A prefabricated flange steel-concrete composite beam-column node, structural system and installation method
By completing the prefabrication and simplified connection method of the prefabricated flange steel-concrete composite beam-column nodes in the prefabrication factory, the traditional construction difficulty and steel bar stability problems are solved, achieving simple and efficient construction and improving fire resistance.
Patent Information
- Application Number
- CN202111082792.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-15
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-09-15
AI Technical Summary
In traditional prefabricated buildings, the connection structure of prefabricated beams and column components in the node area is difficult to construct. In particular, the long anchor section at the bottom of the beam makes the construction complicated, and the location of the steel bars is high and the stability is poor, which affects the quality of concrete pouring and molding. The traditional grouting sleeve connection has a long construction period and high cost.
Prefabricated flange steel-concrete composite beam-column nodes are used. By completing the node prefabrication in the prefabricated factory, using steel pipe columns, flanges and concrete structures, combined with steel cages and sleeve connections, the beam-column nodes can be easily installed, reducing the need for on-site work. Construction difficulty and support layout improve fire resistance.
It greatly reduces the difficulty and construction period of on-site construction, simplifies the connection process, improves the fire resistance of the structure, reduces the use of fire-retardant coatings and construction period, and is flexibly applicable to different layers of building structures.
Smart Images

Figure CN113775050B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of prefabricated buildings, and in particular relates to a prefabricated flange steel-concrete composite beam-column node, a structural system and an installation method. Background Art
[0002] At present, the difficulties in the construction of the frame structure of prefabricated buildings are mainly concentrated on the connection structure of prefabricated beams and column components in the node area. There are two main traditional construction methods. The first is to bend and anchor the longitudinal reinforcement at the bottom of the beam extending from the end of the prefabricated beam in the beam-column node to solve the problem that the horizontal straight anchor section of the bent anchor section at the bottom of the beam required under the traditional reinforcement structure is long, resulting in the bottom straight anchor bars of the two prefabricated beams in the same direction being overlapped side by side in the beam-column node. This requires consideration of the left and right avoidance of the straight anchor bars at the bottom of the beam during construction to prevent collisions, causing construction difficulties. At the same time, it is easy to cause the straight anchor bars at the bottom of the beam to be offset and the matching gap to be too small, affecting the pouring and molding quality of concrete. The second method is to only extend the horizontal straight anchor section from the ends of the two prefabricated beams in the same direction, and use grouting sleeves to connect the straight anchor section beam bars on both sides in the beam-column node. However, this operation method requires hardening and maintenance, and the required construction period is long, which affects the construction progress and has high construction costs. In addition, both of the above-mentioned two types of beam-column node structures have high requirements on the position of the steel bars of the prefabricated components, and also have many difficulties during construction. In addition, the stability of the steel bar structure formed by the steel bars of the node is also poor. Summary of the invention
[0003] The present invention provides an assembled flange steel-concrete composite beam-column node, a structural system and an installation method, aiming to solve the above-mentioned technical problems.
[0004] To this end, the present invention adopts the following technical solutions:
[0005] An assembled flange steel-concrete composite beam-column node and structural system, comprising a column node and a beam node;
[0006] The column node is arranged on the column body, and the column body includes an upper column body and a lower column body. The interior of the upper column body and the lower column body is a steel pipe column, and a steel cage is arranged on the outer layer of the steel pipe column. Concrete is poured outside the steel pipe column. The upper and lower ends of the steel pipe column and the steel cage are extended out of the poured concrete. Flanges are respectively fixed on the steel pipe columns at the upper and lower ends of the upper column body and the lower column body, and the lower end of the upper column body and the upper end of the lower column are fixedly connected by the flanges; the steel cage between the upper column body and the lower column body is fixedly connected by a sleeve, and concrete is also poured between the upper column body and the lower column body, and the concrete is used to wrap the flanges and the exposed steel cage;
[0007] The beam node is arranged in the middle of the column, and a transverse bolt protruding outward is preset in the middle of the column. The transverse bolts are arranged in a ring shape, and the front end of the transverse bolt is fixedly connected to a horizontal steel pipe column. A flange is fixed to the front end of the steel pipe column, and concrete is poured at the connection between the steel pipe column and the column. A composite beam is connected between the two beam nodes, and the composite beam includes a steel pipe column, a flange and concrete poured outside the steel pipe column. The flanges at the front and rear ends of the composite beam are respectively fixedly connected to the flanges on the two beam nodes by bolts, and concrete is poured between the ends of the composite beam and the beam nodes.
