A traction device for partition wall formwork in a multi-arch tunnel and a method of using the same

By using the traction device of walking longitudinal beams and middle partition wall formwork in the middle partition wall construction of the arch tunnel, the problems of narrow construction space, complex formwork assembly and large safety risks are solved, and efficient and accurate middle partition wall construction is achieved. Ensures the continuity and appearance quality of concrete.

CN113700501BActive Publication Date: 2024-11-08CHINA MCC5 GROUP CORP LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202110973567.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-24
Publication Date
2024-11-08
Estimated Expiration
2041-08-24

AI Technical Summary

Technical Problem

During the construction of partition walls in the continuous arch tunnel, due to the small space, large number of formwork, complex assembly, many reinforcement support, large personnel safety risks, difficult to control the formwork joints, and difficult to guarantee the appearance quality of concrete.

Method used

Design a traction device including walking longitudinal beam, driving device, middle partition wall formwork, inner and outer end legs, support jack, formwork bracket and observation window. The driving connection between the walking longitudinal beam and the middle partition wall formwork is achieved to achieve the accuracy of the formwork. Move and use multiple times to reduce installation workload and ensure shape accuracy.

Benefits of technology

It improves the construction efficiency and accuracy of the middle partition wall, reduces construction difficulty and manual errors, shortens the construction cycle, and ensures the continuity and appearance quality of concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113700501B_ABST
    Figure CN113700501B_ABST
Patent Text Reader

Abstract

The present invention discloses a traction device for a partition wall template of a multi-arch tunnel and a method for using the same, comprising two walking longitudinal beams extending into the interior of the tunnel, a driving device arranged on the walking longitudinal beams, and two partition wall templates arranged between the two walking longitudinal beams and transmission-connected to the driving device, wherein a plurality of grouting holes are arranged on the partition wall template. The beneficial effects of the present invention are as follows: the present scheme uses the walking longitudinal beams as reference standards, so that the partition wall template moves along the walking longitudinal beams, and the installed partition wall template can be used multiple times, reducing the workload during the installation of the partition wall template, and the shape accuracy of the partition wall template before and after the change will not change, which can ensure that the shape accuracy of different positions of the same partition wall remains consistent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, in particular to a traction device for a partition wall template in a multi-arch tunnel and a use method thereof. Background Art

[0002] The construction of the middle partition wall is different from the construction of other projects on the ground. It is carried out in a relatively small space. The space left in the middle guide hole after removing the middle partition wall is relatively narrow. In addition, due to the high height of the middle partition wall, manual operation is difficult. There are many templates for pouring the middle partition wall, which is more complicated to assemble manually. There are many reinforcement support measures, more construction workers are needed, and it is labor-intensive and time-consuming. Workers need to pass through the reinforced support, which poses a greater safety risk. At the same time, the template joints are difficult to control, and there are many joints, which makes it difficult to plug leaks, and the appearance quality of the concrete is difficult to control. Summary of the invention

[0003] In order to overcome the deficiencies of the prior art, the object of the present invention is to provide a traction device for a partition wall formwork in a multi-arch tunnel and a method of using the same, so as to improve the construction efficiency and construction accuracy of the partition wall.

[0004] The present invention is achieved through the following technical scheme: a traction device for the middle partition wall formwork of a continuous arch tunnel, comprising two walking longitudinal beams extending into the interior of the tunnel, a driving device arranged on the walking longitudinal beams, and two middle partition wall formworks arranged between the two walking longitudinal beams and transmission-connected to the driving device, wherein a plurality of grouting holes are arranged on the middle partition wall formwork.

[0005] Furthermore, in order to better realize the present invention, an inner support leg is arranged below the end of the walking longitudinal beam located in the tunnel, the inner support leg is arranged on the middle partition wall that has been constructed, an outer support leg is arranged below the end of the walking longitudinal beam located outside the tunnel, and the walking longitudinal beam is arranged parallel to the tunnel ground.

[0006] Furthermore, in order to better implement the present invention, the two middle partition wall templates are symmetrically arranged, and an end surface supporting jack is arranged between the end surfaces of the two middle partition wall templates.

[0007] Furthermore, in order to better implement the present invention, a plurality of supporting jacks connected to the side of the tunnel are arranged on the outer side surface of the middle partition wall template.

[0008] Furthermore, in order to better implement the present invention, the supporting jack is rotatably connected to the middle partition wall template.

[0009] Furthermore, in order to better realize the present invention, a formwork bracket is slidably provided on the walking longitudinal beam, and a connecting jack is provided between the formwork bracket and the middle partition wall formwork.

[0010] Furthermore, in order to better implement the present invention, a plurality of observation windows are provided on the middle partition wall template.

[0011] Furthermore, in order to better realize the present invention, two grooves parallel to the walking longitudinal beams are arranged on the ground of the tunnel, and the middle partition wall template is slidably arranged in the grooves.

