Slope surface soil collection device and method

By designing the slope topsoil collection device, and using the coordination of guides and collection shells, layered collection and storage of slope topsoil is achieved, resource waste is solved, and utilization rate and ecological restoration efficiency are improved.

CN113574988BActive Publication Date: 2024-11-19BEIJING FORESTRY UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110924444.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-12
Publication Date
2024-11-19
Estimated Expiration
2041-08-12

AI Technical Summary

Technical Problem

In the prior art, the problem of resource waste caused by unstacked collection of slope topsoil.

Method used

A slope topsoil collection device is designed, including a moving base and a collection mechanism. Through the cooperation of the first guide member and the second guide member, the layered collection of the slope topsoil is realized, and the first collection shell and the second collection are used. The partition between the housing is arranged in a layered cavity, combining a detachable positioning plate and pressure sensor to ensure layered collection and storage of soil.

Benefits of technology

The layered collection and storage of slope topsoil is realized, the utilization rate of topsoil is improved, resource waste is avoided, and the flatness and ecological restoration of the slope is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113574988B_ABST
    Figure CN113574988B_ABST
Patent Text Reader

Abstract

The present invention provides a device and method for collecting topsoil on a slope. The device includes a mobile base and a collecting mechanism. The mobile base is provided with a first guide member. The collecting mechanism is connected to the mobile base, and the collecting mechanism is provided with a second guide member that slides with the first guide member. The collecting mechanism includes a first collecting shell and a second collecting shell that are stacked. When the mobile base is in motion on the surface of the slope, the first guide member and the surface of the slope are arranged at an angle so that the collecting mechanism can be inserted into the interior of the slope surface when moving along the first guide member to collect the soil surface layer at a preset distance from the slope surface. A method for collecting topsoil on a slope is also provided, which is used to collect and utilize the topsoil on the slope. Thus, the collecting mechanism can slide relative to the mobile base, so that the collecting end of the collecting mechanism is inserted into a position at a preset distance inside the surface of the slope, and then the topsoil on the slope is collected in layers in the first collecting shell and the second collecting shell.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of slope management, and in particular to a device and method for collecting surface soil of a slope. Background Art

[0002] In recent years, my country's large-scale development and construction projects have formed a large number of exposed slopes. Strengthening the control of topsoil stripping, storage and reuse during construction is conducive to accelerating the vegetation recovery of exposed slopes and reducing construction costs. Topsoil is the top layer of the soil profile close to the surface. This layer has dense plant roots, good structure, and contains more humus. It is most effective for soil fertility recovery and plant growth. According to statistics, it takes about 200-1000 years to form 2.5cm thick topsoil. Therefore, topsoil is a non-renewable scarce resource with extremely important ecological value.

[0003] According to the soil seed bank experiment completed earlier, the unit density of the soil seed bank in each forest land at different soil layer thicknesses is different. The unit density of the soil seed bank also gradually decreases with the increase of soil depth. The unit density of the soil seed bank in the 0-10cm deep soil layer is greater than that of the 10-20cm deep soil seed bank. The seed content in the 0-5cm, 0-10cm, and 0-15cm deep soil layers accounts for 39.78%, 66.12%, and 86.46% of the 0-20cm deep soil seed bank content. Since the proportion of soil seeds at different depths is also different, it is necessary to collect the topsoil at a specific depth in layers, and provide layered storage and utilization plans to improve the utilization rate of the topsoil. Summary of the invention

[0004] The embodiment of the present invention provides a device and method for collecting topsoil on a slope, which are used to solve the technical problem in the prior art that the topsoil on a slope is not collected in layers, resulting in waste of topsoil resources.

[0005] The embodiment of the present invention provides a slope surface soil collection device, comprising: a mobile base, wherein the mobile base is provided with a first guide member;

[0006] A collecting mechanism is connected to the mobile base, and the collecting mechanism is provided with a second guide member that slidably cooperates with the first guide member, and the collecting mechanism includes a first collecting shell and a second collecting shell that are stacked; wherein,

[0007] When the mobile base is in motion on the slope surface, the first guide member is set at an angle to the slope surface so that the collecting mechanism can be inserted into the slope surface to collect the soil surface at a preset distance from the slope surface when moving along the first guide member.

