A kind of pull-up cantilever scaffold construction device and method thereof

By pre-embedding of U-shaped bolts and fixing plates on the shear wall, and using steel tie rods and reinforced components to form a stable triangular structure, the problem of insufficient stability of I-shaped steel and cantilever scaffolding in the prior art is solved, and the stability and safety of high-rise building construction is achieved.

CN113550551BActive Publication Date: 2025-03-07SUNYOUNG CONSTR GROUP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202110959147.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-20
Publication Date
2025-03-07
Estimated Expiration
2041-08-20

AI Technical Summary

Technical Problem

When installing cantilever scaffolding construction devices in the existing pull-up cantilever scaffolding, the stability of I-shaped steel cannot be improved simultaneously, and the stability of cantilever scaffolding is insufficient, which cannot meet the needs of high-rise building construction.

Method used

By embedding the U-shaped bolts, fixing plates and auxiliary pipes on the shear wall, a stable triangular structure is formed by using the first steel tie rod, the flower basket bolts and the second steel tie rods to form a stable triangular structure, and the fixed connection between the components and the auxiliary pipes and the embedded plates are reinforced to improve the stability of the I-shaped steel and cantilever scaffolding.

Benefits of technology

The stability of I-steel and the stability of cantilever scaffolding are achieved simultaneously, meeting the needs of high-rise buildings and ensuring safety and efficiency during the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113550551B_ABST
    Figure CN113550551B_ABST
Patent Text Reader

Abstract

The present invention discloses a pull-up cantilever scaffold construction device and method thereof, comprising a shear wall, wherein I-beams are evenly arranged at the edge position of the top of the shear wall, and a cantilever scaffold is installed at one end of the top of the I-beam away from the shear wall, and two groups of embedded U-shaped bolts cooperating with the I-beam are arranged at the position of the top of the cantilever scaffold close to the I-beam, and a fixing plate is sleeved on the top of the outer side of the embedded U-shaped bolts. The present invention applies an upward pulling force to the end of the I-beam close to the cantilever scaffold through a first steel tie rod, a basket bolt and a second steel tie rod, and then uses a reinforcement component to give a downward pressure to the end of the I-beam away from the cantilever scaffold, so that the first steel tie rod, the basket bolt, the I-beam, the reinforcement component and the second steel tie rod together form a stable triangular structure, which can greatly improve the force-bearing capacity of the entire I-beam, and also improve the stability of the cantilever scaffold after being installed on multiple groups of I-beams.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering, in particular to a pull-up cantilever scaffold construction device and a method thereof. Background Art

[0002] With the development of the times and the progress of society, high-rise and super-high-rise buildings have entered an accelerated era. The construction technology of external scaffolding of high-rise buildings has also received more and more attention and research. Cantilever scaffolding is one of the top ten new technologies in the construction industry promoted by the Ministry of Construction. It is increasingly widely used in high-rise building construction because of its low one-time investment (saving a lot of turnover materials), wide range of applications, no restrictions on floor height and site, and conducive to on-site civilized construction management.

[0003] The current method of installing the pull-up cantilever scaffolding is usually to bury U-shaped anchors in the floor slab in advance, and then use the U-shaped anchors to fix the I-beams. Although this installation method can fix the I-beams, when the cantilever scaffolding installed on the I-beams is heavy, the stability requirements of the U-shaped anchors are extremely high, and it is impossible to further improve the stability of the I-beams while reducing the force applied by the I-beams to the U-shaped anchors; and when the current pull-up cantilever scaffolding construction devices are in use, most of them only rely on the steel pull rods to pull the exposed end of the I-beams to increase the bearing capacity of the I-beams, and it is impossible to further improve the stability of the pull-up cantilever scaffolding after installation while increasing the bearing capacity of the I-beams. Summary of the invention