[0012] A method for using a traction device for a middle partition wall formwork of a multi-arch tunnel comprises installing a walking longitudinal beam inside the tunnel so that the walking longitudinal beam is parallel to the designed length direction of the middle partition wall, installing the middle partition wall formwork between two walking longitudinal beams and drivingly connected to a driving device on the walking longitudinal beam, casting the middle partition wall section by section using the space between the two middle partition wall formworks as the casting space, and using the end face of the middle partition wall of the first section that has been constructed as the end face formwork of the middle partition wall of the second section to be constructed.

[0013] The beneficial effects achieved by this scheme are: this scheme uses the walking longitudinal beam as a reference standard to enable the middle partition wall template to move along the walking longitudinal beam, and the installed middle partition wall template can be used multiple times, reducing the workload during the installation of the middle partition wall template, and the shape accuracy of the middle partition wall template before and after the movement will not change, which can ensure that the shape accuracy of different positions of the same middle partition wall remains consistent. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the end face of this scheme;

[0015] Figure 2 This is a schematic diagram of the structure of this scheme;

[0016] Among them, 1-middle partition wall formwork, 2-inner end support leg, 3-walking longitudinal beam, 4-formwork bracket, 5-support jack, 6-end face support jack, 7-wooden formwork, 8-outer end support leg, 9-observation window, 10-grouting hole, 11-driving device. DETAILED DESCRIPTION

[0017] The present invention is further described in detail below in conjunction with examples, but the embodiments of the present invention are not limited thereto.

[0018] Embodiment 1:

[0019] like Figure 1 , Figure 2 As shown, in this embodiment, a traction device for a partition wall formwork in a continuous arch tunnel includes two walking longitudinal beams 3 extending into the interior of the tunnel, a driving device 11 arranged on the walking longitudinal beams 3, and two partition wall formworks 1 arranged between the two walking longitudinal beams 3 and transmission-connected to the driving device 11, wherein a plurality of grouting holes 10 are arranged on the partition wall formwork 1.

[0020] When the middle partition wall is constructed, the middle partition wall end template is required. After the first section of the middle partition wall is constructed, the middle partition wall template 1 is driven by the driving device 11 to move along the length direction of the walking longitudinal beam 3, so that the end of the middle partition wall template 1 close to the middle partition wall does not separate from the middle partition wall. The end face of the middle partition wall that has been constructed can be used as the end face template of the middle partition wall to be constructed, and concrete is poured and grouting is performed from the grouting hole 10 to ensure the continuity of the middle partition wall, and the middle partition walls constructed in two sections can also be well connected together. The walking longitudinal beam 3 can limit the moving direction accuracy of the middle partition wall template 1, thereby controlling the position accuracy of the middle partition wall template 1.

[0021] When adopting this construction scheme, there is no need to repeatedly dismantle and install the middle partition wall template 1, which can reduce the construction difficulty, shorten the construction period, and enable the shape accuracy of the middle partition wall template 1 to remain consistent, which is conducive to improving construction accuracy and reducing the problem of poor construction accuracy caused by human errors.

[0022] In this embodiment, the driving device 11 is a traveling hoist.

[0023] In this embodiment, a wooden formwork 7 can also be installed between the middle partition wall formwork 1 and the tunnel.

[0024] Embodiment 2:

[0025] On the basis of the above embodiments, in this embodiment, an inner leg 2 is arranged below the end of the walking longitudinal beam 3 located in the tunnel, the inner leg 2 is arranged on the completed middle partition wall, an outer leg 8 is arranged below the end of the walking longitudinal beam 3 located outside the tunnel, and the walking longitudinal beam 3 is arranged parallel to the tunnel ground.

[0026] The inner leg 2 and the outer leg 8 are used to support the walking longitudinal beam 3, and the walking longitudinal beam 3 is kept at a certain height so as to reasonably utilize the remaining space inside the tunnel. The walking longitudinal beam 3 is arranged parallel to the tunnel ground so as to make the middle partition wall template 1 maintain its relative position accuracy with the tunnel.

[0027] Embodiment 3:

[0028] On the basis of the above-mentioned embodiment, in this embodiment, the two middle partition wall templates 1 are symmetrically arranged, and an end surface supporting jack 6 is arranged between the end surfaces of the two middle partition wall templates 1.

[0029] Using the end face supporting jacks 6 to support the end face of the middle partition wall template 1 is beneficial to keep the position accuracy between the two end faces of the middle partition wall template 1 unchanged, thereby avoiding affecting the position accuracy of other parts of the middle partition wall template 1.

[0030] Embodiment 4:

[0031] On the basis of the above-mentioned embodiment, in this embodiment, a plurality of supporting jacks 5 connected to the side of the tunnel are arranged on the outer surface of the middle partition wall formwork 1. When pouring concrete, the supporting jacks 5 are supported between the middle partition wall formwork 1 and the side of the tunnel, so as to improve the stability, rigidity and impact resistance of the middle partition wall formwork 1, avoid displacement or deformation of the middle partition wall formwork 1 under the impact of concrete, and ensure the pouring quality. When the middle partition wall formwork 1 needs to be moved, the supporting jacks 5 can be removed to facilitate the movement of the middle partition wall formwork 1.

[0032] In this embodiment, the support jack 5 is rotatably connected to the middle partition wall template 1. When support is needed, the support jack 5 is rotated to a suitable position, and then the piston rod of the support jack 5 is controlled to extend and abut against the side of the tunnel.

