Refrigerator center beam assembly production device, production method and refrigerator center beam assembly
By combining progressive die and feeding device, in-mold riveting of the center beam and reinforcing iron is achieved, solving the problems of low production efficiency and welding smoke and noise of refrigerator center beam, and improving production efficiency and environmental cleanliness.
Patent Information
- Application Number
- CN202010163753.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-03-10
AI Technical Summary
The existing refrigerator center beam production efficiency is low, the traditional mold structure leads to frequent line breakage, labor costs are high, and the welding method has problems with smoke, spatter and noise, making it difficult to meet the requirements of clean and safe production.
By using a progressive die and a feeding device, a flange hole is punched out on the center beam through a stamping process and a reinforcing iron is fed in, so as to realize the in-mold riveting of the center beam and the reinforcing iron, simplifying the production process and avoiding welding fumes and noise.
It significantly improves production efficiency, reduces labor costs, enhances process safety and environmental cleanliness, and aligns with the trend of green industrial development.
Smart Images

Figure CN113369387B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of stamping processing, and in particular to a refrigerator center beam assembly production device, a production method and a refrigerator center beam assembly. Background Art
[0002] Existing refrigerator center beams are mostly produced using traditional mold structures, with many processes, among which the more common is the knife mold structure, which has many steps and the assembly line is often broken due to shortages, resulting in low production efficiency, high labor costs, and high product scrap rates. In addition, the center beam and the reinforcing iron in the refrigerator center beam assembly are mostly combined by welding. On the one hand, the cost is high, and on the other hand, the two will produce smoke, splashes, noise, etc. during the welding process, resulting in low process safety and cleanliness of the working environment, making it difficult to meet the needs of clean and safe production. Summary of the invention
[0003] In view of this, the present invention aims to propose a refrigerator center beam assembly production device and production method, which can complete the in-mold riveting between the center beam and the reinforcing iron, facilitate assembly, and significantly improve production efficiency, as well as a refrigerator center beam assembly that is convenient for realizing the above-mentioned in-mold riveting.
[0004] To achieve the above object, the technical solution of the present invention is achieved as follows:
[0005] A refrigerator center beam assembly production device, the center beam assembly comprising a center beam and a reinforcing iron arranged on the center beam, the refrigerator center beam assembly production device comprising:
[0006] A progressive die, which is used to produce the center beam and can punch out flange holes on the center beam; and
[0007] A feeding device, the feeding device is used to feed reinforcing iron into the progressive die, the reinforcing iron is provided with a riveting hole, and the end of the riveting hole is provided with a material receiving cavity connected with the riveting hole; the feeding device feeds the reinforcing iron into the progressive die after punching the flanging hole on the center beam, so that the flanging hole passes through the riveting hole;
[0008] The material receiving cavity is capable of accommodating strip material during the progressive die stamping process to connect the reinforcing iron and the center beam together.
[0009] Optionally, the progressive die includes an upper die assembly and a lower die assembly capable of relative movement in the vertical direction, the upper die assembly includes an upper die bending module and an upper die shaping module sequentially arranged along the process route, the lower die assembly includes a lower die bending module and a lower die shaping module sequentially arranged along the process route, the upper die bending module and the lower die bending module cooperate to perform multiple bends on the strip material placed on the progressive die, the upper die shaping module and the lower die shaping module cooperate to shape the bent strip material to obtain a finished product, and the feeding device is configured to be able to convey the reinforcing iron to the lower die shaping module so that the positions of the riveting holes and the flanging holes correspond.
[0010] Optionally, the upper die assembly includes an upper die seat, an upper pad, an upper clamping plate, a stop plate and a stripper plate; the upper die bending module includes a bending punch 1, a bending punch 2, a stripper insert 1, a bending punch 3, a bending punch 4, an upper inclined block 1, a bending strip 2, an upper inclined block 2 and a bending strip 3;
[0011] The lower die assembly includes a lower die seat, a lower pad and a lower die plate; the lower die bending module includes an insert 1, a bending strip 1, an insert 2, an insert 3, a bending punch 1, a die, an insert 4, a bending punch 2, an insert 5 and an insert 6;
[0012] The bending punch, the second bending punch and the first insert are configured to perform a first bending on the strip material after punching, so that both side ends of the strip material form a first bending portion bent downward;
[0013] Two bending strips 1 are correspondingly arranged on both sides of the second insert, and the second insert, the bending strip 1 and the stripping insert 1 are arranged to cooperate with each other to perform a second bending on the strip material, so that the two sides with the first bending portion are bent upward to form a U shape;
[0014] The bending punch 3 and the insert 3 are configured to perform a third bending on the strip material, so that both sides of the U-shaped strip material are bent downward to a horizontal state;
[0015] Two concave dies are symmetrically arranged on both sides of the bending punch 1, and the bending punch 4, the bending punch 1 and the concave dies are arranged to cooperate with each other to perform the fourth bending of the strip material, so that the horizontal parts on both sides of the strip material are bent upward, and two U-shaped parts are formed on both sides of the strip material;
[0016] The upper inclined block 1, the bending strip 2, the insert block 4, and the bending punch 2 are configured to cooperate with each other to perform a fifth bend on the strip material so that the two U-shaped portions are bent toward each other;
[0017] The upper inclined block 2, the bending strip 3, the insert 5 and the insert 6 are arranged to cooperate with each other to bend the strip material for the sixth time, so that the two U-shaped parts are placed in a horizontal state where the opening ends are away from each other.
