Multi-section type vacuum glue filling method and system
Through the multi-stage vacuum glue filling method and system, the internal glue of the battery is adjusted according to different vacuum degrees and glue filling speeds, which solves the problem that the existing technology cannot meet the underwater battery glue filling process, and realizes that the battery is more stable and safe underwater use.
Patent Information
- Application Number
- CN202411550375.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2025-01-03
AI Technical Summary
The existing vacuum glue filling technology cannot be flexibly adjusted according to different vacuum degrees and glue filling speeds, and cannot meet the glue filling process needs of underwater battery products, resulting in safety and waterproofing problems when used underwater.
The multi-stage vacuum glue filling method and system are adopted to control the metering module, mixing module, vacuum module and glue filling module through the PLC controller to realize the allocation of different vacuum degrees and glue filling speeds, ensuring that the internal glue of the battery is bubble-free. Fully wrap the battery module to reduce the amount of error.
It realizes a more stable and safe use of the battery underwater, ensures that the battery module is not eroded by water, reduces the amount of internal glue, and improves the safety and waterproofness of underwater use.
Smart Images

Figure CN119237256A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vacuum glue pouring, and in particular to a multi-stage vacuum glue pouring method and system. Background Art
[0002] The glue pouring device is an automated machine that controls the colloid and drips, covers, and pours the colloid on the surface or inside of the product. It can improve the insulation level, waterproof level, electrical performance, mechanical performance, and reduce temperature rise of the product.
[0003] In the production process of new energy batteries, as battery module technology becomes increasingly mature, the battery module glue filling process is becoming more and more mature. The existing vacuum glue filling is based on the change of cavity vacuum degree, and it is impossible to achieve glue filling processes with different vacuums and different glue filling speeds, and it cannot meet the glue filling process of underwater battery products.
[0004] Therefore, it is necessary to provide a multi-stage vacuum glue filling method and system. Summary of the invention
[0005] The present invention provides a multi-stage vacuum glue filling method and system, which adopts multi-stage setting of different vacuum and different glue filling speeds to fill the battery, so that there are no bubbles in the glue inside the battery, so that the battery module can be fully wrapped, the battery module will not be corroded by water, and the battery can be more stable and safer underwater. According to the same volume of inner cavity, multiple vacuum and multiple glue filling speeds are performed to adjust the glue filling by themselves, reduce the error amount, so that there will be no voids in the glue inside the product, and solve the safety and waterproofness of battery use underwater.
[0006] The present invention provides a multi-stage vacuum glue pouring method, comprising:
[0007] The first colloid and the second colloid are added into their corresponding tanks respectively, and the metering module is controlled by the PLC controller to meter the first colloid and the second colloid in the tanks;
[0008] Using a PLC controller, controlling a colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid;
[0009] Use the PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber;
[0010] Use the PLC controller to control the glue quantity module and control the glue quantity of the mixed colloid;
[0011] The PLC controller is used to control the glue filling module and the three-axis servo robot in the vacuum chamber to fill the mixed colloid after the glue quantity is controlled into the battery to be filled with glue.
[0012] Furthermore, the PLC controller is used to control the metering module to meter the first colloid and the second colloid in the tank, including:
[0013] A metering module is configured, and the metering module includes a pressure sensor module and a gear sensor module; the pressure sensor module is configured on the tank body corresponding to the first colloid, and the gear sensor module is configured on the tank body corresponding to the second colloid;
[0014] Using a pressure sensor module and a PLC controller to achieve metering of the first colloid;
[0015] The second colloid is metered by using a gear sensor module and a PLC controller.
[0016] Furthermore, the pressure sensor module and the PLC controller are used to achieve metering of the first colloid, including:
[0017] Using a pressure sensor module to obtain pressure data in a tank corresponding to the first colloid;
[0018] The pressure data is obtained by using a PLC controller, and the pressure data is compared with the set pressure threshold data. According to the first comparison result, a first control command is generated, and according to the first control command, the glue output of the tank corresponding to the first colloid is controlled to achieve the metering of the first colloid.
[0019] Furthermore, the gear sensor module and the PLC controller are used to achieve metering of the second colloid, including:
[0020] Using the gear sensor module to obtain the gear speed data in the tank corresponding to the second colloid;
[0021] The gear speed data is obtained by using a PLC controller, and a second comparison is performed between the gear speed data and the set gear speed threshold data. A second control command is generated according to the second comparison result, and according to the second control command, the glue output of the tank corresponding to the second colloid is controlled to achieve metering of the second colloid.
