device; short-circuiting the action signals of the protection device, opening and closing the circuit breaker, so that the digital real-time dynamic simulation system can correctly collect the input quantity signals;

[0020] (S6) using the verification system to simulate the fault of the electrical primary equipment to be verified, perform closed-loop simulation, record the action of the protection device to be verified, derive the fault waveform of the protection device, and analyze whether the protection action is correct;

[0021] (S7) If it is incorrect, analyze the cause, modify the protection setting, and return to step (S6) to simulate the same fault; if it is correct, return to step (S6) to simulate other faults until all fault points are simulated and the verification is terminated.

[0022] Furthermore, in the step (S4), the specific access method of the relay protection device to be checked is: input the protection setting to be checked into the protection device at the production site; according to the normal operation mode of the power system, the function connection and output connection of the protection device are put into operation according to the protection setting; the power amplifier of the relay protection simulation system is connected to the relevant current and voltage circuit wiring of the protection device to be checked, and the opening and closing positions of the circuit breaker controlled by the protection device to be checked are connected to the switch quantity input module wiring of the relay protection simulation system.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] (1) The verification system of the present invention realizes the integration of multiple devices including digital real-time dynamic simulation, signal conversion device, power amplifier, etc., so that the verification system is miniaturized and it is more convenient to conduct relay protection setting verification on site.

[0025] (2) The distributed protection mobile test device of the present invention installs a signal conversion device and multiple power amplifiers on an installation cabinet equipped with universal wheels. It can be moved to a required location according to actual needs on site, and is easy to use. The analog and switch signals of the device are led out using special test wires for relay protection. It is fully hot-swappable and has a convenient and flexible wiring design.

[0026] (3) The distributed protection mobile test device in the present invention has high integration and lower cost; the plug-in type wiring between the original signal conversion device and the power amplifier is changed to a circuit board inside the integrated power amplifier, thereby avoiding hidden dangers such as poor contact of terminal wiring and having high reliability.

[0027] (4) The distributed protection mobile test device in the present invention adopts an aluminum alloy structure with high strength and light weight. A platform is reserved on the upper part for placing a portable workstation of the digital dynamic simulation system, and a power supply unit is integrated at the bottom. The external AC power supply only needs to be introduced into the lower terminal of the device, which saves time and effort.

[0028] (5) The verification method of the present invention adopts a scheme of verifying the relay protection device on site at the power plant / substation. The relay protection device verified is the protection device actually used on site, which is completely close to reality and the verification result is completely reliable. If there are some hidden defects that are not easy to be found on site, they can also be discovered in time, making the verification more systematic and comprehensive.

[0029] (6) The verification method of the present invention can be used for verification when the entire power plant / substation is shut down for maintenance or when a single set of protection devices is out of operation. It does not require laboratory resources, has lower costs, and is more operational. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a block diagram of the overall structural principle of the present invention.

[0031] Figure 2 It is a front view of the distributed protection mobile testing device in the present invention.

[0032] Figure 3 It is a rear view of the distributed protection mobile testing device in the present invention.

[0033] Figure 4 It is a side view of the distributed protection mobile testing device in the present invention.

[0034] Figure 5 It is a schematic diagram of the process of the present invention.

[0035] The names corresponding to the reference numerals are:

[0036] 1-installation cabinet, 2-working platform, 3-signal conversion device, 4-integrated power amplifier, 5-power supply unit, 6-universal wheel, 7-aluminum alloy plate, 8-switch input and output interface, 9-control button, 10-display light, 11-analog output interface, 12-cooling fan, 13-air switch, 14-socket, 15-terminal block, 16-grounding copper busbar, 17-handrail. DETAILED DESCRIPTION

[0037] The present invention is further described below in conjunction with the accompanying drawings and embodiments. The embodiments of the present invention include but are not limited to the following embodiments.

[0038] Example

[0039] like Figures 1 to 4 As shown, the present invention discloses a system for on-site dynamic verification of relay protection device constants, comprising a digital real-time dynamic simulation system, a distributed protection mobile test device connected to the digital real-time dynamic simulation system, a plurality of relay protection devices to be verified whose input ends are connected to the distributed protection mobile test device, and a circuit breaker correspondingly connected to each relay protection device; wherein the output ends of the relay protection devices and the output ends of the circuit breakers are also connected to the digital real-time dynamic simulation system.

[0040] A distributed protection mobile test device includes an installation cabinet 1, a multi-layer work platform 2 reserved inside the installation cabinet 1, and an anti-slip mat is laid on the work platform. The work platform is provided with a signal conversion device 3, an integrated power amplifier 4 and a power supply unit 5 from top to bottom, wherein multiple integrated power amplifiers 4 can be provided, and two are provided in this embodiment. The signal conversion device is connected to an external digital dynamic simulation system through an optical fiber interface, and is used to expand the optical fiber interface of the digital dynamic simulation system to meet the use of multiple sets of integrated power amplifiers. The integrated power amplifier and the signal conversion device are connected by pigtails or optical cables according to the distance, and the digital quantity signal output from the digital dynamic simulation system is converted into an AC or DC small signal, and the small signal is converted into a standard voltage, current and other analog signals through an internal circuit board and output to the relay protection device, and the protection action signal of the relay protection device and the switch quantity signals such as the opening and closing position of the (simulated) circuit breaker are converted into digital quantities and returned to the digital dynamic simulation system.

