Precise positioning and installation method of pre-buried casing of building structure and casing assembly components

Through laser positioning technology and modular casing assembly components, the problems of low casing installation accuracy and large errors are solved, and efficient and accurate casing installation is achieved, which improves construction quality and efficiency.

CN113309369BInactive Publication Date: 2024-11-12方泽华
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110724165.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-29
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing construction technology, the casing installation accuracy and large errors are low, resulting in shifting and unevenness of the casing center line, and low construction efficiency and high cost.

Method used

Using a combination of laser sag and laser level, the sleeve is accurately positioned and installed through the combination of positioning holes and limiting plates to avoid cumulative errors, ensure the same horizontal line of the sleeve pipe opening, and adopt modular sleeve assembly components Optimize the construction process.

Benefits of technology

The casing installation accuracy is improved, the vertical error is no more than 3mm and the horizontal error is no more than 1mm, which improves construction efficiency, reduces costs and construction periods, and improves project quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113309369B_ABST
    Figure CN113309369B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for accurately positioning and installing pre-buried sleeves of building structures and sleeve assembly components, the method comprising: processing and manufacturing sleeve assembly components; determining the installation position of the sleeves on the first floor using the building axis data; and completing the positioning and installation of the sleeves on other floors using laser measurement equipment. The sleeve assembly component comprises a limit plate, a sleeve and a positioning hole component, the sleeve is fixedly installed on the limit plate, the sleeve assembly component has at least two positioning hole components, the positioning hole component is provided with a positioning hole, and one end of the positioning hole component with the positioning hole extends into the sleeve. When installing the sleeve using this method, a three-point-one-line method is adopted, which avoids cumulative errors and improves installation accuracy and efficiency. At the same time, the sleeve assembly component can accurately express the positional relationship between the sleeves, and can achieve a vertical installation error of no more than 3mm, a horizontal installation error of no more than 1mm, and reduces construction costs and improves project quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a precise positioning and installation method for a pre-buried sleeve of a building structure and a sleeve assembly component. Background Art

[0002] In high-rise buildings, in order to ensure that the pipeline can be smoothly laid, pre-buried casings must be installed on each floor. The methods currently used include axis positioning method, plumb line method, beam positioning method, etc. The axis positioning method is to use the building axis layout data according to the casing position in the building design drawing, mark the casing position on the template, fix the casing on the steel bar or template respectively, and then pour concrete. The plumb line method is to use the building axis layout data to roughly estimate the center position of the casing, then open a hole in the template (diameter greater than 60mm), use a plumb line to pass through the upper template to the center of the next layer of casing, arrange personnel to observe and adjust the plumb line near the next layer of casing, so that the plumb line coincides with the center of the upper and lower layers of casing, and then mark the casing circumference position on the template, and then fix the casing on the steel bar or template according to the marked position, and finally pour concrete with the floor slab. The beam positioning method uses laser equipment to locate the upper casing through the lower casing, and then fix the casing. Another method is to install the casing directly on the pipe, hoist it into the reserved pipe well together, then restore the pipe well steel bars, fix the casing on the pipe well steel bars, and finally install the pipe well formwork and pour concrete. This method is only applicable to installing casing in the pipe well.

[0003] The axis positioning method, the plumb line method, etc. require frequent use of axis layout data of different floors, which can easily lead to cumulative errors. The axis layout data error of high-rise buildings is usually 20mm~30mm, and frequent use of building axis layout data will expand the vertical installation error of the casing to more than 30mm~50mm, seriously affecting the quality and progress of pipeline installation. The beam positioning method in the prior art only measures the casing positions of the upper and lower floors, which is also easy to lead to cumulative errors for high-rise buildings, and cannot accurately determine the positional relationship between adjacent casings, which may cause the center line of the casing to shift and the casing to be uneven. In addition, each casing needs to be positioned and installed separately during the construction process, which has low work efficiency and high construction cost. Summary of the invention

[0004] The purpose of the present invention is to provide a method for accurately positioning and installing a pre-buried sleeve of a building structure and a sleeve assembly component, so as to solve the problems of low sleeve installation accuracy, large error and low efficiency in the current prior art.