[0004] The object of the present invention is to provide a pull-up cantilever scaffold construction device and method thereof to solve the related problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a pull-up cantilever scaffolding construction device, comprising a shear wall, wherein I-beams are evenly arranged at the edge position of the top of the shear wall, and a cantilever scaffold is installed together with one end of the top of the I-beam away from the shear wall, and two groups of embedded U-shaped bolts cooperating with the I-beam are arranged at the position of the top of the cantilever scaffolding close to the I-beam, and a fixing plate is jointly sleeved on the top of the outer side of the embedded U-shaped bolt, and a first nut is arranged on the top thread of the embedded U-shaped bolt, and the inner and outer wall surfaces of the shear wall are symmetrically installed with mounting seats, a group A first steel tie rod is arranged on the outer side of the mounting seat, and a basket bolt is arranged at the bottom end of the first steel tie rod, a second steel tie rod is arranged at the bottom inside the basket bolt, the bottom end of the second steel tie rod is hinged to the end of the top of the I-beam away from the shear wall, a reinforcement component is arranged on the end of the outer side of the I-beam away from the cantilever scaffolding, an embedded plate is arranged on the end of the top of the shear wall close to the cantilever scaffolding, fixing holes are symmetrically opened on the outer side of the embedded plate, an auxiliary pipe is installed inside the cantilever scaffolding, and the end of the auxiliary pipe close to the shear wall passes through the fixing hole and is threadedly installed with a second nut.

[0006] Preferably, the reinforcement assembly includes a first threaded rod, an internal threaded tube, a second threaded rod, a movable seat, a fixing bolt and an auxiliary rotating rod. A fixing bolt is provided on the outer side of the I-beam, and the second threaded rod is hinged on the top of the fixing bolt. The top thread of the outer side of the second threaded rod is provided with an internal threaded tube, the top thread of the inner side of the internal threaded tube is provided with the first threaded rod, and the top of the first threaded rod is hinged to the outer side of an adjacent group of mounting seats, an auxiliary rotating rod is installed at the middle position of the outer side of the internal threaded tube, and fixing bolts are symmetrically threaded on both sides of the movable seat.

[0007] Preferably, a support rod is hinged to one end of the bottom of the I-beam near the cantilever scaffolding, and a fixed seat is hinged to the bottom end of the support rod. Two groups of embedded threaded rods are installed on the outside of the cantilever scaffolding near the support rod, and the embedded threaded rods pass through the fixed seat and are threaded with a third nut. The fixed seat is fixedly connected to the outside of the cantilever scaffolding through the embedded threaded rods and the third nut.

[0008] Preferably, the basket bolts include two groups of tie rods and three groups of steel bars, and the three groups of steel bars are evenly installed on the outer sides of the two groups of tie rods. The ends of the cantilever scaffolding and the second steel tie rod that are close to each other both pass through the center position of the adjacent tie rods.

[0009] Preferably, a pre-buried steel pipe is provided on one side of the cantilever scaffolding close to the auxiliary pipe, and high-strength bolts are provided inside the pre-buried steel pipe, and the mounting seat is fixedly connected to the cantilever scaffolding by the high-strength bolts.

[0010] Preferably, two groups of inserts cooperating with steel pipes in the cantilever scaffolding are installed at one end of the top of the I-beam near the auxiliary pipe, and two groups of reinforcing bolts are symmetrically threaded on both sides of the bottom of the I-beam near one end of the auxiliary pipe.

[0011] Preferably, a T-shaped groove cooperating with the shape of the I-beam is provided on the inner side of the movable seat, and screw holes cooperating with the fixing bolts are symmetrically threaded on both sides of the movable seat.

[0012] Preferably, auxiliary steel pipes are obliquely installed between two adjacent vertical steel pipes in the cantilever scaffolding, and a protective net is installed on the outer side of the cantilever scaffolding.

[0013] Preferably, the rotation directions of the outer threads of the first threaded rod and the second threaded rod are completely opposite, and the two ends of the inner side of the internal threaded tube are symmetrically provided with internal threads corresponding to the outer threads of the first threaded rod and the second threaded rod.

