A construction method for installing mild steel dampers on all-metal steel frames

By optimizing the design and installation construction methods of mild steel dampers, we solved the problem that existing technology cannot adapt to the construction of high-intensity earthquake-proof areas, and achieved the effective installation of mild steel dampers in super-high-rise buildings and the improvement of energy-dissipation and shock-absorbing performance. Improved construction efficiency and accuracy.

CN113356662BInactive Publication Date: 2024-10-18CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110636971.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-08
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing mild steel damper installation method cannot adapt to the construction of high-intensity earthquake-proof areas, especially in super high-rise buildings, and cannot effectively meet the needs of energy dissipation and shock absorption.

Method used

By optimizing the design and installation construction methods of mild steel dampers, including using BIM technology to conduct collision inspections, adjusting the structural direction, determining the preset gap distance, and determining the best welding plan through welding experiments, using segmented welding, symmetrical welding and jump welding The welding method is combined with the installation positioning device for precise positioning and welding fixation.

Benefits of technology

It realizes the effective installation of mild steel dampers in high-intensity earthquake-proof areas, shortens the construction period, saves costs, improves construction accuracy and efficiency, reduces the amount of rework and rework adjustments, and improves the first-time acceptance pass rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113356662B_ABST
    Figure CN113356662B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of building construction technology, and in particular to a method for installing and constructing a mild steel damper applied to an all-metal steel frame, comprising the following steps: optimizing the mild steel damper: designing the size of the mild steel damper that meets the requirements of the secondary structure wall according to the specifications of the secondary structure wall and the performance requirements of the mild steel damper itself; the mild steel damper comprises a main body, an upper connecting part arranged above the main body, and a lower connecting part arranged below the main body; designing a construction plan for the connection node between the mild steel damper and the secondary structure wall; designing an installation plan for the mild steel damper; and installing and constructing the mild steel damper. The present invention enables the energy dissipation and shock absorption performance of the mild steel damper to be fully utilized, and can be applied to the energy dissipation and shock absorption construction of super high-rise buildings (≧40 floors) in high-intensity earthquake-resistant areas, greatly reducing the amount of rework of welding and the situation of rework adjustment caused by secondary structure collision, improving construction efficiency, and also improving the first-time acceptance rate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a mild steel damper installation construction method applied to a full metal steel frame. Background Art

[0002] Over the years, with the continuous development of my country's construction industry, construction technology has also been continuously improving. Earthquake record collection technology and information technology are changing with each passing day, and construction steel and design methods are developing rapidly. China is ushering in the era of steel structure construction. Structural energy dissipation and shock absorption technology is to set energy dissipation devices in certain parts of the structure, such as setting dampers on support beams, shear walls, joints or connecting components, so that before the main body enters the inelastic state, the energy dissipation device first enters the energy dissipation working state, and the device generates friction, bending, or shear, torsion and other elastic-plastic or viscoelastic hysteresis deformation to dissipate energy or absorb the energy of the earthquake input structure, so as to achieve the purpose of reducing the seismic response of the main structure. Mild steel dampers are widely used because of their small impact on buildings, strong energy dissipation capacity, and high efficiency. However, the existing installation method of soft steel dampers can only adapt to the construction of low-intensity earthquake-proof areas, and cannot adapt to the construction of high-intensity earthquake-proof areas, especially the energy dissipation and shock absorption construction of super-high-rise buildings in the eight-degree fortification area, which needs to be improved. Summary of the invention

[0003] Features and advantages of the invention are set forth in part in the following description, or may be obvious from the description, or may be learned through practice of the invention.

[0004] In order to overcome the problems of the prior art, the present invention provides an installation and construction method of a soft steel damper which can be applied to super high-rise buildings in eight-degree defense areas and can be installed on a full metal steel frame structure.

[0005] In order to achieve the above object, the technical solution provided by the present invention is:

[0006] A mild steel damper installation construction method applied to an all-metal steel frame, the mild steel damper installation construction method comprising the following steps:

[0007] Optimizing the mild steel damper: designing the size of the mild steel damper that meets the requirements of the secondary structure wall according to the specifications of the secondary structure wall and the performance requirements of the mild steel damper itself; the mild steel damper includes a body, an upper connecting part arranged above the body, and a lower connecting part arranged below the body;

[0008] Design the construction plan for the connection nodes between the mild steel damper and the secondary structure wall;

[0009] Design the installation plan of the mild steel damper: Use BIM technology to perform collision checks between the mild steel damper and the secondary structure wall, adjust the direction of the secondary structure wall according to the collision check results, and determine the preset gap distance between the body of the mild steel damper and the upper or lower connection part, and then determine the best welding plan through welding experiments;

[0010] Installation and construction of mild steel dampers: According to the installation plan of mild steel dampers, the mild steel dampers are installed on the corresponding secondary structure walls in sequence by installing positioning devices.