[0005] To achieve the above object, the present invention provides a method for accurately positioning and installing a pre-buried casing of a building structure, comprising the following steps:

[0006] Step 1: Process and manufacture the sleeve assembly components, determine the size and quantity of the sleeve and the positioning hole parts and their positions on the limit plate;

[0007] Step 2: Use the first-floor building axis data to determine the first-floor casing installation position, and fix the casing assembly components described in step 1 on the first-floor formwork, and then pour them into the concrete along with the main structure;

[0008] Step 3: a. Use a laser plumb line to locate and install the casing assembly component above the second layer template: Place the laser plumb line above the second layer template, use the building axis layout data to estimate the center position of the casing, then drill a hole at the corresponding center position on the second layer template, observe the lower laser of the laser plumb line to make it pass through the opening on the second layer template and the positioning hole on the casing assembly component that has been installed on the first floor slab at the same time, so as to determine that the position of the opening of the second layer template is accurate, place the casing assembly component to be installed on the second layer template, and adjust the position of the casing assembly component to be installed so that the lower laser of the laser plumb line passes through the positioning hole on the casing assembly component to be installed on the second layer template, the opening on the second layer template, and the positioning hole on the casing assembly component that has been installed on the first floor slab at the same time;

[0009] b. Select two positioning holes on the casing assembly component to be installed and repeat the above operation to determine the position of the casing assembly component to be installed on the second layer template. At the same time, use a laser level to adjust the installation height of the casing assembly component to be installed so that all casing pipe openings are on the same horizontal line;

[0010] c. Fix the casing assembly components to be installed on the formwork or steel bars, and finally pour the casing assembly components into the floor slab concrete along with the main floor slab pouring construction;

[0011] Step 4: a. Use a laser plumb line to position and install the casing assembly component above the third layer template: place the laser plumb line above the third layer template, use the building axis layout data to estimate the center position of the casing, then open a hole at the corresponding center position on the third layer template, observe the lower laser of the laser plumb line to make it pass through the opening of the third layer template, the positioning hole on the casing assembly component on the second floor slab that has been installed, and the positioning hole on the casing assembly component on the first floor slab that has been installed, so as to determine that the position of the opening of the third layer template is accurate, place the casing assembly component to be installed on the third layer template, and adjust the position of the casing assembly component so that the lower laser of the laser plumb line passes through the positioning hole on the casing assembly component of the third layer template, the opening of the third layer template, the positioning hole on the casing assembly component on the second floor slab that has been installed, and the positioning hole on the casing assembly component on the first floor slab that has been installed;

[0012] b. Select two positioning holes on the casing assembly member to be installed and repeat the above operation to determine the position of the casing assembly member to be installed on the third layer of the template, and use the laser level to adjust the installation height of the casing assembly member so that all casing pipe openings are on the same horizontal line;

[0013] c. Fix the casing assembly components to be installed on the formwork or steel bars, and finally pour the casing assembly components into the floor slab concrete along with the main floor slab pouring construction;

[0014] Step 5: When installing the casing on the fourth floor and above, repeat the operation of step 4 until all the casings of the entire building are installed.

[0015] Furthermore, step a of step three is replaced by using a laser plumb line to position the sleeve assembly component below the second layer template: the laser plumb line is placed between the second layer template and the first floor slab, so that the lower laser of the laser plumb line passes through the positioning hole on the first floor slab where the sleeve assembly component has been installed, the upper laser of the laser plumb line is projected onto the lower surface of the second layer template, a hole is opened at the laser projection point of the second layer template, the upper laser passes through the hole, the sleeve assembly component to be installed is placed on the second layer template, and the position of the sleeve assembly component is adjusted so that the upper laser of the laser plumb line passes through the opening on the second layer template and the positioning hole on the sleeve assembly component to be installed at the same time;

[0016] Step a of step four is replaced by using a laser plumb line to position the sleeve assembly component under the third layer of formwork: the laser plumb line is placed between the third layer of formwork and the second layer of floor slab, so that the lower laser of the laser plumb line simultaneously passes through the positioning hole on the sleeve assembly component on the second layer of floor slab where the installation has been completed and the positioning hole on the sleeve assembly component on the first layer of floor slab where the installation has been completed, the upper laser of the laser plumb line is projected onto the lower surface of the third layer of formwork, a hole is opened at the laser projection point of the third layer of formwork, the upper laser passes through the hole, the sleeve assembly component to be installed is placed on the third layer of formwork, and the position of the sleeve assembly component is adjusted so that the upper laser of the laser plumb line simultaneously passes through the opening of the third layer of formwork and the positioning hole on the sleeve assembly component to be installed.