[0014] Preferably, a method for using a pull-up cantilever scaffolding construction device comprises the following steps:

[0015] 1. Pre-embed U-shaped bolts, embedded plates and embedded steel pipes evenly in the wall of the shear wall in advance, and the positions are as shown in the attached figure of the specification. Then, the mounting base is fixed to the inner wall and outer wall of the shear wall by high-strength bolts. Then, the I-beam is placed on the inner side of the two adjacent sets of embedded U-shaped bolts, and the fixing plate is covered and the first nut is tightened, so that the I-beam is fixed to the ground of the corresponding floor of the shear wall;

[0016] Second, the top end of the first steel tie rod is fixed to the outside of the corresponding set of mounting seats, and the bottom end of the second steel tie rod is hinged to the top of the I-beam, and then the internal threaded tube is rotated by the auxiliary rotating rod to shorten the distance between the first threaded rod and the second threaded rod, and then the movable seat is tightly fixed to the I-beam by the fixing bolts, and the I-beam is supported by the supporting rod composed of the first threaded rod, the internal threaded tube and the second threaded rod;

[0017] 3. Then install the steel pipes on the cantilever scaffolding one by one to the top of the I-beam, and assemble the complete cantilever scaffolding. In the process, fix the auxiliary pipe to the corresponding steel pipe on the cantilever scaffolding through the rotating fastener, and make the end of the auxiliary pipe close to the shear wall pass through the fixing hole on the embedded plate, and then fix the auxiliary pipe and the embedded plate with the second nut. At this point, the stable installation of the pull-up cantilever scaffolding is completed.

[0018] Compared with the prior art, the present invention provides a pull-up cantilever scaffolding construction device and method thereof, which has the following beneficial effects:

[0019] 1. The present invention firstly uses the embedded U-bolt, the first nut and the fixing plate to firmly fix the I-beam on the first floor of the shear wall, and then shortens the distance between the first threaded rod and the second threaded rod by rotating the internal threaded tube, thereby adjusting the support angle of the support rod composed of the first threaded rod, the internal threaded tube and the second threaded rod, and applies downward pressure to the end of the I-beam away from the cantilever scaffolding, which is beneficial to balance the upward force of the end of the I-beam away from the cantilever scaffolding, thereby ensuring the stability of the I-beam after being subjected to force during use.

[0020] 2. The present invention applies an upward pulling force to the end of the I-beam close to the cantilever scaffolding by means of the first steel tie rod, the basket bolt and the second steel tie rod, and then uses the reinforcement assembly to give a downward pressure to the end of the I-beam away from the cantilever scaffolding, so that the first steel tie rod, the basket bolt, the I-beam, the reinforcement assembly and the second steel tie rod together form a stable triangular structure, which can greatly improve the force-bearing capacity of the entire I-beam, and also improve the stability of the cantilever scaffolding after it is installed on multiple groups of I-beams. Then, the auxiliary pipe is fixedly connected to the embedded plate, which can further ensure the stability and firmness of the cantilever scaffolding after the height is increased. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 is a side cross-sectional view of the present invention;

[0022] Figure 2 It is a front cross-sectional view of the turnbuckle bolt of the present invention;

[0023] Figure 3 is a side view of the reinforcement assembly of the present invention;

[0024] Figure 4 It is a front cross-sectional view of the movable seat of the present invention;

[0025] Figure 5 It is a front view of the embedded plate of the present invention;

[0026] Figure 6 For the present invention Figure 1 A magnified image of point A;

[0027] Figure 7 For the present invention Figure 1 Enlarged view of point B.