[0022] Further, a PLC controller is used to control a colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid, including:
[0023] Set the dispensing parameters, height parameters, stirring parameters and stirring temperature; dispensing parameters include dispensing speed and dispensing time;
[0024] Using a PLC controller, the dispensing speed and dispensing time of the first colloid and the second colloid are controlled according to dispensing parameters;
[0025] Using a PLC controller, according to a height parameter, the total amount of the first colloid and the second colloid injected into the colloid mixing module is controlled;
[0026] The first colloid and the second colloid injected into the colloid mixing module are stirred and mixed according to the stirring parameters and the stirring temperature by using the PLC controller to obtain a mixed colloid.
[0027] Furthermore, the PLC controller is used to control the vacuum module to control the vacuum degree of the vacuum chamber, including:
[0028] Set the negative pressure values that the vacuum chamber needs to reach;
[0029] The PLC controller is used to control the vacuum module to control the vacuum degree of the vacuum chamber according to the negative pressure value.
[0030] Furthermore, the PLC controller is used to control the glue filling module and the three-axis servo manipulator in the vacuum chamber to fill the mixed colloid after the glue quantity is controlled into the glue-filled battery, including:
[0031] Using the PLC controller, under different glue filling requirements and vacuum conditions, the three-axis servo manipulator in the vacuum chamber is controlled to align the glue filling module with the position of the battery to be filled with glue, and then the mixed colloid after the glue amount is controlled is continuously poured into the battery to be filled with glue;
[0032] Among them, different glue pouring requirements and vacuum conditions include: first controlling the vacuum module to control the vacuum degree of the vacuum chamber body, and then implementing glue pouring; after completing the glue pouring, control the vacuum module to control the vacuum degree of the vacuum chamber body; not controlling the vacuum module to control the vacuum degree of the vacuum chamber body, and only implementing glue pouring; while controlling the vacuum module to control the vacuum degree of the vacuum chamber body, implement glue pouring simultaneously.
[0033] Furthermore, when the vacuum module is controlled to control the vacuum degree of the vacuum chamber, glue pouring is simultaneously performed, including:
[0034] When the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach a set negative pressure value, the battery to be filled with glue is filled in multiple stages at the same filling speed;
[0035] When the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach a set negative pressure value, the battery to be filled with glue is filled in multiple stages according to different filling speeds;
[0036] Under the condition that the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach multiple set negative pressure values, the batteries to be filled are filled with glue at the same filling speed;
[0037] Under the condition that the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach the set multiple negative pressure values, the batteries to be filled are filled with glue at different filling speeds.
[0038] Furthermore, it also includes: using the configured glue pouring process monitoring component to monitor the glue pouring process, and feeding back the monitoring results to the glue pouring implementation process to adjust the glue pouring strategy and glue pouring speed of the glue pouring implementation; specifically:
[0039] A monitoring component is configured to monitor the glue pouring process; the monitoring component includes an irradiation light source, a camera and a processor; the irradiation light source is used to irradiate the colloid poured into the vacuum chamber in real time, the camera is used to collect and obtain the colloid image on the pouring surface layer of the colloid under the irradiation light source in real time; the processor is used to extract the characteristic information of the colloid image;
[0040] According to different glue filling requirements and vacuum conditions, set several glue filling monitoring sequence time points;
[0041] According to the implementation process of multi-stage glue pouring, several glue pouring progress position monitoring surfaces are set;
[0042] Based on the glue filling monitoring sequence time points and the glue filling progress position monitoring surface, the monitoring component is used to monitor and obtain the characteristic information of multiple corresponding colloid images;
[0043] Match the characteristic information with the set standard characteristic information. If there is a mismatch in the parameter matching, take corresponding measures.
[0044] The response process includes: if the parameter matching inconsistency occurs at the glue filling monitoring sequence time point, the parameter values at multiple future moments are predicted based on the LSTM neural network model. If the prediction result shows that the parameter matching inconsistency still exists at the first N moments in the future, the glue filling is stopped; if the prediction result shows that the parameter matching inconsistency no longer exists at the first N moments in the future, the glue filling is continued; N is the set time threshold;
[0045] If the inconsistent parameter matching occurs on the glue pouring progress position monitoring surface, the glue pouring speed is increased or decreased according to the set adjustment range; wherein, the adjustment range is obtained by: using the set glue pouring implementation simulation working model to simulate the glue pouring process and obtain simulation implementation data; according to the simulation implementation data, the adjustment range of the glue pouring speed is set.
