End-loading ore-dropping similarity simulation test device and use method thereof
By designing an adjustable end-drawing similar simulation test device and using the inclined rod and bolt chute mechanism, the problem that the existing technology cannot be applied to the mining and drawing test of the inclined ore body caving method with different thicknesses and inclination angles has been achieved. The flexible adjustment and cost reduction of the test device are suitable for simulation tests of various ore body sizes and inclination angles.
Patent Information
- Application Number
- CN202110938252.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-16
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology is difficult to apply to similar simulation tests of mining and drawing by the caving method of inclined ore bodies with different thicknesses and inclinations, and a large number of similar simulation test devices of ore drawing cannot adjust the size and inclination of the ore body, and cannot meet the test needs of various scenarios.
A similar end-drawing ore-drawing simulation test device with a simple structure, low cost, and easy installation that can adjust the size and inclination of the ore body is designed. The internal dimensions of the test device are realized by using the inclined bar, horizontal bar, vertical bar and bolt chute mechanism. Flexible adjustment of tilt angle, suitable for ore body simulation tests with different thicknesses and tilt angles.
The flexible adjustment of the test device is realized, and it is suitable for simulation tests of various ore body sizes and inclination angles, reducing costs, simplifying the installation process, and improving the applicability and economy of the test.
Smart Images

Figure CN113552326B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mining engineering, and more particularly to an end-stage ore-dropping similarity simulation test device and a use method thereof. Background Art
[0002] Due to the complexity and non-replicability of underground mining projects, it is impossible to conduct too many test mining at the project site. At the same time, on-site industrial tests also have problems such as high cost and long cycle. Similar simulation test of ore placement is an effective means to study related technical problems in the process of underground mine caving mining. Under the premise of following the similarity principle, making a similar model that can simulate caving ore placement and conducting simulated test mining can effectively avoid the problems of high cost and long cycle of on-site tests, and has good economic effect.
[0003] At present, similar simulation tests for vertical caving mining are more common, while similar simulation tests for inclined ore bodies are less common. In addition, a large number of ore-drawing similar simulation test devices are installed in a fixed manner, and the inclination and thickness of the ore body cannot be adjusted, so they cannot be applied to the requirements of similar simulation tests for inclined ore bodies of different thicknesses.
[0004] Therefore, it is necessary to design an adjustable end-loading similar simulation test device specifically for changes in the inclination and thickness of the ore body. Summary of the invention
[0005] The present invention aims to overcome the deficiencies of the prior art and provide an end-point ore-dropping similarity simulation test device and a method of using the device which has the advantages of simple structure, low cost, easy installation and good use effect and can adjust the size and inclination of the ore body.
[0006] To achieve the above purpose, the specific technical solutions adopted by the present invention are as follows:
[0007] A similar simulation test device for end ore placement includes an inclined rod, an upper crossbar, a lower crossbar, a vertical rod, a short crossbar, a bottom plate, a bottom cross brace, a side back plate and a front back plate; wherein:
[0008] There are four oblique rods in total and they together form a three-dimensional parallelogram. One of the parallelogram faces of the three-dimensional parallelogram is defined as the front, and the other parallelogram face is defined as the rear. The upper end of the oblique rod is connected to two upper cross bars respectively arranged at the front and rear positions thereof, and the lower end is connected to two lower cross bars respectively arranged at the front and rear positions thereof; the lower cross bar is divided into left and right sections, the left section of which is the same length as the upper cross bar, and the rest is the right section. The lower ends of the four oblique rods are all connected to the left section of the lower cross bar; there are four short cross bars in total, which are divided into The upper and lower short cross bars are respectively connected with the two upper short cross bars on the left and right sides of the upper cross bar, and the left and right sections of the lower cross bar are respectively connected with the two lower short cross bars; the connection positions between the oblique bar, the upper short cross bar, the lower short cross bar and the corresponding upper cross bars and lower cross bars can be freely adjusted; the vertical bar is located on the right side of the oblique bar, and there are two vertical bars in total. The upper end of the vertical bar is connected with the two upper cross bars and the upper short cross bar on the right side by bolts, and the lower end is connected with the two lower cross bars and the lower short cross bar on the right section of the lower cross bar by bolts. Connection; A bolt slot is drilled on the midline of one of the sides of the right section of the lower crossbar, and the slot is marked with scale positions corresponding to different angles. The scale position takes the screw hole at the bottom of the right oblique rod as the center of the circle. When the oblique rod and the upper crossbar are rotated around the screw hole at the bottom of the right oblique rod to 10° to 90°, the projection position of the screw hole at the right end of the upper crossbar on the midline of the right section of the lower crossbar is obtained. A bolt slot is also drilled along the midline of the other side of the right section of the lower crossbar; the two bolt slots on the lower crossbar correspond to the lower end of the sliding connection pole and the lower short crossbar on the right side respectively; A bolt slot is also drilled on the center line of one of the sides of the upper part of the vertical pole. The position of the slot is based on the screw hole at the bottom of the right oblique rod as the center of the circle. When the oblique rod and the upper cross bar rotate around the screw hole at the bottom of the right oblique rod to 10° and 90° respectively, the projection position of the screw hole at the right end of the upper cross bar on the center line of the vertical pole is the position of the slot, which is the connecting line between the two projected screw holes. A bolt slot is also drilled in the vertical direction along the center line of the other side of the vertical pole. The two bolt slots on the vertical pole correspond to the right end of the upper cross bar and the upper short cross bar on the right side for sliding connection respectively.