[0011] Preferably, the size of the mild steel damper should meet the following requirements:

[0012] In the plane direction of the secondary structure wall, the mild steel damper cannot exceed the width of the window wall or partition wall of the secondary structure;

[0013] In the thickness direction of the secondary structure wall, the thickness of the mild steel damper after installation cannot exceed the thickness of the inner wall or the outer wall.

[0014] Preferably, the construction scheme of the connection node includes the following steps:

[0015] A gap is reserved between the structural column and the upper connecting part or the lower connecting part; the distance of the reserved gap is 20 mm;

[0016] Fill the reserved gap with flexible damping material.

[0017] Preferably, the flexible damping material is made of at least one of butyl, acrylate, nitrile, silicone rubber, polyurethane, polyvinyl chloride, and epoxy resin.

[0018] Preferably, the installation and positioning device includes an elastic support platform arranged at the bottom of the main body, a positioning caliper arranged on the elastic support platform and used to locate the center position of the main body, a clamp arranged in the middle of the positioning caliper and connected to the main body, at least one supporting cross bar having one side end connected to the clamp, and at least one telescopic caliper connected to the other side end of the supporting cross bar.

[0019] Preferably, the telescopic caliper includes an adjusting sleeve with a cavity in the middle, a slide groove arranged in the cavity of the adjusting sleeve, an upper adjusting ruler slidably arranged on the slide groove and extendable from the top of the adjusting sleeve, a lower adjusting ruler slidably arranged on the slide groove and extendable from the bottom of the adjusting sleeve, and a locking member arranged on the adjusting sleeve and used to fix the upper adjusting ruler and / or the lower adjusting ruler; the upper adjusting ruler and the lower adjusting ruler are both provided with scales.

[0020] Preferably, the installation and construction of the mild steel damper comprises the following steps:

[0021] Align the ribs of the lower connection portion with the stiffening plates of the web of the steel beam to ensure force transmission, and perform temporary fixation;

[0022] The main body is arranged above the lower connection portion according to a preset gap distance in the installation scheme of the mild steel damper by installing a positioning device, and is temporarily fixed;

[0023] According to the installation scheme of the mild steel damper, the preset gap distance between the main body and the upper connection part is accurately positioned by adjusting the installation positioning device, and then the upper connection part is arranged above the installation positioning device, and the rib plate of the upper connection part is aligned with the stiffening plate of the web of the steel beam, and then welded and fixed;

[0024] According to the optimal welding scheme, the mild steel damper is welded and fixed.

[0025] Preferably, the best solution for welding includes the following steps:

[0026] Before welding and fixing, preheat the heat-affected area of ​​the base material;

[0027] When welding and fixing, at least one of segmented welding, symmetrical welding, and skip welding is adopted.

[0028] Beneficial effects of the present invention: By optimizing the design of the mild steel damper and the connection nodes, as well as optimizing the installation and construction process, the energy dissipation and shock absorption performance of the mild steel damper can be fully utilized, and it can be applied to the energy dissipation and shock absorption construction of super high-rise buildings (≧40 floors) in high-intensity earthquake-resistant areas. By installing the positioning device, the problems of long positioning time and inaccurate positioning of the mild steel damper are effectively solved, which greatly shortens the construction period, saves construction costs, improves construction accuracy, ensures construction quality, and provides guarantees for the interlaced construction of secondary structures. The optimal welding scheme determined by welding experiments and the application of BIM technology improve the installation efficiency of the mild steel damper, and greatly reduce the amount of welding rework and rework adjustments caused by secondary structure collisions, improve construction efficiency, and also improve the first-time acceptance rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The present invention will be described in detail below with reference to the accompanying drawings and in combination with examples, and the advantages and implementation methods of the present invention will become more obvious. The contents shown in the accompanying drawings are only used to explain the present invention and do not constitute any limitation to the present invention in any sense. In the accompanying drawings:

[0030] Figure 1 It is a flow chart of a construction method for installing a mild steel damper applied to an all-metal steel frame in a specific embodiment of the present invention;

