A device and method for collecting sediment during shield tunnel construction

By designing a sediment collection device for shield tunnel construction, the sediment is automatically collected by using the structure of fenders and top rods, the problems of low manual cleaning efficiency and major safety hazards in the existing technology are solved, and high efficiency is achieved clean up the silt.

CN113338987BActive Publication Date: 2024-11-15CHINA CONSTR SILK ROAD CONSTR INVESTMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110731425.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-29
Publication Date
2024-11-15
Estimated Expiration
2041-06-29

AI Technical Summary

Technical Problem

In shield tunnel construction, especially in high-pressure formations, the slag outlet of the soil pressure balance shield machine is prone to gushing, resulting in silt and sand spurting or leaking water entering the tunnel. The existing methods rely on manual cleaning efficiency and safety There are great hidden dangers and it is impossible to collect silt and sand quickly and effectively.

Method used

A mud collection device including bottom plate, bottom rod, fender, positioning rod, top rod and horizontal rod was designed. By adjusting the angles of the fender and top rod, the mud and sand were stabilized by using cone piercing and slot structures. Collect bags to realize the device and method of automatically collecting silt and sand.

Benefits of technology

The device can automatically collect silt and sand, reduce manual intervention, improve construction efficiency, reduce labor demand and safety hazards, and ensure the normal operation of the battery truck.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113338987B_ABST
    Figure CN113338987B_ABST
Patent Text Reader

Abstract

The invention discloses a sediment collection device and method for shield tunnel construction, wherein one end of a bottom rod is fixedly connected to a bottom plate, and mud guards are connected to the symmetrical axes on both sides of the bottom rod on the bottom plate, and the rotation direction of the mud guards is parallel to the bottom plate; the lower end of a positioning rod is connected to the other end of the bottom rod, and the positioning rod is provided with a plurality of slots along its length direction; a top rod comprises a first rod member and a second rod member, the first rod member and the second rod member are connected in a V shape, the connecting portion of the first rod member and the second rod member is connected to the bottom rod axis, and the rotation direction of the top rod around the connecting axis is perpendicular to the bottom plate; a bayonet for being stuck in the slot is provided on the first rod member, and an elastic component for propping the first rod member and the bottom rod apart is provided between the first rod member and the bottom rod; the end of the second rod member is connected to a horizontal rod, and a plurality of cone thorns are provided on the horizontal rod, and the horizontal rod is perpendicular to the top rod. The invention can solve the problems of low construction efficiency, large labor force and great safety hazards existing in the existing manual cleaning method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of sediment collection at the shield tail during shield tunnel construction, and in particular relates to a sediment collection device and method used in the process of shield tunnel construction. Background Art

[0002] When a shield tunnel passes through water-rich strata such as rivers and lakes, especially strata with high water pressure and poor self-stability, the earth pressure balance shield machine is prone to gushing at the slag outlet, and the shield tail is also prone to water leakage. At this time, the silt or sediment in the stratum will be brought into the tunnel by the gushing and leakage water, and accumulate on the assembled segments. Since the battery car track has been set up after the segments are assembled, it is blocked by sleepers and cannot be silted by mechanized methods. The existing method completely uses manual shovels to shovel into woven bags and then transport them out of the tunnel. This method is not only inefficient and requires a lot of labor, but also requires continuous avoidance of battery cars during the cleaning process, which will further cause low cleaning efficiency and increase construction safety hazards. Therefore, in order to ensure that under the premise of normal operation of the battery car, reduce labor costs and improve the efficiency of cleaning sediment, a new type of collection device and method that can quickly collect sediment and has a simple structure and convenient operation is needed. Summary of the invention

[0003] In order to solve the problems existing in the prior art, the purpose of the present invention is to provide a sediment collection device and method for use in the construction of a shield tunnel, which can solve the problems of low construction efficiency, large labor requirements and great safety hazards existing in the existing manual cleaning methods.