[0009] The length of the bottom plate is the same as that of the short crossbar, and the width is set according to the thickness of the simulated ore body; several bottom cross braces parallel to the short crossbar and with equal side lengths are placed on the left section of the lower crossbar, and the bottom plate is placed on the bottom cross braces;
[0010] The two front back panels are installed at the front and rear of the test device respectively, and the two side back panels are installed at the left and right sides of the test device respectively; the front back panel and the side back panels are transparent panels, which are inserted into the inner side of the inclined rod from the upper part of the test device and connected to the inclined rod;
[0011] The front back plate is in the shape of a parallelogram, with a width equal to the distance between the inner sides of the left and right inclined bars, a height equal to the distance from the upper surface of the bottom plate to the upper side of the upper cross bar, and an inclination angle the same as that of the inclined bars; the side back plate is arranged with several rows of step slots parallel to the inclined bars, and the spacing and spatial positions of the step slots are designed in accordance with different similar simulation tests for ore placement; the front back plate located in the front is arranged with blasting boundary slots, which are at an angle to the horizontal plane, and the oblique length and spatial position of the blasting boundary slots are designed in accordance with different similar simulation tests for ore placement, and access slots are arranged below the blasting boundary slots, and the width, height and spatial position of the access slots are designed in accordance with different similar simulation tests for ore placement; if the blasting boundary slots and access slots are regarded as a group of slots, then the front back plate located in the front is provided with two groups of slots, upper and lower; the front back plate located in the back is a complete transparent plate without blasting boundary slots and access slots;
[0012] The step slot is inserted with a lower segmented step partition, the blasting boundary slot is inserted with a blasting boundary partition, and the access slot is inserted with an access partition; the lower segmented step partition is two special-shaped iron sheets, and the shape of the iron sheets is designed according to different similar ore-dropping simulation tests; there is a distance between the boundary of the lower segmented step partition inside the test device and the blasting boundary partition and access partition of the upper and lower segments, and the boundary outside the test device exceeds the outer surface of the side back plate; one end of the blasting boundary partition and the access partition is flush with the inner side of the front back plate at the rear, and the other end exceeds the outer side of the front back plate at the front; the width of the blasting boundary partition is less than the oblique length of the blasting boundary slot; the access partition is composed of two concave iron sheets that are inverted up and down;
[0013] The transition segmented step partition is a special-shaped iron sheet parallel to the front back plate. The shape of the iron sheet is designed according to different similar simulation tests of ore placement. The upper boundary of each transition segmented step partition is the intersection line of the corresponding ore placement step dividing line and the wavy ore rock boundary. A steel bar pull rod is also welded on the upper boundary of the transition segmented step partition, and the upper end of the steel bar pull rod exceeds the upper end of the front back plate.
[0014] The present invention adopts the above technical solution and utilizes the instability of the parallelogram. The four oblique rods, two upper cross rods, and two upper short cross rods can rotate around the screw hole at the bottom of the right oblique rod. The lower cross rod has an angle scale. The vertical rod is installed at a predetermined angle position. After the oblique rod and the upper cross rod rotate to reach the vertical rod position, they are connected to the vertical rod for fixing. Since the connection positions between the oblique rod, the upper short cross rod, the lower short cross rod and the corresponding upper cross rod and lower cross rod can be freely adjusted, and the connection positions between the upper cross rod, the upper short cross rod and the vertical rod can be freely adjusted, the structure can flexibly adjust the internal test area size and the tilt angle of the test device.
[0015] The invention has the characteristics of simple structure, low cost, easy installation, and adjustable ore body inclination and thickness, and is suitable for the field of similar simulation test of ore drawing in underground caving mining.
[0016] Preferably, the diagonal rod, upper cross rod, lower cross rod, vertical rod and short cross rod are all angle steels; the diagonal rod, short cross rod are connected to the upper cross rod and lower cross rod by bolts, and a row of screw holes are drilled on the midlines of both sides of the diagonal rod and the short cross rod; the two rows of screw holes on the diagonal rod are staggered by the length of the angle steel side in the vertical direction, and the lower end of one side of the diagonal rod is semicircular, and the center of the circle is concentric with the screw hole at the lower end; the two rows of screw holes on the short cross rod are staggered by the length of the angle steel side in the horizontal direction; a row of screw holes are drilled on the midlines of the side where the upper cross rod contacts the diagonal rod and the side where the left section of the lower rod contacts the diagonal rod, and the drilling positions of the two are the same.
[0017] Preferably, the bottom cross brace is a square steel tube with a side length equal to the side length of the short cross bar angle steel, and the two ends of each bottom cross brace are respectively flush with the outer surfaces of the two lower cross bars located in the front and rear.
[0018] Preferably, the front back panel and the side back panels are connected to the diagonal rods through screw holes and corresponding bolts.
[0019] Preferably, the boundary of the lower segmented step partition located inside the test device is 8 to 10 mm away from the upper and lower segmented blasting boundary partitions and access partitions, and the boundary of the lower segmented step partition located outside the test device exceeds the outer surface of the side back panel by 16 to 20 mm, and a pull-out hole is also drilled at the outer boundary of the lower segmented step partition.