[0028] In the figure: 1. cantilever scaffolding; 2. auxiliary pipe; 3. first steel tie rod; 4. basket bolt; 5. support rod; 6. fixed seat; 7. embedded U-bolt; 8. I-beam; 9. reinforcement assembly; 901. first threaded rod; 902. internal threaded pipe; 903. second threaded rod; 904. movable seat; 905. fixing bolt; 906. auxiliary rotating rod; 10. first nut; 11. shear wall; 12. second steel tie rod; 13. second nut; 14. mounting seat; 15. embedded plate; 16. fixing hole; 17. protective net; 18. reinforcement bolt; 19. fixing plate. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] See also Figure 1-7 The present invention provides a technical solution: a pull-up cantilever scaffolding construction device, comprising a shear wall 11, an I-beam 8 is evenly arranged at the edge position of the top of the shear wall 11, and a cantilever scaffolding 1 is installed at one end of the top of the I-beam 8 away from the shear wall 11, and two groups of embedded U-shaped bolts 7 cooperating with the I-beam 8 are arranged at the top of the cantilever scaffolding 1 near the I-beam 8, and a fixing plate 19 is jointly sleeved on the top of the outer side of the embedded U-shaped bolt 7, and a first nut 10 is arranged on the top thread of the embedded U-shaped bolt 7, and the inner and outer wall surfaces of the shear wall 11 are symmetrically installed with mounting seats 14, and the outer side of a group of mounting seats 14 is A first steel tie rod 3 is arranged on the side, and a basket bolt 4 is arranged at the bottom end of the first steel tie rod 3, a second steel tie rod 12 is arranged at the bottom inside the basket bolt 4, the bottom end of the second steel tie rod 12 is hinged to the end of the top of the I-beam 8 away from the shear wall 11, a reinforcement component 9 is arranged on the outer end of the I-beam 8 away from the cantilever scaffolding 1, an embedded plate 15 is arranged at the end of the top of the shear wall 11 close to the cantilever scaffolding 1, and fixing holes 16 are symmetrically opened on the outside of the embedded plate 15, an auxiliary pipe 2 is installed inside the cantilever scaffolding 1, and the end of the auxiliary pipe 2 close to the shear wall 11 passes through the fixing hole 16 and is threadedly installed with a second nut 13.

[0031] Furthermore, the reinforcement assembly 9 includes a first threaded rod 901, an internally threaded tube 902, a second threaded rod 903, a movable seat 904, a fixing bolt 905 and an auxiliary rotating rod 906. The fixing bolt 905 is arranged on the outer side of the I-beam 8, and the top of the fixing bolt 905 is hinged with the second threaded rod 903, the top thread of the outer side of the second threaded rod 903 is arranged with the internally threaded tube 902, the top thread of the inner side of the internally threaded tube 902 is arranged with the first threaded rod 901, and the top of the first threaded rod 901 is connected to an adjacent set of mounting seats. 14 is hinged on the outside, an auxiliary rotating rod 906 is installed at the middle position of the outside of the internal threaded tube 902, and fixing bolts 905 are symmetrically arranged on the two sides of the movable seat 904. The internal threaded tube 902 is rotated by the auxiliary rotating rod 906 to shorten the distance between the first threaded rod 901 and the second threaded rod 903, and then the movable seat 904 is tightly fixed on the I-beam 8 by the fixing bolts 905, and the I-beam 8 is supported by the support rod composed of the first threaded rod 901, the internal threaded tube 902 and the second threaded rod 903.

[0032] Furthermore, a support rod 5 is hinged at one end of the bottom of the I-beam 8 near the cantilever scaffolding 1, and a fixing seat 6 is hinged at the bottom end of the support rod 5. Two sets of embedded threaded rods are installed at the outer side of the cantilever scaffolding 1 near the support rod 5, and the embedded threaded rods pass through the fixing seat 6 and are threaded with a third nut. The fixing seat 6 is fixedly connected to the outer side of the cantilever scaffolding 1 through the embedded threaded rods and the third nut, which helps to improve the force-bearing capacity of the I-beam 8 near one end of the cantilever scaffolding 1, thereby ensuring the overall stability of the cantilever scaffolding 1.