[0018] Optionally, the upper mold shaping module includes an upper inclined block three, and the lower mold shaping module includes an insert seven, a bending strip four and a positioning punch. The upper inclined block three, the insert seven, the bending strip four and the positioning punch are configured to cooperate with each other to flatten and shape the strip material after bending. The feeding device is configured to convey the reinforcing iron to the position of the positioning punch so that the reinforcing iron can be located between the positioning punch and the strip material.
[0019] Optionally, the upper die assembly includes a riveting pre-punching punch and a riveting punch for pre-punching the flanging hole before the strip is bent.
[0020] Optionally, the feeding device includes a slideway and a driving unit for driving the reinforcing iron to move along the slideway, and the slideway is configured to extend in a horizontal direction perpendicular to the stamping direction of the progressive die.
[0021] Optionally, the driving unit includes a slide seat, a guide rod arranged on the slide seat, a slider sliding along the guide rod, and a push rod arranged on the slider, and the push rod is configured to push the reinforcing iron to slide along the slideway.
[0022] Optionally, the feeding device includes a preparation seat for placing a plurality of the reinforcing irons in parallel, the preparation seat is arranged perpendicular to the slide, and the preparation seat is connected to the slide so that the reinforcing irons can enter the slide in sequence.
[0023] A second aspect of the present invention provides a method for producing a refrigerator center beam assembly, the process being completed using the refrigerator center beam assembly production device described in any of the above schemes, and specifically comprising the following steps:
[0024] S1, the progressive die is used to produce the center beam and the flanging hole is processed on the center beam;
[0025] S2, feeding the reinforcing iron into the progressive die so that the riveting hole can be aligned with the flanging hole, and the reinforcing iron is provided with the riveting hole having the material containing cavity;
[0026] S3. Fill the material cavity with strips to connect the reinforcing iron and the middle beam together.
[0027] The third aspect of the present invention provides a refrigerator center beam assembly, which includes a center beam and a reinforcing iron. The center beam includes a plate and U-shaped portions arranged on both sides of the bottom of the plate. The open ends of the U-shaped portions on both sides are arranged to be away from each other. The U-shaped portion and the plate are bent integrally. A slot extending along the length direction of the refrigerator center beam assembly is formed between the U-shaped portions on both sides. A riveting hole is provided on the reinforcing iron, and a flanging hole passing through the riveting hole is provided in the slot. A material accommodating cavity connected to the riveting hole is provided at the end of the riveting hole, and the material accommodating cavity is arranged to be able to accommodate strip material so that the reinforcing iron and the center beam are connected together.
[0028] Compared with the prior art, the refrigerator center beam assembly production device of the present invention has the following advantages:
[0029] The refrigerator center beam assembly production device of the present invention proposes to use a progressive die to produce the center beam, and to feed the reinforcing iron in the progressive die stamping process, so that the strip material on the progressive die is filled between the reinforcing iron and the center beam through the stamping step, thereby completing the in-mold riveting between the two, facilitating assembly, significantly improving production efficiency, and saving labor costs. At the same time, the device of the present invention can simplify the production and processing procedures. Compared with the traditional welding method between the center beam and the reinforcing iron, it does not generate smoke and splashes and has less noise, greatly improving the safety of the process and the cleanliness of the working environment, reducing the harm to the staff, and conforming to the development trend of green industry.
[0030] Other features and advantages of the present invention will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The schematic embodiments of the present invention and the description thereof are used to explain the present invention and do not constitute improper limitations on the present invention.
[0032] In the attached picture:
[0033] Figure 1 It is a structural schematic diagram of a refrigerator center beam assembly production device according to an embodiment of the present invention;
[0034] Figure 2 for Figure 1 The process drawing of the progressive die in;
[0035] Figure 3 for Figure 1 A schematic diagram of the structure of a feeding device;
[0036] Figure 4 This is a schematic structural diagram of a refrigerator center beam assembly according to an embodiment of the present invention;
[0037] Figure 5for Figure 4 Side view of
[0038] Figure 6 for Figure 4 AA surface section view;
[0039] Figure 7 for Figure 4 Cross-sectional view of the middle reinforcement iron.