[0008] According to a slope topsoil collecting device according to an embodiment of the present invention, the mobile base comprises a first support base and a second support base, and the first support base and the second support base are arranged opposite to each other;

[0009] The collecting mechanism is arranged between the first supporting seat and the second supporting seat.

[0010] According to the slope topsoil collecting device of one embodiment of the present invention, the first support seat and the second support seat are both provided with the first guide member, and are arranged on the opposite side of the first support seat and the second support seat;

[0011] The second guide member is arranged on two opposite sides of the collecting mechanism facing the first supporting seat and the second supporting seat.

[0012] According to the slope surface soil collecting device of one embodiment of the present invention, one of the first guide member and the second guide member is a slide groove, and the other is a sliding block matched with the slide groove.

[0013] According to the slope topsoil collecting device of one embodiment of the present invention, a partition is provided between the first collecting shell and the second collecting shell;

[0014] The first collecting shell and the second collecting shell form a first collecting chamber and a second collecting chamber which are spaced apart from each other relative to the partition.

[0015] According to a slope topsoil collection device according to one embodiment of the present invention, at least one detachable positioning plate is provided on a side of the first collection shell away from the first collection chamber, and a pressure sensor is provided on a side of the positioning plate away from the first collection chamber.

[0016] According to the slope surface soil collecting device of one embodiment of the present invention, a guide groove is provided on the first collecting shell, and the positioning plate slides along the guide groove.

[0017] According to the slope surface soil collecting device of one embodiment of the present invention, the adjacent positioning plates are set at a preset distance so that the first collecting shell can obtain soil surface soil at a preset distance.

[0018] According to the slope topsoil collecting device of one embodiment of the present invention, the first collecting shell further comprises a detachably connected first cover plate, and the second collecting shell further comprises a detachably connected second cover plate;

[0019] The first collecting shell is provided with a plurality of first matching holes, and the first cover plate is provided with a plurality of first matching columns matching with the first matching holes;

[0020] The second collecting shell is provided with a plurality of second matching holes, and the second cover plate is provided with a plurality of second matching columns matching with the second matching holes.

[0021] The present invention also provides a slope surface soil collection method based on the above-mentioned slope surface soil collection device, comprising:

[0022] Survey of the current status of the topsoil stripping area;

[0023] Conduct on-site survey and layout of construction to determine the boundary scope that needs to be constructed;

[0024] Clean up the debris within the boundary of the construction site;

[0025] The preset thickness of the slope topsoil is collected, and topsoil of different thicknesses is stored separately; wherein, the stripping area is first determined, and the stripping area is related to the average gravel coverage of the surface, and the thickness to be stripped in different stripping areas corresponds to the average thickness of the topsoil layer;

[0026] Utilize the stored topsoil of different thicknesses in layers;

[0027] Acceptance inspection of topsoil includes but is not limited to the amount of topsoil stripping, stripping rate, stratified storage conditions, topsoil utilization conditions, and topsoil utilization rate.

[0028] In the slope surface soil collection device and method provided by the embodiment of the present invention, the collection mechanism can slide relative to the movable base, so that the collection end of the collection mechanism is inserted into the preset distance position inside the slope surface, and then the surface soil of the slope is collected in layers in the first collection shell and the second collection shell. For example, the soil 10 cm below the slope surface can be collected by the first collection shell, and the soil 20 cm below the slope surface can be collected by the second collection shell, so that the surface soil of the slope can be collected and utilized when the slope is being treated, so as to avoid wasting the surface soil of the slope. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0030] Figure 1 It is a structural schematic diagram of an angle of an embodiment of a slope surface soil collection device of the present invention;

[0031] Figure 2 for Figure 1 A schematic structural diagram of the slope topsoil collection device from another angle shown;

[0032] Figure 3 for Figure 1 The schematic diagram of the moving mechanism and the collecting mechanism as shown is a bottom-up structural diagram;

[0033] Figure 4 for Figure 3 The cross-sectional view at AA is shown;

[0034] Figure 5 A schematic structural diagram of an embodiment of a slope;

[0035] Figure 6 for Figure 5 A schematic structural diagram of another embodiment of the slope shown;

[0036] Figure 7 It is a flow chart of the slope topsoil collection method of the present invention;