[0020] Preferably, the angle between the blasting boundary slot and the horizontal plane is 15-30°; the minimum straight-line distance between the blasting boundary slot and the access slot boundary is 20 mm.
[0021] Preferably, the ends of the blasting boundary partition and the access partition extend beyond the outer side of the front back plate located in front by 16 to 20 mm; the width of the blasting boundary partition is 5 to 8 mm smaller than the oblique length of the blasting boundary slot.
[0022] Preferably, the left and right boundaries of the transition segmented step partition are 5 to 8 mm away from the inner surface of the front back plate, and the vertical distance between the lower boundary and the adjacent blasting boundary partition is 5 to 8 mm; the upper end of the steel bar pull rod protrudes from the upper end of the front back plate by 20 to 30 mm; a steel ring is welded to the upper end of the steel bar pull rod, and the annular surface of the steel ring is parallel to the front back plate.
[0023] The present invention further provides a method for using a similar simulation test device for end-point ore discharge, comprising the following steps:
[0024] Step 1, installation of the test device: according to the designed geometric similarity ratio, determine the length, width, height and inclination angle of the ore-laying part inside the test device. First, use bolts to connect the lower crossbar, lower short crossbar and vertical pole at the set angle position, then use bolts to connect the lower crossbar, inclined rod, upper crossbar and upper short crossbar, and then rotate the inclined rod and upper crossbar to the vertical pole position, and use bolts to connect the upper crossbar and vertical pole, and the upper short crossbar and vertical pole to fix them; then install the bottom cross brace and bottom plate, and finally insert the front back plate and side back plate;
[0025] Step 2, construction of similar model: pour similar simulated loose ore into the test device, and when the upper surface of the loose ore reaches the installation height of the access partition, blasting boundary partition or lower segment step partition of the lower segment, pre-embed the access partition, blasting boundary partition or lower segment step partition through the corresponding access slot, blasting boundary slot or step slot, and then continue to pour the loose ore; when the upper surface of the loose ore reaches the access partition and blasting boundary partition of the upper segment, first pre-embed the access slot and blasting boundary slot, and then pre-embed the transition segment step partitions of different heights in sequence according to the step requirements to ensure that the upper end surface of the transition segment step partition is flush with the wavy ore-rock boundary left after the vein recovery, and then continue to pour the loose ore to the wavy ore-rock boundary, and finally pour the loose waste rock to the point where it is flush with the cross-section on the side back plate;
[0026] Step 3: Conducting the ore-releasing test: During the transition segmentation mining, firstly, pull out the first transition segmentation step baffle on the rear side from the top of the test device, and then drag out the blasting boundary baffle of the upper segment and the upper half of the approach baffle respectively, and simulate the ore-releasing from the front end of the approach baffle according to the similar test requirements, record the amount of ore and waste rock discharged, and observe the movement of loose waste rock and loose ore until the simulated cut-off ore-releasing requirements are met; after one step-length ore-releasing is completed, repeat the ore-releasing for the next step-length in sequence until all step-lengths in the segment are completed. The ore discharge has been completed; when mining the lower section, first pull out the first lower section step partition on the rear side from the two side back plates, then drag forward the blasting boundary partition of the lower section and the upper part of the approach partition, and simulate ore discharge from the front end of the approach partition according to similar test requirements, record the amount of ore and waste rock discharged, and observe the movement of loose waste rock and loose ore until the simulated cut-off ore discharge requirements are met; after one step discharge is completed, repeat the ore discharge for the next step in sequence until all steps in the section have been discharged.
[0027] By adopting the above technical solution, the present invention has the following positive effects compared with the prior art:
[0028] The present invention is composed of an inclined rod, an upper crossbar, a lower crossbar, a vertical rod, a short crossbar, a bottom plate, a bottom cross brace, a side back plate and a front back plate. Each rod body is connected by bolts, and has a simple structure, low cost and easy installation. A large number of screw holes are drilled on the inclined rod, the crossbar and the vertical rod of the present invention, and different installation screw holes can be selected to flexibly adjust the size and inclination angle of the internal test area of the test device. Therefore, the present invention has the characteristics of simple structure, low cost, easy installation, and adjustable size and inclination angle, and is suitable for the field of similar simulation test of ore placement in underground caving mining. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0030] Figure 1 The overall structure diagram of the present invention is
[0031] Figure 2 It is a front schematic diagram of the present invention;
[0032] Figure 3 It is a side schematic diagram of the present invention;
[0033] Figure 4 A top view of the present invention;
[0034] Figure 5 It is a structural schematic diagram of the side back plate of the present invention;
[0035] Figure 6 It is a schematic diagram of the structure of the front and back panels of the present invention;
[0036] Figure 7 This is a schematic diagram of the partition installation position;
[0037] Figure 8 This is a schematic diagram of the use state of the present invention;
[0038] Fig. 9 This is a schematic diagram of the installation of the access partition.