[0033] Furthermore, the basket bolt 4 includes two groups of tie rods and three groups of steel bars. The three groups of steel bars are evenly installed on the outer sides of the two groups of tie rods. The ends of the cantilever scaffolding 1 and the second steel tie rod 12 that are close to each other both pass through the center position of the adjacent tie rods, which helps to utilize the first steel tie rod 3, the basket bolt 4 and the second steel tie rod 12 to jointly improve the force-bearing capacity of the I-beam 8 close to one end of the cantilever scaffolding 1.

[0034] Furthermore, a pre-buried steel pipe is provided on one side of the cantilever scaffolding 1 close to the auxiliary pipe 2, and high-strength bolts are provided inside the pre-buried steel pipe. The mounting seat 14 is fixedly connected to the cantilever scaffolding 1 by the high-strength bolts, so as to facilitate the stable installation of the mounting seat 14 on the shear wall 11.

[0035] Furthermore, two groups of inserts that cooperate with the steel pipes in the cantilever scaffolding 1 are installed at one end of the top of the I-beam 8 near the auxiliary pipe 2, and two groups of reinforcing bolts 18 are symmetrically threaded on both sides of the bottom of the I-beam 8 near one end of the auxiliary pipe 2, which helps to stably install the steel pipe at the bottom of the cantilever scaffolding 1 to the top of the I-beam 8.

[0036] Furthermore, a T-shaped groove that matches the shape of the I-beam 8 is opened on the inner side of the movable seat 904, and screw holes that match the fixing bolts 905 are opened on the two sides of the movable seat 904 symmetrically. When adjusting the distance between the first threaded rod 901 and the second threaded rod 903, the movable seat 904 can move stably on the outside of the I-beam 8.

[0037] Furthermore, auxiliary steel pipes are obliquely installed between two adjacent vertical steel pipes in the cantilever scaffolding 1 , and a protective net 17 is installed on the outer side of the cantilever scaffolding 1 , which helps to protect the personal safety of workers on the cantilever scaffolding 1 .

[0038] Furthermore, the rotation directions of the outer threads of the first threaded rod 901 and the second threaded rod 903 are completely opposite, and the two ends of the inner side of the internal threaded tube 902 are symmetrically provided with internal threads corresponding to the outer threads of the first threaded rod 901 and the second threaded rod 903, so that the first threaded rod 901 and the second threaded rod 903 can be forced to approach or move away from each other synchronously by rotating the internal threaded tube 902.

[0039] Furthermore, a method for using the pull-up cantilever scaffolding construction device is provided, and the steps of the method for using the pull-up cantilever scaffolding construction device are as follows:

[0040] 1. Pre-embed U-bolts 7, embedded plates 15 and embedded steel pipes evenly in the shear wall 11 in advance. The positions are as shown in the attached manual. Figure 1 As shown, the mounting base 14 is then fixedly mounted on the inner and outer walls of the shear wall 11 by high-strength bolts, and then the I-beam 8 is placed inside the two adjacent sets of embedded U-bolts 7, and the fixing plate 19 is covered and the first nut 10 is tightened, so that the I-beam 8 is fixedly mounted on the ground of the corresponding floor of the shear wall 11;

[0041] Second, the top end of the first steel tie rod 3 is then fixed to the outside of the corresponding set of mounting seats 14, and the bottom end of the second steel tie rod 12 is hinged to the top of the I-beam 8, and then the internal threaded tube 902 is rotated by the auxiliary rotating rod 906 to shorten the distance between the first threaded rod 901 and the second threaded rod 903, and then the movable seat 904 is tightly fixed to the I-beam 8 by the fixing bolts 905, and the I-beam 8 is supported by the support rod composed of the first threaded rod 901, the internal threaded tube 902 and the second threaded rod 903;

[0042] 3. Then, the steel pipes on the cantilever scaffolding 1 are installed one by one on the top of the I-beam 8 to assemble the complete cantilever scaffolding 1. During the process, the auxiliary pipe 2 is fixed to the corresponding steel pipe on the cantilever scaffolding 1 by means of a rotating fastener, and the end of the auxiliary pipe 2 close to the shear wall 11 is passed through the fixing hole 16 on the embedded plate 15. After that, the auxiliary pipe 2 and the embedded plate 15 are fixedly connected by the second nut 13. At this point, the stable installation of the pull-up cantilever scaffolding is completed.