[0046] A multi-stage vacuum glue filling system, comprising:
[0047] A colloid metering module is used to add the first colloid and the second colloid into their corresponding tanks respectively, and use a PLC controller to control the metering module to meter the first colloid and the second colloid in the tanks;
[0048] The colloid mixing module is used to control the colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid by using a PLC controller;
[0049] The colloid filling implementation module is used to use the PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber; control the glue quantity module to control the glue quantity of the mixed colloid; control the glue filling module and the three-axis servo robot in the vacuum chamber to fill the mixed colloid after glue quantity control into the battery to be filled.
[0050] Compared with the prior art, the present invention has the following advantages and beneficial effects: the battery is glued by adopting a multi-stage method of setting different vacuums and different glue filling speeds, so that there are no bubbles in the glue inside the battery, so that the battery module can be fully wrapped, and the battery module will not be corroded by water, making the battery more stable and safer underwater. According to the same volume of inner cavity, multiple vacuums and multiple glue filling speeds are performed to adjust the glue filling by themselves, reducing the error amount, so that there will be no voids in the glue inside the product, thereby solving the safety and waterproofness of using batteries underwater.
[0051] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description and the accompanying drawings.
[0052] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0054] Figure 1 It is a schematic diagram of the steps of a multi-stage vacuum glue filling method;
[0055] Figure 2 A schematic diagram of the method steps for controlling the metering module to meter the first colloid and the second colloid in the tank using a PLC controller;
[0056] Figure 3 The figure is a schematic diagram of the structure of a multi-stage vacuum glue filling system. DETAILED DESCRIPTION
[0057] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0058] The present invention provides a multi-stage vacuum glue pouring method, such as Figure 1 As shown, including:
[0059] The first colloid and the second colloid are added into their corresponding tanks respectively, and the metering module is controlled by the PLC controller to meter the first colloid and the second colloid in the tanks;
[0060] Using a PLC controller, controlling a colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid;
[0061] Use the PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber;
[0062] Use the PLC controller to control the glue quantity module and control the glue quantity of the mixed colloid;
[0063] The PLC controller is used to control the glue filling module and the three-axis servo robot in the vacuum chamber to fill the mixed colloid after the glue quantity is controlled into the battery to be filled with glue.
[0064] The working principle of the above technical scheme is as follows: in order to realize a multi-stage vacuum glue filling method, the present invention first adds the first colloid and the second colloid into their respective corresponding tank bodies, and uses a PLC controller to control the metering module to meter the first colloid and the second colloid in the tank body; then uses the PLC controller to control the colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid; uses the PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber body; uses the PLC controller to control the glue amount module to control the glue amount of the mixed colloid; finally, uses the PLC controller to control the glue filling module and the three-axis servo manipulator in the vacuum chamber body to fill the mixed colloid after glue amount control into the glue filling battery.
[0065] The beneficial effect of the above technical solution is: adopting the solution provided by this embodiment, by adopting a multi-stage method to set different vacuums and different glue filling speeds to fill the battery, there will be no bubbles in the glue inside the battery, so that the battery module can be fully wrapped, and the battery module will not be corroded by water, making the battery more stable and safer underwater. According to the same volume of the inner cavity, multiple vacuums and multiple glue filling speeds can be used to adjust the glue filling by themselves, reducing the error amount, so that there will be no voids in the glue inside the product, thereby solving the safety and waterproofness of using batteries underwater.
[0066] In one embodiment, Figure 2As shown, a PLC controller is used to control the metering module to meter the first colloid and the second colloid in the tank, including:
[0067] A metering module is configured, and the metering module includes a pressure sensor module and a gear sensor module; the pressure sensor module is configured on the tank body corresponding to the first colloid, and the gear sensor module is configured on the tank body corresponding to the second colloid;
[0068] Using a pressure sensor module and a PLC controller to achieve metering of the first colloid;
[0069] The second colloid is metered by using a gear sensor module and a PLC controller.
[0070] The working principle of the above technical solution is: in order to realize the metering of the first colloid and the second colloid in the tank body, the present invention first configures a metering module, and the metering module includes a pressure sensor module and a gear sensor module; the pressure sensor module is configured on the tank body corresponding to the first colloid, and the gear sensor module is configured on the tank body corresponding to the second colloid; then the pressure sensor module and the PLC controller are used to realize the metering of the first colloid; the gear sensor module and the PLC controller are used to realize the metering of the second colloid.