[0017] Furthermore, in the above step, whether the laser passes through the positioning hole can be determined by direct manual observation or by using a pinhole camera installed on a mobile phone.

[0018] Furthermore, the diameter of the hole opened on the floor template of the sleeve assembly component to be installed is 15mm~25mm.

[0019] Based on the above-mentioned precise positioning and installation method of embedded sleeves in building structures, the present invention also provides a sleeve assembly component, including a limit plate, a sleeve and a positioning hole component, the sleeve is fixedly installed on the limit plate, the sleeve assembly component has at least two positioning hole components, the positioning hole component is provided with a positioning hole, and one end of the positioning hole component with the positioning hole extends into the interior of the sleeve.

[0020] Furthermore, the positioning hole component and the limiting plate are an integrated structure, and the positioning hole component and the sleeve are welded.

[0021] Furthermore, the positioning hole member and the limiting plate are detachably connected, the positioning hole member is plugged into the sleeve, and a socket matched with the positioning hole member is provided on the sleeve wall.

[0022] Furthermore, the sleeve assembly component also includes a positioning lock, the lower end of the positioning lock is detachably connected to the limit plate, the positioning hole member is detachably connected to the positioning lock, the positioning hole member is plugged into the sleeve, and a socket matched with the positioning hole member is provided on the sleeve wall.

[0023] Furthermore, the positioning hole member is provided with a cutting groove at a position located inside the sleeve and close to the sleeve wall.

[0024] Furthermore, the positioning hole is a through hole with a diameter of 1.5 mm to 6 mm.

[0025] The beneficial effects of the present invention are as follows: the present invention improves the installation accuracy of the pre-buried casing of the building structure, avoids the cumulative error of the prior art in the casing installation process, and overcomes the problems of the displacement of the casing centerline and the unevenness of the casing after the casing is installed, and can achieve a vertical installation error of no more than 3mm and a horizontal installation error of no more than 1mm. In addition, the present invention adopts modularization and standardization to manufacture casing assembly components, optimizes the casing construction process, improves the casing installation efficiency, simplifies the process, reduces the construction cost and the later pipeline installation cost, shortens the construction period, and improves the project quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of the casing assembly component of the present invention;

[0027] Figure 2 It is a structural schematic diagram of a limiting plate of a first type of casing assembly component of the present invention;

[0028] Figure 3 It is a structural schematic diagram of a first casing assembly component of the present invention;

[0029] Figure 4 for Figure 3 Schematic diagram of the AA section;

[0030] Figure 5 It is a structural schematic diagram of a limiting plate of a second casing assembly component of the present invention;

[0031] Figure 6 It is a structural schematic diagram of a positioning hole member of a second type of sleeve assembly component of the present invention;

[0032] Figure 7 It is a structural schematic diagram of a second casing assembly component of the present invention;

[0033] Figure 8 for Figure 7 Schematic diagram of the middle BB section;

[0034] Fig. 9 It is a structural schematic diagram of a limiting plate of a third type of casing assembly component of the present invention;

[0035] Fig.10 It is a structural schematic diagram of a positioning hole member of a third type of sleeve assembly component of the present invention;

[0036] Fig.11 It is a top view schematic diagram of a third type of sleeve assembly component positioning lock of the present invention;

[0037] Fig.12 It is a bottom view schematic diagram of a third type of sleeve assembly component positioning lock of the present invention;

[0038] Fig.13 It is a structural schematic diagram of a third casing assembly component of the present invention;

[0039] Fig.14 for Fig.13 Schematic diagram of the CC section.

[0040] In the figure: 1, limit plate; 1a, first limit plate; 1b, second limit plate; 1c, third limit plate; 2, sleeve; 3, positioning hole member; 3a, first positioning hole member; 3b, second positioning hole member; 3c, third positioning hole member; 4, positioning hole; 5, cutting groove; 6, sleeve patch; 7, positioning lock; 8, T-shaped support; 9, groove; 10, T-shaped empty slot. DETAILED DESCRIPTION

[0041] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings.