[0040] Description of reference numerals:
[0041] 1-upper support plate, 2-upper pad, 3-upper die seat, 4-upper pad, 5-upper clamp, 6-stop plate, 7-stripping plate, 8-lower template, 9-lower pad, 10-lower die seat, 11-lower pad, 12-lower support plate, 13-blanking punch, 14-rivet and pre-punch punch, 15-first punch, 16-rivet and flanging punch, 17-detection needle, 18-second punch, 19-stripping insert nine, 20-4 sequence bending punch one, 21-4 stripping insert eight, 22-4 bending punch two, 23-5 stripping insert one, 24-6 bending punch three, 25-6 stripping insert two, 26-7 bending punch four, 27-7 stripping insert three, 28-upper inclined block one, 29-8 bending strip two, 30-8 stripping insert four, 31-upper inclined block two, 32-9 bending strip three, 33-9 stripping insert five, 34-upper inclined block three, 35-1 1-sequence stripping insert six, 36-12-sequence stripping insert seven, 37-bud punch, 38-ejection pin, 39-positioning pin, 40-lifting block, 41-lifting block, 42-4-sequence insert one, 43-5-sequence bending strip one, 44-5-sequence insert two, 45-6-sequence insert three, 46-7-sequence die, 47-7-sequence bending punch one, 48-8-sequence insert four, 49-8-sequence bending punch two, 50-9-sequence insert five, 51-9-sequence Insert six, 52—11 sequence insert seven, 53—11 sequence bending strip four, 54—11 sequence positioning punch, 55—12 sequence insert eight, 56—12 sequence shaping punch, 57—middle beam, 58—reinforcement iron, 59—riveting hole, 60—flanging hole, 61—material holding cavity, 62—slideway, 63—slide seat, 64—guide rod, 65—slider, 66—push rod, 67—material preparation seat, 68—plate, 69—U-shaped part, 70—slot. DETAILED DESCRIPTION
[0042] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.
[0043] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0044] Combination Figure 1-Figure 7According to one aspect of the present invention, a refrigerator center beam assembly production device is provided, wherein the center beam assembly comprises a center beam 57 and a reinforcing iron 58 arranged on the center beam 57, and the refrigerator center beam assembly production device comprises:
[0045] A progressive die, which is used to produce the center beam 57 and can punch out a flanging hole 60 on the center beam 57; and
[0046] A feeding device, the feeding device is used to feed a reinforcing iron 58 into the progressive die, the reinforcing iron 58 is provided with a riveting hole 59, and the end of the riveting hole 59 is provided with a material receiving cavity 61 connected with the riveting hole 59; the feeding device feeds the reinforcing iron 58 into the progressive die after the flanging hole 60 is punched out on the middle beam 57, so that the flanging hole 60 passes through the riveting hole 59;
[0047] The material receiving cavity 61 can accommodate strip material during the progressive die stamping process to connect the reinforcing iron 58 and the center beam 57 together.
[0048] It should be noted that progressive die processing refers to the stepwise displacement of the strip material used to produce the product between the upper die assembly and the lower die assembly by dragging the strip material used to produce the product through a driving mechanism, and the product area in the middle of the strip material is stamped by multiple punches of the upper die assembly and the lower die assembly to finally produce the finished product.
[0049] The refrigerator center beam assembly production device of the present invention proposes to use a progressive die to produce the center beam. In order to cooperate with the stamping process of the progressive die, the progressive die is used to punch out the flange hole 60 on the center beam 57 and then the reinforcing iron 58 is fed into the center beam. It should be noted that the reinforcing iron 58 needs to be pre-processed so that a riveting hole 59 is formed on the reinforcing iron 58. At the same time, in order to make the reinforcing iron 58 and the center beam 57 integrally formed during the stamping process, a material accommodating cavity 61 is provided at the end of the riveting hole 59. The material accommodating cavity 61 can be understood as a chamfer opened at the end of the riveting hole 59. Figure 7 As shown, the strip material on the progressive die can be filled in the above-mentioned chamfer between the reinforcing iron and the middle beam during the stamping process through the stamping step, thereby completing the in-mold riveting between the two, facilitating the assembly of the middle beam assembly, significantly improving production efficiency, and saving labor costs. At the same time, the present invention can simplify the production and processing procedures by coordinating the progressive die and the feeding device to realize the integrated processing of the middle beam and the reinforcing iron. Compared with the traditional welding method between the middle beam and the reinforcing iron, it does not generate smoke and splashes and has less noise, greatly improving the safety of the process and the cleanliness of the working environment, reducing the harm to the staff, and conforming to the development trend of green industry.
