A waterproof structure and construction method for a settlement joint in a waterproof area
By adopting a waterproof structure mainly for diversion in the settlement joint, using waterproof tape, diversion pipe and drainage riser combined with water stop nails and waterproof coatings, the problem of water accumulation in wet areas and water stop belts in traditional methods is solved. It achieves efficient waterproofing and construction stability.
Patent Information
- Application Number
- CN202111162240.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-30
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional settlement joint waterproofing method is prone to water accumulation in wet areas, resulting in water leakage, and the water stop zone is prone to displacement or breakage, affecting construction stability.
It adopts a waterproof structure mainly for diversion, including two waterproof tapes, horizontal diversion pipes and drainage risers. The seepage is discharged through directional diversion, and combined with water stop nails and waterproof coatings to form a sealed waterproof layer.
Effectively solve the problem of water leakage in the settlement joints in the wet area, improve the waterproofing effect, avoid water accumulation, and enhance the safety and stability of construction.
Smart Images

Figure CN113718973B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a settlement joint waterproof structure located in a waterproof area and a construction method. Background Art
[0002] During the decoration construction process of building projects, how to deal with the settlement joints between two buildings is a relatively important issue at present.
[0003] This article proposes a settlement joint method that is located in the waterproof area, which changes the traditional settlement joint method of mainly "blocking"; the new method is mainly based on dredging to avoid excessive water accumulation and reduce the chance of leakage from the settlement joint.
[0004] Settlement joints are located in wet areas where water consumption is large and frequent. Traditional methods are prone to water accumulation and slow evaporation. The new method is conductive and directional, safe and environmentally friendly, and can effectively solve the drainage problem of settlement joints in wet areas.
[0005] At present, the main methods of waterproofing settlement joints are:
[0006] The first type of settlement joint uses traditional buried waterstop to prevent water seepage and leakage in the settlement joint, and plays a certain role in tightening and sealing. However, the waterstop is relatively soft and easy to move or break. After filling the waterstop, the construction workers need to add hard foam or asphalt wood fiber board as caulking board above and below the circular holes of the waterstop. The waterstop is prone to displacement during the filling and pouring process.
[0007] The second method is a traditional blocking method, which is suitable for areas with low water consumption. It blocks the water flow and evaporates slowly. If the water consumption is large and drainage is frequent, water will easily accumulate and there will be no time for evaporation, resulting in leakage. In addition, this method pours concrete in the settlement joints, which will affect the release of vertical displacement. Summary of the invention
[0008] The present invention provides a waterproof structure for the settlement joints in the waterproof area, which mainly guides the water in a directional manner to discharge the seepage water, and can effectively solve the waterproof problem; solve the fundamental problem of water leakage in the settlement joints in the wet area; and overcome the defects of the prior art.
[0009] The present invention provides a settlement joint waterproof structure located in a waterproof area, comprising: two first waterproof tapes 10, a horizontal guide pipe 20, at least one drainage riser 30, and a second waterproof tape 40; the two first waterproof tapes 10 are symmetrically arranged; one first waterproof tape 10 is attached to the upper surface and the side surface of one side of the settlement joint F that has been treated, and the other first waterproof tape 10 is attached to the upper surface and the side surface of the other side of the settlement joint F that has been treated; the lower ends of the two first waterproof tapes 10 are exposed to the base layer 1 where the settlement joint F is located; Below; the horizontal drainage pipe 20 is arranged below the settlement joint F; the horizontal drainage pipe 20 has an opening, and the opening width of the horizontal drainage pipe 20 matches the width of the settlement joint F; two first waterproof tapes 10 are embedded in the inner wall of the horizontal drainage pipe 20 from the opening position; the drainage riser 30 is connected to the horizontal drainage pipe 20 and is sealed; the second waterproof tape 40 is attached to the outer wall of the horizontal drainage pipe 20, and the drainage riser 30 passes through the second waterproof tape 40; the second waterproof tape 40 is also attached to the lower surface of the base layer 1 where the settlement joint F is located.