[0042] The present invention provides a method for accurately positioning and installing a pre-buried casing of a building structure, comprising the following steps:

[0043] Step 1: Process and manufacture the sleeve assembly components, determine the size and quantity of the sleeve and the positioning hole parts and their positions on the limit plate;

[0044] Step 2: Use the first-floor building axis data to determine the first-floor casing installation position, fix the casing assembly components on the first-floor formwork, and then pour them into the concrete along with the main structure;

[0045] Step 3: a. Use a laser plumb line to locate and install the casing assembly component on the second layer of the template: Place the laser plumb line on the second layer of the template, use the building axis layout data to estimate the center position of the casing, and then drill a hole at the corresponding center position on the second layer of the template. Observe the lower laser of the laser plumb line to make it pass through the opening on the second layer of the template and the positioning hole on the casing assembly component that has been installed on the first floor of the slab at the same time, so as to determine that the position of the opening on the second layer of the template is accurate, place the casing assembly component to be installed on the second layer of the template, and adjust the position of the casing assembly component to be installed so that the lower laser of the laser plumb line passes through the positioning hole on the casing assembly component to be installed on the second layer of the template, the opening on the second layer of the template, and the positioning hole on the casing assembly component that has been installed on the first floor of the slab at the same time;

[0046] b. Select two positioning holes on the casing assembly component to be installed and repeat the above operation to determine the position of the casing assembly component to be installed on the second layer template. At the same time, use a laser level to adjust the installation height of the casing assembly component to be installed so that all casing pipe openings are on the same horizontal line;

[0047] c. Fix the casing assembly components to be installed on the formwork or steel bars, and finally pour the casing assembly components into the floor slab concrete along with the main floor slab pouring construction;

[0048] Step 4: a. Use a laser plumb line to locate and install the casing assembly component above the third-layer template: Place the laser plumb line above the third-layer template, use the building axis layout data to estimate the center position of the casing, and then drill a hole at the corresponding center position on the third-layer template. Observe the lower laser of the laser plumb line to make it pass through the opening of the third-layer template, the positioning hole on the casing assembly component on the second-layer floor slab that has been installed, and the positioning hole on the casing assembly component on the first-layer floor slab that has been installed, so as to determine that the opening position of the third-layer template is accurate, place the casing assembly component to be installed on the third-layer template, and adjust the position of the casing assembly component so that the lower laser of the laser plumb line passes through the positioning hole on the casing assembly component of the third-layer template, the opening of the third-layer template, the positioning hole on the casing assembly component on the second-layer floor slab that has been installed, and the positioning hole on the casing assembly component on the first-layer floor slab that has been installed;

[0049] b. Select two positioning holes on the casing assembly component to be installed and repeat the above operation to determine the position of the casing assembly component to be installed on the third layer template. At the same time, use a laser level to adjust the installation height of the casing assembly component so that all casing pipe openings are on the same horizontal line;

[0050] c. Fix the casing assembly components to be installed on the formwork or steel bars, and finally pour the casing assembly components into the floor slab concrete along with the main floor slab pouring construction;

[0051] Step 5: When installing the casing on the fourth floor and above, repeat the operation of step 4 until all the casings of the entire building are installed.

[0052] Specifically, in the above method steps, when judging whether the laser passes through the positioning hole, direct manual observation or a pinhole camera installed on a mobile phone can be used for observation. Generally, for ordinary buildings, the distance between floors is not too large, so direct manual observation of whether the laser passes through the positioning hole can be used. For some buildings with relatively high requirements for floor height, a pinhole camera installed on a mobile phone can be used to observe whether the laser passes through the positioning hole.

[0053] Specifically, the diameter of the hole opened on the floor template of the casing assembly component to be installed is generally 15mm~25mm. The diameter of the hole opened on the template in the present invention is 20mm. In the prior art, the diameter of the hole opened on the template is generally greater than 60mm, and the template hole needs to be repaired later to prevent leakage. The method provided by the present invention is to open a hole with a diameter of 20mm on the floor template of the casing to be installed. The hole is relatively small, has little effect on pouring concrete, and is easier to repair.