[0050] Among them, the progressive die includes an upper die assembly and a lower die assembly which can move relative to each other in the vertical direction, the upper die assembly includes an upper die bending module and an upper die shaping module which are arranged in sequence along the process route, the lower die assembly includes a lower die bending module and a lower die shaping module which are arranged in sequence along the process route, the upper die bending module and the lower die bending module cooperate to perform multiple bends on the strip material placed on the progressive die, the upper die shaping module and the lower die shaping module cooperate to shape the bent strip material to obtain a finished product, and the feeding device is configured to be able to convey the reinforcing iron 58 to the lower die shaping module so that the positions of the riveting holes 59 and the flanging holes 60 correspond.
[0051] Specifically, the upper die assembly includes an upper die seat 3, an upper pad 4, an upper clamping plate 5, a stop plate 6 and a stripper plate 7; in this embodiment, the upper die bending module includes a bending punch 1 20, a bending punch 2 22, a stripper insert 1 23, a bending punch 3 24, a bending punch 4 26, an upper inclined block 1 28, a bending bar 2 29, an upper inclined block 2 31 and a bending bar 3 32;
[0052] The lower die assembly includes a lower die base 10, a lower pad 8 and a lower die plate 9; the lower die bending module includes an insert 42, a bending strip 43, an insert 44, an insert 45, a bending punch 47, a die 46, an insert 48, a bending punch 49, an insert 50 and an insert 6 51;
[0053] Among them, the bending punch 20 and the bending punch 22 are respectively arranged corresponding to the insert 1 42, the insert 2 44 and the bending strip 1 43 are respectively arranged corresponding to the stripping insert 1 23, the bending punch 3 24 and the insert 3 45 are respectively arranged correspondingly, the bending punch 1 47 and the die 46 are respectively arranged correspondingly to the bending punch 4 26, the upper inclined block 1 28 and the insert 4 48 are respectively arranged correspondingly, the bending strip 29 and the bending punch 2 49 are respectively arranged correspondingly, the upper inclined block 2 31 and the bending strip 3 32 are respectively arranged correspondingly to the insert 6 51;
[0054] The bending punch 20, the bending punch 22, the insert 1 42, the insert 2 44, the bending strip 1 43, the stripping insert 1, the bending punch 3 24, the insert 3 45, the bending punch 1 47, the die 46, the bending punch 4 26, the upper inclined block 1 28, the insert 4 48, the bending strip 2 29, the bending punch 2 49, the upper inclined block 2 31, the bending strip 3 32 and the insert 6 51 are used to perform multiple bends on the strip placed on the progressive die.
[0055] The upper die assembly also includes an upper support plate 1 and an upper pad 2, and the lower die assembly also includes a lower pad 11 and a lower support plate 12. The upper support plate 1, the upper pad 2 and the upper die base 3 are locked together with screws, the upper pad 4 and the upper clamping plate 5 are locked on the upper die base 3 with positioning pins, and the stop plate 6 and the stripper plate 7 are positioned and locked together with positioning pins; the lower die base 10, the lower pad 8 and the lower mold plate 9 are locked together with positioning pins, and the lower mold plate 9, the lower pad 11 and the lower support plate 12 are locked together with screws. The upper die assembly and the lower die assembly are guided by external guide pillars, and the upper die assembly is connected to the punch press and can move vertically.
[0056] It should be noted that the step of punching out the flanging hole 60 using a progressive die can be performed before the strip is bent multiple times, and the feeding device can choose to feed the reinforcing iron 58 into the progressive die after the strip is bent multiple times. It can be understood that the strip has initially obtained the required shape of the center beam 57 after multiple bending. The reinforcing iron 58 is then fed in, so that the reinforcing iron 58 and the center beam 57 can be integrally formed during the final shaping and stamping process to obtain a finished product of the center beam assembly.
[0057] Combination Figure 1 and Figure 2 , the following is a detailed description of the processing process in the progressive die:
[0058] The bending punch 20, the bending punch 22 and the insert 1 42 are configured to perform a first bending on the strip material after punching, so that both side ends of the strip material form a first bending portion that is bent downward;
[0059] Two bending strips 43 are correspondingly arranged on both sides of the second insert 44, and the second insert 44, the bending strip 43 and the stripping insert 23 are configured to cooperate with each other to perform a second bending on the strip material, so that the two sides with the first bending portion are bent upward to form a U shape;
[0060] The bending punch 3 24 and the insert 3 45 are configured to perform a third bending on the strip material, so that both sides of the U-shaped strip material are bent downward by 90° to a horizontal state;
[0061] Two said concave dies 46 are symmetrically arranged on both sides of the said bending convex die 47, and the said bending punch 426, the said bending convex die 47 and the said concave dies 46 are arranged to cooperate with each other to perform the fourth bending of the strip material, so that the parts of the strip material on both sides in a horizontal state are bent upwards, and two U-shaped parts are formed on both sides of the strip material;
[0062] The upper inclined block 1 28, the bending strip 29, the insert 48, and the bending punch 2 49 are configured to cooperate with each other to perform a fifth bend on the strip material so that the two U-shaped portions are bent toward each other;
[0063] The upper inclined block 2 31 , the bending strip 3 32 , the insert 5 50 , and the insert 6 51 are configured to cooperate with each other to bend the strip material for the sixth time, so that the two U-shaped portions are placed in a horizontal state where the opening ends are away from each other.
