Distribution network relay protection vector inspection and action logic verification test device and method

By using converter equipment and a test device that simulates load in the distribution network, a systematic test of relay protection vector inspection and action logic verification is realized, which solves the problem of inaccurate test results in the distribution network and provides continuous Stable and adjustable voltage and current improve test accuracy and adaptability.

CN113933648BActive Publication Date: 2024-11-08STATE GRID HEBEI ELECTRIC POWER RES INST +2
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202111138042.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-27
Publication Date
2024-11-08
Estimated Expiration
2041-09-27

AI Technical Summary

Technical Problem

The prior art is difficult to realize systematic testing of relay protection vector checks and action logic verification in the distribution network, resulting in inaccurate test results, and the output voltage and current of the test system are difficult to continuously and stably adjust, which cannot meet the testing of the distribution network. need.

Method used

Using a test device including converter equipment and simulated load, the output voltage and current are adjusted through the IGBT converter module and the step-down transformer. Combined with inductive and capacitive simulated loads, the impedance prediction, compensation and fault simulation of the equipment to be tested are realized, and the impedance prediction, compensation and fault simulation are improved. Systematic and accurate testing.

Benefits of technology

It realizes a systematic test of vector inspection and action logic verification in the distribution network, improves the accuracy of the test results, can output continuous, stable and adjustable voltage and current, adapts to the testing requirements of the distribution network, and fills the distribution network The lack of vector inspection and logic verification technology gaps eliminate the safety hazards of secondary systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113933648B_ABST
    Figure CN113933648B_ABST
Patent Text Reader

Abstract

The present invention is applicable to the technical field of power system detection, and provides a distribution network relay protection vector inspection and action logic verification test device and method. The above-mentioned distribution network relay protection vector inspection and action logic verification test device is characterized in that it includes a current conversion device and a simulated load, the input end of the current conversion device is connected to the mains power supply, the output end is connected to the input end of the device to be tested, and the simulated load is connected to the output end of the device to be tested; the current conversion device is used to adjust the output voltage and output current output to the device to be tested, and the simulated load includes a parallel test inductor, an inductive simulated load, a capacitive simulated load and a simulated grounding wire, which can form multiple loops with the device to be tested; when testing the device to be tested, at least one of the following functions is achieved by adjusting the simulated load: estimating the impedance of the device to be tested; performing impedance compensation on the device to be tested; and simulating faults of the device to be tested.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system detection, and in particular to a distribution network relay protection vector inspection and action logic verification test device and method. Background Art

[0002] Vector checking and action logic verification are important items in relay protection work. Vector and logic errors in the distribution network will lead to false operation or refusal of relay protection in normal operation and fault conditions. Relevant regulations clearly stipulate that for newly installed equipment or devices with major changes in the circuit, the working current and working voltage of the primary system must be inspected and determined before being put into operation. If the actual working voltage and load current of the power grid are directly connected without inspection, it is easy to fail to put into operation. Therefore, in order to ensure the safe operation of the secondary equipment of the distribution network, the correctness of the vector and the action logic of the secondary device must be fully verified before commissioning.

[0003] Traditional relay protection work inspections require special adjustments to system operation modes for testing before commissioning, as the primary system often has difficulty organizing loads, which greatly prolongs the system transition time.

[0004] In recent years, for the vector check in relay protection work, a technical route for relay protection vector check before the commissioning of a new substation has been proposed in this field, and it has been successfully applied to the vector check before the commissioning of various high-voltage power plants and substations. However, there are some difficulties in promoting its application in distribution networks. The line distance of the distribution network is short, the transformer capacity is small, and the output voltage and output current of the test system cannot be continuously and stably controlled, which cannot meet the needs of relay protection vector check.