[0043] Embodiment 1, as Figure 1-7 As shown, when it is necessary to install the I-beam 8 and reinforce the end of the I-beam 8 away from the cantilever scaffolding 1, first place the I-beam 8 on the inner side of the two adjacent groups of embedded U-bolts 7, cover the fixing plate 19 and tighten the first nut 10, so that the I-beam 8 is fixedly installed on the ground of the corresponding floor of the shear wall 11, and then the top end of the first steel tie rod 3 is fixed to the outside of the corresponding group of mounting seats 14, and the bottom end of the second steel tie rod 12 is hinged to the top of the I-beam 8, and then the internal threaded tube 902 is rotated by the auxiliary rotating rod 906 to shorten the distance between the first threaded rod 901 and the second threaded rod 903, and then the movable seat 904 is tightly fixed to the I-beam 8 by the fixing bolts 905, and the I-beam 8 is supported by the support rod composed of the first threaded rod 901, the internal threaded tube 902 and the second threaded rod 903.

[0044] Embodiment 2, as Figure 1-7 As shown, after the cantilever scaffolding 1 is fixedly installed on the top of the I-beam 8, the auxiliary pipe 2 is fixed to the corresponding steel pipe on the cantilever scaffolding 1 by a rotating fastener, and the end of the auxiliary pipe 2 close to the shear wall 11 passes through the fixing hole 16 on the embedded plate 15, and then the auxiliary pipe 2 and the embedded plate 15 are fixedly connected by the second nut 13. The auxiliary pipe 2 and the embedded plate 15 can ensure the stability of the steel pipes at various height positions of the cantilever scaffolding 1. When the height of the cantilever scaffolding 1 gradually increases, the pressure on the end of the top of the I-beam 8 close to the cantilever scaffolding 1 also gradually increases. Since the first steel tie rod 3, the basket bolt 4, the I-beam 8, the reinforcement assembly 9 and the second steel tie rod 12 together constitute a stable triangular structure, the force-bearing capacity of the I-beam 8 can be further improved.

[0045] Working principle: Before installing the I-beam 8, pre-embed U-bolts 7, pre-embedded plates 15 and pre-embedded steel pipes are evenly embedded in the shear wall 11 in advance. The positions are as shown in the attached manual. Figure 1As shown, the mounting seat 14 is then fixedly installed on the inner and outer walls of the shear wall 11 by high-strength bolts, and then the I-beam 8 is placed on the inner side of the two adjacent groups of embedded U-bolts 7, and the fixing plate 19 is covered and the first nut 10 is tightened, so that the I-beam 8 is fixedly installed on the ground of the corresponding floor of the shear wall 11, and then the top end of the first steel tie rod 3 is fixed to the outer side of the corresponding group of mounting seats 14, and the bottom end of the second steel tie rod 12 is hinged to the top of the I-beam 8, and then the internal threaded tube 902 is rotated by the auxiliary rotating rod 906 to shorten the distance between the first threaded rod 901 and the second threaded rod 903, and then the movable seat 904 is tightly fixed on the I-beam 8 by the fixing bolts 905, and the support rod composed of the first threaded rod 901, the internal threaded tube 902 and the second threaded rod 903 is used to support the I-beam. 8 is used for support, and then the steel pipes on the cantilever scaffolding 1 are installed one by one to the top of the I-beam 8, and the complete cantilever scaffolding 1 is assembled. During the process, the auxiliary pipe 2 is fixed to the corresponding steel pipe on the cantilever scaffolding 1 by a rotating fastener, and the end of the auxiliary pipe 2 close to the shear wall 11 passes through the fixing hole 16 on the embedded plate 15, and then the auxiliary pipe 2 and the embedded plate 15 are fixedly connected by the second nut 13. At this point, the stable installation of the upper pull-up cantilever scaffolding is completed. When the height of the cantilever scaffolding 1 gradually increases, the pressure on the end of the top of the I-beam 8 close to the cantilever scaffolding 1 also gradually increases. Since the first steel tie rod 3, the basket bolt 4, the I-beam 8, the reinforcement assembly 9 and the second steel tie rod 12 together constitute a stable triangular structure, the force-bearing capacity of the I-beam 8 can be further improved.