[0064] In order to shape the strip material after bending, the upper mold shaping module includes an upper inclined block three 34, and the lower mold shaping module includes an insert seven 52, a bending strip four 53 and a positioning punch 54. The upper inclined block three 34, the insert seven 52, the bending strip four 53 and the positioning punch 54 are configured to cooperate with each other to flatten and shape the strip material after bending, and the feeding device is configured to convey the reinforcing iron 58 to the position of the positioning punch 54 so that the reinforcing iron 58 can be located between the positioning punch 54 and the strip material.
[0065] In order to realize the pre-punching of the flanging hole 60, the upper die assembly includes a riveting pre-punching punch 14 and a riveting hole punch 16 for pre-punching the flanging hole 60 before the strip is bent. Furthermore, the upper die assembly also includes a blanking punch 13, a first punch 15, a detection needle 17, a second punch 18 and a stripping insert 19. The blanking punch 13, the riveting pre-punching punch 14, the first punch 15, the riveting hole punch 16, the detection needle 17, the second punch 18 and the stripping insert 19 are used to complete the first three processes of the progressive die, i.e., punching and trimming, and then the strip is bent multiple times as described above. It can be understood that the progressive die is usually provided with a ejector pin 38, a positioning pin 39, a lifting block 40 and a lifting block 41, which are mainly used to lift the strip for step-by-step conveying.
[0066] In addition, in order to ensure that the strip material can fall off the mold for continuous transportation during the stamping and bending process, the upper mold assembly also includes a stripping insert eight 21 arranged opposite to the insert one 42, a stripping insert two 25 arranged opposite to the insert three 45, a stripping insert three 27 arranged opposite to the bending punch one 47, a stripping insert four 30 arranged opposite to the bending punch two 49, a stripping insert five 33 arranged opposite to the insert six 51, and a stripping insert seven 36 arranged opposite to the shaping punch 56. Specifically, the bending punch 20, the bending punch 22, the stripping insert 8 21 and the insert 1 42 are used to complete the 4th order bending; the insert 2 44, the bending bar 1 43 and the stripping insert 1 23 are used to complete the 5th order bending; the bending punch 3 24, the stripping insert 25 and the insert 3 45 are used to complete the 6th order bending; the bending punch 4 26, the stripping insert 3 27, the bending punch 1 47 and the die 46 are used to complete the 7th order bending; the upper inclined block 1 28, the bending bar 29, the stripping insert 4 30, the insert 48 and the bending punch 2 49 are used to complete the 8th order bending; the upper inclined block 2 31, the bending bar 32, the stripping insert 5 33, the insert 5 50 and the insert 6 51 are used to complete the 9th order bending.
[0067] Furthermore, the progressive die also includes a 10th process for punching holes, which is mainly used to punch out installation holes at both ends of the middle beam to facilitate the installation of the middle beam, such as Figure 4 As shown in the figure, one mounting hole is punched out at the left end of the center beam, and three mounting holes are punched out at the right end. The number of mounting holes can be set according to actual application needs.
[0068] In addition, the upper die bending module also includes a stripping insert six 35 arranged opposite to the positioning punch 54. The upper inclined block three 34, the stripping insert six 35, the insert seven 52, the bending strip four 53 and the positioning punch 54 are used to complete the shaping of the 11th sequence. In this process, the middle beam has been initially formed. At this time, the reinforcing iron 58 is delivered so that the reinforcing iron 58 is located between the positioning punch 54 and the middle beam strip material to ensure that the positions of the riveting hole 59 and the flanging hole 60 correspond to each other. Furthermore, during the shaping and stamping process, the strip material can be further filled in the material receiving cavity 61, thereby fixing the reinforcing iron 58 on the middle beam and completing the in-mold riveting of the two.