[0037] Figure 8 for Figure 7 The flowchart of the slope topsoil collection method shown;

[0038] Reference numerals:

[0039] 10. Mobile base; 110. First guide member; 120. First support seat; 130. Second support seat; 140. Roller;

[0040] 20, collecting mechanism; 210, second guide member; 220, first collecting shell; 2210, first collecting chamber; 2220, positioning plate; 2230, pressure sensor; 2240, guide groove; 2250, first cover plate; 2260, first matching hole; 2270, first matching column; 230, second collecting shell; 2310, second collecting chamber; 2320, second cover plate; 2330, second matching hole; 2340, second matching column; 240, partition;

[0041] 30. Push plate; 310. Handle; 320. Controller. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the embodiment of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0044] Combine the following Figures 1 to 4 The present invention provides a slope surface soil collection device, including a mobile base 10 and a collecting mechanism 20, wherein the mobile base 10 is provided with a first guide member 110; the collecting mechanism 20 is connected to the mobile base 10, and the collecting mechanism 20 is provided with a second guide member 210 that slidably cooperates with the first guide member 110, and the collecting mechanism 20 includes a first collecting shell 220 and a second collecting shell 230 that are stacked; wherein, when the mobile base 10 is in a moving state on the slope surface, the first guide member 110 is set at an angle with the slope surface, so that the collecting mechanism 20 can be inserted into the interior of the slope surface when moving along the first guide member 110 to collect the soil surface layer at a preset distance from the slope surface.

[0045] It should be noted that the mobile base 10 is used to move along the surface of the slope, and the topsoil of the slope is collected by the collecting mechanism 20 while moving. The collecting mechanism 20 includes a first collecting shell 220 and a second collecting shell 230, thereby realizing the collection of topsoil at two different distances. For example, the first collecting shell 220 can collect the topsoil 0-10 cm below the slope, and the second collecting shell 230 can collect the topsoil 10-20 cm below the slope, thereby realizing the layered collection of 20 cm of topsoil on the slope. In other embodiments, the preset collection distance below the slope is not limited to 0-20 cm, but can also be 0-5 cm, 0-15 cm, 0-25 cm, etc., which is not limited here. The setting of layered collection can be adjusted according to the different collectible thicknesses of the first collecting shell 220 and the second collecting shell 230.

[0046] In one embodiment of the present invention, the mobile base 10 includes a first support seat 120 and a second support seat 130, the first support seat 120 and the second support seat 130 are arranged opposite to each other, and the collecting mechanism 20 is arranged between the first support seat 120 and the second support seat 130. The first support seat 120 and the second support seat 130 are arranged at intervals, and the bottom of the first support seat 120 and the second support seat 130 are provided with rollers 140 for moving on the surface of the slope. It should be noted that the collection of the topsoil of the slope is carried out when the slope is flat, that is, when the larger stones or slopes on the slope are cleared, the topsoil of the slope is collected. The setting of the roller 140 facilitates the movement of the collecting device on the surface of the slope. In other embodiments, it can also be replaced by a mobile mechanism such as a crawler, which is not limited here.

[0047] Further, the first support seat 120 and the second support seat 130 are both provided with a first guide member 110, and are provided on the opposite sides of the first support seat 120 and the second support seat 130. The second guide member 210 is provided on the opposite sides of the collection mechanism 20 facing the first support seat 120 and the second support seat 130. In one embodiment of the present invention, one of the first guide member 110 and the second guide member 210 is a slide groove, and the other is a slider matched with the slide groove. Specifically, the side of the first support seat 120 facing the second support seat 130 and the side of the second support seat 130 facing the first support seat 120 are provided with slide grooves arranged oppositely, and the side of the collection mechanism 20 facing the first support seat 120 and the second support seat 130 is provided with a slider matched with the slide groove. The extending direction of the slide groove is set at an angle with the bottom surface of the first support seat 120 and the second support seat 130. That is, when the mobile base 10 moves on the slope, the collecting mechanism 20 moves along the first guide member 110 to adjust the depth of the bottom of the collecting mechanism 20 inserted into the slope surface, which also corresponds to the thickness of the slope surface soil that the collecting mechanism 20 can collect.