[0033] When the partition wall formwork 1 needs to be moved, the piston rod of the supporting jack 5 is retracted, and under the action of gravity, the supporting jack 5 rotates downward to a natural position. There is no need to repeatedly remove or install the supporting jack 5, making the construction more convenient.

[0034] Embodiment 5:

[0035] On the basis of the above embodiment, in this embodiment, a template support 4 is slidably provided on the walking longitudinal beam 3, and a connecting jack is provided between the template support 4 and the middle partition wall template 1. The connection position of the connecting jack and the middle partition wall template 1 is distributed in the middle position of the middle partition wall template 1, so that the middle position of the middle partition wall template 1 can be supported by the connecting jack, thereby improving the rigidity and stability of the middle position of the middle partition wall template 1, and avoiding deformation of the middle position of the middle partition wall template 1 and affecting the casting quality of the middle partition wall.

[0036] By using the formwork support 4 as the supporting basis, the distance between the middle partition wall formwork 1 and the supporting structure can be shortened, a smaller jack can be used, and the formwork support 4 can be slidably connected to the walking longitudinal beam 3. The formwork support 4 can move synchronously with the middle partition wall formwork 1, maintaining the relative position accuracy between the formwork support 4 and the middle partition wall formwork 1, and avoiding deformation of the middle partition wall formwork 1 during movement.

[0037] Embodiment 6:

[0038] On the basis of the above embodiment, in this embodiment, a plurality of observation windows 9 are provided on the middle partition wall template 1. The observation windows 9 are used to observe the pouring condition inside the middle partition wall template 1.

[0039] Embodiment 7:

[0040] On the basis of the above embodiment, in this embodiment, two grooves parallel to the walking longitudinal beam 3 are arranged on the ground of the tunnel, and the middle partition wall template 1 is slidably arranged in the grooves. The grooves can be used to limit the moving direction of the middle partition wall template 1. In addition, the rotational freedom of the middle partition wall template 1 can be limited to prevent the middle partition wall template 1 from deflecting with the tunnel length direction as the axis, thereby ensuring the position accuracy of the middle partition wall template 1.

[0041] In this embodiment, a roller that is rollingly connected to the groove can also be provided on the middle partition wall template 1 to reduce the resistance when the middle partition wall template 1 moves.

[0042] A braking structure for braking the rollers can also be provided on the middle partition wall formwork 1, so that when concrete needs to be poured, the rollers can be braked to prevent the middle partition wall formwork 1 from moving and affecting the pouring quality.

[0043] In this embodiment, other contents not described are the same as those in the above embodiment, and thus will not be described in detail.

[0044] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. A method for using a traction device for a partition wall formwork in a multi-arch tunnel, characterized in that: The traction device comprises two walking longitudinal beams (3) extending into the interior of the tunnel, a driving device (11) arranged on the walking longitudinal beams (3), and two intermediate partition wall templates (1) arranged between the two walking longitudinal beams (3) and drivingly connected to the driving device (11), wherein the intermediate partition wall templates (1) are provided with a plurality of grouting holes (10); An inner end support leg (2) is arranged below the end of the walking longitudinal beam (3) located inside the tunnel, and the inner end support leg (2) is arranged on the middle partition wall that has been constructed. An outer end support leg (8) is arranged below the end of the walking longitudinal beam (3) located outside the tunnel, and the walking longitudinal beam (3) is arranged parallel to the tunnel ground. The two middle partition wall templates (1) are symmetrically arranged, and an end face supporting jack (6) is arranged between the end faces of the two middle partition wall templates (1); The outer side surface of the intermediate partition wall template (1) is provided with a plurality of supporting jacks (5) connected to the side of the tunnel; The supporting jack (5) is rotatably connected to the middle partition wall template (1); A formwork support (4) is slidably arranged on the walking longitudinal beam (3), and a connecting jack is arranged between the formwork support (4) and the middle partition wall formwork (1); The middle partition wall template (1) is provided with a plurality of observation windows (9); Two grooves parallel to the walking longitudinal beam (3) are arranged on the ground of the tunnel, and the middle partition wall template (1) is slidably arranged in the grooves; The method comprises installing the walking longitudinal beam (3) inside the tunnel so that the walking longitudinal beam (3) is parallel to the designed length direction of the middle partition wall, installing the middle partition wall template (1) between the two walking longitudinal beams (3) and drivingly connected to the driving device (11) on the walking longitudinal beam (3), casting the middle partition wall section by section using the space between the two middle partition wall templates (1) as the casting space, and using the end face of the middle partition wall of the previous section that has been constructed as the end face template of the middle partition wall of the next section to be constructed.

Citation Information

Patent Citations

  • Tunnel inverted arch construction method adopting hydraulic arc-shaped formwork

    CN112943303A

  • Straight wall vault type open-cut tunnel main body construction movable formwork

    CN208844612U

  • Traction device for partition wall formwork in multi-arch tunnel

    CN216142760U

  • Tunnel lining method and lining apparatus

    JP2002242596A