[0071] The beneficial effect of the above technical solution is: by adopting the solution provided in this embodiment, by configuring the metering module, using the pressure sensor module and the gear sensor module in combination with the PLC controller, the metering of the first colloid and the second colloid in the tank can ensure the accuracy of the metering.
[0072] In one embodiment, the pressure sensor module and the PLC controller are used to achieve metering of the first colloid, including:
[0073] Using a pressure sensor module to obtain pressure data in a tank corresponding to the first colloid;
[0074] The pressure data is obtained by using a PLC controller, and the pressure data is compared with the set pressure threshold data. According to the first comparison result, a first control command is generated, and according to the first control command, the glue output of the tank corresponding to the first colloid is controlled to achieve the metering of the first colloid.
[0075] The working principle of the above technical solution is: in order to achieve the metering of the first colloid, the present invention first uses the pressure sensor module to obtain the pressure data in the tank body corresponding to the first colloid; then uses the PLC controller to obtain the pressure data, and performs a first comparison between the pressure data and the set pressure threshold data, and generates a first control command according to the first comparison result, and according to the first control command, controls the glue output of the tank body corresponding to the first colloid to achieve the metering of the first colloid.
[0076] The beneficial effect of the above technical solution is: by adopting the solution provided by this embodiment, the pressure data in the tank corresponding to the first colloid is obtained by using the pressure sensor module, and by comparing the pressure data, accurate measurement of the first colloid can be achieved.
[0077] In one embodiment, the second colloid is metered using a gear sensor module and a PLC controller, including:
[0078] Using the gear sensor module to obtain the gear speed data in the tank corresponding to the second colloid;
[0079] The gear speed data is obtained by using a PLC controller, and a second comparison is performed between the gear speed data and the set gear speed threshold data. A second control command is generated according to the second comparison result, and according to the second control command, the glue output of the tank corresponding to the second colloid is controlled to achieve metering of the second colloid.
[0080] The working principle of the above technical solution is: in order to realize the metering of the second colloid, the present invention first uses the gear sensor module to obtain the gear speed data in the tank body corresponding to the second colloid; then uses the PLC controller to obtain the gear speed data, and performs a second comparison on the gear speed data and the set gear speed threshold data, and generates a second control command according to the second comparison result, and controls the glue output of the tank body corresponding to the second colloid according to the second control command to realize the metering of the second colloid.
[0081] The beneficial effect of the above technical solution is: by adopting the solution provided in this embodiment, by using the gear sensor module to obtain the gear speed data in the tank corresponding to the second colloid, and comparing the gear speed data, accurate measurement of the second colloid can be ensured.
[0082] In one embodiment, a PLC controller is used to control a colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid, including:
[0083] Set the dispensing parameters, height parameters, stirring parameters and stirring temperature; dispensing parameters include dispensing speed and dispensing time;
[0084] Using a PLC controller, the dispensing speed and dispensing time of the first colloid and the second colloid are controlled according to dispensing parameters;
[0085] Using a PLC controller, according to a height parameter, the total amount of the first colloid and the second colloid injected into the colloid mixing module is controlled;
[0086] The first colloid and the second colloid injected into the colloid mixing module are stirred and mixed according to the stirring parameters and the stirring temperature by using the PLC controller to obtain a mixed colloid.
[0087] The working principle of the above technical solution is: in order to control the colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid, the present invention first sets the glue discharging parameters, height parameters, stirring parameters and stirring temperature; the glue discharging parameters include the glue discharging speed and the glue discharging time; then, the PLC controller is used to control the glue discharging speed and the glue discharging time of the first colloid and the second colloid according to the glue discharging parameters; the PLC controller is used to control the total amount of glue discharged from the first colloid and the second colloid injected into the colloid mixing module according to the height parameter; the PLC controller is used to stir and mix the first colloid and the second colloid injected into the colloid mixing module according to the stirring parameters and the stirring temperature to obtain a mixed colloid.
[0088] The beneficial effect of the above technical solution is: by adopting the solution provided in this embodiment, by setting different parameters and using a PLC controller, the first colloid and the second colloid are stirred and mixed according to the parameters to obtain a mixed colloid, and the mixing quality of the mixed colloid can be guaranteed.
[0089] In one embodiment, a PLC controller is used to control the vacuum module to control the vacuum degree of the vacuum chamber, including:
[0090] Set the negative pressure values that the vacuum chamber needs to reach;
[0091] The PLC controller is used to control the vacuum module to control the vacuum degree of the vacuum chamber according to the negative pressure value.