[0031] Figure 2It is a schematic diagram of a mild steel damper and a secondary structure wall in a mild steel damper installation construction method applied to a full metal steel frame in a specific embodiment of the present invention;

[0032] Figure 3 It is a schematic diagram of an installation and positioning device for a mild steel damper installation construction method applied to a full metal steel frame in a specific embodiment of the present invention;

[0033] Figure 4 It is a schematic diagram of an adjustment sleeve of a mild steel damper installation construction method applied to an all-metal steel frame in a specific embodiment of the present invention;

[0034] Figure 5 It is a schematic diagram of longitudinal residual stress distribution in a welding experiment of a mild steel damper installation construction method applied to an all-metal steel frame in a specific embodiment of the present invention;

[0035] Figure 6 The figure is a schematic diagram of the transverse residual stress distribution in a welding experiment of a mild steel damper installation construction method applied to an all-metal steel frame in a specific embodiment of the present invention. DETAILED DESCRIPTION

[0036] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0037] In the description of the present invention, unless otherwise specified, “plurality” means two or more than two; the orientations or positional relationships indicated by terms such as “upper”, “lower”, “inner”, “outer”, “top”, and “bottom” are based on the orientations or positional relationships shown in the accompanying drawings, and are merely simplified descriptions for the convenience of describing the present invention, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0038] like Figures 1 to 4 As shown, the present invention provides a mild steel damper installation construction method applied to a full metal steel frame, and the mild steel damper 500 installation construction method comprises the following steps:

[0039] Optimizing the mild steel damper 100: Designing the size of the mild steel damper 500 that meets the requirements of the secondary structure wall 600 according to the specifications of the secondary structure wall 600 and the performance requirements of the mild steel damper itself; the mild steel damper 500 includes a body 510, an upper connecting portion 520 disposed above the body 510, and a lower connecting portion 530 disposed below the body 510;

[0040] Designing a construction plan 200 for the connection node between the mild steel damper 500 and the secondary structure wall 600;

[0041] Design an installation plan 300 of the mild steel damper 500: perform a collision check between the mild steel damper 500 and the secondary structure wall 600 through BIM technology, adjust the direction of the secondary structure wall 600 according to the collision check result, and determine a preset gap distance between the body 510 of the mild steel damper 500 and the upper connecting part 520 or the lower connecting part 530, and then determine the best welding plan through welding experiments;

[0042] Installation construction 400 of the mild steel damper 500: According to the installation plan of the mild steel damper 500, the mild steel damper 500 is installed on the corresponding secondary structure wall 600 in sequence by installing the positioning device 700.

[0043] Furthermore, the preset gap distance between the body 510 of the mild steel damper 500 and the upper connecting portion 520 or the lower connecting portion 530 is 10 mm.

[0044] Furthermore, the steel material of the core energy-consuming part of the body 510 is soft steel LY225, the yield point of the steel is between 205Mpa and 245Mpa, the tensile strength is between 300Mpa and 400Mpa, and the elongation is above 40%.

[0045] Furthermore, the size of the mild steel damper 500 should meet the following requirements:

[0046] In the plane direction of the secondary structure wall 600, the mild steel damper 500 cannot exceed the width of the window wall or partition wall of the secondary structure;

[0047] In the thickness direction of the secondary structure wall 600, the thickness of the mild steel damper 500 after installation cannot exceed the thickness of the inner wall or the outer wall.

[0048] Preferably, the construction scheme of the connection node includes the following steps:

[0049] A gap 620 is reserved between the structural column 610 and the upper connecting portion 520 or the lower connecting portion 530; the distance of the reserved gap 620 is 20 mm;

[0050] The reserved gap 620 is filled with a flexible damping material.

[0051] Furthermore, the flexible damping material is made of at least one of butyl, acrylate, nitrile, silicone rubber, polyurethane, polyvinyl chloride, and epoxy resin.