[0046] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0047] The electrical components mentioned in this article are all connected to an external main controller and 220V mains electricity, and the main controller can be a conventional known device for controlling a computer or the like.

[0048] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pull-up cantilever scaffolding construction device, comprising a shear wall (11), characterized in that: I-beams (8) are evenly arranged at the edge position of the top of the shear wall (11), and a cantilever scaffolding (1) is installed at one end of the top of the I-beam (8) away from the shear wall (11), and two groups of embedded U-shaped bolts (7) that cooperate with the I-beam (8) are arranged at the top of the cantilever scaffolding (1) near the I-beam (8), and a fixing plate (19) is sleeved on the top of the outer side of the embedded U-shaped bolts (7), and a first nut (10) is arranged on the top thread of the embedded U-shaped bolts (7), and the inner and outer wall surfaces of the shear wall (11) are symmetrically installed with mounting seats (14), and a first steel tie rod (3) is arranged on the outer side of one group of the mounting seats (14), and the bottom end of the first steel tie rod (3) is fixed to the top of the outer side of the embedded U-shaped bolts (7). A basket bolt (4) is provided, a second steel tie rod (12) is provided at the bottom of the inner side of the basket bolt (4), the bottom end of the second steel tie rod (12) is hinged to the end of the top of the I-beam (8) away from the shear wall (11), a reinforcement component (9) is provided at the end of the outer side of the I-beam (8) away from the cantilever scaffold (1), an embedded plate (15) is provided at the end of the top of the shear wall (11) close to the cantilever scaffold (1), and fixing holes (16) are symmetrically opened on the outer side of the embedded plate (15), an auxiliary pipe (2) is installed inside the cantilever scaffold (1), and the end of the auxiliary pipe (2) close to the shear wall (11) passes through the fixing hole (16) and is threadedly installed with a second nut (13); The reinforcement component (9) comprises a first threaded rod (901), an internally threaded tube (902), a second threaded rod (903), a movable seat (904), a fixing bolt (905) and an auxiliary rotating rod (906); the fixing bolt (905) is arranged on the outer side of the I-beam (8), and the second threaded rod (903) is hinged on the top of the fixing bolt (905); the top thread of the outer side of the second threaded rod (903) is provided with an internally threaded tube (902); the top thread of the inner side of the internally threaded tube (902) is provided with the first threaded rod (901), and the top of the first threaded rod (901) is hinged to the outer side of an adjacent group of mounting seats (14); the auxiliary rotating rod (906) is installed at the middle position of the outer side of the internally threaded tube (902), and the fixing bolts (905) are symmetrically threaded on both sides of the movable seat (904); A support rod (5) is hingedly connected to one end of the bottom of the I-beam (8) close to the cantilever scaffold (1), and a fixing seat (6) is hingedly connected to the bottom end of the support rod (5). Two groups of embedded threaded rods are installed at positions close to the support rod (5) on the outside of the cantilever scaffold (1), and the embedded threaded rods pass through the fixing seat (6) and are threadedly provided with a third nut. The fixing seat (6) is fixedly connected to the outside of the cantilever scaffold (1) through the embedded threaded rods and the third nut. The basket bolt (4) comprises two groups of tie rods and three groups of steel bars. The three groups of steel bars are evenly installed on the outside of the two groups of tie rods. The ends of the cantilever scaffold (1) and the second steel tie rod (12) that are close to each other both pass through the center position of the adjacent tie rods.