[0005] As for the action logic verification of the self-healing device and the protection device in the relay protection work, since the devices are distributed and arranged between switch stations that are far away, and the action logic involves the synchronous interaction of information on all sides, on-site testing has always been a problem that plagues the relay protection action verification. The existing technology often uses the method of simulating the signals on all sides on site and the virtual power system fault environment. However, this test method lacks systematic debugging of the device and verifies it through the secondary current simulated fault. It cannot truly restore the action behavior of the protection device and the self-healing device after the power grid fault, which affects the accuracy of the test results. Summary of the invention

[0006] In view of this, an embodiment of the present invention provides a distribution network relay protection vector check and action logic verification test device and method, which realizes systematic testing of vector check and action logic verification in the distribution network and improves the accuracy of the test results.

[0007] In order to achieve the above object, the present invention adopts the following technical scheme:

[0008] In the first aspect, an embodiment of the present invention provides a distribution network relay protection vector inspection and action logic verification test device, characterized in that it includes a current converter and a simulated load, the input end of the current converter is connected to the AC power supply, the output end is connected to the input end of the device under test, and the simulated load is connected to the output end of the device under test; the current converter is used to adjust the output voltage and output current output to the device under test, the simulated load includes a parallel test inductor, an inductive simulated load, a capacitive simulated load and a simulated grounding wire, and can form multiple loops with the device under test; when testing the device under test, at least one of the following functions is achieved by adjusting the simulated load: estimating the impedance of the device under test; performing impedance compensation on the device under test; and simulating faults of the device under test.

[0009] Based on the first aspect, in some embodiments, the converter device includes an IGBT converter module, a step-down transformer and a processor; the input end of the IGBT converter module is connected to a mains power supply, the output end is connected to a step-down transformer, and the other end of the step-down transformer is connected to the device to be tested; the IGBT converter module is used to convert the mains power into the voltage and current required for the test and output it to the step-down transformer; the step-down transformer is used to output a stable load current or a pulse current; the processor is used to automatically read the current, voltage and active power values, and calculate the load capacity of the test device.

[0010] Based on the first aspect, in some embodiments, the IGBT converter module adopts a PWM control method to convert the AC power into a continuously adjustable output voltage and output current.

[0011] Based on the first aspect, in some embodiments, the inductive simulated load is star-connected, and the capacitive simulated load is delta-connected; and the simulated load is continuously adjustable.

[0012] In a second aspect, an embodiment of the present invention provides a method for checking the vector and verifying the action logic of a distribution network relay protection, which is characterized in that it is applicable to a distribution network test device as described in any one of the first aspects, and the method includes: adjusting the simulated load so that the test inductor is connected to the device under test, and adjusting the output current and output voltage of the converter device to preset test values; the processor reads the current, voltage and active power at the output end of the converter device, and estimates the impedance of the device under test according to the current, voltage, active power and the inductive reactance value of the test inductor; adjusting the output voltage, output current and simulated load of the converter device according to the impedance of the device under test and the test type, so that the simulated load reaches a preset value, and the simulated load is the total value of the impedance of the device under test and the load of the simulated load; the test types include busbar short-circuit test, transmission line short-circuit test, distribution transformer short-circuit test and simulated line fault test; starting the test device, the device under test, the protection device and the self-healing device; performing at least one of the following actions according to the data and action status of the protection device and the self-healing device: obtaining the vector check result of the device under test, and verifying the correctness of the action logic of the protection device and the self-healing device.

[0013] Based on the second aspect, in some embodiments, estimating the impedance of the device under test based on the current, voltage, active power and the inductive reactance value of the test inductor includes: the processor reads the current, voltage and active power at the output end of the converter device, and calculates the load capacity XL of the test device based on the current, voltage and active power; the load capacity XL is the sum of the impedance Xd of the device under test and the inductive reactance Xs of the test inductor; and the impedance Xd of the device under test is calculated based on Xd=XL-Xs.

[0014] In the embodiment of the present invention, a test inductor is connected in series at the end of the device under test, and the impedance of the device under test is calculated, so as to facilitate quantitative compensation of the device by simulating a load, thereby improving the reliability control and quantitative grasp of the test process.