[0052] Furthermore, the installation and positioning device 700 includes an elastic support platform 710 disposed at the bottom of the body 510, a positioning caliper 720 disposed on the elastic support platform 710 and used to locate the center position of the body 510, a clamp 730 disposed in the middle of the positioning caliper 720 and connected to the body 510, at least one support cross bar 740 connected to the clamp 730 at one end, and at least one telescopic caliper 750 connected to the other end of the support cross bar 740. The elastic support platform 710 includes a bottom plate 711, at least one spring 712 on the bottom plate 711 at one end, and a top plate 713 fixed to the other end of the spring 712 and slidably connected to the bottom of the positioning caliper 720; a sliding groove 714 is provided on the side wall of the top plate 713 to facilitate the sliding of the positioning caliper 720. If the bottom plate 711 and the top plate 713 are provided with connecting pieces at both ends, the material of the connecting piece is preferably an elastic material, and the elastic material is preferably rubber or silicone material to avoid affecting the up and down adjustment function of the spring. The positioning caliper 720 is provided with a scale, and the starting point of the scale is at the midpoint of the positioning caliper 720, and extends from the midpoint to both ends. Through the scale on the positioning caliper 720, it is possible to quickly determine whether the clamp 730 is fixed to the middle position of the body 510, so that the body 510 is located at the center of the installation positioning device 700, which is more convenient for accurate positioning; the distance between the body 510 and the upper connecting part 520 or the lower connecting part 530 is determined by the telescopic caliper 750, and then the position of the body 510 is accurately positioned, thereby improving the installation accuracy and facilitating the installation of the construction personnel, and effectively solving the problems of long positioning time and inaccurate positioning of the mild steel damper 500. The installation positioning device 700 can be repeatedly used in different construction projects, greatly saving the construction cost of the project.

[0053] Furthermore, the telescopic caliper 750 includes an adjusting sleeve 751 with a cavity in the middle, a slide groove 755 arranged in the cavity of the adjusting sleeve 751, an upper adjusting ruler 752 slidably arranged on the slide groove 755 and extendable from the top of the adjusting sleeve 751, a lower adjusting ruler 753 slidably arranged on the slide groove 755 and extendable from the bottom of the adjusting sleeve 751, and a locking member 754 arranged on the adjusting sleeve 751 and used to fix the upper adjusting ruler 752 and / or the lower adjusting ruler 753; the upper adjusting ruler 752 and the lower adjusting ruler 753 are both provided with scales. As a preferred embodiment of the present invention, a partition 756 is provided on the inner wall of the adjusting sleeve 751, and the partition 756 separates the cavity of the adjusting sleeve 751 to form a first inner tube 757 and a second inner tube 758. The inner wall of the first inner tube 757 is provided with a first slide groove for facilitating the sliding of the lower adjusting ruler 753, and the inner wall of the second inner tube 758 is provided with a second slide groove for facilitating the sliding of the upper adjusting ruler 752; the locking member 754 includes a locking member 754 provided on one side outer wall of the adjusting sleeve 751 and connected to the first inner tube 757. 7 and provided with an internal thread, a first screw rod detachably provided on the first through hole 759 and used to clamp the lower adjustment ruler 753, a second through hole provided on the inner wall of the other side of the adjustment sleeve 751 and connected to the second inner tube 758 and provided with an internal thread, a second screw rod detachably provided on the second through hole and used to clamp the upper adjustment ruler 752; the first screw rod is provided with an external thread matching the internal thread of the first through hole 759; the second screw rod is provided with an external thread matching the internal thread of the second through hole. In order to strengthen the fixing effect of the locking member 754 on the upper adjustment ruler 752 and / or the lower adjustment ruler 753, a cushion block 900 is also provided on the partition plate 756.

[0054] Furthermore, the installation construction 400 of the mild steel damper 500 includes the following steps:

[0055] Align the ribs of the lower connecting portion 530 with the stiffening plates of the web of the steel beam 800 to ensure force transmission and perform temporary fixation;

[0056] The main body 510 is installed above the lower connecting portion 530 by installing the positioning device 700 according to the preset gap distance in the installation scheme of the mild steel damper 500, and is temporarily fixed;

[0057] According to the installation scheme of the mild steel damper 500, the preset gap distance between the main body 510 and the upper connecting part 520 is accurately positioned by adjusting the installation positioning device 700, and then the upper connecting part 520 is arranged above the installation positioning device 700, and the ribs of the upper connecting part 520 are aligned with the stiffening plates of the web of the steel beam 800, and then welded and fixed;

[0058] According to the best welding solution, the mild steel damper 500 is welded and fixed.

[0059] Furthermore, the best solution for welding includes the following steps:

[0060] Before welding and fixing, preheat the heat-affected area of ​​the base material;

[0061] When welding and fixing, at least one of segmented welding, symmetrical welding, and skip welding is adopted.