[0010] Furthermore, the present invention provides a waterproof structure for a settlement joint located in a waterproof area, which may also have the following characteristics: each first waterproof tape 10 includes: a first horizontal section 11, a first vertical section 12 and a first arc section 13; one end of the first horizontal section 11 is vertically connected to the upper end of the first vertical section 12, and the upper end of the first arc section 13 is connected to the lower end of the first vertical section 12; the lower surface of the first horizontal section 11 of a first waterproof tape 10 is attached to the upper surface on the left side of the treated settlement joint F; the first vertical section 12 is attached to the left vertical surface of the treated settlement joint F; the first arc section 13 is exposed on the lower surface of the base layer 1; the lower surface of the first horizontal section 11 of another first waterproof tape 10 is attached to the upper surface on the right side of the treated settlement joint F; the first vertical section 12 is attached to the right vertical surface of the treated settlement joint F; the first arc section 13 is exposed on the lower surface of the base layer 1; the first arc sections 13 of the two first waterproof tapes 10 are arranged in an outer "eight" shape.
[0011] Furthermore, the present invention provides a waterproof structure for a settlement joint located in a waterproof area, which may also have the following characteristics: the cross-section of the horizontal guide pipe 20 is fan-shaped; the central angle of the fan-shape is greater than 180 degrees; and the shape of the fan-shape matches the shape of the first circular arc segment 13 of the two first waterproof tapes 10.
[0012] Furthermore, the present invention provides a waterproof structure of a settlement joint located in a waterproof area, which may also have the following characteristics: the second waterproof tape 40 includes: a second arc segment 41 and two horizontal wings 42; the second arc segment 41 matches the shape of the horizontal flow guide pipe 20; the two horizontal wings 42 are respectively located on both sides of the second arc segment 41, and are respectively connected to the two ends of the second arc segment 41, so that the second waterproof tape 40 is in an inverted "Ω" shape; at least one or more avoidance holes 41A are provided on the second arc segment 41, and the positions and numbers of the avoidance holes correspond one-to-one to the drainage riser 30; the drainage riser 30 passes through the second waterproof tape 40 from the position of the avoidance holes 41A.
[0013] Furthermore, the present invention provides a waterproof structure of a settlement joint located in a waterproof area, which may also have the following characteristics: it also includes a plurality of pairs of waterstop nails 50; two rows of waterstop nails 50 are driven into the position where the second waterproof tape 40 adheres to the lower surface of the base layer 1.
[0014] In addition, the present invention provides a construction method for a settlement joint waterproof structure in a waterproof area, comprising the following steps:
[0015] Step A, installing the first waterproof tape 10 on the treated settlement joint F; one first waterproof tape 10 is attached to the upper surface and side surface of one side of the treated settlement joint F, and another first waterproof tape 10 is attached to the upper surface and side surface of the other side of the treated settlement joint F; the lower ends of the two first waterproof tapes 10 are exposed below the base layer 1 where the settlement joint F is located.
[0016] Step B: two first waterproof tapes 10 are embedded into the inner wall of the horizontal flow guide pipe 20 from the opening position thereof.
[0017] Step C: The drainage riser 30 is connected to the horizontal flow guide pipe 20 and sealed.
[0018] Step D: The second waterproof tape 40 is attached to the outer wall of the horizontal guide pipe 20, and the drainage riser 30 passes through the second waterproof tape 40; the second waterproof tape 40 is also attached to the lower surface of the base layer 1 where the settlement joint F is located.
[0019] Furthermore, the present invention provides a construction method for a waterproof structure of a settlement joint located in a waterproof area, which may also have the following characteristics: it also includes step E; driving two rows of water-stopping nails 50 into the position where the second waterproof tape 40 adheres to the lower surface of the base layer 1.