[0039] In the figure: 1-diagonal rod, 2-upper cross bar, 3-lower cross bar, 4-vertical rod, 5-bottom plate, 6-bottom cross brace, 7-side back plate, 8-front back plate, 9-upper short cross bar, 10-lower short cross bar, 11-bolt slide groove, 12-scale position, 13-pitch slot, 14-blasting boundary slot, 15-access slot, 16-lower segmented step partition, 17-blasting boundary partition, 18-access partition, 19-transition segmented step partition, 20-pull-out hole, 21-steel bar pull rod, 22-steel ring, 23-wavy ore rock boundary, 24-loose ore, 25-loose waste rock. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] Embodiment 1:
[0042] like Figure 1 As shown, the present invention is a similar simulation test device for end ore placement, comprising an inclined rod 1, an upper crossbar 2, a lower crossbar 3, a vertical rod 4, a short crossbar, a bottom plate 5, a bottom cross brace 6, a side back plate 7 and a front back plate 8; wherein,
[0043] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the diagonal bar 1, the upper cross bar 2, the lower cross bar 3, the vertical bar 4 and the short cross bar are all angle steels with a side length of 4 to 6 mm. The lengths of the diagonal bar 1, the upper cross bar 2, the lower cross bar 3, the vertical bar 4 and the short cross bar are 1 to 1.8 m, 1 to 1.8 m, 2 to 3.6 m, 1 to 1.8 m and 0.3 to 0.8 m respectively.
[0044] A row of screw holes is drilled every 100 mm along the midlines of the two sides of the diagonal rod 1. The two rows of screw holes are staggered in the vertical direction by the length of the angle steel side. The lower end of one side of the diagonal rod 1 is semicircular, and the center of the circle is concentric with the screw hole at the lower end. There are four diagonal rods 1 in total, and together they form a three-dimensional parallelogram. One of the parallelogram faces of the three-dimensional parallelogram is defined as the front, and the other parallelogram face is defined as the rear.
[0045] A screw hole is drilled every 100mm along the center line of one side of the upper cross bar 2, the rightmost screw hole is 150mm away from the adjacent screw hole next to it, and a screw hole is drilled along the center line of the other side of the upper cross bar 2 at a distance half the length of the angle steel at both ends. There are two upper cross bars 2 in total, and the upper end of the diagonal bar 1 is connected to the two upper cross bars 2 respectively arranged in front and rear positions thereof by bolts.
[0046] The lower cross bar 3 can be divided into two sections, the left section is the same length as the upper cross bar 2, and the rest is the right section. The drilling position of the left section of the lower cross bar 3 is exactly the same as that of the upper cross bar 2. There are two lower cross bars 3 in total, and the lower end of the diagonal bar 1 is connected to the left sections of the two lower cross bars 3 respectively arranged in the front and rear positions thereof.
[0047] A row of screw holes is drilled every 100 mm along the center line of the two sides of the short crossbar, and the two rows of screw holes are staggered in the horizontal direction by the length of the angle steel side. There are four short crossbars, two upper short crossbars 9 and two lower short crossbars 10. The left and right sides of the upper crossbar 2 are connected to the two upper short crossbars 9, and the left and right sections of the lower crossbar 3 are connected to the two lower short crossbars 10. The connection positions between the oblique bar 1, the upper short crossbar 9, the lower short crossbar 10 and the corresponding upper crossbar 2 and lower crossbar 3 can be freely adjusted by selecting different screw hole positions.
[0048] The vertical pole 4 is located on the right side of the diagonal pole 1, and there are two of them. The upper end of the vertical pole 4 is connected to the two upper cross bars 2 and the upper short cross bar 9 on the right side by bolts, and the lower end is connected to the two lower cross bars 3 and the lower short cross bar 10 located at the right section of the lower cross bar 3 by bolts.
[0049] A bolt slot 11 is drilled on the midline of one of the sides of the right section of the lower cross bar 3, and scale positions 12 corresponding to different angles are marked on the slot. The scale position 12 takes the lowermost screw hole of the right oblique bar 1 as the center of the circle. When the oblique bar 1 and the upper cross bar 2 are rotated around the bottom screw hole of the right oblique bar 1 to different angles (10°~90°), the projection position of the rightmost screw hole of the upper cross bar 2 on the midline of the right section of the lower cross bar 3 is obtained. A bolt slot 11 is also drilled along the midline of the other side of the right section of the lower cross bar 3. The slot position is staggered to the right by the length of the angle steel side in the horizontal direction; the two bolt slots 11 on the lower cross bar 3 correspond to the lower end of the sliding connection vertical rod 4 and the lower short cross bar 10 on the right side, respectively.
[0050] A screw hole is drilled along the midline of one side of the vertical pole 4 at a distance half the length of the angle steel side at the lower end. A bolt slide groove 11 is also drilled along the midline of the upper part of the vertical pole 4. The position of the slide groove takes the lowermost screw hole of the right-side oblique rod 1 as the center of the circle. When the oblique rod 1 and the upper cross bar 2 are rotated around the bottom screw hole of the right-side oblique rod 1 to 10° and 90° respectively, the projection position of the rightmost screw hole of the upper cross bar 2 on the midline of the vertical pole 4 is the position of the slide groove, that is, the connecting line between the two projected screw holes. The same screw hole and slide groove are drilled along the midline of the other side of the vertical pole 4 at a distance staggered upward from the length of the angle steel side. The two bolt slide grooves 11 on the vertical pole 4 correspond to the right end of the upper cross bar 2 and the upper short cross bar 9 on the right side for sliding connection.