[0062] Furthermore, the best solution for this welding is obtained through the following welding experiments:

[0063] First, the temperature of the welding site was initially set to 20 °C, and gas shielded welding with electrode ER50-6 was used. The thermal efficiency of this welding method is 0.75~0.90. The size of the welding thermal efficiency determines the size of the energy converted from the arc to the welded component. The simulated welding uses three schemes with welding parameters as shown in Table 1, that is, different welding currents are used to cause different line energies to perform welding simulation.

[0064] Table 1 Welding parameters of three welding schemes

[0065]

[0066] Through observation of three welding schemes, it was found that during welding, due to the temperature difference before and after the heat source, an unstable stress difference gradient will appear near the moving welding heat source. The temperature in front of the heat source is very high, and the temperature isotherms are relatively dense, which causes the metal of the welded component to begin to melt due to the high temperature, and then the metal expands, but the expansion area of ​​the weld metal is surrounded by the lower temperature base metal area, which hinders the expansion of the metal to a certain extent. Compressive stress gradually occurs in this area and gradually reaches a very high value; after the heat source passes behind the heat source, the metal will crystallize during the process of cooling and solidification from heat to cooling. The metal crystals cool and shrink, but the surrounding low-temperature metal area constrains and limits the cooling and shrinkage of the affected metal area, which is hindered to a certain extent. This part of the area begins to undergo plastic deformation, and the stress generated forms residual stress and remains in the component, resulting in a decrease in the mechanical properties of the overall component. Therefore, segmented welding and / or symmetrical welding and / or jump welding should be used to minimize welding stress.

[0067] like Figures 5 and 6 As shown in the figure, by monitoring the longitudinal / transverse residual stress during welding, it was found that the longitudinal residual stress was significantly greater than the transverse residual stress, indicating that the longitudinal welding stress was dominant during welding, and the transverse residual stress mainly controlled the width distribution of the heat affected zone. Therefore, the heat affected zone of the base material should be fully preheated during welding to reduce the transverse residual stress.

[0068] In addition, as shown in Table 1 and Figure 5 As shown in the figure, the three schemes show that when the welding current is small, the line energy generated by welding is small, and the stress amplitude reached is small. As the welding current increases, the longitudinal residual stress of welding also increases. For example, the stress at the beginning and end of welding in scheme 1 is approximately close to -5MPa, while the stress at the beginning and end of welding in scheme 3 is obviously close to -15MPa. Therefore, under the conditions of ensuring welding requirements and post-welding quality, the selection of a smaller welding line energy can reduce the longitudinal residual stress of welding to a certain extent.

[0069] Further, after a certain number of mild steel dampers 500 are constructed, the construction of the secondary structure wall 600 can be interspersed. During construction, the construction is carried out according to the direction of the secondary structure wall 600 given by the collision inspection result to avoid collision rework and improve construction efficiency.

[0070] The above-mentioned soft steel damper 500 installation construction method is applied to the engineering project of super high-rise skyscrapers and high-end commercial centers with all-metal steel frame structures. The total construction area of ​​the building is 600,600 square meters and the main building height is 407 meters. According to the calculation of the project department of the engineering project, 105 welding workers were reduced, and the total labor cost of this item was reduced by 36,750 yuan based on the local welder salary of 350 yuan / d; 55 installation workers were reduced, and the total labor cost of this item was reduced by 14,300 yuan based on the local labor salary of 260 yuan / d; compared with traditional processes, the weld repair rate of this construction method was reduced by 8%, and the direct repair cost was reduced by 80,000 yuan in total; the construction of this construction method accelerated the construction speed. According to the calculation of the project department, a total of 8 days of construction period were saved, and project management costs and operating expenses were saved: including tower crane rental fees and management personnel wages, welfare expenses and other expenses of about 160,000 yuan; comprehensive calculation saves a total of 291.05 million yuan, with significant economic benefits.

[0071] The installation and construction method of the mild steel damper applied to the all-metal steel frame provided by the present invention enables the mild steel damper to be applied to the energy dissipation and shock absorption construction of super high-rise buildings in the eight-degree defense zone, and effectively solves the problems of long positioning time and inaccurate positioning of the mild steel damper, greatly shortens the construction period, saves construction costs, improves construction accuracy, ensures construction quality, provides guarantee for the interlaced construction of secondary structures, greatly reduces the amount of rework of welding and the rework and adjustment caused by collision of secondary structures, improves construction efficiency, and also improves the first-time acceptance rate, meets more construction needs, and has broader market prospects.