[0020] Furthermore, the present invention provides a construction method for a waterproof structure of a settlement joint located in a waterproof area, which may also have the following characteristics: before step A, it also includes a preparation step: cleaning the base layer 1 where the settlement joint F is located, repairing and cleaning the settlement joint F, and preparing a ground leveling layer 1a for the unevenness in the joint; preparing a ground protection layer 1b on the ground leveling layer 1a; and sticking a first waterproof tape 10 on the ground protection layer 1b.
[0021] Furthermore, the present invention provides a construction method for a waterproof structure of a settlement joint located in a waterproof area, which may also have the following characteristics: it also includes step F; applying a waterproof coating on the ground protection layer 1b on both sides of the settlement joint F to form a waterproof layer 61; after the waterproof layer 61 is completed, preparing a waterproof protective layer 62 on top of the waterproof layer 61 with a slope of 2%-5%.
[0022] Furthermore, the present invention provides a construction method for a waterproof structure of a settlement joint located in a waterproof area, which may also have the following characteristics: it also includes step G; installing an anti-slip cover assembly above the settlement joint F. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a cross-sectional view of the settlement joint waterproofing structure in the waterproofing area at the drainage riser position.
[0024] Figure 2 is a cross-sectional view of the first waterproof tape.
[0025] Figure 3 It is a cross-sectional view of the horizontal diversion pipe at the drainage riser position.
[0026] Figure 4 It is a cross-sectional view of the second waterproof tape at the drainage riser position.
[0027] Figure 5 It is a structural schematic diagram of the anti-slip cover assembly. DETAILED DESCRIPTION
[0028] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0029] Example
[0030] like Figure 1 As shown, in this embodiment, the waterproof structure of the settlement joint located in the waterproof area includes: two first waterproof tapes 10, a horizontal guide pipe 20, at least one drainage riser 30, a second waterproof tape 40 and a plurality of pairs of water stop nails 50.
[0031] Before laying the first waterproof tape 10, the base layer 1 where the settlement joint F is located should be cleaned, the settlement joint F should be chiseled and cleaned first, and the ground leveling layer 1a should be prepared in advance with cement mortar for the unevenness in the joint. A ground protection layer 1b is prepared on the ground leveling layer 1a.
[0032] In this embodiment, the first waterproof tape 10 is a butyl waterproof tape. Two first waterproof tapes 10 are symmetrically arranged. Each first waterproof tape 10 includes: a first horizontal section 11, a first vertical section 12 and a first arc section 13; of course, the three are a whole. One end of the first horizontal section 11 is vertically connected to the upper end of the first vertical section 12, and the upper end of the first arc section 13 is connected to the lower end of the first vertical section 12.
[0033] The lower surface of the first horizontal section 11 of a first waterproof tape 10 is attached to the upper surface of the left side of the processed settlement joint F, that is, attached to the left horizontal ground protection layer 1b. The first vertical section 12 is attached to the left vertical surface of the processed settlement joint F, that is, attached to the left vertical ground protection layer 1b. The first arc section 13 is exposed on the lower surface of the base layer 1.
[0034] The lower surface of the first horizontal section 11 of another first waterproof tape 10 is attached to the upper surface of the right side of the treated settlement joint F, that is, attached to the right horizontal ground protection layer 1b. The first vertical section 12 is attached to the right vertical surface of the treated settlement joint F, that is, attached to the right vertical ground protection layer 1b. The first arc section 13 is exposed on the lower surface of the base layer 1.
[0035] The two first waterproof tapes 10 are symmetrically arranged. The first arc segments 13 of the two first waterproof tapes 10 are arranged in an outer "eight" shape.
[0036] In this embodiment, the horizontal flow guide pipe 20 is a PVC pipe with a fan-shaped cross section, and the central angle of the fan-shaped pipe is greater than 180 degrees, preferably 225 degrees to 270 degrees. The fan-shaped shape matches the shape of the first arc segments 13 of the two first waterproof tapes 10. The opening width of the horizontal flow guide pipe 20 matches the width of the settlement joint F.