[0092] The working principle of the above technical solution is: in order to achieve the vacuum environment of the vacuum bin body, the present invention uses a PLC controller to control the vacuum module to control the vacuum degree of the vacuum bin body, first setting several negative pressure values that the vacuum bin body needs to reach; then according to the negative pressure value, controlling the vacuum module to control the vacuum degree of the vacuum bin body.
[0093] The beneficial effect of the above technical solution is: by adopting the solution provided in this embodiment, a vacuum environment of the vacuum chamber can be obtained by controlling the vacuum module to control the vacuum degree of the vacuum chamber according to the negative pressure value.
[0094] In one embodiment, a PLC controller is used to control the glue filling module and the three-axis servo manipulator in the vacuum chamber to fill the mixed colloid after the glue quantity is controlled into the battery to be filled with glue, including:
[0095] Using the PLC controller, under different glue filling requirements and vacuum conditions, the three-axis servo manipulator in the vacuum chamber is controlled to align the glue filling module with the position of the battery to be filled with glue, and then the mixed colloid after the glue amount is controlled is continuously poured into the battery to be filled with glue;
[0096] Among them, different glue pouring requirements and vacuum conditions include: first controlling the vacuum module to control the vacuum degree of the vacuum chamber body, and then implementing glue pouring; after completing the glue pouring, control the vacuum module to control the vacuum degree of the vacuum chamber body; not controlling the vacuum module to control the vacuum degree of the vacuum chamber body, and only implementing glue pouring; while controlling the vacuum module to control the vacuum degree of the vacuum chamber body, implement glue pouring simultaneously.
[0097] The working principle of the above technical scheme is: in order to realize the process of filling the battery to be filled with glue, the present invention uses a PLC controller to control the three-axis servo manipulator in the vacuum chamber to align the filling module with the battery to be filled with glue under different filling requirements and vacuum conditions, and then continue to fill the battery with the mixed colloid after the glue amount is controlled; among them, different filling requirements and vacuum conditions include: first controlling the vacuum module to control the vacuum degree of the vacuum chamber, and then implementing the filling; after the filling is completed, the vacuum module is controlled to control the vacuum degree of the vacuum chamber; the vacuum module is not controlled to control the vacuum degree of the vacuum chamber, and only the filling is implemented; while the vacuum module is controlled to control the vacuum degree of the vacuum chamber, the filling is implemented simultaneously.
[0098] The beneficial effect of the above technical solution is: by adopting the solution provided in this embodiment, by distinguishing different glue filling requirements and vacuum conditions, controlling the three-axis servo manipulator in the vacuum chamber to align the glue filling module with the position of the battery to be filled with glue, and then continuing to pour the mixed colloid after the glue amount is controlled into the battery to be filled with glue, the glue filling work can be completed efficiently.
[0099] In one embodiment, when the vacuum module is controlled to control the vacuum degree of the vacuum chamber, glue pouring is performed simultaneously, including:
[0100] When the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach a set negative pressure value, the battery to be filled with glue is filled in multiple stages at the same filling speed;
[0101] When the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach a set negative pressure value, the battery to be filled with glue is filled in multiple stages according to different filling speeds;
[0102] Under the condition that the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach multiple set negative pressure values, the batteries to be filled are filled with glue at the same filling speed;
[0103] Under the condition that the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach the set multiple negative pressure values, the batteries to be filled are filled with glue at different filling speeds.
[0104] The working principle of the above technical scheme is: in order to realize the simultaneous implementation of glue filling when the vacuum module is controlled to control the vacuum degree of the vacuum bin body, the present invention proposes that when the vacuum module is controlled to control the vacuum degree of the vacuum bin body to reach a set negative pressure value, the battery to be filled with glue is filled in multiple stages according to the same glue filling speed; and when the vacuum module is controlled to control the vacuum degree of the vacuum bin body to reach a set negative pressure value, the battery to be filled with glue is filled in multiple stages according to different glue filling speeds; and under the condition that the vacuum module is controlled to control the vacuum degree of the vacuum bin body to reach multiple set negative pressure values, the battery to be filled with glue is filled at the same glue filling speed; and under the condition that the vacuum module is controlled to control the vacuum degree of the vacuum bin body to reach multiple set negative pressure values, the battery to be filled with glue is filled at different glue filling speeds.
[0105] The beneficial effect of the above technical solution is: by adopting the solution provided in this embodiment, the effect and quality of glue pouring can be guaranteed by implementing targeted glue pouring according to different vacuum conditions.