[0051] The bottom plate 5 is an acrylic plate with a thickness of 6 to 10 mm, the length of which is the same as that of the short cross bar, and the width is set according to the thickness of the simulated ore body; three bottom cross braces 6 parallel to the short cross bars are placed on the lower cross bars 3, and the bottom cross braces 6 are square steel tubes with a side length equal to the side length of the short cross bar angle steel, and the two ends of each bottom cross brace 6 are respectively located flush with the outer surfaces of the front and rear two lower cross bars 3; the bottom plate 5 is placed on the three bottom cross braces 6.
[0052] The two front back panels 8 are respectively installed on the front and rear of the test device, and the two side back panels 7 are respectively installed on the left and right sides of the test device. The front back panel 8 and the side back panels 7 are both transparent acrylic panels with a thickness of 6 to 10 mm. They are inserted into the inner side of the inclined rod 1 from the upper part of the test device and connected to the inclined rod 1 through screw holes and corresponding bolts.
[0053] The front back plate 8 is in the shape of a parallelogram, with a width equal to the distance between the inner sides of the left and right oblique bars 1 and a height equal to the distance from the upper surface of the bottom plate 5 to the upper side of the upper cross bar 2 , and an inclination angle the same as that of the oblique bars 1 .
[0054] like Figure 5 As shown, the side back plate 7 is provided with several rows of 2 mm wide step slots 13 parallel to the inclined rod 1, and the spacing and spatial position of the step slots 13 are designed according to different similar simulation tests of ore placement. Figure 6 As shown, a blasting boundary slot 14 with a width of 8 to 10 mm is arranged on the front back plate 8, the angle between the blasting boundary slot 14 and the horizontal plane is 15 to 30 degrees, the oblique length and spatial position of the blasting boundary slot 14 are designed according to different similar simulation tests of ore placement, and an access slot 15 is arranged below the blasting boundary slot 14, and the width, height and spatial position of the access slot 15 are designed according to different similar simulation tests of ore placement; if the blasting boundary slot 14 and the access slot 15 are regarded as a group of slots, then the front back plate 8 located in the front is provided with an upper and lower group of slots; the minimum straight-line distance between the blasting boundary slot 14 and the access slot 15 is 20 mm, and the front back plate 8 located in the rear is a complete transparent plate without the blasting boundary slot 14 and the access slot 15.
[0055] like Figure 7 and Figure 8 As shown, the step slot 13 is inserted with a lower segmented step partition 16, the blasting boundary slot 14 is inserted with a blasting boundary partition 17, and the access slot 15 is inserted with an access partition 18. The lower segmented step partition 16 is two special-shaped iron sheets, and the shape of the iron sheet is designed according to different similar ore-drawing simulation tests; the boundary of the lower segmented step partition 16 located inside the test device is 8 to 10 mm away from the upper and lower segmented blasting boundary partitions 17 and the access partition 18, and the boundary located outside the test device exceeds the outer surface of the side back plate 7 by 16 to 20 mm, and a pull-out hole 20 with a diameter of 5 mm is also drilled at the midpoint of the outer boundary of the lower segmented step partition 16 in the vertical direction.
[0056] One end of the blasting boundary partition 17 and the access partition 18 is flush with the inner side of the front back plate 8 at the rear, and the other end is 16-20 mm beyond the outer side of the front back plate 8 at the front; the width of the blasting boundary partition 17 is 5-8 mm less than the oblique length of the blasting boundary slot 14. Fig. 9 As shown, the inlet partition plate 18 is composed of two concave iron sheets that are inverted one above the other.
[0057] like Figure 7 and Figure 8 As shown, the transition segmented step partition 19 is a special-shaped iron sheet parallel to the front back plate 8. The shape of the iron sheet is designed according to different similar simulation tests of ore discharge. The upper boundary of each transition segmented step partition 19 is the intersection of each corresponding ore discharge step dividing line and the wavy ore rock boundary 23. The left and right boundaries of the transition segmented step partition 19 are 5 to 8 mm away from the inner surface of the front back plate 8, and the lower boundary is 5 to 8 mm away from the adjacent blasting boundary partition 17. A steel bar pull rod 21 is welded at each of the two trisection points on the upper boundary of the transition segmented step partition 19, and the upper end of the steel bar pull rod 21 extends beyond the upper end of the front back plate 8 by 20 to 30 mm. A steel circular ring 22 with an inner diameter of 5 mm is welded to the upper end of the steel bar pull rod 21, and the annular surface of the steel circular ring 22 is parallel to the front back plate 8.