[0037] The horizontal flow guide pipe 20 is located below the base layer 1 where the settlement joint F is located, and the first arc segments 13 of the two first waterproof tapes 10 are respectively embedded into the inner wall of the horizontal flow guide pipe 20 from the opening of the horizontal flow guide pipe 20 .
[0038] In this embodiment, the drainage riser 30 is also a PVC pipe. The drainage riser 30 is set in the horizontal flow guide pipe 20 as needed. The drainage riser 30 is connected to the horizontal flow guide pipe 20 and is sealed. The bottom of the drainage riser 30 is connected to the drain port or drainage pipe so that the seepage water enters the water pipe and flows to the drain port. Of course, according to the length of the base 1 where the settlement joint F is located, multiple drainage risers 30 can be set at intervals.
[0039] The second waterproof tape 40 includes: a second arc segment 41 and two horizontal wings 42, which are an integral whole. The second arc segment 41 matches the shape of the horizontal flow guide pipe 20. The two horizontal wings 42 are respectively located on both sides of the second arc segment 41 and are respectively connected to the two ends of the second arc segment 41, so that the second waterproof tape 40 is in an inverted "Ω" shape. At least one or more avoidance holes 41A are provided on the second arc segment 41, and the positions and quantities correspond to the drainage riser 30 one by one.
[0040] The second arc segment 41 of the second waterproof tape 40 is pasted on the outer wall of the horizontal guide pipe 20, and the drainage riser 30 passes through the avoidance hole 41A. The two horizontal wings 42 of the second waterproof tape 40 are respectively pasted on the lower surface of the base layer 1 where the settlement joint F is located.
[0041] Two rows of water-stopping nails 50 are driven from bottom to top at the positions of the two horizontal wings 42 of the second waterproof tape 40. Each water-stopping nail 50 penetrates the horizontal wing 42 and the lower surface of the base layer 1 above the horizontal wing 42 to play a role of fixing and water-stopping.
[0042] In this embodiment, the waterproof structure of the settlement joint in the waterproof area also includes: a waterproof layer 61 and a waterproof protective layer 62. A waterproof coating is applied on the ground protective layer 1b on both sides of the settlement joint F to form a waterproof layer 61. After the waterproof layer 61 is completed, a waterproof protective layer 62 is prepared on the waterproof layer 61 with a slope of 2%-5%. In this embodiment, a slope of 3% is preferably selected.
[0043] In this embodiment, the waterproof structure of the settlement joint located in the waterproof area further includes: an anti-slip cover assembly 70. The anti-slip cover assembly is installed above the settlement joint F.
[0044] Figure 5 The anti-slip cover assembly 70 includes: a long strip bottom plate 71 , two left and right long strip side plates 72 , two sliding blocks 77 , a long strip cover plate 73 , and fixing bolts 74 .
[0045] The long strip bottom plate 71 is provided with slide grooves symmetrically on the left and right. The lower ends of the two sliders 77 are embedded in the slide grooves of the bottom plate 71 and can move left and right in the slide grooves. The upper ends of the two sliders 77 are respectively fixed under the two side plates 72, so as to realize the sliding connection between the side plates 72 and the bottom plate 71. The bottom surfaces of the two side plates 72 are respectively arranged on the waterproof protective layer 62 of the settlement joint F. The lower bottom surface of the cover plate 73 is attached to the upper surface of the two side plates 72. The center position of the bottom plate 71 has a fixed internal thread 71A. The fixing bolt 74 passes through the top of the cover plate 73 and engages with the fixed internal thread of the bottom plate 71.
[0046] In this embodiment, a first sealing gasket 75 is disposed between the bottom surface of the two side panels 72 and the waterproof protective layer 62. A second sealing gasket 76 is disposed between the inner wall of the two side panels 72 and the cover plate 73. Figure 1 shown.