[0004] In order to achieve the above object, the present invention adopts the following technical solution:

[0005] A sediment collection device used in the shield tunnel construction process, comprising a bottom plate, a bottom rod, a mud guard, a positioning rod, a top rod and a horizontal rod;

[0006] One end of the bottom rod is fixedly connected to the bottom plate, and mudguards are connected to the symmetrical axes on both sides of the bottom rod on the bottom plate, and the rotation direction of the mudguards is parallel to the bottom plate;

[0007] The lower end of the positioning rod is connected to the other end of the bottom rod, and the positioning rod is provided with a plurality of slots along its length direction;

[0008] The top rod includes a first rod and a second rod, the first rod and the second rod are connected in a V shape, the connecting part of the first rod and the second rod is connected to the bottom rod axis, and the rotation direction of the top rod around the connecting axis is perpendicular to the bottom plate; the first rod is provided with a pin for being clamped in the clamping groove, and an elastic component for spreading the first rod and the bottom rod is provided between the first rod and the bottom rod; the end of the second rod is connected to a horizontal rod, a plurality of cone spikes are provided on the horizontal rod, and the horizontal rod is perpendicular to the top rod.

[0009] Preferably, the lower end of the positioning rod is axially connected to the bottom rod, and the rotation direction of the positioning rod is coplanar with the bottom rod.

[0010] Preferably, the card slot is an upwardly inclined groove.

[0011] Preferably, a pedal is provided at the end of the first rod.

[0012] Preferably, the elastic component is a V-shaped spring sheet, and two sides of the spring sheet are respectively connected to the first rod and the bottom rod.

[0013] Preferably, the mudguard is perpendicular to the bottom plate, a vertical shaft is provided on the bottom plate, an annular structure is provided at one end of the mudguard, and the mudguard is sleeved on the vertical shaft through the annular structure.

[0014] Preferably, the end of the second rod is connected to the third rod, the middle of the horizontal rod is vertically connected to one end of the third rod, the angle between the third rod and the first rod is an acute angle, and the third rod is a telescopic rod.

[0015] Preferably, both ends of the horizontal rod are connected to telescopic rods, and the telescopic rods are provided with the cone thorns.

[0016] Preferably, the sediment collection device used in the shield tunnel construction process of the present invention further comprises a sediment collection bag, the bag opening of which can be sleeved on the horizontal rod and the bottom plate;

[0017] A hook for hooking the silt collecting bag is arranged on the bottom plate.

[0018] The present invention also provides a method for collecting sediment during shield tunnel construction. The method is performed using the sediment collection device for shield tunnel construction as described above, and includes the following steps:

[0019] The sediment collection device used in shield tunnel construction is placed between two sleepers, the angles of two mud guards are adjusted, and the other ends of the mud guards are fixed to the sleepers in the upstream direction of the water flow;

[0020] The lower side of the mouth of the silt collection bag is pressed against the lower part of the bottom plate, and the upper edge of the mouth of the silt collection bag is hung on the horizontal rod through the cone thorns, and the angle between the first rod and the bottom rod is adjusted to open the mouth of the silt collection bag, and the bayonet on the first rod is clamped in the corresponding slot on the positioning rod to ensure that the mouth of the silt collection bag is in a tight state;

[0021] In the process of collecting sediment, the water carrying the sediment naturally flows into the sediment collection bag. After a certain amount of sediment is collected in the sediment collection bag, the sediment collection bag is replaced.

[0022] The present invention has the following beneficial effects:

[0023] The invention is used in the process of shield tunnel construction. The silt collecting device is provided with a top rod, and the top rod is axially connected with the bottom plate. Therefore, the distance between the horizontal rod and the bottom plate can be adjusted through the top rod. When in use, the mouth of the silt collecting bag is sleeved on the horizontal rod and one end of the bottom plate. The tightness of the opening of the mouth of the silt collecting bag can be adjusted by adjusting the top rod. By arranging cone thorns on the horizontal rod, the silt collecting bag can be stably sleeved on the horizontal rod and the bottom plate to prevent it from being washed away by water. By arranging a mud guard, water flow can be introduced into the mouth of the silt collecting bag, and the silt collecting bag can filter the water flow and collect the silt. The mud guard is axially connected with the bottom plate, so that the angle of the mud guard can be adjusted to adapt to the use environment of different widths. A clamping groove is provided on the positioning rod, a clamping pin is provided on the first rod member, and an elastic component for spreading the first rod member and the bottom rod is provided between the first rod member and the bottom rod. In this way, after the distance between the horizontal rod and the bottom plate is adjusted, the clamping pin is clamped in the clamping groove to stabilize the state of the entire device. When the device of the present invention is in use, it is only necessary to place the entire device between two sleepers, adjust the angles of the two mud guards, and fix the other ends of the mud guards on the sleepers in the upstream direction of the water flow. Then, the mud and sand in the flowing water can be automatically collected. When the mud and sand collection bag is full, it only needs to be replaced. There is no need for manual shoveling of mud, which can solve the problems of low construction efficiency, large labor requirements, and great safety hazards in existing manual cleaning methods. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is an overall schematic diagram of a sediment collection device used in shield tunnel construction;

[0025] Figure 2 An exploded schematic diagram of a sediment collection device used during shield tunnel construction;

[0026] FIG3 (a) is a top view of the sediment collection device used in the shield tunnel construction process of the present invention;

[0027] FIG3( b ) is a left side view of FIG3( a );

[0028] FIG3( c ) is a front view of FIG3( a );

[0029] Figure 4 It is a schematic diagram of the relative position relationship between the sediment collection device and the battery car track during the shield tunnel construction process of the present invention;

[0030] Among them: 1-1 bottom plate; 1-2 bottom rod; 1-3 spring sheet; 1-4 connecting shaft; 1-5 vertical shaft; 1-6 mudguard; 2-1 positioning rod; 2-2 slot; 2-3 positioning rod shaft; 3-1 top rod; 3-1-1-first rod; 3-1-2-second rod; 3-1-3-third rod; 3-2 pedal; 3-3 horizontal rod; 3-4 telescopic rod; 3-5 bite cone; 3-6 positioning nut; 3-7-pin; 4 woven bag; 5-rail; 6-sleeper. DETAILED DESCRIPTION

[0031] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0032] Reference Figure 1 - Figure 3 (c), the present invention is used for a sediment collection device during shield tunnel construction, comprising a bottom plate 1-1, a bottom rod 1-2, a mudguard 1-6, a positioning rod 2-1, a top rod 3-1 and a horizontal rod 3-3; one end of the bottom rod 1-2 is fixedly connected to the bottom plate 1-1, and mudguards 1-6 are connected to the symmetrical axes on both sides of the bottom rod 1-2 on the bottom plate 1-1, and the rotation direction of the mudguard 1-6 is parallel to the bottom plate 1-1; the lower end of the positioning rod 2-1 is connected to the other end of the bottom rod 1-2, and the positioning rod 2-1 is provided with a plurality of slots 2-2 along its length direction; the top rod 3-1 comprises a first rod member 3-1-1 and a second rod member 3-1-2, the first rod member 3-1-1 and the second rod member 3-1-2. A rod 3-1-1 and a second rod 3-1-2 are connected in a V shape, the connecting portion of the first rod 3-1-1 and the second rod 3-1-2 is connected to the axis of the bottom rod 1-2, and the rotation direction of the top rod 3-1 around the connecting axis is perpendicular to the bottom plate 1-1; the first rod 3-1-1 is provided with a latch 3-7 for being clamped in the clamping groove 2-2, and an elastic component for spreading the first rod 3-1-1 and the bottom rod 1-2 is provided between the first rod 3-1-1 and the bottom rod 1-2; the end of the second rod 3-1-2 is connected to the horizontal rod 3-3, the horizontal rod 3-3 is provided with a plurality of cone spikes, and the horizontal rod 3-3 is perpendicular to the top rod 3-1.

[0033] As a preferred embodiment of the present invention, refer to Figure 1 , Figure 2 As shown in Figure 3 (c), the lower end of the positioning rod 2-1 is axially connected to the bottom rod 1-2, and the rotation direction of the positioning rod 2-1 is coplanar with the bottom rod 1-2. Taking the orientation shown in Figure 3 (c) as an example, this structure can make the positioning rod 2-1 swing left and right, and when the top rod 3-1 rotates to different angles, the pin 3-7 and the slot 2-2 can also be effectively combined.