[0058] The method for using the above-mentioned end-loading similarity simulation test device comprises the following steps:
[0059] Step 1, installation of the test device: according to the designed geometric similarity ratio, determine the length, width, height and inclination angle of the ore placing part inside the test device. First, use bolts to connect the lower cross bar 3, the lower short cross bar 10 and the vertical bar 4 at the set angle position, then use bolts to connect the lower cross bar 3, the inclined bar 1, the upper cross bar 2 and the upper short cross bar 9, and then rotate the inclined bar 1 and the upper cross bar 2 to the position of the vertical bar 4, and use bolts to connect the upper cross bar 2 and the vertical bar 4, and the upper short cross bar 9 and the vertical bar 4 to fix them; then install the bottom cross brace 6 and the bottom plate 5, and finally insert the front back plate 8 and the side back plate 7;
[0060] Step 2: Construction of a similar model: Pour similar simulated loose ore 24 into the test device. When the upper surface of the loose ore 24 reaches the installation height of the lower segmented access partition 18, the blasting boundary partition 17 or the lower segmented step partition 16, the access partition 18, the blasting boundary partition 17 or the lower segmented step partition 16 is pre-embedded through the corresponding access slot 15, the blasting boundary slot 14 or the step slot 13, and then continue to pour the loose ore 24; when the upper surface of the loose ore 24 reaches the installation height of the lower segmented access partition 18, the blasting boundary partition 17 or the lower segmented step partition 16, the access slot 15, the blasting boundary slot 14 or the step slot 13 is pre-embedded, and the loose ore 24 is continued to be poured; When the surface reaches the upper segmented access partition 18 and blasting boundary partition 17, first pre-embed the access slot 15 and blasting boundary slot 14, and then pre-embed the transition segment step partitions 19 of different heights in sequence according to the step requirements, to ensure that the upper end surface of the transition segment step partition 19 is flush with the wavy ore-rock boundary 23 left after the vein recovery, and then continue to pour the bulk ore 24 to the wavy ore-rock boundary 23, and finally pour the bulk waste rock 25 to the level with the upper section of the side back plate 7;
[0061] Step 3: Conducting the ore-releasing test: During the transition segmentation mining, firstly, pull out the first transition segmentation step baffle 19 on the rear side from the top of the test device, and then drag out the blasting boundary baffle 17 of the upper segment and the upper half of the approach baffle 18 respectively, and simulate the ore-releasing from the front end of the approach baffle 18 according to the similar test requirements, record the amount of ore and waste rock discharged, and observe the movement of the bulk waste rock 25 and the bulk ore 24 until the simulated cut-off ore-releasing requirements are met; after one step-length ore-releasing is completed, repeat the ore-releasing for the next step-length in sequence until all the step-lengths in the segment are completed. The ore discharge has been completed; when mining the lower section, first pull out the first lower section step partition 16 on the rear side from the two side back plates 7, then drag forward the blasting boundary partition 17 of the lower section and the upper part of the approach partition 18, and simulate the ore discharge from the front end of the approach partition 18 according to similar test requirements, record the amount of ore and waste rock discharged, and observe the movement of loose waste rock 25 and loose ore 24 until the simulated cut-off ore discharge requirements are met; after one step of ore discharge is completed, repeat the ore discharge for the next step in sequence until all steps in the section have been completed.
[0062] Embodiment 2:
[0063] This embodiment provides a similar simulation test device for end-loading ore with adjustable ore body size and inclination and a method for using the same. The structure of the test device is the same as that of the first embodiment except for the following specific technical parameters.
[0064] The diagonal bar 1, upper crossbar 2, lower crossbar 3, vertical bar 4 and short crossbar are all angle steels with a side length of 5 to 6 mm. The lengths of the diagonal bar 1, upper crossbar 2, lower crossbar 3, vertical bar 4 and short crossbar are 1.4 to 1.8 m, 1.4 to 1.8 m, 2.8 to 3.6 m, 1 to 1.8 m and 0.5 to 0.8 m respectively. The front back plate 8 and the side back plate 7 are both transparent acrylic plates with a thickness of 7 to 8 mm.
[0065] A blasting boundary slot 14 with a width of 9 to 10 mm is arranged on the front back plate 8, and the blasting boundary slot 14 forms an angle of 22 to 30 degrees with the horizontal plane.
[0066] The boundary of the lower segmented step partition 16 inside the test device is 9 to 10 mm away from the upper and lower segmented blasting boundary partitions 17 and the access partition 18, and the boundary outside the test device exceeds the outer surface of the side back plate 7 by 18 to 20 mm.
[0067] One end of the blasting boundary partition 17 and the access partition 18 is flush with the inner side of the front back plate 8 at the rear, and the other end extends 18 to 20 mm beyond the outer side of the front back plate 8 at the front; the width of the blasting boundary partition 17 is 6 to 8 mm less than the oblique length of the blasting boundary slot 14.
[0068] The left and right boundaries of the transition segmented step partition 19 are 6 to 8 mm away from the inner surface of the front back plate 8, and the vertical distance between the lower boundary and the adjacent blasting boundary partition 17 is 6 to 8 mm; the upper end of the steel bar pull rod 21 exceeds the upper end of the front back plate 8 by 25 to 30 mm.
[0069] The method of using the end-loading ore-simulating test device is the same as that in Example 1.
[0070] The present invention is composed of an inclined rod 1, an upper crossbar 2, a lower crossbar 3, a vertical rod 4, a short crossbar, a bottom plate 5, a bottom cross brace 6, a side back plate 7 and a front back plate 8. Each rod body is connected by bolts, and has a simple structure, low cost and easy installation. A large number of screw holes are drilled on the inclined rod 1, the crossbar and the vertical rod 4 of the present invention, and different installation screw holes can be selected to flexibly adjust the size and inclination angle of the internal test area of the test device. Therefore, the present invention has the characteristics of simple structure, low cost, easy installation, and adjustable size and inclination angle, and is suitable for the field of similar simulation test of ore placement in underground caving mining.