[0048] For example, it is determined that the thickness of the topsoil that can be collected on the slope is 20 cm, and the collecting mechanism 20 is moved along the first guide member 110 until the bottom of the collecting mechanism 20 is flush with the surface 20 cm below the slope, and then when the mobile base 10 moves on the slope, the collecting mechanism 20 can collect 20 cm of topsoil. Furthermore, the first collecting shell 220 and the second collecting shell 230 can collect topsoil within 0-10 cm and topsoil within 10-20 cm, respectively.

[0049] In one embodiment of the present invention, a partition 240 is provided between the first collection shell 220 and the second collection shell 230, and the first collection shell 220 and the second collection shell 230 are spaced relative to the partition 240 to form a first collection chamber 2210 and a second collection chamber 2310. The thickness of the partition 240 increases in the direction toward the first collection chamber 2210 and the second collection chamber 2310, so as to facilitate the flow of the collected soil to the first collection chamber 2210. On the one hand, the stability of the partition 240 can be improved, and on the other hand, the setting of the partition 240 can prevent the topsoil collected in the first collection chamber 2210 from flowing out, so as to limit the position of the collected soil. It can be understood that the second collection shell 230 is spaced parallel to the partition 240 and is provided with a guide plate, and the thickness of the guide plate increases in the direction toward the second collection chamber 2310, so as to prevent the topsoil collected in the second collection chamber 2310 from flowing out, thereby limiting the position of the soil in the second collection chamber 2310.

[0050] At least one detachable positioning plate 2220 is provided on one side of the first collection shell 220 away from the first collection chamber 2210, and a pressure sensor 2230 is provided on one side of the positioning plate 2220 away from the first collection chamber 2210. The positioning plate 2220 is provided to facilitate limiting the thickness of the slope topsoil collected by the first collection shell 220, and also to monitor the thickness of the soil collected by the first collection shell 220 and the second collection shell 230 at all times.

[0051] For example, when it is necessary to collect soil 15 cm below the surface, and the collectible thickness of the first collection shell 220 and the second collection shell 230 is 10 cm, the bottom of the second collection shell 230 can be moved to 15 cm below the slope to collect soil 5 cm to 15 cm below the surface of the slope, and the positioning plate 2220 is adjusted to the 5 cm collection mark in the first collection shell 220. Then, during the collection process of the collection mechanism 20, if the second collection shell 230 extends to more than 15 cm below the surface of the slope, the surface of the slope will partially abut against the pressure sensor 2230, so that the pressure value received by the pressure sensor 2230 during the movement of the mobile base 10 exceeds the threshold, and then an alarm is issued to learn that the current collection thickness exceeds the threshold, so as to adjust the position of the collection mechanism 20. A distance sensor may be provided to measure the distance between the slope surface and the positioning plate 2220. When the gap between the surface of the slope soil and the positioning plate 2220 is too large, it can be determined that the thickness collected at the bottom of the second collection shell 230 is not enough to reach 15 cm. In this case, the second collection shell 230 needs to be pushed deeper into the surface soil until the bottom surface of the positioning plate 2220 fits the surface of the slope.

[0052] A push plate 30 is provided above the collecting mechanism 20, and a handle 310 is provided on the push plate 30. A controller 320 is also provided on the push plate 30. The controller 320 is coupled to the pressure sensor 2230. The controller 320 is used to receive the value of the pressure sensor 2230 and then issue an alarm when the pressure value received by the pressure sensor 2230 exceeds a threshold value.

[0053] The first collecting shell 220 is provided with a guide groove 2240, and the positioning plate 2220 slides along the guide groove 2240. The pressure sensors 2230 are arranged at intervals along the length extension direction of the positioning plate 2220 to obtain a more accurate pressure value.

[0054] In one embodiment of the present invention, adjacent positioning plates 2220 are set at a preset distance so that the first collection shell 220 can obtain the soil topsoil of the preset distance. For example, the spacing distance between adjacent positioning plates 2220 can be 2.5 cm, 3 cm or 4 cm, etc. It can be adjusted according to the requirements of the thickness of the collected soil. For example, if 20 cm thick topsoil is collected, one positioning plate 2220 can be set, so that the collectable thickness of the first collection shell 220 is 10 cm.