[0072] The preferred embodiments of the present invention are described above with reference to the accompanying drawings. A person skilled in the art may implement the present invention in a variety of variations without departing from the scope and essence of the present invention. For example, a feature shown or described as part of one embodiment may be used in another embodiment to obtain another embodiment. The above are only preferred feasible embodiments of the present invention, and do not limit the scope of rights of the present invention. Any equivalent changes made using the contents of the present specification and the accompanying drawings are included in the scope of rights of the present invention.

Claims

1. A method for installing a mild steel damper on a full metal steel frame, characterized in that: The mild steel damper installation construction method comprises the following steps: Optimizing the mild steel damper: designing the size of the mild steel damper that meets the requirements of the secondary structure wall according to the specifications of the secondary structure wall and the performance requirements of the mild steel damper itself; the mild steel damper includes a body, an upper connecting part arranged above the body, and a lower connecting part arranged below the body; Design a construction scheme for the connection node between the mild steel damper and the secondary structure wall; the construction scheme for the connection node includes the following steps: A gap is reserved between the structural column and the upper connecting part or the lower connecting part; the distance of the reserved gap is 20 mm; and a flexible damping material is filled in the reserved gap; Design the installation plan of the mild steel damper: Use BIM technology to perform collision checks between the mild steel damper and the secondary structure wall, adjust the direction of the secondary structure wall according to the collision check results, and determine the preset gap distance between the body of the mild steel damper and the upper or lower connection part, and then determine the best welding plan through welding experiments; Installation and construction of mild steel dampers: According to the installation plan of mild steel dampers, install the mild steel dampers on the corresponding secondary structure walls in sequence by installing positioning devices; The dimensions of the mild steel damper shall meet the following requirements: In the plane direction of the secondary structure wall, the mild steel damper cannot exceed the width of the window wall or partition wall of the secondary structure; In the thickness direction of the secondary structure wall, the thickness of the mild steel damper after installation cannot exceed the thickness of the inner wall or the outer wall.

2. The method for installing a mild steel damper for a full metal steel frame according to claim 1 is characterized in that: The material of the flexible damping material is at least one of butyl, acrylate, nitrile, silicone rubber, polyurethane, polyvinyl chloride, and epoxy resin.

3. The method for installing a mild steel damper for a full metal steel frame according to claim 1 is characterized in that: The installation and positioning device includes an elastic support platform arranged at the bottom of the main body, a positioning caliper arranged on the elastic support platform and used to locate the center position of the main body, a clamp arranged in the middle of the positioning caliper and connected to the main body, at least one supporting cross bar with one side end connected to the clamp, and at least one telescopic caliper connected to the other side end of the supporting cross bar.

4. The method for installing a mild steel damper for a full metal steel frame according to claim 3 is characterized in that: The telescopic caliper comprises an adjusting sleeve with a cavity in the middle, a slide groove arranged in the cavity of the adjusting sleeve, an upper adjusting ruler slidably arranged on the slide groove and capable of extending from the top of the adjusting sleeve, a lower adjusting ruler slidably arranged on the slide groove and capable of extending from the bottom of the adjusting sleeve, and a locking member arranged on the adjusting sleeve and used for fixing the upper adjusting ruler and / or the lower adjusting ruler; both the upper adjusting ruler and the lower adjusting ruler are provided with scales.

5. The method for installing a mild steel damper for a full metal steel frame according to claim 1 is characterized in that: The installation and construction of the mild steel damper includes the following steps: Align the ribs of the lower connection portion with the stiffening plates of the web of the steel beam to ensure force transmission, and perform temporary fixation; The main body is arranged above the lower connection portion according to a preset gap distance in the installation scheme of the mild steel damper by installing a positioning device, and is temporarily fixed; According to the installation scheme of the mild steel damper, the preset gap distance between the main body and the upper connection part is accurately positioned by adjusting the installation positioning device, and then the upper connection part is arranged above the installation positioning device, and the rib plate of the upper connection part is aligned with the stiffening plate of the web of the steel beam, and then welded and fixed; According to the optimal welding scheme, the mild steel damper is welded and fixed.

6. The method for installing a mild steel damper for a full metal steel frame according to claim 1 is characterized in that: The best solution for welding includes the following steps: Before welding and fixing, preheat the heat-affected area of ​​the base material; When welding and fixing, at least one of segmented welding, symmetrical welding, and skip welding is adopted.

Citation Information

Patent Citations

  • Viscoelastic-mild steel shear-type combined energy consumer

    CN103216022A

  • Damping and restrained brace combined damping energy dissipation device

    CN105839969A