[0047] In this embodiment, the cover plate 73 is provided with at least one dredging hole at a set position, and a dredging cover is provided on the drainage hole. If the settlement joint F passes through the kitchen, water will definitely seep into the ground due to the large water consumption in the kitchen, and the seepage water will flow into the horizontal guide pipe 20 and the drainage riser 30 through the slope of the waterproof protective layer, and be directly discharged from the drain port. The dredging hole and dredging cover on the cover plate 73 facilitate the dredging of the drainage riser 30 in the later stage.
[0048] The waterproof construction method of the settlement joint located in the waterproof area includes the following steps:
[0049] Preparation steps: Before construction, the base layer 1 must be cleaned first, and the settlement joints F should be chiseled and cleaned first. For the unevenness in the joints, a ground leveling layer 1a should be prepared in advance with 1:1 cement mortar. A ground protection layer 1b should be prepared on the ground leveling layer 1a.
[0050] Step A: After the base layer 1 is cleaned and the mortar of the ground protection layer 1b has sufficient strength, the first waterproof tape 10 is installed.
[0051] The lower surface of the first horizontal section 11 of a first waterproof tape 10 is attached to the upper surface of the left side of the processed settlement joint F, that is, attached to the left horizontal ground protection layer 1b. The first vertical section 12 is attached to the left vertical surface of the processed settlement joint F, that is, attached to the left vertical ground protection layer 1b. The first arc section 13 is exposed on the lower surface of the base layer 1.
[0052] The lower surface of the first horizontal section 11 of another first waterproof tape 10 is attached to the upper surface of the right side of the treated settlement joint F, that is, attached to the right horizontal ground protection layer 1b. The first vertical section 12 is attached to the right vertical surface of the treated settlement joint F, that is, attached to the right vertical ground protection layer 1b. The first arc section 13 is exposed on the lower surface of the base layer 1.
[0053] The two first waterproof tapes 10 are symmetrically arranged. The first arc segments 13 of the two first waterproof tapes 10 are arranged in an "eight" shape. Since the butyl waterproof tape is a flexible product, it has strong plasticity, can withstand a certain degree of deformation, has a long service life, and has good corrosion resistance.
[0054] Step B: Install the horizontal flow guide pipe 20 at the lower part of the base layer 1 of the settlement joint F, and embed the first arc segments 13 of the two first waterproof tapes 10 into the inner wall of the horizontal flow guide pipe 20 from the opening of the horizontal flow guide pipe 20 respectively.
[0055] Step C: The horizontal flow guide pipe 20 is provided with a drainage riser 30 at intervals. The drainage riser 30 is communicated with the horizontal flow guide pipe 20 and is sealed. The bottom of the drainage riser 30 is communicated with a drainage port or a drainage pipe.
[0056] Step D: The second arc segment 41 of the second waterproof tape 40 is pasted on the outer wall of the horizontal guide pipe 20, and the drainage riser 30 passes through the avoidance hole. The two horizontal wings 42 of the second waterproof tape 40 are respectively pasted on the lower surface of the base layer 1 where the settlement joint F is located.
[0057] Step E: drive two rows of water-stopping nails 50 from bottom to top at the positions of the two horizontal wings 42 of the second waterproof tape 40 , and each water-stopping nail 50 penetrates the horizontal wing 42 and the lower surface of the base layer 1 above the horizontal wing 42 .
[0058] Step F: Apply waterproof coating on the ground protection layer 1b on both sides of the settlement joint F to form a waterproof layer 61. After the waterproof layer 61 is completed, a waterproof protection layer 62 is prepared on the waterproof layer 61 with a slope of 2%-5%. In this embodiment, the slope is preferably 3%.
[0059] Step G: Install the anti-slip cover assembly above the settlement joint F.
[0060] Step G-1: a first sealing gasket 75 is disposed on each of the waterproof protective layers 62 on both sides of the settlement joint F.