[0055] The first collection shell 220 further includes a detachably connected first cover plate 2250, and the second collection shell 230 further includes a detachably connected second cover plate 2320. The first cover plate 2250 and the second cover plate 2320 are configured to transport the soil collected by the first collection shell 220 and the second collection shell 230 to a designated location, respectively. For example, the collected soil can be transported to a collection box at the bottom of the slope on the side slope for storage.

[0056] Specifically, the first collection shell 220 is provided with a plurality of first matching holes 2260, and the first cover plate 2250 is provided with a plurality of first matching columns 2270 matching with the first matching holes 2260; the second collection shell 230 is provided with a plurality of second matching holes 2330, and the second cover plate 2320 is provided with a plurality of second matching columns 2340 matching with the second matching holes 2330. A connecting handle is provided on one side of the first cover plate 2250 and the second cover plate 2320, so as to facilitate opening the first collection shell 220 and the second collection shell 230 and then collecting the topsoil collected by the first collection shell 220 and the second collection shell 230.

[0057] In one embodiment of the present invention, when collecting the topsoil of the slope, the soil can be collected from bottom to top in a designated area first, and then the second collection work can be carried out from bottom to top in parallel with a distance less than the long side of the mobile base 10, and the first round of collection work can be carried out repeatedly. Figure 5 and Figure 6, multiple E areas can be collected first, and the B area is the position where the first support seat 120 and the second support seat 130 move. The width of the B area is smaller than the width of the collecting mechanism 20, so that the collecting mechanism 20 can collect the topsoil of the B area. After the first round of collection work is completed, the position of the collecting mechanism 20 is adjusted so that the bottom of the mobile base 10 fits the surface of the topsoil of the slope dug out in the first round of collection work, that is, fits the surface of the E area, and then the second round of collection work is performed on the remaining area, that is, the C area. During the collection process, the bottom of the first support seat 120 and the second support seat 130 fits the bottom surface of the D area. Such collection can avoid the irregular shape of the slope from being bumpy, which is convenient for improving the flatness of the slope surface. The collection work of the slope is divided into two steps. On the one hand, during the movement of the mobile base 10, the first support seat 120 and the second support seat 130 are always in a flush state on the fitting surface of the slope, which is convenient for collecting the topsoil. On the other hand, it can avoid the formation of gullies on the slope surface during the collection of the topsoil, which affects the flatness of the slope.

[0058] See also Figure 7 The present invention also provides a slope surface soil collection method based on the above-mentioned slope surface soil collection device, comprising:

[0059] S110: Investigate the current status of the topsoil stripping area. Specifically investigate the thickness of the topsoil layer, the surface gravel coverage and the soil gravel content.

[0060] S120: Measure and lay out the construction site to determine the boundary range required for construction.

[0061] According to the results of the topsoil resource survey and specific construction requirements, on-site measurement and layout are carried out. During this process, the topsoil stripping area and the final red line range of the construction scope are calculated to avoid unnecessary disturbance in subsequent work.

[0062] S130: Clean up the debris within the boundary range to be constructed.

[0063] According to the on-site investigation, remove stones, broken branches, debris and fallen leaves on the surface. For large gravel or tree stumps that are difficult to remove from the surface, use a pneumatic pick or blasting to break them. The debris removed should be classified and handled in a timely manner to avoid fire or environmental pollution.

[0064] S140: Collecting preset thickness of slope topsoil and storing topsoil of different thicknesses respectively; wherein, firstly determining a stripping area, wherein the stripping area is related to the average gravel coverage of the surface, and the average thickness of the topsoil layer corresponds to the thickness to be stripped in different stripping areas.