[0008] Furthermore, both upper and lower ends of the auxiliary steel bars are threadedly connected with sleeves, the upper sleeve is threadedly connected to the steel bar at the lower end of the upper column, and the lower sleeve is threadedly connected to the steel bar at the upper end of the lower column.
[0009] Furthermore, the sleeve is an external hexagonal sleeve.
[0010] Furthermore, concrete is poured into the steel pipe columns of the upper column and the lower column.
[0011] A method for installing a prefabricated flange steel-concrete composite beam-column node and a structural system, comprising the following steps:
[0012] 1) Column construction: First, cast and fix the lower column according to the construction requirements, use the lifting equipment to vertically lift the upper column to the top of the lower column, place the flange at the lower end of the upper column on the flange at the upper end of the lower column, and make the mounting holes on the two flanges face each other, and then install bolts in the mounting holes to fix the flanges;
[0013] Select auxiliary steel bars, install sleeves at the upper and lower ends of the auxiliary steel bars respectively, place the auxiliary steel bars vertically between the two opposite steel bars of the upper column and the lower column, rotate the upper sleeve upward to connect with the corresponding steel bars, and rotate the lower sleeve downward to connect with the corresponding steel bars, so as to connect the auxiliary steel bars to the steel cage;
[0014] Install a template between the upper column and the lower column, pour concrete between the upper column and the lower column through the template, and remove the template after the concrete solidifies;
[0015] 2) Beam node construction: Connect the beam nodes through the bolts reserved on the column to ensure that the beam nodes are level and the two opposite beam nodes are located on the same straight line;
[0016] 3) Installation of composite beams: lift the composite beam between the two beam nodes so that the composite beam is in a horizontal state. The flanges at both ends of the composite beam are close to the flanges at the ends of the two beam nodes respectively. Then install bolts on the flanges, and then install auxiliary steel bars and sleeves on the steel cage. Finally, fix the formwork between the composite beam and the beam node, pour concrete between the composite beam and the beam node through the formwork, and remove the formwork after the concrete solidifies.
[0017] The beneficial effects of the present invention are:
[0018] 1. Prefabrication of beam-column nodes in factories greatly reduces the difficulty of on-site construction. The beam-column nodes of the present invention are prefabricated in prefabrication factories, and the connection points are set at the positions where the beam-column rods are less stressed. Only connection is required on site, which can effectively avoid pouring concrete at the construction site nodes and complex node connections, greatly reducing the difficulty of on-site construction.
[0019] 2. Convenient construction. The connection between columns is made of steel pipe flange and large diameter steel sleeve, which is easy to connect and convenient for construction.
[0020] 3. Reduce support layout. The steel pipe flange connection between columns can achieve preliminary column fixation and reduce on-site column support layout compared to the traditional grouting sleeve connection.
[0021] 4. Good fire resistance. Combining the advantages of concrete structure, the external concrete plays a protective role, making up for the poor fire resistance of steel structure, improving the fire resistance of the structure, and reducing the application of on-site fire retardant coatings compared to prefabricated steel structures, saving fire retardant coatings and construction period.