[0034] As a preferred embodiment of the present invention, the slot 2-2 is an upwardly inclined groove, taking the orientation shown in FIG. 3(c) as an example, this can prevent the latch pin 3-7 from slipping off the slot 2-2, thereby ensuring the stability of the structure.

[0035] As a preferred embodiment of the present invention, refer to Figure 1 , Figure 2 , Figure 3(a), Figure 3(c) and Figure 4 A pedal 3-2 is provided at the end of the first rod 3-1-1, and the pedal 3-2 can be stepped on by the foot to facilitate applying force to engage the slot 2-2 and the pin 3-7.

[0036] As a preferred embodiment of the present invention, refer to Figure 1 , Figure 2 3 (c), the elastic component adopts a V-shaped spring sheet 1-3, and the two sides of the spring sheet 1-3 are respectively connected to the first rod 3-1-1 and the bottom rod 1-2.

[0037] As a preferred embodiment of the present invention, refer to Figure 1 The fender 1-6 is perpendicular to the base plate 1-1, a vertical shaft 1-5 is provided on the base plate 1-1, an annular structure is provided at one end of the fender 1-6, and the fender 1-6 is sleeved on the vertical shaft 1-5 through the annular structure.

[0038] As a preferred embodiment of the present invention, refer to Figure 1 The end of the second rod 3-1-2 is connected to the third rod 3-1-3, the middle part of the horizontal rod 3-3 is vertically connected to one end of the third rod 3-1-3, and the angle between the third rod 3-1-3 and the first rod 3-1-1 is an acute angle, so that the distance between the horizontal rod 3-3 and the bottom plate can be quickly adjusted. The third rod 3-1-3 is a telescopic rod, so it can be adjusted to adapt to sediment collection bags of different mouth sizes.

[0039] As a preferred embodiment of the present invention, refer to Figure 1 Both ends of the horizontal rod 3-3 are connected with telescopic rods 3-4, and the telescopic rods 3-4 are provided with the cone thorns, so that the telescopic rods 3-4 can be adjusted to adapt to the sediment collection bags with different mouth sizes.

[0040] As a preferred embodiment of the present invention, the sediment collection device used in the shield tunnel construction process of the present invention also includes a sediment collection bag, the bag mouth of the sediment collection bag can be put on the horizontal rod 3-3 and the bottom plate 1-1; the bottom plate 1-1 is provided with a hook for hooking the sediment collection bag.

[0041] Reference Figure 1-Figure 4 The use process of the sediment collection device used in the shield tunnel construction process of the present invention as described above includes:

[0042] The sediment collection device used in shield tunnel construction is placed between two sleepers, the angles of the two mudguards 1-6 are adjusted, and the other ends of the mudguards 1-6 are fixed to the sleepers in the upstream direction of the water flow;

[0043] The lower side of the mouth of the silt collection bag is pressed against the lower part of the bottom plate 1-1, and the upper edge of the mouth of the silt collection bag is hung on the horizontal rod 3-3 through the cone thorns. The angle between the first rod 3-1-1 and the bottom rod 1-2 is adjusted to open the mouth of the silt collection bag, and the latch 3-7 on the first rod 3-1-1 is latched in the corresponding latch groove 2-2 on the positioning rod 2-1 to ensure that the mouth of the silt collection bag is in a tight state;

[0044] In the process of collecting sediment, the water carrying the sediment naturally flows into the sediment collection bag. After a certain amount of sediment is collected in the sediment collection bag, the sediment collection bag is replaced.

[0045] From the above, it can be seen that the present invention can effectively solve the process of manually shoveling mud and sand into woven bags, and can also realize the collection of mud and sand during the normal running of the battery vehicle, greatly improving the cleaning efficiency. By using this device to collect mud and sand in the water flow, only a small number of maintenance personnel are required, greatly reducing the cost of manual cleaning.