[0071] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for using a similar simulation test device for end-loading ore, characterized in that: The end-loading ore-dropping similarity simulation test device includes an inclined rod, an upper crossbar, a lower crossbar, a vertical rod, a short crossbar, a bottom plate, a bottom cross brace, a side back plate and a front back plate; wherein, There are four oblique rods in total and they together form a three-dimensional parallelogram. One of the parallelogram faces of the three-dimensional parallelogram is defined as the front, and the other parallelogram face is defined as the rear. The upper end of the oblique rod is connected to two upper cross bars respectively arranged at the front and rear positions thereof, and the lower end is connected to two lower cross bars respectively arranged at the front and rear positions thereof; the lower cross bar is divided into left and right sections, the left section of which is the same length as the upper cross bar, and the rest is the right section. The lower ends of the four oblique rods are all connected to the left section of the lower cross bar; there are four short cross bars in total, which are divided into The upper and lower short cross bars are respectively connected with the two upper short cross bars on the left and right sides of the upper cross bar, and the left and right sections of the lower cross bar are respectively connected with the two lower short cross bars; the connection positions between the oblique bar, the upper short cross bar, the lower short cross bar and the corresponding upper cross bars and lower cross bars can be freely adjusted; the vertical bar is located on the right side of the oblique bar, and there are two vertical bars in total. The upper end of the vertical bar is connected with the two upper cross bars and the upper short cross bar on the right side by bolts, and the lower end is connected with the two lower cross bars and the lower short cross bar on the right section of the lower cross bar by bolts. Connection; A bolt slot is drilled on the midline of one of the sides of the right section of the lower crossbar, and the slot is marked with scale positions corresponding to different angles. The scale position takes the screw hole at the bottom of the right oblique bar as the center of the circle. When the oblique bar and the upper crossbar are rotated around the screw hole at the bottom of the right oblique bar to 10°~90°, the projection position of the screw hole at the right end of the upper crossbar on the midline of the right section of the lower crossbar is obtained, and a bolt slot is also drilled along the midline of the other side of the right section of the lower crossbar; the two bolt slots on the lower crossbar correspond to the lower end of the sliding connection vertical rod and the lower short crossbar on the right side respectively; A bolt slot is also drilled on the center line of one of the sides of the upper part of the vertical pole. The position of the slot is based on the screw hole at the bottom of the right oblique rod as the center of the circle. When the oblique rod and the upper cross bar rotate around the screw hole at the bottom of the right oblique rod to 10° and 90° respectively, the projection position of the screw hole at the right end of the upper cross bar on the center line of the vertical pole is the position of the slot, which is the connecting line between the two projected screw holes. A bolt slot is also drilled in the vertical direction along the center line of the other side of the vertical pole. The two bolt slots on the vertical pole correspond to the right end of the upper cross bar and the upper short cross bar on the right side for sliding connection respectively. The length of the bottom plate is the same as that of the short crossbar, and the width is set according to the thickness of the simulated ore body; several bottom cross braces parallel to the short crossbar and with equal side lengths are placed on the left section of the lower crossbar, and the bottom plate is placed on the bottom cross braces; The two front back panels are installed at the front and rear of the test device respectively, and the two side back panels are installed at the left and right sides of the test device respectively; the front back panel and the side back panels are transparent panels, which are inserted into the inner side of the inclined rod from the upper part of the test device and connected to the inclined rod; The front back plate is in the shape of a parallelogram, with a width equal to the distance between the inner sides of the left and right inclined bars, a height equal to the distance from the upper surface of the bottom plate to the upper side of the upper cross bar, and an inclination angle the same as that of the inclined bars; the side back plate is arranged with several rows of step slots parallel to the inclined bars, and the spacing and spatial positions of the step slots are designed in accordance with different similar simulation tests for ore placement; the front back plate located in the front is arranged with blasting boundary slots, which are at an angle to the horizontal plane, and the oblique length and spatial position of the blasting boundary slots are designed in accordance with different similar simulation tests for ore placement, and access slots are arranged below the blasting boundary slots, and the width, height and spatial position of the access slots are designed in accordance with different similar simulation tests for ore placement; if the blasting boundary slots and access slots are regarded as a group of slots, then the front back plate located in the front is provided with two groups of slots, upper and lower; the front back plate located in the back is a complete transparent plate without blasting boundary slots and access slots; The step slot is inserted with a lower segmented step partition, the blasting boundary slot is inserted with a blasting boundary partition, and the access slot is inserted with an access partition; the lower segmented step partition is two special-shaped iron sheets, and the shape of the iron sheets is designed according to different similar ore-dropping simulation tests; there is a distance between the boundary of the lower segmented step partition inside the test device and the blasting boundary partition and access partition of the upper and lower segments, and the boundary outside the test device exceeds the outer surface of the side back plate; one end of the blasting boundary partition and the access partition is flush with the inner side of the front back plate at the rear, and the other end exceeds the outer side of the front back plate at the front; the width of the blasting boundary partition is less than the oblique length of the blasting boundary slot; the access partition is composed of two concave iron sheets that are inverted up and down; The transition segment step partition is a special-shaped iron sheet parallel to the front back plate. The shape of the iron sheet is designed according to different ore-drawing similarity simulation tests. The upper boundary of each transition segment step partition is the intersection line of each corresponding