[0015] Based on the second aspect, in some embodiments, the test type includes a busbar crossing short circuit test, and the simulated load is adjusted according to the impedance of the device under test and the test type so that the simulated load reaches a preset value, including: when performing the busbar crossing short circuit test, the device under test is a busbar, and the simulated load is adjusted so that the inductive simulated load is connected to the device under test; according to the estimated impedance value of the busbar, the inductive simulated load is adjusted to compensate for the impedance of the device under test, and the simulated load is compensated to a preset value, and the simulated load is an inductive simulated load.

[0016] Based on the second aspect, in some embodiments, the test type includes a transmission line short-circuit test, and the simulated load is adjusted according to the impedance of the device under test and the test type so that the simulated load reaches a preset value, including: when performing a transmission line short-circuit test, the device under test is a transmission line, and the simulated load is adjusted so that the inductive simulated load is connected to the device under test; according to the estimated impedance value of the transmission line, the inductive simulated load is adjusted to compensate for the impedance of the device under test, and the simulated load is compensated to a preset value, and the simulated load is an inductive simulated load.

[0017] Based on the second aspect, in some embodiments, the test type includes a distribution transformer short-circuit test, and the simulated load is adjusted according to the impedance of the device under test and the test type so that the simulated load reaches a preset value, including: when performing a distribution transformer short-circuit test, the device under test is a distribution transformer, and the simulated load is adjusted so that the capacitive simulated load is connected to the device under test; according to the estimated impedance value of the distribution transformer, the capacitive simulated load is adjusted to compensate for the impedance of the device under test, and the simulated load is compensated to a preset value, and the simulated load is an inductive simulated load or a capacitive simulated load.

[0018] Based on the second aspect, in some embodiments, the test type includes a simulated line fault test, and the simulated load is adjusted according to the impedance of the device under test and the test type so that the simulated load reaches a preset value, including: when performing a simulated line fault test, the three phases of the output end of the converter device are connected in parallel as one phase in series with the input end of the device under test, and a simulated grounding wire is connected in parallel inside or outside the protection zone of the device under test to simulate a single-phase fault; the trigger setting of the protection device and the self-healing device is adjusted to be below the maximum simulated fault current, the output current and output voltage of the converter device are adjusted to the maximum value, the converter device is turned on, and maintained for a preset time, and the preset time is set according to the action logic events of the protection device and the self-healing device; whether the action logic of the self-healing device and the protection device is judged correct according to the action status of the protection device and the self-healing device.

[0019] The distribution network relay protection vector inspection and action logic verification test device proposed in the embodiment of the present invention can output continuous, stable, adjustable, high-power test output voltage and output current, which is adapted to the test requirements of the primary system of the distribution network, and breaks through the limitations of the test system on the short distance of the distribution network line and the small capacity of the transformer. The proposed relay protection vector inspection and action logic verification method effectively fills the gap in the vector inspection and logic verification technology currently lacking in the distribution network, improves the accuracy of the test results, and has good adaptability. It can be widely used in various types of urban distribution networks to help eliminate safety hazards in the secondary system. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0021] Figure 1 It is a schematic diagram of the structure of a distribution network relay protection vector inspection and action logic verification test device provided by an embodiment of the present invention;

[0022] Figure 2 It is another structural schematic diagram of the distribution network relay protection vector inspection and action logic verification test device provided by an embodiment of the present invention;

[0023] Figure 3 It is a flow chart of a method for checking the relay protection vector and verifying the action logic of a distribution network provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0024] The present invention will be described more clearly below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the effects of the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several variations and improvements may be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0025] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.

[0026] The present invention proposes a distribution network test device and a relay protection vector inspection and action logic verification method before the distribution network is put into operation, which can solve the problem that the voltage and output current of the existing test system in the distribution network cannot be continuously and stably adjusted, and can solve the problem that the existing test system cannot output large current in the distribution network, breaking through the limitations of the test system on the short distance of the distribution network line and the small capacity of the transformer, effectively filling the gap in the vector inspection and logic verification technology currently lacking in the distribution network, can eliminate the safety hazards of the secondary system, and can be widely used in various types of urban distribution networks.