[0046] Example

[0047] This embodiment is used for the sediment collection device during the shield tunnel construction process, such as Figure 1 - As shown in Figure 3 (c), it includes a lower structure, a locking device, an upper structure and a woven bag 4: the lower structure 1 mainly includes a bottom plate 1-1, a bottom rod 1-2, a spring sheet 1-3, a connecting shaft 1-4, a vertical shaft 1-5 and a mudguard 1-6, wherein the bottom rod 1-2 and the vertical shaft 1-5 are respectively welded to the bottom plate 1-1 to form a whole, and the mudguard 1-6 is inserted into the vertical rod 1-5 after bending the end to form a connection, and the mudguard 1-6 mainly plays a diversion role (as shown in Figure 3). The locking device is mainly composed of a positioning rod 2-1 and a positioning rod 2-3 axis. The positioning rod 2-1 has a plurality of slots 2-2 along the length direction, wherein the positioning rod 2-1 is hinged to the bottom rod 1-2 through the positioning rod axis 2-3, and the top rod 3-1 is provided with a pin 3-7 (as shown in Figure 3) that is adapted to engage with the slot 2-2. Figure 4 The upper structure is mainly composed of a top rod 3-1, a pedal 3-2, a horizontal rod 3-3, a telescopic rod 3-4, a bite cone 3-5, and a positioning nut 3-6 (as shown). Figure 1-Figure 4 As shown). The pedal 3-2 is fixed to the top rod 3-1 by welding. The top rod 3-1 is a hollow structure, which can realize the vertical adjustment of the horizontal rod 3-3 and is fastened by the positioning nut 3-6; at the same time, the horizontal rod 3-3 also adopts a hollow structure, which can realize the horizontal adjustment of the telescopic rod 3-4 and is fastened by the positioning nuts 3-6 at both ends; the top of the horizontal rod 3-3 and the end of the telescopic rod 3-4 are both provided with a bite cone 3-5, which is a conical cone thorn structure to realize the bite of the woven bag 4. The lower structure and the upper structure are hinged by the connecting shaft 1-4, and the two ends of the spring sheet 1-3 are fixed to the top rod 3-1 and the bottom rod 1-2 respectively to provide a reset force.

[0048] The specific steps of using the sediment collection device in the shield tunnel construction process of this embodiment are as follows:

[0049] (1) Placement of sediment collection device: Figure 4 As shown, the present embodiment is used in the shield tunnel construction process. The sediment collection device is placed between two sleepers, the angle of the mud guard 1-6 is adjusted, and the other end of the mud guard 1-6 is fixed on the sleeper 6 in the upstream direction of the water flow.

[0050] (2) Installation of the woven bag: Press the lower side of the mouth of the prepared woven bag 4 under the bottom plate 1-1, and insert the upper edge of the mouth of the woven bag into the horizontal rod 3-3. Adjust the horizontal rod 3-3 up and down, and adjust the telescopic rod 3-4 horizontally at the same time to ensure that the device matches the size of the mouth of the woven bag 4; step on the pedal to make the mouth of the woven bag 3-2 taut, and buckle the corresponding slot of the positioning rod 2-1 into the buckle 2-2 to keep the woven bag taut.

[0051] (3) Collection and cleaning of sediment: Fine-tune the collection device to ensure that water flows naturally into the woven bag. After a certain amount of sediment has been collected in the woven bag, loosen the positioning rod 2-1, remove the woven bag that has collected the sediment, and repeat the steps in (2) to insert a new woven bag.

[0052] From the above, it can be seen that the use of the present invention to collect and clean mud and sand during shield construction can effectively solve the process of manually shoveling mud and sand into woven bags, and at the same time can realize the collection of mud and sand during the normal travel of the electric vehicle, greatly improving the cleaning efficiency and greatly reducing the manual cleaning cost.