ore-drawing step dividing line and the wavy ore rock boundary. A steel bar tie rod is also welded on the upper boundary of the transition segment step partition, and the upper end of the steel bar tie rod exceeds the upper end of the front back plate. A method for using an end-loading ore-dropping similarity simulation test device comprises the following steps: Step 1, installation of the test device: according to the designed geometric similarity ratio, determine the length, width, height and inclination angle of the ore-laying part inside the test device. First, use bolts to connect the lower crossbar, lower short crossbar and vertical pole at the set angle position, then use bolts to connect the lower crossbar, inclined rod, upper crossbar and upper short crossbar, and then rotate the inclined rod and upper crossbar to the vertical pole position, and use bolts to connect the upper crossbar and vertical pole, and the upper short crossbar and vertical pole to fix them; then install the bottom cross brace and bottom plate, and finally insert the front back plate and side back plate; Step 2, construction of similar model: pour similar simulated loose ore into the test device, and when the upper surface of the loose ore reaches the installation height of the access partition, blasting boundary partition or lower segment step partition of the lower segment, pre-embed the access partition, blasting boundary partition or lower segment step partition through the corresponding access slot, blasting boundary slot or step slot, and then continue to pour the loose ore; when the upper surface of the loose ore reaches the access partition and blasting boundary partition of the upper segment, first pre-embed the access slot and blasting boundary slot, and then pre-embed the transition segment step partitions of different heights in sequence according to the step requirements to ensure that the upper end surface of the transition segment step partition is flush with the wavy ore-rock boundary left after the vein recovery, and then continue to pour the loose ore to the wavy ore-rock boundary, and finally pour the loose waste rock to the point where it is flush with the cross-section on the side back plate; Step 3: Conducting the ore-releasing test: During the transition segmentation mining, firstly, pull out the first transition segmentation step baffle on the rear side from the top of the test device, and then drag out the blasting boundary baffle of the upper segment and the upper half of the approach baffle respectively, and simulate the ore-releasing from the front end of the approach baffle according to the similar test requirements, record the amount of ore and waste rock discharged, and observe the movement of loose waste rock and loose ore until the simulated cut-off ore-releasing requirements are met; after one step-length ore-releasing is completed, repeat the ore-releasing for the next step-length in sequence until all step-lengths in the segment are completed. The ore discharge has been completed; when mining the lower section, first pull out the first lower section step partition on the rear side from the two side back plates, then drag forward the blasting boundary partition of the lower section and the upper part of the approach partition, and simulate ore discharge from the front end of the approach partition according to similar test requirements, record the amount of ore and waste rock discharged, and observe the movement of loose waste rock and loose ore until the simulated cut-off ore discharge requirements are met; after one step discharge is completed, repeat the ore discharge for the next step in sequence until all steps in the section have been discharged.
2. The method for using the end-loading similarity simulation test device according to claim 1 is characterized in that: The diagonal rod, upper cross bar, lower cross bar, vertical rod and short cross bar are all angle steels; the diagonal rod, short cross bar are connected to the upper cross bar and lower cross bar by bolts, and a row of screw holes are drilled on the midlines of both sides of the diagonal rod and the short cross bar; the two rows of screw holes on the diagonal rod are staggered by the length of the angle steel side in the vertical direction, and the lower end of one side of the diagonal rod is semicircular, and the center of the circle is concentric with the lower end screw hole; the two rows of screw holes on the short cross bar are staggered by the length of the angle steel side in the horizontal direction; a row of screw holes are drilled on the midlines of the side where the upper cross bar contacts the diagonal rod and the side where the left section of the lower rod contacts the diagonal rod, and the drilling positions of the two are the same.
3. The method for using the end-loading similarity simulation test device according to claim 2 is characterized in that: The bottom cross brace is a square steel tube with a side length equal to the side length of the short cross bar angle steel, and the two ends of each bottom cross brace are flush with the outer surfaces of the two lower cross bars located in the front and rear respectively.
4. The method for using the end-loading similarity simulation test device according to claim 2 is characterized in that: The front back plate and the side back plates are connected to the diagonal rods through screw holes and corresponding bolts.
5. The method for using the end-loading similarity simulation test device according to claim 1 is characterized in that: The boundary of the lower segmented step partition located inside the test device is 8~10mm away from the upper and lower segmented blasting boundary partitions and access partitions. The boundary of the lower segmented step partition located outside the test device exceeds the outer surface of the side back panel by 16~20mm. A pull-out hole is also drilled at the outer boundary of the lower segmented step partition.
6. The method for using the end-loading ore-dropping similarity simulation test device according to claim 1 is characterized in that: The angle between the blasting boundary slot and the horizontal plane is 15~30°; the minimum straight-line distance between the blasting boundary slot and the approach slot boundary is 20mm.
7. The method for using the end-loading ore-dropping similarity simulation test device according to claim 1 is characterized in that: The ends of the blasting boundary partition and the approach partition extend outward from the outside of the front back plate by 16 to 20 mm; the width of the blasting boundary partition is 5 to 8 mm smaller than the oblique length of the blasting boundary slot.
8. The method for using the end-loading ore-simulating test device according to claim 1 is characterized in that: The left and right boundaries of the transition segmented step partition are 5~8mm away from the inner surface of the front back plate, and the vertical distance between the lower boundary and the adjacent blasting boundary partition is 5~8mm; the upper end of the steel bar pull rod exceeds the upper end of the front back plate by 20~30mm; a steel ring is welded to the upper end of the steel bar pull rod, and the ring surface of the steel ring is parallel to the front back plate.