2. The pull-up cantilever scaffolding construction device according to claim 1 is characterized in that: A pre-buried steel pipe is provided on one side of the cantilever scaffolding (1) close to the auxiliary pipe (2), and a high-strength bolt is provided inside the pre-buried steel pipe. The mounting seat (14) is fixedly connected to the cantilever scaffolding (1) via the high-strength bolt.

3. The pull-up cantilever scaffolding construction device according to claim 1 is characterized in that: Two groups of inserts that cooperate with the steel pipes in the cantilever scaffold (1) are installed at one end of the top of the I-beam (8) close to the auxiliary pipe (2), and two groups of reinforcing bolts (18) are symmetrically threaded on both sides of the bottom of the I-beam (8) close to one end of the auxiliary pipe (2).

4. The pull-up cantilever scaffolding construction device according to claim 1 is characterized in that: The inner side of the movable seat (904) is provided with a T-shaped sliding groove that matches the shape of the I-beam (8), and the two sides of the movable seat (904) are symmetrically threaded with screw holes that match the fixing bolts (905).

5. The pull-up cantilever scaffolding construction device according to claim 1 is characterized in that: Auxiliary steel pipes are installed obliquely between two adjacent vertical steel pipes in the cantilever scaffolding (1), and a protective net (17) is installed on the outside of the cantilever scaffolding (1).

6. The pull-up cantilever scaffolding construction device according to claim 1, characterized in that: The rotation directions of the outer threads of the first threaded rod (901) and the second threaded rod (903) are completely opposite, and the two ends of the inner side of the inner threaded tube (902) are symmetrically provided with inner threads corresponding to the outer threads of the first threaded rod (901) and the second threaded rod (903).

7. A method for using the pull-up cantilever scaffolding construction device according to any one of claims 1 to 6, the steps of the method for using the pull-up cantilever scaffolding construction device are as follows:

1. Pre-embedded U-shaped bolts (7), pre-embedded plates (15) and pre-embedded steel pipes are uniformly pre-embedded in the wall of the shear wall (11) in advance, and then the mounting base (14) is fixedly installed on the inner wall and the outer wall of the shear wall (11) by high-strength bolts, and then the I-beam (8) is placed on the inner side of two adjacent groups of pre-embedded U-shaped bolts (7), and the fixing plate (19) is covered and the first nut (10) is tightened, so that the I-beam (8) is fixedly installed on the ground of the corresponding floor of the shear wall (11); Second, the top end of the first steel tie rod (3) is then fixed to the outside of a corresponding set of mounting seats (14), and the bottom end of the second steel tie rod (12) is hinged to the top of the I-beam (8), and then the internal threaded tube (902) is rotated by the auxiliary rotating rod (906) to shorten the distance between the first threaded rod (901) and the second threaded rod (903), and then the movable seat (904) is tightly fixed to the I-beam (8) by the fixing bolt (905), and the I-beam (8) is supported by the support rod composed of the first threaded rod (901), the internal threaded tube (902) and the second threaded rod (903); 3. Next, the steel pipes on the cantilever scaffolding (1) are installed one by one on the top of the I-beam (8) to assemble the complete cantilever scaffolding (1). During the process, the auxiliary pipe (2) is fixed to the corresponding steel pipe on the cantilever scaffolding (1) by means of a rotating fastener, and the end of the auxiliary pipe (2) close to the shear wall (11) is passed through the fixing hole (16) on the embedded plate (15). Then, the auxiliary pipe (2) and the embedded plate (15) are fixedly connected by means of a second nut (13). Thus, the stable installation of the pull-up cantilever scaffolding is completed.