[0027] The distribution network testing device provided by the present invention is as follows Figure 1 As shown, the test device includes a converter 100 and a simulated load 200. The converter 100 has an input connected to a 380V mains power supply, an output connected to an input of a device under test, and one end of the simulated load 200 connected to an output of the device under test.

[0028] The converter 100 is used to adjust the output voltage and output current to the device under test. When testing the device under test, at least one of the following functions is achieved by adjusting the simulated load 200: estimating the impedance of the device under test or performing impedance compensation on the device under test.

[0029] The converter device 100 includes an IGBT converter module 110, a step-down transformer 120 and a processor 130. The IGBT converter module 110 adopts an AC IGBT converter mode controlled by pulse width modulation (PWM) and can output continuously adjustable current and voltage; the step-down transformer 120 is used to achieve voltage regulation.

[0030] The above-mentioned current conversion equipment is of the nature of a current source and adopts an IGBT power electronics design. It can stably output the required load current and quickly respond to the required pulse current. Its nominal design is 50kVA, 100A / 150V phase voltage; an electromagnetic transformer design can also be used to achieve the function.

[0031] The simulated load 200 includes a parallel-connected test inductor 210 , an inductive simulated load 220 , a capacitive simulated load 230 , and a simulated ground line 240 , and can form a variety of loops with the device under test.

[0032] The simulated load 200 is continuously adjustable, and the test inductance 210, the inductive simulated load 220, the capacitive simulated load 230 and the simulated ground wire 240 are selected by gears. The fixed value of the test inductance is 0.5Ω. The inductive simulated load is connected in star wiring mode, and the adjustable range is 0-1.0Ω. The capacitive simulated load is connected in delta wiring mode, and the delta wiring can greatly reduce the volume of the simulated load. The adjustable range of capacitance C is 50uF-200uF.

[0033] When performing a fault line fault test, the allowable current output by the converter device 100 should be no less than 100 A, and the dynamic stability of the simulated grounding wire 240 should at least meet 150 A / 1 min.

[0034] The simulated load is the total value of the impedance of the device under test and the simulated load 200. When testing, the simulated load is adjusted to compensate the device under test, and the simulated load is adjusted to a compensated 1Ω inductive or capacitive load.

[0035] The current converter and the simulated load are both continuously adjustable, and the test device composed of them has the remarkable advantages of small size, light weight, automation and high reliability.

[0036] like Figure 2 As shown, the simulated load 200 may also be connected to the processor 130, and the processor 130 may automatically control the switching of the simulated load type according to the function to be implemented by the test type.

[0037] like Figure 3 As shown, the present invention also discloses a method for checking relay protection vector and action logic, including steps 101 to 105.

[0038] Step 101: Adjust the simulated load so that the test inductor is connected to the device under test, and adjust the output voltage and output voltage of the converter device to a preset test value.

[0039] The input end of the converter is connected to the 380V AC power supply of the distribution network switch station, the output end is connected to the input end of the device under test, one end of the simulated load is connected to the output end of the device under test, and the other end is in a three-phase short-circuit state, forming a complete test circuit.

[0040] Switch the simulated load gear to the test inductor, connect the three-phase test inductor in series at the end of the device to be tested, and adjust the output current and output voltage of the converter to the preset test values. The preset test value current is 30A-50A and the voltage is 20V-60V.

[0041] Step 102: The processor reads the current, voltage and active power at the output end of the converter device, and estimates the impedance of the device under test according to the current, voltage, active power and the inductive reactance value of the test inductor.

[0042] After adjusting the output current and output voltage of the converter device to the preset test values, the processor reads the current, voltage and active power at the output end of the converter device, and automatically measures and calculates the load capacity XL of the test device. The load capacity XL is the sum of the impedance Xd of the device to be tested and the inductive reactance Xs of the test inductor. In this way, the impedance Xd of the device to be tested can be obtained, Xd=XL-Xs, which is obtained by subtracting the test inductive reactance from the load capacity.