[0106] In one embodiment, the method further includes: monitoring the glue pouring process using a configured glue pouring process monitoring component, and feeding back the monitoring result to the glue pouring implementation process to adjust the glue pouring strategy and glue pouring speed of the glue pouring implementation; specifically:
[0107] A monitoring component is configured to monitor the glue pouring process; the monitoring component includes an irradiation light source, a camera and a processor; the irradiation light source is used to irradiate the colloid poured into the vacuum chamber in real time, the camera is used to collect and obtain the colloid image on the pouring surface layer of the colloid under the irradiation light source in real time; the processor is used to extract the characteristic information of the colloid image;
[0108] According to different glue filling requirements and vacuum conditions, set several glue filling monitoring sequence time points;
[0109] According to the implementation process of multi-stage glue pouring, several glue pouring progress position monitoring surfaces are set;
[0110] Based on the glue filling monitoring sequence time points and the glue filling progress position monitoring surface, the monitoring component is used to monitor and obtain the characteristic information of multiple corresponding colloid images;
[0111] Match the characteristic information with the set standard characteristic information. If there is a mismatch in the parameter matching, take corresponding measures.
[0112] The response process includes: if the parameter matching inconsistency occurs at the glue filling monitoring sequence time point, the parameter values at multiple future moments are predicted based on the LSTM neural network model. If the prediction result shows that the parameter matching inconsistency still exists at the first N moments in the future, the glue filling is stopped; if the prediction result shows that the parameter matching inconsistency no longer exists at the first N moments in the future, the glue filling is continued; N is the set time threshold;
[0113] If the inconsistent parameter matching occurs on the glue pouring progress position monitoring surface, the glue pouring speed is increased or decreased according to the set adjustment range; wherein, the adjustment range is obtained by: using the set glue pouring implementation simulation working model to simulate the glue pouring process and obtain simulation implementation data; according to the simulation implementation data, the adjustment range of the glue pouring speed is set.
[0114] The working principle of the above technical scheme is as follows: in order to ensure that glue pouring is carried out efficiently and accurately during the implementation of glue pouring, the present invention proposes a technical scheme for monitoring, specifically, using a configured glue pouring process monitoring component to monitor the glue pouring process, and feeding back the monitoring results to the implementation process of glue pouring, so as to adjust the glue pouring strategy and glue pouring speed of the glue pouring implementation; firstly, a monitoring component for monitoring the glue pouring process is configured; the monitoring component includes an irradiation light source, a camera and a processor; the irradiation light source is used to irradiate the colloid poured into the vacuum chamber in real time, and the camera is used to collect and obtain the colloid image on the pouring surface layer of the colloid under the irradiation of the irradiation light source in real time; the processor is used to extract the characteristic information of the colloid image; then, according to different glue pouring requirements and vacuum conditions, a number of glue pouring monitoring sequence time points are set; according to the implementation process of multi-stage glue pouring, a number of glue pouring progress position monitoring surfaces are set; finally, based on the glue pouring monitoring sequence time points and the glue pouring progress position monitoring surfaces, the monitoring component is used to monitor and obtain the characteristic information of multiple corresponding colloid images; The characteristic information is matched with the set standard characteristic information by parameters. If there is a parameter mismatch, a response is performed; wherein the response is further divided into different situations: if the parameter mismatch occurs at a time point in the glue pouring monitoring sequence, the parameter values of the characteristic information at multiple future moments are predicted based on the LSTM neural network model. If the prediction result shows that the parameter mismatch still exists in the first N moments of multiple future moments, the glue pouring is stopped; if the prediction result shows that the parameter mismatch no longer exists in the first N moments of multiple future moments, the glue pouring is continued; N is the set time threshold; if the parameter mismatch occurs in the glue pouring progress position monitoring surface, the glue pouring speed is increased or decreased according to the set adjustment range; wherein, the adjustment range is obtained including: using the set glue pouring implementation simulation working model to simulate the glue pouring process and obtain simulation implementation data; and setting the adjustment range of the glue pouring speed according to the simulation implementation data.
[0115] The beneficial effect of the above technical solution is: by adopting the solution provided in this embodiment, the glue pouring process is monitored by using the configured glue pouring process monitoring component during the glue pouring implementation process, and the monitoring results are fed back to the glue pouring implementation process to adjust the glue pouring strategy and glue pouring speed of the glue pouring implementation, thereby ensuring efficient and accurate implementation of the glue pouring.