[0069] In order to make the structural shape of the center beam assembly further meet the requirements, the progressive die may also include a 12th order riveting, punching and shaping and a 13th order flashing product. Specifically, the upper die shaping module also includes a stripping insert seven 36, and the lower die shaping module also includes an insert eight 55 and a shaping punch 56. To achieve punching, the 12th order also includes a sprouting punch 37. The stripping insert seven 36, the insert eight 55 and the shaping punch 56 are used to complete the 12th order riveting and shaping, specifically, to bend the lower sides of the two U-shaped parts upward to obtain the finished center beam. It should be noted that the riveting between the center beam 57 and the reinforcing iron 58 can be completed simultaneously in the 11th sequence, and can also be completed in the 12th sequence. When it is completed in the 12th sequence, it is only necessary to transport the reinforcing iron 58 to the shaping punch 56 of the 12th sequence, and the punching in this step is also to continue to punch out the installation holes described in the 10th sequence. If the punching step is completed in the previous process, it can be omitted in this process.
[0070] like Figure 3 As shown, in this embodiment, the feeding device includes a slide 62 and a driving unit for driving the reinforcing iron 58 to move along the slide 62, and the slide 62 is arranged to extend in a horizontal direction perpendicular to the stamping direction of the progressive die. The reinforcing iron 58 is horizontally transported to the progressive die by the driving unit, so as not to affect the stamping of the progressive die. In this embodiment, the reinforcing iron 58 is transported to the 11th process. Specifically, the top of the positioning punch 54 can be adaptively lowered in height to form a space for accommodating the reinforcing iron 58. The reinforcing iron 58 slides along the slide 62 to the top of the positioning punch 54, and the positions of the riveting hole 59 and the flanging hole 60 are ensured to correspond to each other, which proves that the reinforcing iron 58 is transported in place.
[0071] Of course, the driving unit can adopt any suitable structure as long as it can complete the driving of the reinforcing iron 58, for example, a motor that pushes the reinforcing iron 58 to move can be provided. In this embodiment, the driving unit includes a slide 63, a guide rod 64 arranged on the slide 63, a slider 65 sliding along the guide rod 64, and a push rod 66 arranged on the slider 65, and the push rod 66 is arranged to be able to push the reinforcing iron 58 to slide along the slideway 62. It should be noted that the slider 65 can be driven by a motor, and when the slider 65 slides on the guide rod 64, the push rod 66 integrally arranged with the slider 65 slides along the slideway 62, and the slideway 62 and the guide rod 64 are arranged to extend in the same horizontal direction. The end of the push rod 66 can contact the reinforcing iron 58, thereby completing the pushing of the reinforcing iron 58. In order to push the reinforcing iron 58 to the specified position, the slideway 62 extends to the position of the positioning punch 54.
[0072] In addition, in order to cooperate with the production of the progressive die and improve the production efficiency of the center beam assembly, the feeding device includes a preparation seat 67 for placing multiple reinforcing irons 58 in parallel. The preparation seat 67 is arranged perpendicular to the slide 62. The preparation seat 67 is connected to the slide 62 so that the reinforcing irons 58 can enter the slide 63 in turn, thereby continuously transporting the reinforcing irons 58 to the 11th process.
[0073] A second aspect of the present invention provides a method for producing a refrigerator center beam assembly, the process being completed using the refrigerator center beam assembly production device described in any of the above schemes, and specifically comprising the following steps:
[0074] S1, the progressive die processes the flanging hole 60 on the center beam 57;
[0075] S2, feeding the reinforcing iron 58 into the progressive die so that the riveting hole 59 can be aligned with the flanging hole 60, and the reinforcing iron 58 is provided with the riveting hole 59 having the material receiving cavity 61;
[0076] S3. Fill the material cavity 61 with strip material to connect the reinforcing iron 58 and the middle beam 57 together.
[0077] It should be noted that, in this embodiment, step S1 includes 13 processes of progressive die processing, which are 1 punching and trimming, 2 punching and trimming, 3 punching and trimming, 4 bending, 5 bending, 6 bending, 7 bending, 8 bending, 9 bending, 10 punching, 11 shaping, 12 riveting and punching shaping, and 13 flashing the product. Of course, in some other embodiments, the processes can be reduced appropriately. Among them, the progressive die adopts the progressive die described in the above scheme. Specifically, the blanking punch 13, the riveting pre-punch punch 14, the first punch 15, the riveting flanging punch 16, the detection needle 17, the second punch 18 and the stripping insert nine 19 are used to complete the first three processes of the progressive die, namely, punching and trimming, to complete the processing of the flanging hole 60, and then, the bending punch 20, the bending punch two 22, the stripping insert eight 21 and the insert one 42 are used to complete the 4th order bending; the insert two 44, the bending strip one 43 and the stripping insert one 23 are used to complete the 5th order bending; the bending punch three 24, the stripping insert two 25 and the insert three 45 are used to complete the 6th order bending; the bending punch four 26, the stripping insert three 27, the bending Bending punch 47 and die 46 are used to complete the bending of the 7th sequence; upper inclined block 28, bending strip 29, stripping insert 4 30, insert 48 and bending punch 2 49 are used to complete the bending of the 8th sequence; upper inclined block 2 31, bending strip 32, stripping insert 5 33, insert 5 50 and insert 6 51 are used to complete the bending of the 9th sequence; in the 10th sequence, it can be used to process the mounting hole of the center beam, upper inclined block 34, stripping insert 6 35, insert 7 52, bending strip 4 53 and positioning punch 54 are used to complete the shaping of the 11th sequence, stripping insert 7 36, extraction punch 37, insert 8 55 and shaping punch 56 are used to complete the riveting shaping of the 12th sequence, and finally the product is obtained through the 13th sequence flash.