[0061] Step G-2, place the bottom plate 71 directly above the settlement gap F, press the two side plates 72 on the first sealing gaskets 75 provided on both sides of the settlement gap F respectively, and adjust the relative position of the side plates 72 and the bottom plate 71 to adapt to different settlement gaps F.
[0062] Step G-3: Press the lower bottom of the cover plate 73 onto the upper surfaces of the two side plates 72, and pass the fixing bolts 74 through the top of the cover plate 73 and engage with the fixing internal threads of the bottom plate 71 to fix the two.
[0063] Step G-4: a second sealing gasket 76 is disposed between the inner walls of the two side plates 72 and the cover plate 73 .
[0064] Step G-5: Cover the dredging cover on the dredging hole of the cover plate 73.
[0065] Finally, tiles 80 or other floor finishing surfaces are laid on the waterproof protective layer 62 around the anti-slip cover assembly 70 .
[0066] The embodiments described above are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0067] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by the terms "up", "down", "left", "right", "inside", "outside", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
Claims
1. A waterproof structure of a settlement joint located in a waterproof area, Features: It comprises two first waterproof tapes (10), a horizontal flow guide pipe (20), at least one drainage riser (30), and a second waterproof tape (40); Two first waterproof tapes (10) are symmetrically arranged; A first waterproof tape (10) is attached to the upper surface and the side surface of one side of the treated settlement joint (F), and another first waterproof tape (10) is attached to the upper surface and the side surface of the other side of the treated settlement joint (F); the lower ends of the two first waterproof tapes (10) are exposed below the base layer (1) where the settlement joint (F) is located; The horizontal flow guide pipe (20) is arranged below the settlement joint (F); the horizontal flow guide pipe (20) has an opening, and the width of the opening of the horizontal flow guide pipe (20) matches the width of the settlement joint (F); two first waterproof adhesive tapes (10) are embedded in the inner wall of the horizontal flow guide pipe (20) from the opening position thereof; The drainage riser (30) is in communication with the horizontal flow guide pipe (20) and is sealedly connected; The second waterproof tape (40) is attached to the outer wall of the horizontal flow guide pipe (20), and the vertical drainage pipe (30) passes through the second waterproof tape (40); the second waterproof tape (40) is also attached to the lower surface of the base layer (1) where the settlement joint (F) is located; Each first waterproof adhesive tape (10) comprises: a first horizontal section (11), a first vertical section (12) and a first arc section (13); One end of the first horizontal section (11) is vertically connected to the upper end of the first vertical section (12), and the upper end of the first arc section (13) is connected to the lower end of the first vertical section (12); The lower surface of a first horizontal section (11) of a first waterproof tape (10) is attached to the upper surface of the left side of the treated settlement joint (F); the first vertical section (12) is attached to the vertical surface of the left side of the treated settlement joint (F); and the first arc section (13) is exposed on the lower surface of the base layer (1); The lower surface of the first horizontal section (11) of another first waterproof tape (10) is attached to the upper surface of the right side of the treated settlement joint (F); the first vertical section (12) is attached to the vertical surface of the right side of the treated settlement joint (F); and the first arc section (13) is exposed on the lower surface of the base layer (1); The first arc sections (13) of the two first waterproof adhesive tapes (10) are arranged in an outward "eight" shape; The cross section of the horizontal flow guide pipe (20) is fan-shaped; the central angle of the fan-shaped circle is greater than 180 degrees; and the shape of the fan-shaped circle matches the shape of the first arc segments (13) of the two first waterproof adhesive tapes (10); The second waterproof tape (40) comprises: a second circular arc segment (41) and two horizontal wings (42); The second arc segment (41) matches the shape of the horizontal flow guide pipe (20); the two horizontal wings (42) are respectively located on both sides of the second arc segment (41) and are respectively connected to the two ends of the second arc segment (41), so that the second waterproof tape (40) is in an