[0022] 5. Flexible design and application. The column of the present invention adopts hollow steel tubes wrapped with concrete. For low-rise and multi-story buildings, concrete may not be poured in the steel tubes under conditions permitted by the design, thereby reducing the deadweight of the structure and saving materials. For high-rise buildings, concrete may be poured in the steel tubes to improve the structural strength and reduce the cross-sectional area of the components. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the structure of the column node connection of the present invention;
[0024] Figure 2 It is a structural schematic diagram of the present invention after the column node construction is completed;
[0025] Figure 3 It is a structural schematic diagram of the present invention when the beam nodes are connected;
[0026] Figure 4 It is a structural schematic diagram of the present invention after the beam node construction is completed;
[0027] In the figure: 1-lower column, 2-upper column, 3-steel pipe column, 4-reinforcement cage, 5-flange, 6-sleeve, 7-auxiliary reinforcement, 8-composite beam. DETAILED DESCRIPTION
[0028] The present invention will be further described below in conjunction with the accompanying drawings:
[0029] An assembled flange steel-concrete composite beam-column node and structural system, comprising a column node and a beam node;
[0030] like Figure 1 and 2 As shown, the column node is arranged on the column, and the column includes an upper column 2 and a lower column 1. The upper column 2 and the lower column 1 have steel pipe columns 3 inside, and the outer layer of the steel pipe column 3 is provided with a steel cage 4. Concrete is poured outside the steel pipe column 3. The upper and lower ends of the steel pipe column 3 and the steel cage 4 are extended out of the poured concrete. Flanges 5 are fixed on the steel pipe columns 3 at the upper and lower ends of the upper column 2 and the lower column 1, respectively. The lower end of the upper column 2 and the upper end of the lower column 1 are fixedly connected by the flange 5; the steel cage 4 between the upper column 2 and the lower column 1 is fixedly connected by a sleeve 6, and the upper and lower ends of the auxiliary steel bars 7 are threadedly connected with sleeves 6, the upper sleeve 6 is threadedly connected to the steel bars at the lower end of the upper column 2, and the lower sleeve 6 is threadedly connected to the steel bars at the upper end of the lower column 1. Concrete is also poured between the upper column 2 and the lower column 1, and the concrete is used to wrap the flange 5 and the exposed steel cage 4. Concrete is poured into the steel pipe columns 3 of the upper column 2 and the lower column 1.
[0031] like Figure 3 and 4 As shown, the beam node is set in the middle of the column, and the middle of the column is preset with transverse bolts protruding outward, which are arranged in a ring shape. The front end of the transverse bolt is fixedly connected with a horizontal steel pipe column 3, and the front end of the steel pipe column 3 is fixed with a flange 5, and the connection between the steel pipe column 3 and the column is poured with concrete. A composite beam 8 is connected between the two beam nodes, and the composite beam 8 includes a steel pipe column 3, a flange 5, and concrete poured outside the steel pipe column 3. The flanges 5 at the front and rear ends of the composite beam 8 are respectively fixedly connected with the flanges 5 on the two beam nodes by bolts, and concrete is poured between the ends of the composite beam 8 and the beam nodes.
[0032] A method for installing a prefabricated flange steel-concrete composite beam-column node and a structural system, comprising the following steps:
[0033] 1) Column construction: First, cast and fix the lower column 1 according to the construction requirements, use the lifting equipment to vertically lift the upper column 2 to the top of the lower column 1, place the flange 5 at the lower end of the upper column 2 on the flange 5 at the upper end of the lower column 1, and make the mounting holes on the two flanges 5 face each other, and then install bolts in the mounting holes to fix the flange 5;
[0034] Select the auxiliary steel bar 7, install sleeves 6 at the upper and lower ends of the auxiliary steel bar 7 respectively, vertically place the auxiliary steel bar 7 between the two opposite steel bars of the upper column 2 and the lower column 1, rotate the upper sleeve 6 upward to connect with the steel bar, and rotate the lower sleeve 6 downward to connect with the steel bar, so as to connect the auxiliary steel bar 7 to the steel cage 4;
[0035] A template is installed between the upper column 2 and the lower column 1, and concrete is poured between the upper column 2 and the lower column 1 through the template. The template is removed after the concrete solidifies.
[0036] 2) Beam node construction: Connect the beam nodes through the bolts reserved on the column to ensure that the beam nodes are horizontal and the two opposite beam nodes are located on the same straight line.