[0041] In addition, the installation cabinet 1 is hollowed out at the front and back, and aluminum alloy plates 7 with rectangular holes are installed on the left and right sides of the installation cabinet 1 to facilitate heat dissipation of the equipment. The front of the integrated power amplifier 5 is provided with a switch input and output interface 8, a control button 9 and a display light 10, and the rear is provided with an analog output interface 11 and a cooling fan 12. The connection wires of the analog output interface and the switch input and output interface of the integrated power amplifier 4 are designed as hot-swappable wires dedicated to relay protection testing.

[0042] In this embodiment, the power supply unit includes three parts: an air switch 13, a socket 14, and a wiring terminal 15. A three-phase AC power supply is adopted and is equipped with a three-phase incoming air switch. Each device is equipped with a two-phase air switch. The power supply unit leads the AC power to each device through the socket and power cord.

[0043] In this embodiment, a grounding copper bar 16 with a length, width and thickness of 475mm*25mm*4mm is provided at the lower part of the installation cabinet 1. Two circular holes with a diameter of 14mm and 20 circular holes with a diameter of 10mm are symmetrically punched on the grounding copper bar. The grounding terminals of each device adopt 4mm 2 The dedicated grounding wire is connected to the grounding copper busbar.

[0044] In this embodiment, four universal wheels 6 are arranged under the installation cabinet, and all of the four universal wheels have locking mechanisms, and handrails 17 are arranged on the left and right sides of the top of the installation cabinet 1, so as to facilitate the overall movement of the device and facilitate its use.

[0045] like Figure 5 As shown, when the verification is carried out specifically, the system and electrical primary equipment parameters, main wiring methods, etc. involved in the relay protection device setting are first collected and sorted, and modeling is carried out in the digital dynamic simulation platform according to the collected system and electrical primary equipment parameters, main wiring methods, etc.; different fault types and fault points of the electrical primary equipment corresponding to the protection device to be verified are set in the relay protection device setting verification system. Fault types include single-phase grounding, two-phase short circuit, two-phase short circuit grounding, three-phase short circuit, turn-to-turn short circuit, line break, system oscillation, frequency deviation from normal value, etc.; fault points refer to different fault locations, such as between 0% and 100% of the transmission line, a certain position of the transformer winding, etc.

[0046] In the verification system, open-loop simulation of different fault types and fault points of electrical primary equipment is performed, the fault waveform is recorded, and it is analyzed whether the fault waveform is correct and complete; if it is not correct, analyze the cause and modify it, then return to the previous step, if it is correct, proceed to the next step.

[0047] Input the protection setting to be verified into the protection device at the production site; according to the normal operation mode of the power system, put the protection device function connection and export connection into operation according to the protection setting; connect the power amplifier of the relay protection simulation system to the relevant current and voltage circuit wiring of the protection device to be verified, and connect the opening and closing positions of the circuit breaker controlled by the protection device to be verified to the switch quantity input module wiring of the relay protection simulation system; use the digital dynamic simulation platform to simulate the normal operation of the system with no load and different loads. Different loads refer to: 25%, 50%, 75%, and 100% of the rated capacity for generators and transformers; 25%, 50%, 75%, and 100% of the capacity of the power station / substation to which the busbar and transmission line belong.

[0048] Record the voltage and current analog sampling values ​​of the protection device when the system is unloaded and with different loads, compare them with the voltage and current values ​​calculated in the simulation system, calculate the sampling error, and make the sampling error less than 2.5%.

[0049] The digital real-time dynamic simulation system is used to simulate and check the output signals of each switch quantity of the system to check the correct displacement of the corresponding input quantity of the protection device; the action signal of the protection device is short-circuited, and the circuit breaker is opened and closed, so that the digital real-time dynamic simulation system can correctly collect the input quantity signal.

[0050] Use the verification system to simulate the fault of the electrical primary equipment to be verified, perform closed-loop simulation, record the action of the protection device to be verified, derive the fault waveform of the protection device, and analyze whether the protection action is correct. If it is not correct, analyze the cause, modify the protection setting, and simulate the same fault again; if it is correct, perform other fault simulations until all fault points are simulated and the verification is ended.

[0051] Through the above design, the verification method of the present invention adopts the scheme of verifying the relay protection device on site in the power plant / substation. The verified relay protection device is the protection device actually used on site, which is completely close to reality and the verification result is completely reliable. If there are some hidden defects that are not easy to be found on site, they can also be discovered in time, making the verification more systematic and comprehensive. Therefore, it has high use value and promotion value.

[0052] The above embodiment is only one of the preferred implementation modes of the present invention and should not be used to limit the protection scope of the present invention. Any changes or modifications that are made to the main design concept and spirit of the present invention and have no substantive significance, and the technical problems they solve are still consistent with the present invention, should be included in the protection scope of the present invention.