[0054] Based on the above-mentioned method for accurately positioning and installing a pre-buried casing of a building structure, the present invention further provides a casing assembly component, which is completed by laser cutting according to the design drawings, and includes a limit plate 1, a casing 2 and a positioning hole member 3, such as Figure 1 As shown, the sleeve 2 is fixedly installed on the limiting plate 1. The number and position relationship of the sleeve 2 on the sleeve assembly component are determined according to the actual situation of the building structure. The limiting plate 1 can be a steel plate or an iron plate. The sleeve assembly component has at least two positioning hole parts 3. The positioning hole parts 3 can be made of metal or non-metallic material. The positioning hole parts 3 are provided with positioning holes 4. The end of the positioning hole part 3 with the positioning hole 4 extends into the interior of the sleeve 2.

[0055] Specifically, the positioning hole member 3 is located inside the sleeve and is provided with a cutting groove 5 at a position close to the sleeve wall, so that the end of the positioning hole member 3 located inside the sleeve can be removed from the positioning hole member 3.

[0056] Specifically, the positioning hole 4 can be rectangular, circular or other shapes, usually circular, and its diameter is related to the laser beam width and installation accuracy, and is generally a through hole of 1.5mm~6mm. The positioning hole diameter used in the present invention is 4.5mm.

[0057] Embodiment 1:

[0058] On the basis of the precise positioning and installation method of embedded sleeves of building structures provided in the above specific implementation manner, this embodiment replaces step a of step three of the above method with using a laser plumb line to position the sleeve assembly component below the second layer template: the laser plumb line is placed between the second layer template and the first floor slab, so that the lower laser of the laser plumb line passes through the positioning hole on the sleeve assembly component on the first floor slab where installation has been completed, the upper laser of the laser plumb line is projected onto the lower surface of the second layer template, a hole is opened at the laser projection point of the second layer template, the upper laser passes through the hole, the sleeve assembly component to be installed is placed on the second layer template, and the position of the sleeve assembly component is adjusted so that the upper laser of the laser plumb line passes through the opening on the second layer template and the positioning hole on the sleeve assembly component to be installed at the same time.

[0059] In this embodiment, step a of step four of the above method is replaced by using a laser plumb line to position the sleeve assembly component under the third layer of formwork, and the laser plumb line is placed between the third layer of formwork and the second layer of floor slab, so that the lower laser of the laser plumb line passes through the positioning hole on the sleeve assembly component on the second layer of floor slab that has been installed and the positioning hole on the sleeve assembly component on the first layer of floor slab that has been installed at the same time, and the upper laser of the laser plumb line is projected onto the lower surface of the third layer of formwork, and a hole is opened at the laser projection point of the third layer of formwork, so that the upper laser passes through the hole, and the sleeve assembly component to be installed is placed on the third layer of formwork, and the position of the sleeve assembly component is adjusted so that the upper laser of the laser plumb line passes through the opening of the third layer of formwork and the positioning hole on the sleeve assembly component to be installed at the same time.

[0060] Embodiment 2:

[0061] On the basis of the precise positioning and installation method of embedded sleeves of building structures provided in the above specific implementation manner, in step one, this embodiment processes sleeve assembly components, which include a limit plate 1, a sleeve 2 and a positioning hole member 3. According to the design drawing, sleeves 2 of different diameters are vertically welded to the limit plate 1. The sleeve assembly components are completed by laser cutting. The laser cutting accuracy is 0.2mm. The positional relationship between the sleeves can be accurately expressed by adopting the sleeve assembly component. The installation accuracy can reach the micron level by calculation and adjustment. The prior art cannot accurately determine the positional relationship between adjacent sleeves. When the prior art is used to install the sleeve, the vertical error is usually between 30mm and 50mm, and the horizontal error is between 10mm and 15mm. The method provided in this embodiment can achieve a vertical installation error of no more than 3mm and a horizontal installation error of no more than 1mm for installing sleeves in super high-rise buildings.