Claims

1. A sediment collection device used in shield tunnel construction, characterized in that: It includes a bottom plate (1-1), a bottom rod (1-2), a fender (1-6), a positioning rod (2-1), a top rod (3-1) and a horizontal rod (3-3); One end of the bottom rod (1-2) is fixedly connected to the bottom plate (1-1); mudguards (1-6) are connected to the bottom plate (1-1) at symmetrical axes on both sides of the bottom rod (1-2); and the rotation direction of the mudguards (1-6) is parallel to the bottom plate (1-1); The lower end of the positioning rod (2-1) is axially connected to the other end of the bottom rod (1-2); the rotation direction of the positioning rod (2-1) is coplanar with the bottom rod (1-2); and the positioning rod (2-1) is provided with a plurality of slots (2-2) along its length direction; The top rod (3-1) comprises a first rod member (3-1-1) and a second rod member (3-1-2), the first rod member (3-1-1) and the second rod member (3-1-2) are connected in a V shape, the connecting portion of the first rod member (3-1-1) and the second rod member (3-1-2) is connected to the axis of the bottom rod (1-2), and the rotation direction of the top rod (3-1) around the connecting axis is perpendicular to the bottom plate (1-1); a latch pin (3-7) for latching in the latch groove (2-2) is provided on the first rod member (3-1-1), and an elastic component for opening the first rod member (3-1-1) and the bottom rod (1-2) is provided between the first rod member (3-1-1) and the bottom rod (1-2); the end of the second rod member (3-1-2) is connected to a horizontal rod (3-3), a plurality of cone spikes are provided on the horizontal rod (3-3), and the horizontal rod (3-3) is perpendicular to the top rod (3-1); The clamping groove (2-2) is a groove inclined upward.

2. A sediment collection device for use in shield tunnel construction according to claim 1, characterized in that: A pedal (3-2) is provided at the end of the first rod (3-1-1).

3. The device for collecting sediment during shield tunnel construction according to claim 1, characterized in that: The elastic component adopts a V-shaped spring sheet (1-3), and the two sides of the spring sheet (1-3) are respectively connected to the first rod (3-1-1) and the bottom rod (1-2).

4. The device for collecting sediment during shield tunnel construction according to claim 1, characterized in that: The fender (1-6) is perpendicular to the bottom plate (1-1); a vertical shaft (1-5) is provided on the bottom plate (1-1); an annular structure is provided at one end of the fender (1-6); and the fender (1-6) is sleeved on the vertical shaft (1-5) via the annular structure.

5. The device for collecting sediment during shield tunnel construction according to claim 1, characterized in that: The end of the second rod (3-1-2) is connected to the third rod (3-1-3), the middle of the horizontal rod (3-3) is vertically connected to one end of the third rod (3-1-3), the angle between the third rod (3-1-3) and the first rod (3-1-1) is an acute angle, and the third rod (3-1-3) is a telescopic rod.

6. The device for collecting sediment during shield tunnel construction according to claim 1, characterized in that: Both ends of the horizontal rod (3-3) are connected to telescopic rods (3-4), and the telescopic rods (3-4) are provided with the cone thorns.

7. The device for collecting sediment during shield tunnel construction according to claim 1, characterized in that: It also includes a sediment collection bag, the bag opening of which can be put on the horizontal rod (3-3) and the bottom plate (1-1); A hook for hooking the sediment collection bag is provided on the bottom plate (1-1).

8. A method for collecting sediment during shield tunnel construction, characterized in that: The method of using the sediment collection device for shield tunnel construction according to any one of claims 1 to 7 includes the following steps: The sediment collection device used in shield tunnel construction is placed between two sleepers, the angles of the two mudguards (1-6) are adjusted, and the other ends of the mudguards (1-6) are fixed to the sleepers in the upstream direction of the water flow; The lower side of the mouth of the sediment collection bag is pressed against the lower part of the bottom plate (1-1), and the upper edge of the mouth of the sediment collection bag is hung on the horizontal rod (3-3) through the cone thorns, and the angle between the first rod (3-1-1) and the bottom rod (1-2) is adjusted to open the mouth of the sediment collection bag, and the latch (3-7) on the first rod (3-1-1) is latched in the corresponding latch groove (2-2) on the positioning rod (2-1) to ensure that the mouth of the sediment collection bag is in a tight state; In the process of collecting sediment, the water carrying the sediment naturally flows into the sediment collection bag. After a certain amount of sediment is collected in the sediment collection bag, the sediment collection bag is replaced.