[0116] A multi-stage vacuum glue filling system, such as Figure 3 As shown, including:
[0117] A colloid metering module is used to add the first colloid and the second colloid into their corresponding tanks respectively, and use a PLC controller to control the metering module to meter the first colloid and the second colloid in the tanks;
[0118] The colloid mixing module is used to control the colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid by using a PLC controller;
[0119] The colloid filling implementation module is used to use the PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber; control the glue quantity module to control the glue quantity of the mixed colloid; control the glue filling module and the three-axis servo robot in the vacuum chamber to fill the mixed colloid after glue quantity control into the battery to be filled.
[0120] The working principle of the above technical scheme is as follows: in order to realize a multi-stage vacuum glue filling system, the present invention proposes a colloid metering module, which is used to add the first colloid and the second colloid into their respective corresponding tanks, and use a PLC controller to control the metering module to meter the first colloid and the second colloid in the tank; a colloid mixing module is proposed, which is used to use a PLC controller to control the colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid; a colloid perfusion implementation module is proposed, which is used to use a PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber; control the glue amount module to control the glue amount of the mixed colloid; control the glue filling module and the three-axis servo manipulator in the vacuum chamber to perfuse the mixed colloid after the glue amount control into the glue-filled battery.
[0121] The beneficial effect of the above technical solution is: adopting the solution provided by this embodiment, by adopting a multi-stage method to set different vacuums and different glue filling speeds to fill the battery, there will be no bubbles in the glue inside the battery, so that the battery module can be fully wrapped, and the battery module will not be corroded by water, making the battery more stable and safer underwater. According to the same volume of the inner cavity, multiple vacuums and multiple glue filling speeds can be used to adjust the glue filling by themselves, reducing the error amount, so that there will be no voids in the glue inside the product, thereby solving the safety and waterproofness of using batteries underwater.
[0122] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A multi-stage vacuum glue filling method, characterized in that: include: The first colloid and the second colloid are added into their corresponding tanks respectively, and the metering module is controlled by the PLC controller to meter the first colloid and the second colloid in the tanks; Using a PLC controller, controlling a colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid; Use the PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber; Use the PLC controller to control the glue quantity module and control the glue quantity of the mixed colloid; The PLC controller is used to control the glue filling module and the three-axis servo robot in the vacuum chamber to fill the mixed colloid after the glue quantity is controlled into the battery to be filled with glue.
2. A multi-stage vacuum glue pouring method according to claim 1, characterized in that: The PLC controller is used to control the metering module to meter the first colloid and the second colloid in the tank, including: A metering module is configured, and the metering module includes a pressure sensor module and a gear sensor module; the pressure sensor module is configured on the tank body corresponding to the first colloid, and the gear sensor module is configured on the tank body corresponding to the second colloid; Using a pressure sensor module and a PLC controller to achieve metering of the first colloid; The second colloid is metered by using a gear sensor module and a PLC controller.
3. A multi-stage vacuum glue pouring method according to claim 2, characterized in that: The pressure sensor module and the PLC controller are used to achieve metering of the first colloid, including: Using a pressure sensor module to obtain pressure data in a tank corresponding to the first colloid; The pressure data is obtained by using a PLC controller, and the pressure data is compared with the set pressure threshold data. According to the first comparison result, a first control command is generated, and according to the first control command, the glue output of the tank corresponding to the first colloid is controlled to achieve the metering of the first colloid.
4. A multi-stage vacuum glue pouring method according to claim 2, characterized in that: The second colloid is metered by using the gear sensor module and PLC controller, including: Using the gear sensor module to obtain the gear speed data in the tank corresponding to the second colloid; The gear speed data is obtained by using a PLC controller, and a second comparison is performed between the gear speed data and the set gear speed threshold data. A second control command is generated according to the second comparison result, and according to the second control command, the glue output of the tank corresponding to the second colloid is controlled to achieve metering of the second colloid.
5. A multi-stage vacuum glue pouring method according to claim 1, characterized in that: Using a PLC controller to control a colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid, including: Set the dispensing parameters, height parameters, stirring parameters and stirring temperature; dispensing parameters include dispensing speed and dispensing time; Using a PLC controller, the dispensing speed and dispensing time of the first colloid and the second colloid are controlled according to dispensing parameters; Using a PLC controller, according to a height parameter, the total amount of the first colloid and the second colloid injected into the colloid mixing module is controlled; The first colloid and the second colloid injected into the colloid mixing module are stirred and mixed according to the stirring parameters and the stirring temperature by using the PLC controller to obtain a mixed colloid.