[0065] The topsoil collection is planned to adopt a combination of manual and mechanical methods, that is, manual collection combined with the above-mentioned slope topsoil collection device. The topsoil stripping grade, stripping area and stripping thickness are detailed in Tables 1 and 2. The collected topsoil should not contain soil lumps or gravel with a diameter greater than 10 cm. Manual collection is generally carried out by using a flat or pointed shovel to dig and collect the soil. Mechanical collection can use the above-mentioned slope topsoil collection device to collect the topsoil in each area through the slope topsoil collection device. Because the slope topsoil collection device has a first collection shell and a second collection shell, it can collect multiple levels of topsoil below the slope surface. The collected soil is stored in a collection box, and the storage time of the topsoil should not exceed 90 days. Multiple collection boxes can be set up for classified storage, and the topsoil in the collection box can be numbered to achieve classified records for coordinated use to improve the utilization efficiency of the soil topsoil. Table 1 and Table 2 can refer to the following figure:

[0066] Table 1 Peeling level and area determination table

[0067] Average gravel coverage on the ground Peeling grade Stripping area <25% excellent Area A 25%-50% good Zone B 50%-75% middle Zone C ≥75% Difference Stripping is not recommended

[0068] Table 2 Peel thickness determination scheme

[0069]

[0070] That is, the stripping level is determined by the average surface gravel coverage, and then it is determined whether the current area belongs to area A, area B or area C. The average stripping thickness of different areas is determined respectively.

[0071] S150: Utilize the stored topsoil of different thicknesses in layers.

[0072] The utilization requirements can follow the principles of priority in the same area, priority in demand, and use as soon as possible to make reasonable use of the stripped topsoil. The restoration priorities are habitat protection, slope management, and landscape creation. Although these three utilization methods are all related to ecological environmental restoration, their closeness, emphasis, and urgency are different. In order to restore the original ecological environment in the project area as soon as possible, the stripped topsoil should be used first to complete habitat protection work, such as the construction of protected areas and ecological corridors, and the maintenance and protection of rare vegetation resources. These tasks will be difficult to carry out without the support of local topsoil. Slope management projects also require the supply of topsoil. The use of local topsoil supplemented by corresponding measures can improve project efficiency, reduce unnecessary soil erosion, and shorten the recovery period.

[0073] Specific topsoil restoration methods can be found in Table 3.

[0074] as follows:

[0075] Table 3 Topsoil restoration and utilization plan

[0076]

[0077] S160: Acceptance inspection of topsoil, including but not limited to the amount of topsoil stripping, stripping rate, stratified storage, topsoil utilization, and topsoil utilization rate.

[0078] After the collection of topsoil in a region is completed, the collected topsoil of different thicknesses can be inspected in stages to ensure that the collected soil standards are within the preset range. The topsoil stripping acceptance indicators include the amount of topsoil stripping, stripping rate, layered storage, topsoil utilization, topsoil utilization rate, etc. Through the topsoil stripping acceptance, the accuracy of the collection and utilization of topsoil of different thicknesses can be improved.

[0079] Calculation of topsoil stripping amount:

[0080] Q=∑Hi×Si×fi

[0081] Where:

[0082] Q——Total amount of topsoil stripped from the stripping area (m 3 );

[0083] Hi——stripping thickness of the ith topsoil stripping block (m);

[0084] Si——stripping area of ​​the ith topsoil stripping block (m 2 )

[0085] fi——topsoil stripping rate of the ith topsoil stripping block (%)

[0086] Calculation of topsoil stripping rate:

[0087]

[0088] Where:

[0089] Qi——Total amount of topsoil stripping in the ith stripping block (m 3 );

[0090] Qpi——the estimated total amount of topsoil stripping in the ith stripping block (m 3 )

[0091] fi——topsoil stripping rate of the ith topsoil stripping block (%)

[0092] In a feasible embodiment of the present invention, the following location is used as an example: located at 115°46′25″ east longitude and 40°30′14″ north latitude, 885m above sea level, with a slope gradient of 5°, located at the lower slope position. The average gravel coverage of the sample plot is less than 25% and the average stripping thickness is 17.5cm. The seed density at different soil depths is shown in Table 4 below:

[0093] Table 4 Seed density at different depths in Example

[0094]

[0095] The stripping scheme is judged as follows: Since the average gravel coverage of the sample plot is less than 25%, it can be seen from Table 1 that the stripping grade is excellent and the stripping area is Area A. The average stripping thickness is 17.5 cm according to the survey, and it can be seen from Table 2 that the recommended stripping thickness is 20 cm. The slope is 5°, the site conditions of the sample plot are good, and mechanical stripping is used. For example, the slope topsoil collection device can be used to collect the topsoil in Area A in layers.