inverted "Ω" shape; At least one or more avoidance holes (41A) are provided on the second arc segment (41), and the positions and number of the avoidance holes correspond one-to-one with the drainage riser (30); the drainage riser (30) passes through the second waterproof tape (40) from the position of the avoidance holes (41A); Wherein, the waterproof structure of the settlement joint located in the waterproof area further comprises: an anti-slip cover component (70) installed above the settlement joint (F); The anti-slip cover assembly (70) comprises: an elongated bottom plate (71), two left and right elongated side plates (72), two sliders (77), an elongated cover plate (73), and fixing bolts (74); the elongated bottom plate (71) is symmetrically provided with sliding grooves, the lower ends of the two sliders (77) are embedded in the sliding grooves of the bottom plate (71) and can move left and right in the sliding grooves, the upper ends of the two sliders (77) are respectively fixed below the two side plates (72), so as to realize the sliding connection between the side plates (72) and the bottom plate (71), the bottom surfaces of the two side plates (72) are respectively arranged on the waterproof protective layer (63) of the settlement joint (F), the lower bottom surface of the cover plate (73) is attached to the upper surfaces of the two side plates (72), the center position of the bottom plate (71) has a fixed internal thread (71A), and the fixing bolt (74) passes through the top of the cover plate (73) and meshes with the fixed internal thread of the bottom plate (71).
2. The waterproof structure of the settlement joint in the waterproof area as claimed in claim 1, Features: It also includes a plurality of pairs of water-stopping nails (50); two rows of water-stopping nails (50) are driven into the position where the second waterproof tape (40) is attached to the lower surface of the base layer (1).
3. A construction method for the waterproof structure of the settlement joint in the waterproof area as claimed in claim 1, Features: The following steps are involved: Step A, installing a first waterproof tape (10) on the treated settlement joint (F); A first waterproof tape (10) is attached to the upper surface and the side surface of one side of the treated settlement joint (F), and another first waterproof tape (10) is attached to the upper surface and the side surface of the other side of the treated settlement joint (F); the lower ends of the two first waterproof tapes (10) are exposed below the base layer (1) where the settlement joint (F) is located; Step B, two first waterproof tapes (10) are embedded into the inner wall of the horizontal flow guide pipe (20) from the opening position thereof; Step C, the drainage riser (30) is connected to the horizontal flow guide pipe (20) and sealed; Step D: The second waterproof tape (40) is adhered to the outer wall of the horizontal guide pipe (20), and the vertical drainage pipe (30) passes through the second waterproof tape (40); the second waterproof tape (40) is also adhered to the lower surface of the base layer (1) where the settlement joint (F) is located.
4. The construction method of the waterproof structure of the settlement joint in the waterproof area as claimed in claim 3, Features: Also includes step E; Step E: driving two rows of water-stopping nails (50) into the position where the second waterproof tape (40) is attached to the lower surface of the base layer (1).
5. The construction method of the waterproof structure of the settlement joint in the waterproof area as claimed in claim 3, Features: Before step A, there are also preparation steps: Preparation steps: cleaning the base layer (1) where the settlement joint (F) is located, chiseling and cleaning the settlement joint (F), and preparing a ground leveling layer (1a) for the unevenness in the joint; preparing a ground protection layer (1b) on the ground leveling layer (1a); The first waterproof tape (10) is attached to the ground protection layer (1b).
6. The construction method of the waterproof structure of the settlement joint in the waterproof area as claimed in claim 5, Features: Also comprising step F; Step F, coating a waterproof coating on the ground protection layer (1b) on both sides of the settlement joint (F) to form a waterproof layer (61); After the waterproof layer (61) is completed, a waterproof protective layer (62) is prepared on the waterproof layer (61) with a slope of 2%-5%.
7. The construction method of the waterproof structure of the settlement joint in the waterproof area as claimed in claim 3, Features: Also comprising step G; Step G: Install the anti-slip cover assembly above the settlement joint (F).