[0043] The inductive reactance of the three-phase test inductor connected in series at the end of the device under test is Xs, and the resistance component of the impedance of the device under test in the distribution network is within the allowable error range. When the device under test is a bus or line, the impedance of the device under test is mainly the line impedance. After the inductive simulated load compensation, the resistance component of the line impedance can be ignored. When the device under test is a distribution transformer, the impedance of the device under test is mainly the transformer through impedance, and the resistance component of the transformer can be ignored.

[0044] Step 103: adjust the output voltage, output current and simulated load of the converter device according to the impedance of the device to be tested and the test type, so that the simulated load reaches a preset value; the simulated load is the total value of the impedance of the device to be tested and the simulated load; the test types include busbar short-circuit test, transmission line short-circuit test, distribution transformer short-circuit test and simulated line fault test.

[0045] Adjust the output current and output voltage of the converter equipment to a reasonable range to facilitate vector inspection. The AC IGBT converter is controlled by PWM. According to the simulated load of 1Ω, the output current and voltage can reach 100A and 100V phase voltage, which fully meets the requirements of relay protection vector inspection and logic function verification.

[0046] Step 1031: When performing a busbar through-short circuit test, the device under test is the busbar, and the simulated load is adjusted so that the inductive simulated load is connected to the device under test.

[0047] According to the estimated impedance value of the busbar, the inductive simulated load is adjusted to compensate for the impedance of the device under test, and the simulated load is compensated to a preset value. The simulated load is an inductive simulated load.

[0048] Step 1032: When performing a transmission line short-circuit test, the device under test is a transmission line, and the simulated load is adjusted so that the inductive simulated load is connected to the device under test.

[0049] According to the estimated impedance value of the transmission line, the inductive simulated load is adjusted to compensate for the impedance of the device under test, and the simulated load is compensated to a preset value. The simulated load is an inductive simulated load.

[0050] Step 1033: When performing a distribution transformer ride-through short-circuit test, the device under test is a distribution transformer, and the simulated load is adjusted so that the capacitive simulated load is connected to the device under test.

[0051] According to the estimated impedance value of the distribution transformer, the capacitive simulated load is adjusted to compensate the impedance of the device under test, and the simulated load is compensated to a preset value. The simulated load is an inductive simulated load or a capacitive simulated load.

[0052] A three-phase simulated load is connected in series at the end of the device under test. The impedance of the device under test and the simulated load together constitute a simulated load. The simulated load of each phase is adjusted until the simulated load is compensated to the preset value of 1Ω. 1Ω is a recommended value that is more convenient and appropriate for experiments. The compensation range can be 0.8Ω-1.5Ω.

[0053] When the device under test is a bus or line, the simulated load is an inductive simulated load, and the simulated load is also inductive. When the device under test is a distribution transformer, the simulated load is a capacitive simulated load. The simulated load is an inductive or capacitive load.

[0054] When performing a busbar through-short circuit test, the device under test is the busbar, and the line impedance between the busbar and the simulated load is almost zero. Full compensation is required, and the simulated load of each phase is adjusted to an inductive 1Ω. When the device under test is a line, the impedance of the line is approximately 0.05Ω-0.2Ω, and partial compensation is required. The simulated load of each phase is adjusted in the range of 0.8Ω-0.95Ω to make the simulated load reach an inductive 1Ω. When the device under test is a distribution transformer, the through impedance of the distribution transformer is generally 5Ω-20Ω, and overcompensation is required. The simulated load is inductive or capacitive 1Ω.

[0055] Step 1034: When performing a simulated line fault test, the three phases of the output end of the converter device are connected in parallel as one phase in series with the input end of the device under test, and a simulated grounding wire is connected in parallel inside or outside the protection zone of the device under test to simulate a single-phase fault.

[0056] The triggering threshold of the protection device and the self-healing device is set below the maximum simulated fault current, and the output current of the converter is adjusted to the maximum simulated fault current value. The maximum simulated fault current is the maximum output current value determined according to the actual performance of the converter.