[0078] It is worth noting that in step S2, the reinforcing iron 58 is fed to the 11th-order positioning punch 54 by a feeding device, so that the riveting hole 59 can be aligned with the flanging hole 60, and then in the stamping process, the strip material is filled in the material cavity 61 to connect the reinforcing iron 58 and the middle beam 57 together, completing the in-mold riveting. This production step can simplify the production process of the middle beam assembly, improve the safety of the process and the cleanliness of the working environment, and reduce the harm to the staff.
[0079] The third aspect of the present invention provides a refrigerator center beam assembly, the refrigerator center beam assembly includes a center beam 57 and a reinforcing iron 58, the center beam 57 includes a plate 68 and a U-shaped portion 69 arranged on both sides of the bottom of the plate 68, the open ends of the U-shaped portions 69 on both sides are arranged to be away from each other, the U-shaped portion 69 and the plate 68 are bent as a whole, and a slot 70 extending along the length direction of the refrigerator center beam assembly is formed between the U-shaped portions 69 on both sides, the reinforcing iron 58 is provided with a riveting hole 59, the slot 70 is provided with a flange hole 60 passing through the riveting hole 59, and the end of the riveting hole 59 is provided with a material accommodating cavity 61 connected to the riveting hole 59, and the material accommodating cavity 61 is arranged to be able to accommodate strip material so that the reinforcing iron 58 and the center beam 57 are connected together. The above refrigerator center beam assembly can be processed by the production device described above, wherein the slot 70 is a position where the positioning punch 54 can extend. By providing the riveting hole 59 and the material cavity 61 on the reinforcing iron 58, during the progressive die processing, the strip material can be accommodated in the position of the material cavity 61, that is, it is in contact with the center beam 57 and the reinforcing iron 58 at the same time, thereby facilitating the in-die riveting of the two.
[0080] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A refrigerator center beam assembly production device, the center beam assembly comprising a center beam (57) and a reinforcing iron (58) arranged on the center beam (57), It is characterized in that The refrigerator center beam assembly production device comprises: A progressive die, the progressive die is used to produce the center beam (57) and is capable of punching a flanging hole (60) on the center beam (57); and A feeding device, the feeding device is used to feed reinforcing iron (58) into the progressive die, the reinforcing iron (58) is provided with a riveting hole (59), and the end of the riveting hole (59) is provided with a material receiving cavity (61) connected to the riveting hole (59); the feeding device feeds the reinforcing iron (58) into the progressive die after the flanging hole (60) is punched out on the center beam (57), so that the flanging hole (60) passes through the riveting hole (59); The material receiving cavity (61) is capable of receiving strip material during the progressive die stamping process to connect the reinforcing iron (58) and the middle beam (57) together; The feeding device comprises a slideway (62) and a driving unit for driving the reinforcing iron (58) to move along the slideway (62); the slideway (62) is arranged to extend in a horizontal direction perpendicular to the stamping direction of the progressive die; the driving unit comprises a slide seat (63), a guide rod (64) arranged on the slide seat (63), a slider (65) sliding along the guide rod (64) and a push rod (66) arranged on the slider (65); the push rod (66) is arranged to be able to push the reinforcing iron (58) to slide along the slideway (62); the feeding device comprises a material preparation seat (67) for placing a plurality of reinforcing irons (58) in parallel; the material preparation seat (67) is arranged perpendicular to the slideway (62); the material preparation seat (67) is connected to the slideway (62) so that the reinforcing irons (58) can enter the slideway (62) in sequence.
2. The refrigerator center beam assembly production device according to claim 1, It is characterized in that The progressive die comprises an upper die assembly and a lower die assembly capable of relative movement in a vertical direction, the upper die assembly comprises an upper die bending module and an upper die shaping module sequentially arranged along a process route, the lower die assembly comprises a lower die bending module and a lower die shaping module sequentially arranged along a process route, the upper die bending module and the lower die bending module cooperate to perform multiple bends on a strip placed on the progressive die, the upper die shaping module and the lower die shaping module cooperate to shape the bent strip to obtain a finished product, the feeding device is configured to be able to convey the reinforcing iron (58) to the lower die shaping module so that the positions of the riveting hole (59) and the flanging hole (60) correspond.