[0062] In step 2 of this embodiment, the first-floor building axis data is used to determine the first-floor casing installation position, and the casing assembly components are fixed to the first-floor formwork through angle codes. Then, as the main structure is cast in concrete, laser measurement equipment is used to determine the casing installation positions of other floors in steps 3 to 5, and the corresponding casing assembly components are fixed to the formwork or steel bars through angle codes or other means. Finally, as the main floor is cast, the casing assembly components are cast in the floor concrete. Since the laser is less affected by the environment, the measurement value is more stable and accurate. Except for the first floor, the method provided in this embodiment does not use the building axis layout data for the installation of casings on other floors, avoiding the cumulative error caused by the frequent use of axis layout data of different floors in the prior art, and improving the installation accuracy and project progress of the casing.

[0063] The method provided in this embodiment adopts laser positioning to determine the installation position of the casing. Except for the first and second floors of the building, other floors adopt the method of simultaneously measuring three positioning holes in the vertical direction, namely, the positioning holes on the casing assembly component of the floor to be installed, the positioning holes on the casing assembly component of the next floor that has been installed, and the positioning holes on the casing assembly components of the next two floors that have been installed. The three-point-one-line method is adopted to avoid the cumulative error in the vertical direction. In the horizontal direction, a laser level is used to ensure that all casing pipe openings are on the same horizontal line.

[0064] In the method provided in this embodiment, since the positional relationship between the sleeves is determined according to the design drawings when the sleeve assembly component is processed and manufactured, for a sleeve assembly component, it is only necessary to arbitrarily select two upper positioning holes to observe whether they are consistent with the positioning holes at the corresponding positions of the two floors below, so as to determine whether the positions of all the sleeves on the sleeve assembly component are consistent, without having to observe all the sleeves one by one, thereby improving the sleeve installation efficiency and reducing the construction cost.

[0065] Embodiment 3:

[0066] On the basis of the sleeve assembly component provided in the above specific embodiments, the sleeve assembly component in this embodiment includes a first limiting plate 1a, a sleeve 2 and a first positioning hole member 3a, such as Figures 2 to 4 As shown, the first positioning hole 3a and the first limiting plate 1a are an integrated structure, which is directly completed by laser cutting. In this way, when the sleeve 2 is connected to the first limiting plate 1a, the sleeve wall must first be partially cut according to the shape of the first positioning hole 3a, and then the sleeve wall is welded to the first positioning hole 3a. After that, the notch of the sleeve wall is repaired with the sleeve patch 6 to make the sleeve wall complete. At this time, the end of the first positioning hole 3a with the positioning hole 4 is located inside the sleeve.

[0067] Embodiment 4:

[0068] On the basis of the sleeve assembly component provided in the above specific implementation manner, the sleeve assembly component in this embodiment includes a second limiting plate 1b, a sleeve 2 and a second positioning hole member 3b, such as Figures 5 to 8 As shown, the second positioning hole member 3b is an independent accessory, and the second positioning hole member 3b and the second limiting plate 1b are detachably connected. A socket compatible with the structure of the second positioning hole member 3b is provided at the connection between the sleeve wall and the second limiting plate 1b. The end of the second positioning hole member 3b with the positioning hole 4 can be inserted into the interior of the sleeve 2 through the socket, and a hollow groove compatible with the second positioning hole member 3b located on the outer part of the sleeve 2 is provided at the corresponding position on the second limiting plate 1b. After the second positioning hole member 3b is inserted into the sleeve 2, the second positioning hole member 3b is welded to the second limiting plate 1b to achieve the purpose of fixation. In this way, cutting of the sleeve wall is avoided when the sleeve 2 is connected to the second limiting plate 1b, thereby simplifying the process.

[0069] Embodiment 5:

[0070] On the basis of the sleeve assembly component provided in the above specific implementation manner, the sleeve assembly component in this embodiment includes a third limiting plate 1c, a sleeve 2, a third positioning hole 3c and a positioning lock 7, such as Figures 9 to 14 As shown, the lower end of the positioning lock 7 has a T-shaped support 8, and the third limiting plate 1c is provided with a corresponding T-shaped empty groove 10. The positioning lock 7 is detachably connected to the third limiting plate 1c through the lower end support. The upper end of the positioning lock 7 has a groove 9 adapted to the third positioning hole member 3c structure. The third positioning hole member 3c is detachably connected to the positioning lock 7. The sleeve wall is provided with a socket adapted to the third positioning hole member 3c structure at a corresponding height to the third positioning hole member 3c located on the positioning lock 7. The end of the third positioning hole member 3c with the positioning hole 4 can be inserted into the sleeve 2 through the socket. The length of the third positioning hole member 3c can be adjusted according to actual needs during production, and it only needs to be adapted to the positioning lock 7 and the third limiting plate 1c. The support at the lower end of the positioning lock 7 can also be any other shape, and it only needs to be adapted to the shape of the empty groove of the third limiting plate 1c. The sleeve assembly component in this embodiment is also suitable for the installation of a rigid waterproof sleeve with a wing ring on the outside.

[0071] The casing assembly component described in the present invention is suitable for installing casing on the template and in the reserved pipe well of the building. The casing assembly component is made according to the design drawings and is numbered. Each casing assembly component corresponds to the floor and specific position where it is located. In this way, the casing assembly component can be installed according to the number. The position of the positioning hole component can be arbitrarily selected before making the component. It only needs to ensure that the same position on different floors is consistent. In addition, a laser leveler is used to ensure that all casing pipe openings are on the same horizontal line. When positioning and installing the casing, two positioning holes are selected on each casing assembly component. A laser vertical leveler is used to make the laser pass through the positioning holes of the casing assembly components at the same position of the floor to be installed, the next floor, and the next two floors at the same time. The three-point one-line method is adopted to avoid the cumulative error in the vertical direction, and also ensure that the position of all casings on the casing assembly component is accurate. After completing the positioning and installation of the casing, the part of the positioning hole component located inside the casing can be removed from the cutting groove to avoid affecting the subsequent pipeline installation. The thickness of the positioning hole component is thin, and the construction personnel can directly break it off, which is simple to operate and convenient and flexible.

[0072] The positioning hole parts and the three-point-in-one-line positioning method described in the present invention are also suitable for the precise positioning of position nodes in the straight line direction in installation projects and measurement and control projects in other related fields such as the shipbuilding industry and the petroleum industry. The size of the positioning holes on the positioning hole parts can determine the accuracy of the installation or measurement control. During the installation or measurement control process, the linear laser is allowed to simultaneously pass through at least three positioning holes on the positioning hole parts with the same size and shape, and the operation is repeated in sequence, which can avoid cumulative errors in the straight line direction and ensure accurate positioning.

[0073] The above-mentioned embodiments are only preferred embodiments of the present invention and are not used to limit the present invention. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative work are within the scope of protection of the present invention.