[0057] Step 104: Start the test device, the device under test, the protection device and the self-healing device.

[0058] Step 105: According to the data and action status of the protection device and the self-healing device, perform at least one of the following actions: obtain the vector check result of the device under test to verify the correctness of the action logic of the protection device and the self-healing device; and perform fault simulation on the device under test.

[0059] During the vector check process, the voltage and current are basically orthogonal in phase. When the simulated load is inductive, the phase angle of the voltage lags behind the current by 90°. When the simulated load is capacitive, the phase angle of the voltage leads the current by 90°.

[0060] During the action logic verification process, turn on the converter and maintain the preset time. The preset time is set according to the action logic judgment time of the protection device and the self-healing device. According to the action of the protection device and the self-healing device, judge whether the action logic of the self-healing device and the protection device is correct. When the simulated grounding wire is connected outside the protection zone of the device under test, simulate the through fault, the protection device should not operate correctly, and the self-healing device should operate correctly according to the logic. When the simulated grounding wire is connected inside the protection zone of the device under test, simulate the fault inside the zone, and the protection device and the self-healing device should operate correctly.

[0061] The above method is applicable to the vector inspection of busbars, lines (current differential and directional overcurrent protection), distribution transformers of distribution networks with voltage levels of 35kV and below, and the action logic verification of all protection devices and self-healing control devices in the distribution network. It is also used to check the correctness of the vectors of secondary equipment such as measuring instruments, metering meters, wave recorders, and control systems.

[0062] Example 1

[0063] A method for checking relay protection vectors and verifying action logic before a distribution network is put into operation includes method steps for checking bus differential protection, incoming and outgoing line current differential protection and vectors of directional backup protection when a busbar is tested through a short circuit. Method steps for checking bus differential protection, current differential protection on both sides and vectors of directional backup protection when a transmission line is tested through a short circuit. Method steps for checking bus differential protection and distribution transformer protection vectors when a distribution transformer is tested through a short circuit. Method steps for checking logic of correct action of in-zone fault protection and self-healing and logic of non-false action of out-of-zone fault protection when a distribution transformer is tested through a short circuit.

[0064] The test device includes a converter and a simulated load. The converter includes an IGBT converter module, a step-down transformer and a processor. The simulated load includes a test inductor, an inductive simulated load, a capacitive simulated load and a simulated ground wire.

[0065] The simulated load is continuously adjustable, and the gear selection is used to test inductance, inductive simulated load, capacitive simulated load and simulated grounding wire. The fixed value of the test inductance is 0.5Ω. The inductive simulated load is star-connected, and the adjustable range is 0-1.0Ω. The capacitive simulated load is angle-connected, and the adjustable range of capacitance C is 50uF-200uF. The allowable current of the capacitive simulated load is not less than 100A, and the dynamic stability of the simulated grounding wire meets at least 150A / 1min. The simulated load is a 1Ω inductive or capacitive load after compensation. The inductive simulated load and the capacitive simulated load have reactive power feedback function, which can greatly reduce the input power supply power.

[0066] After the operating status of the primary and secondary equipment under test in the switch station is adjusted, the steps of vector inspection and action logic verification can be started.

[0067] First, connect a three-phase test inductor in series at the end of the device under test, with an inductive reactance of Xs. Adjust the output current of the converter to 30A-50A and the output voltage to 20V-60V. The test device automatically reads the current, voltage and active power values, and calculates the load XL of the test device. The load XL is the sum of the impedance Xd of the device under test and the test inductive reactance Xs. In this way, the impedance of the device under test can be obtained, that is, Xd=XL-Xs is obtained by subtracting the test inductive reactance from the load. The resistance component of the impedance of the device under test in the distribution network is within the allowable error range. When the device under test is a bus or line, the impedance of the device under test is mainly the line impedance. The line length of the distribution network is short. According to statistics, the impedance value is approximately R=(0.02-0.08)Ω, X=(0.04-0.25)Ω. After the inductive simulated load is compensated to 1Ω, the resistance component of the line impedance can be ignored. When the device under test is a distribution transformer, the impedance of the device under test is mainly the transformer penetration impedance. According to statistics, the impedance value is about 5Ω-20Ω, and the resistance component of the transformer can be ignored.