[0096] Furthermore, the recommended restoration plan can be: 0-10cm topsoil is preferred as the base material for spraying seed layer, and 10-20cm topsoil is recommended as the mixed ingredient for spraying matrix. 0-20cm topsoil can be used as plant planting soil without surface spraying, and 0-10cm is preferred in areas where habitat protection is required.

[0097] Please continue reading Figure 8 In a feasible embodiment of the present invention, the current status of the topsoil stripping area can be investigated first, and then the construction boundary can be determined by measuring and laying out, and then the debris within the boundary can be cleaned up, and then the topsoil stripping thickness and construction method can be determined. The construction method can be manual or mechanical stripping. The stripping thickness can be comprehensively judged based on the gravel coverage, stripping grade and stripping area, and then the layered stripping of the topsoil can be completed, and then the stripped topsoil can be stored and utilized. The specific details can be referred to the above-mentioned specific processes, and no further details will be given here.

[0098] In the description of the embodiments of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limitations on the embodiments of the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0099] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A slope topsoil collection device, characterized in that: include: A movable base, wherein a first guide member is provided on the movable base; A collecting mechanism is connected to the mobile base, and the collecting mechanism is provided with a sliding member that slides with the first guide member. The collecting mechanism comprises a first collecting shell and a second collecting shell arranged in a stacked manner; wherein, When the mobile base is in motion on the slope surface, the first guide member is set at an angle with the slope surface, so that the collecting mechanism can be inserted into the slope surface when moving along the first guide member to collect the soil surface layer at a preset distance from the slope surface; A partition is provided between the first collecting shell and the second collecting shell; the first collecting shell and the second collecting shell form a first collecting chamber and a second collecting chamber spaced apart relative to the partition; and the thickness of the partition increases gradually in a direction toward the first collecting chamber and the second collecting chamber.

2. The slope surface soil collection device according to claim 1, characterized in that: The mobile base includes a first support base and a second support base, and the first support base and the second support base are arranged opposite to each other; The collecting mechanism is arranged between the first supporting seat and the second supporting seat.

3. The slope surface soil collection device according to claim 2, characterized in that: The first guide member is disposed on both the first support seat and the second support seat, and is disposed on the opposite side of the first support seat and the second support seat; The second guide member is arranged on two opposite sides of the collecting mechanism facing the first supporting seat and the second supporting seat.

4. The slope surface soil collection device according to claim 1, characterized in that: One of the first guide member and the second guide member is a slide groove, and the other is a sliding block matched with the slide groove.

5. The slope surface soil collection device according to claim 1, characterized in that: At least one detachable positioning plate is provided on a side of the first collecting shell away from the first collecting chamber, and a pressure sensor is provided on a side of the positioning plate away from the first collecting chamber.

6. The slope surface soil collection device according to claim 5, characterized in that: The first collecting shell is provided with a guide groove, and the positioning plate slides along the guide groove.

7. The slope surface soil collection device according to claim 5, characterized in that: The adjacent positioning plates are set at a preset distance so that the first collecting shell can obtain the soil surface at a preset distance.

8. The slope surface soil collection device according to claim 1, characterized in that: The first collecting shell further comprises a first cover plate which is detachably connected, and the second collecting shell further comprises a second cover plate which is detachably connected; The first collecting shell is provided with a plurality of first matching holes, and the first cover plate is provided with a plurality of first matching columns matching with the first matching holes; The second collecting shell is provided with a plurality of second matching holes, and the second cover plate is provided with a plurality of second matching columns matching with the second matching holes.

9. A method for collecting topsoil from a slope based on the topsoil collecting device for a slope according to any one of claims 1 to 8, characterized in that: include: Survey of the current status of the topsoil stripping area; Conduct on-site survey and layout of construction to determine the boundary scope that needs to be constructed; Clean up the debris within the boundary of the construction site; The preset thickness of the slope topsoil is collected, and topsoil of different thicknesses is stored separately; wherein, the stripping area is first determined, and the stripping area is related to the average gravel coverage of the surface, and the thickness to be stripped in different stripping areas corresponds to the average thickness of the topsoil layer; Utilize the stored topsoil of different thicknesses in layers; Acceptance inspection of topsoil includes but is not limited to the amount of topsoil stripping, stripping rate, stratified storage conditions, topsoil utilization conditions, and topsoil utilization rate.