Claims

1. A method for accurately positioning and installing a pre-buried casing of a building structure, characterized in that: The precise positioning and installation method of the embedded sleeve comprises the following steps: Step 1: Process and manufacture a sleeve assembly component, the sleeve assembly component includes a limit plate, a sleeve and a positioning hole component, determine the size, quantity and position of the sleeve and the positioning hole component on the limit plate; the sleeve is fixedly installed on the limit plate, the sleeve assembly component has at least two positioning hole components, the positioning hole component is provided with a positioning hole, the end of the positioning hole component with the positioning hole extends into the interior of the sleeve, and the positioning hole is a through hole with a diameter of 1.5mm~6mm; the sleeve assembly component also includes a positioning lock, the lower end of the positioning lock is detachably connected to the limit plate, the positioning hole component is detachably connected to the positioning lock, the positioning hole component is plugged into the sleeve, and a socket compatible with the positioning hole component is provided on the sleeve wall; the positioning hole component is located on the inner side of the sleeve and is close to the sleeve wall. A cutting groove is provided at a position; Step 2: Use the first-floor building axis data to determine the first-floor casing installation position, and fix the casing assembly components described in step 1 on the first-floor formwork, and then pour them into the concrete along with the main structure; Step 3: a. Use a laser plumb line to locate and install the casing assembly component above the second layer template: Place the laser plumb line above the second layer template, use the building axis layout data to estimate the center position of the casing, then drill a hole at the corresponding center position on the second layer template, observe the lower laser of the laser plumb line to make it pass through the opening on the second layer template and the positioning hole on the casing assembly component that has been installed on the first floor slab at the same time, so as to determine that the position of the opening of the second layer template is accurate, place the casing assembly component to be installed on the second layer template, and adjust the position of the casing assembly component to be installed so that the lower laser of the laser plumb line passes through the positioning hole on the casing assembly component to be installed on the second layer template, the opening on the second layer template, and the positioning hole on the casing assembly component that has been installed on the first floor slab at the same time; b. Select two positioning holes on the casing assembly component to be installed and repeat the above operation to determine the position of the casing assembly component to be installed on the second layer template. At the same time, use a laser level to adjust the installation height of the casing assembly component to be installed so that all casing pipe openings are on the same horizontal line; c. Fix the casing assembly components to be installed on the formwork or steel bars, and finally pour the casing assembly components into the floor slab concrete along with the main floor slab pouring construction; Step 4: a. Use a laser plumb line to position and install the casing assembly component above the third layer template: place the laser plumb line above the third layer template, use the building axis layout data to estimate the center position of the casing, then open a hole at the corresponding center position on the third layer template, observe the lower laser of the laser plumb line to make it pass through the opening of the third layer template, the positioning hole on the casing assembly component on the second floor slab that has been installed, and the positioning hole on the casing assembly component on the first floor slab that has been installed, so as to determine that the position of the opening of the third layer template is accurate, place the casing assembly component to be installed on the third layer template, and adjust the position of the casing assembly component so that the lower laser of the laser plumb line passes through the positioning hole on the casing assembly component of the third layer template, the opening of the third layer template, the positioning hole on the casing assembly component on the second floor slab that has been installed, and the positioning hole on the casing assembly component on the first floor slab that has been installed; b. Select two positioning holes on the casing assembly member to be installed and repeat the above operation to determine the position of the casing assembly member to be installed on the third layer of the template, and use the laser level to adjust the installation height of the casing assembly member so that all casing pipe openings are on the same horizontal line; c. Fix the casing assembly components to be installed on the formwork or steel bars, and finally pour the casing assembly components into the floor slab concrete along with the main floor slab pouring construction; Step 5: When installing the casing on the fourth floor and above, repeat the operation of step 4 until all the casings of the entire building are installed.

2. The precise positioning and installation method for pre-buried casing of a building structure according to claim 1, characterized in that: Step a of step three is replaced by using a laser plumb line to position the sleeve assembly component below the second layer template: the laser plumb line is placed between the second layer template and the first floor slab, the lower laser of the laser plumb line passes through the positioning hole on the sleeve assembly component on the first floor slab that has been installed, the upper laser of the laser plumb line is projected onto the lower surface of the second layer template, a hole is opened at the laser projection point of the second layer template, the upper laser passes through the hole, the sleeve assembly component to be installed is placed on the second layer template, and the position of the sleeve assembly component is adjusted so that the upper laser of the laser plumb line passes through the opening on the second layer template and the positioning hole on the sleeve assembly component to be installed at the same time; Step a of step four is replaced by using a laser plumb line to position the sleeve assembly component under the third layer of formwork: the laser plumb line is placed between the third layer of formwork and the second layer of floor slab, so that the lower laser of the laser plumb line simultaneously passes through the positioning hole on the sleeve assembly component on the second layer of floor slab where the installation has been completed and the positioning hole on the sleeve assembly component on the first layer of floor slab where the installation has been completed, the upper laser of the laser plumb line is projected onto the lower surface of the third layer of formwork, a hole is opened at the laser projection point of the third layer of formwork, the upper laser passes through the hole, the sleeve assembly component to be installed is placed on the third layer of formwork, and the position of the sleeve assembly component is adjusted so that the upper laser of the laser plumb line simultaneously passes through the opening of the third layer of formwork and the positioning hole on the sleeve assembly component to be installed.

3. The precise positioning and installation method of the pre-buried casing of the building structure according to claim 1 or 2, characterized in that: In the above steps, whether the laser passes through the positioning hole is determined by direct manual observation or by using a mobile phone equipped with a pinhole camera.

4. The precise positioning and installation method for pre-buried casing of a building structure according to claim 1 or 2, characterized in that: The diameter of the hole opened on the floor template of the sleeve assembly component to be installed is 15mm~25mm.