6. A multi-stage vacuum glue pouring method according to claim 1, characterized in that: Use the PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber, including: Set the negative pressure values that the vacuum chamber needs to reach; The PLC controller is used to control the vacuum module to control the vacuum degree of the vacuum chamber according to the negative pressure value.
7. A multi-stage vacuum glue pouring method according to claim 1, characterized in that: The PLC controller is used to control the glue filling module and the three-axis servo manipulator in the vacuum chamber to fill the mixed colloid after the glue quantity is controlled into the battery to be filled with glue, including: Using the PLC controller, under different glue filling requirements and vacuum conditions, the three-axis servo manipulator in the vacuum chamber is controlled to align the glue filling module with the position of the battery to be filled with glue, and then the mixed colloid after the glue amount is controlled is continuously poured into the battery to be filled with glue; Among them, different glue pouring requirements and vacuum conditions include: first controlling the vacuum module to control the vacuum degree of the vacuum chamber body, and then implementing glue pouring; after completing the glue pouring, control the vacuum module to control the vacuum degree of the vacuum chamber body; not controlling the vacuum module to control the vacuum degree of the vacuum chamber body, and only implementing glue pouring; while controlling the vacuum module to control the vacuum degree of the vacuum chamber body, implement glue pouring simultaneously.
8. A multi-stage vacuum glue pouring method according to claim 7, characterized in that: When the vacuum module is controlled to control the vacuum degree of the vacuum chamber, glue pouring is carried out simultaneously, including: When the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach a set negative pressure value, the battery to be filled with glue is filled in multiple stages at the same filling speed; When the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach a set negative pressure value, the battery to be filled with glue is filled in multiple stages according to different filling speeds; Under the condition that the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach multiple set negative pressure values, the batteries to be filled are filled with glue at the same filling speed; Under the condition that the vacuum module is controlled to control the vacuum degree of the vacuum chamber to reach the set multiple negative pressure values, the batteries to be filled are filled with glue at different filling speeds.
9. A multi-stage vacuum glue pouring method according to claim 7, characterized in that: It also includes: using the configured glue pouring process monitoring component to monitor the glue pouring process, and feeding back the monitoring results to the glue pouring implementation process to adjust the glue pouring strategy and glue pouring speed of the glue pouring implementation; specifically: A monitoring component is configured to monitor the glue pouring process; the monitoring component includes an irradiation light source, a camera and a processor; the irradiation light source is used to irradiate the colloid poured into the vacuum chamber in real time, the camera is used to collect and obtain the colloid image on the pouring surface layer of the colloid under the irradiation light source in real time; the processor is used to extract the characteristic information of the colloid image; According to different glue filling requirements and vacuum conditions, set several glue filling monitoring sequence time points; According to the implementation process of multi-stage glue pouring, several glue pouring progress position monitoring surfaces are set; Based on the glue filling monitoring sequence time points and the glue filling progress position monitoring surface, the monitoring component is used to monitor and obtain the characteristic information of multiple corresponding colloid images; Match the characteristic information with the set standard characteristic information. If there is a mismatch in the parameter matching, take corresponding measures. The response process includes: if the parameter matching inconsistency occurs at the glue filling monitoring sequence time point, the parameter values at multiple future moments are predicted based on the LSTM neural network model. If the prediction result shows that the parameter matching inconsistency still exists at the first N moments in the future, the glue filling is stopped; if the prediction result shows that the parameter matching inconsistency no longer exists at the first N moments in the future, the glue filling is continued; N is the set time threshold; If the inconsistent parameter matching occurs on the glue pouring progress position monitoring surface, the glue pouring speed is increased or decreased according to the set adjustment range; wherein, the adjustment range is obtained by: using the set glue pouring implementation simulation working model to simulate the glue pouring process and obtain simulation implementation data; according to the simulation implementation data, the adjustment range of the glue pouring speed is set.
10. A multi-stage vacuum glue filling system, characterized in that: include: A colloid metering module is used to add the first colloid and the second colloid into their corresponding tanks respectively, and use a PLC controller to control the metering module to meter the first colloid and the second colloid in the tanks; The colloid mixing module is used to control the colloid mixing module to mix the measured first colloid and the second colloid to obtain a mixed colloid by using a PLC controller; The colloid filling implementation module is used to use the PLC controller to control the vacuum module to control the vacuum degree of the vacuum chamber; control the glue quantity module to control the glue quantity of the mixed colloid; control the glue filling module and the three-axis servo robot in the vacuum chamber to fill the mixed colloid after glue quantity control into the battery to be filled.