[0068] According to the calculated impedance value, adjust the simulated load to compensate the simulated load to 1Ω, and control the current and voltage output to the primary system through the converter. When performing vector inspection, adjust the electrical quantity required by the output test. Take the simulated load as 1Ω. When the primary rated current of the current transformer of the device under test is greater than 500A, adjust the output current of the converter to greater than 10A. When the primary rated current of the current transformer of the device under test is greater than 1000A, adjust the output current of the converter to greater than 20A. When the primary rated current of the current transformer of the device under test is greater than 2000A, adjust the output current of the converter to greater than 40A. When simulating a line fault, adjust the output current of the converter to the maximum simulated fault current of 100A. The corresponding voltage is determined by the current and the simulated load and does not exceed the nominal range.

[0069] When performing action logic verification, connect the three phases of the converter equipment in parallel, and then connect them in series to the input end of the device under test. Adjust the trigger threshold of the protection device and the self-healing device to be below the maximum simulated fault current. Adjust the output current of the converter equipment to the maximum simulated fault current. Add the current suddenly to the device under test for 1.0s-5.0s. The specific duration can be determined according to the action logic judgment time of the device.

[0070] When simulating a through fault of the device under test, one end of the simulated grounding wire is connected to the simulated fault point of the phase under test outside the protection range of the device under test, and the other end is in a grounded state, forming a complete test loop. When simulating an intra-zone fault of the device under test, one end of the simulated grounding wire is connected to the simulated fault point of the phase under test within the protection range of the device under test (between the two CTs of protection sampling), and the other end is in a grounded state, forming a complete test loop. For an out-of-zone fault, the protection device should not operate correctly, and the self-healing device should operate correctly according to the logic of its system. For an intra-zone fault, the protection device should operate correctly, and the self-healing device should operate correctly according to the logic of its system.

[0071] Example 2

[0072] a. When the device to be tested is the bus within the station, connect the inductive simulated load, adjust the simulated load to 1Ω, adjust the output current and output voltage of the converter, and perform vector checks on bus protection, line current differential protection, line directional overcurrent protection, and related measuring instruments, meters, recorders, control systems and other secondary equipment. It should be noted that the voltage and current are basically orthogonal in phase, and the phase angle of the voltage leads the current by 90°. The correctness of the vector of secondary equipment such as relay protection should be judged according to the conventional vector judgment standard.

[0073] When the primary rated current of the current transformer is greater than 1000A, the output current and voltage of the converter equipment are adjusted to be greater than 20A and 20V (phase voltage). At this time, the secondary equipment such as relay protection being checked will show that the secondary voltage and secondary current are both greater than 0.02A and 0.2V (the current lags the voltage by 90°). The correctness of the vector of the secondary equipment such as relay protection is judged according to the conventional vector judgment standard.

[0074] b. When the device to be tested is an off-site line, the main tests are the current differential protection vector of the distribution line and the bus current differential protection vector of the opposite switch station. The converter equipment is connected to the switch station on this side, and the inductive simulated load is connected to the opposite switch station. The simulated load is adjusted to 1Ω, and the output current and output voltage of the converter equipment are adjusted. The distribution line current differential protection and the bus current differential protection of the opposite switch station are vector checked, as well as the vector checks of related measuring instruments, meters, recorders, control systems and other secondary equipment. It should be noted that the voltage and current are basically orthogonal in phase, and the phase angle of the voltage leads the current by 90°. The correctness of the vectors of secondary equipment such as relay protection is judged according to the conventional vector judgment standards.