[0037] 3) Installation of composite beam 8: lift composite beam 8 between two beam nodes, make composite beam 8 in horizontal state, place flanges 5 at both ends of composite beam 8 close to flanges 5 at the ends of two beam nodes respectively, then install bolts on flanges, and then install auxiliary steel bars 7 and sleeves 6 on steel cage 4; finally, fix formwork between composite beam 8 and beam node, pour concrete between composite beam 8 and beam node through formwork, and remove formwork after concrete solidifies.
[0038] It should be noted that the above are only some embodiments of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A method for installing a prefabricated flange steel-concrete composite beam-column node structure. It is characterized in that The beam-column node structure includes column nodes and beam nodes; The column node is arranged on the column body, and the column body includes an upper column body and a lower column body. The interior of the upper column body and the lower column body is a steel pipe column, and a steel cage is arranged on the outer layer of the steel pipe column. Concrete is poured outside the steel pipe column. The upper and lower ends of the steel pipe column and the steel cage are extended out of the poured concrete. Flanges are respectively fixed on the steel pipe columns at the upper and lower ends of the upper column body and the lower column body, and the lower end of the upper column body and the upper end of the lower column are fixedly connected by the flanges; the steel cage between the upper column body and the lower column body is fixedly connected by a sleeve, and concrete is also poured between the upper column body and the lower column body, and the concrete is used to wrap the flanges and the exposed steel cage; The beam node is arranged at the middle of the column, and a transverse bolt protruding outward is preset in the middle of the column. The transverse bolts are arranged in a ring shape, and the front end of the transverse bolt is fixedly connected with a horizontal steel pipe column, and a flange is fixed at the front end of the steel pipe column. Concrete is poured at the connection between the steel pipe column and the column; a composite beam is connected between the two beam nodes, and the composite beam includes a steel pipe column, a flange, and concrete poured outside the steel pipe column. The flanges at the front and rear ends of the composite beam are respectively fixedly connected with the flanges on the two beam nodes by bolts, and concrete is poured between the end of the composite beam and the beam node; It also includes auxiliary steel bars, wherein the upper and lower ends of the auxiliary steel bars are threadedly connected with sleeves, the upper sleeve is threadedly connected to the steel bar at the lower end of the upper column, and the lower sleeve is threadedly connected to the steel bar at the upper end of the lower column; The installation method includes the following steps: 1) Column construction: First, cast and fix the lower column according to the construction requirements, use the lifting equipment to vertically lift the upper column to the top of the lower column, place the flange at the lower end of the upper column on the flange at the upper end of the lower column, and make the mounting holes on the two flanges face each other, and then install bolts in the mounting holes to fix the flanges; Select auxiliary steel bars, install sleeves at the upper and lower ends of the auxiliary steel bars respectively, place the auxiliary steel bars vertically between the two opposite steel bars of the upper column and the lower column, rotate the upper sleeve upward to connect with the corresponding steel bars, and rotate the lower sleeve downward to connect with the corresponding steel bars, so as to connect the auxiliary steel bars to the steel cage; Install a template between the upper column and the lower column, pour concrete between the upper column and the lower column through the template, and remove the template after the concrete solidifies; 2) Beam node construction: Connect the beam nodes through the bolts reserved on the column to ensure that the beam nodes are level and the two opposite beam nodes are located on the same straight line; 3) Installation of composite beams: lift the composite beam between the two beam nodes so that the composite beam is in a horizontal state. The flanges at both ends of the composite beam are close to the flanges at the ends of the two beam nodes respectively. Then install bolts on the flanges, and then install auxiliary steel bars and sleeves on the steel cage. Finally, fix the formwork between the composite beam and the beam node, pour concrete between the composite beam and the beam node through the formwork, and remove the formwork after the concrete solidifies.
2. The installation method of the assembled flange steel-concrete composite beam-column node structure according to claim 1, It is characterized in that The sleeve is an external hexagonal sleeve.
3. The installation method of the assembled flange steel-concrete composite beam-column node structure according to claim 1, It is characterized in that Concrete is poured inside the steel pipe columns of the upper column and the lower column.
Citation Information
Patent Citations
Fabricated flange steel-concrete combined beam-column joint structure
CN216616240U