Claims

1. A verification method for a relay protection device setting value on-site dynamic verification system, characterized in that: It includes a digital real-time dynamic simulation system, a distributed protection mobile test device connected to the digital real-time dynamic simulation system, a plurality of relay protection devices to be calibrated whose input ends are connected to the distributed protection mobile test device, and a circuit breaker correspondingly connected to each relay protection device; wherein the output end of the relay protection device and the output end of the circuit breaker are also connected to the digital real-time dynamic simulation system; The calibration method of the calibration system comprises the following steps: (S1) Modeling in a digital real-time dynamic simulation system according to actual primary electrical parameters; (S2) performing open-loop simulation of different fault types and fault points in the modeled system; and determining whether the simulation results match; (S3) If the simulation results do not match, analyze the cause and modify the configuration, and return to the previous step; if the simulation results match, proceed to the next step; (S4) Connect the relay protection device to be verified, use the digital real-time dynamic simulation system to simulate the normal operation of the system when it is unloaded and with different loads, record the voltage and current analog sampling values ​​of the protection device when the system is unloaded and with different loads, and compare them with the voltage and current values ​​calculated by the digital real-time dynamic simulation system to make the error less than a set value; (S5) Use the digital real-time dynamic simulation system to simulate the output signals of the switch quantities of the verification system to check the correct displacement of the corresponding input quantity of the protection device; short-circuit the action signal of the protection device and open and close the circuit breaker to enable the digital real-time dynamic simulation system to correctly collect the input quantity signal; (S6) Using the verification system to simulate the fault of the electrical primary equipment to be verified, perform closed-loop simulation, record the action of the protection device to be verified, derive the fault waveform of the protection device, and analyze whether the protection action is correct; (S7) If it is incorrect, analyze the cause, modify the protection setting, and return to step (S6) to simulate the same fault; if it is correct, return to step (S6) to simulate other faults until all fault points are simulated and the verification is terminated.

2. The verification method of the relay protection device setting value on-site dynamic verification system according to claim 1 is characterized in that: The distributed protection mobile test device comprises an installation cabinet (1), a multi-layer work platform (2) reserved inside the installation cabinet (1), a signal conversion device (3), an integrated power amplifier (4) and a power supply unit (5) arranged on the work platform (2) in order from top to bottom, and a universal wheel (6) arranged at the bottom of the installation cabinet (1); wherein the installation cabinet (1) is hollowed out at the front and back, and aluminum alloy plates (7) with rectangular holes are installed on the left and right sides of the installation cabinet (1); and the integrated power amplifier (4) is communicatively connected with the signal conversion device (3).

3. The verification method of the relay protection device setting value on-site dynamic verification system according to claim 2 is characterized in that: The integrated power amplifier (4) is provided with a switch quantity input and output interface (8), a control button (9) and a display light (10) at the front, and an analog quantity output interface (11) and a cooling fan (12) at the rear.

4. The verification method of the relay protection device setting value on-site dynamic verification system according to claim 3 is characterized in that: The connection wires of the analog output interface and the switch input and output interface of the integrated power amplifier (4) are designed to be hot-swappable wires specially used for relay protection testing.

5. The verification method of the relay protection device setting value on-site dynamic verification system according to claim 4 is characterized in that: The power supply unit comprises an air switch (13), a socket (14), and a wiring terminal (15). A three-phase AC power supply line is used and equipped with a three-phase incoming air switch. Each device is equipped with a two-phase air switch. The power supply unit leads the AC power to each device through the socket and the power line.

6. The verification method of the relay protection device setting value on-site dynamic verification system according to claim 5 is characterized in that: A grounding copper bar (16) is provided at the bottom of the installation cabinet (1), and a plurality of circular holes are symmetrically punched on the grounding copper bar (16). The grounding terminals of the signal conversion device (3), the integrated power amplifier (4) and the power supply unit (5) are connected to the grounding copper bar (16) using a dedicated grounding wire.

7. The verification method of the relay protection device setting value on-site dynamic verification system according to claim 2 is characterized in that: Four universal wheels (6) are provided, and each of the four universal wheels is provided with a locking mechanism.

8. The verification method of the relay protection device setting value on-site dynamic verification system according to claim 2 is characterized in that: Handrails (17) are provided on the left and right sides of the top of the installation cabinet (1).

9. The verification method of the relay protection device setting value on-site dynamic verification system according to claim 1 is characterized in that: In the step (S4), the specific access method of the relay protection device to be verified is: inputting the protection setting value to be verified into the protection device at the production site; according to the normal operation mode of the power system, the function connection and the export connection of the protection device are put into operation according to the protection setting value; Connect the power amplifier of the relay protection simulation system to the relevant current and voltage circuit wiring of the protection device to be checked, and connect the opening and closing positions of the circuit breaker controlled by the protection device to be checked to the wiring of the switch quantity input module of the relay protection simulation system.

Citation Information

Patent Citations

  • Digital simulation based method and system for testing relay protection function of intelligent substation

    CN103245855A

  • Multifunctional relay protection experiment device