3. The refrigerator center beam assembly production device according to claim 2, It is characterized in that The upper die assembly comprises an upper die seat (3), an upper pad (4), an upper clamping plate (5), a stop plate (6) and a stripper plate (7); the upper die bending module comprises a bending punch 1 (20), a bending punch 2 (22), a stripper insert 1 (23), a bending punch 3 (24), a bending punch 4 (26), an upper inclined block 1 (28), a bending strip 2 (29), an upper inclined block 2 (31) and a bending strip 3 (32); The lower die assembly comprises a lower die base (10), a lower pad (8) and a lower die plate (9); the lower die bending module comprises an insert 1 (42), a bending strip 1 (43), an insert 2 (44), an insert 3 (45), a bending punch 1 (47), a die (46), an insert 4 (48), a bending punch 2 (49), an insert 5 (50) and an insert 6 (51); The bending punch 1 (20), the bending punch 2 (22) and the insert 1 (42) are configured to perform a first bending on the strip material after punching, so that the two side ends of the strip material form a first bending portion that is bent downward; Two bending strips 1 (43) are correspondingly arranged on both sides of the second insert (44), and the second insert (44), the bending strip 1 (43) and the stripping insert 1 (23) are arranged to cooperate with each other to perform a second bending on the strip material, so that the two sides with the first bending portion are bent upward to form a U shape; The bending punch three (24) and the insert three (45) are configured to perform a third bending on the strip material so that both sides of the U-shaped strip material are bent downward by 90° to a horizontal state; Two said concave dies (46) are symmetrically arranged on both sides of said bending convex die (47), and said bending punch (26), said bending convex die (47) and said concave dies (46) are arranged to cooperate with each other to perform a fourth bending on the strip material, so that the horizontal parts on both sides of the strip material are bent upwards, and two U-shaped parts are formed on both sides of the strip material; The upper inclined block 1 (28), the bending strip 2 (29), the insert 4 (48), and the bending punch 2 (49) are configured to cooperate with each other to perform a fifth bend on the strip material so that the two U-shaped portions are bent toward each other; The upper inclined block 2 (31), the bending strip 3 (32), the insert 5 (50), and the insert 6 (51) are configured to cooperate with each other to perform a sixth bending on the strip material so that the two U-shaped portions are placed in a horizontal state where the open ends are away from each other.
4. The refrigerator center beam assembly production device according to claim 2, It is characterized in that The upper mold shaping module includes an upper inclined block three (34), and the lower mold shaping module includes an insert seven (52), a bending strip four (53) and a positioning punch (54). The upper inclined block three (34), the insert seven (52), the bending strip four (53) and the positioning punch (54) are configured to cooperate with each other to flatten and shape the strip material after bending. The feeding device is configured to convey the reinforcing iron (58) to the position of the positioning punch (54) so that the reinforcing iron (58) can be located between the positioning punch (54) and the strip material.
5. The refrigerator center beam assembly production device according to claim 2, It is characterized in that The upper die assembly comprises a riveting pre-punching punch (14) and a riveting punch (16) for pre-punching the flanging hole (60) before the strip is bent.
6. A method for producing a refrigerator center beam assembly, It is characterized in that The process is completed by using the refrigerator center beam assembly production device according to any one of claims 1 to 5, and specifically comprises the following steps: S1, the progressive die processes the flanging hole (60) on the center beam (57); S2, feeding the reinforcing iron (58) into the progressive die so that the riveting hole (59) is aligned with the flanging hole (60), and the reinforcing iron (58) is provided with the riveting hole (59) having the material receiving cavity (61); S3. Fill the material strips in the material receiving cavity (61) to connect the reinforcing iron (58) and the middle beam (57) together.
7. A refrigerator middle beam assembly, It is characterized in that The refrigerator center beam assembly is manufactured by the refrigerator center beam assembly production method according to claim 6, the refrigerator center beam assembly comprises a center beam (57) and a reinforcing iron (58), the center beam (57) comprises a plate (68) and U-shaped portions (69) arranged on both sides of the bottom of the plate (68), the opening ends of the U-shaped portions (69) on both sides are arranged to be away from each other, the U-shaped portions (69) and the plate (68) are integrally bent, and a slot (70) extending along the length direction of the refrigerator center beam assembly is formed between the U-shaped portions (69) on both sides, the reinforcing iron (58) is provided with a rivet hole (59), the slot (70) is provided with a flange hole (60) passing through the rivet hole (59), the end of the rivet hole (59) is provided with a material receiving cavity (61) connected to the rivet hole (59), and the material receiving cavity (61) is arranged to be able to accommodate strip material so that the reinforcing iron (58) and the center beam (57) are connected together.