[0075] When the primary rated current of the current transformer is greater than 1000A, the output current and voltage of the converter equipment are adjusted to be greater than 20A and 20V (phase voltage). At this time, the secondary equipment such as relay protection being checked will show that the secondary voltage and secondary current are both greater than 0.02A and 0.2V (the current lags the voltage by 90°). The correctness of the vector of the secondary equipment such as relay protection is judged according to the conventional vector judgment standard.

[0076] c. When the device to be tested is a distribution transformer in the station, the through impedance of the distribution transformer is relatively large, such as a 10kV, 500kVA, 6% distribution transformer. The simulated load should be under-compensated, and the final simulated load is 1Ω inductive. When the through impedance of the distribution transformer is relatively small, such as a 10kV, 1000kVA, 4% distribution transformer, the simulated load should be over-compensated, and the final simulated load is 1Ω capacitive. Adjust the output current and output voltage of the converter equipment, perform vector inspection of the distribution transformer protection, and vector inspection of related measuring instruments, meters, wave recorders, control systems and other secondary equipment. It should be noted that the voltage and current are basically orthogonal in phase. When the inductive load is applied, the phase angle of the voltage leads the current by 90°, and when the capacitive load is applied, the phase angle of the voltage lags the current by 90°. According to the conventional vector judgment standard, the correctness of the vector of secondary equipment such as relay protection is judged.

[0077] When the primary rated current of the current transformer is greater than 1000A, the output current and voltage of the converter equipment are adjusted to be greater than 20A and 20V (phase voltage). At this time, the secondary equipment such as relay protection being checked will show that the secondary voltage and secondary current are both greater than 0.02A and 0.2V (the current leads or lags the voltage by 90°). The correctness of the vector of the secondary equipment such as relay protection is judged according to the conventional vector judgment standard.

[0078] d. When simulating line faults and checking the relay protection action logic, the input end of the converter device is connected to the 380V power supply of the distribution network switch station, the three phases of the output end are connected in parallel, and one phase is output and connected in series to the input end of the phase to be tested of the device under test. The simulated load selects the simulated grounding wire gear, and the corresponding grounding settings are made to simulate a single-phase fault. One end of the simulated grounding wire is connected to the simulated fault point position of the phase to be tested outside the protection range of the device under test, and the other end is in a grounded state, forming a complete test loop. The action logic check at this time belongs to the out-of-zone fault action logic check of the device under test. When simulating an in-zone fault of the device under test, one end of the simulated grounding wire is connected to the simulated fault point position of the phase to be tested within the protection range of the device under test (between the two CTs of protection sampling), and the other end is in a grounded state, forming a complete test loop. The action logic check at this time belongs to the in-zone fault action logic check of the device under test.

[0079] After the operating status of the tested primary and secondary equipment in the switch station is adjusted, the trigger threshold of the protection device and the self-healing device is modified to below the maximum simulated fault current, so that the action logic verification step can be started. Through the PWM control method of IGBT conversion, the output current is suddenly increased by 3*100A, and the duration range is 1.0s-5.0s. When selected, it must be greater than the time of the protection and self-healing action logic. For faults outside the zone, the protection device should not act correctly, and the self-healing device should act correctly according to the logic of its system. For faults within the zone, the protection device should act correctly, and the self-healing device should act correctly according to the logic of its system.

[0080] At this time, you can check the action reports of the protection devices and self-healing devices, and check the electrical quantities and switching quantities under the fault state according to the sampling accuracy and logical performance of the devices, so as to truly restore the systematic action of protection and self-healing after the power grid fault, and ensure that the devices meet the relay protection requirements.

[0081] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.

Claims

1. A distribution network relay protection vector inspection and action logic verification test device, It is characterized in that It includes a current conversion device and a simulated load, wherein the input end of the current conversion device is connected to the mains power supply, the output end is connected to the input end of the device under test, and the simulated load is connected to the output end of the device under test; The current conversion device is used to adjust the output voltage and output current output to the device under test, and the simulated load includes a parallel test inductor, an inductive simulated load, a capacitive simulated load and a simulated grounding wire, which can form multiple loops with the device under test; When testing the device under test, at least one of the following functions is achieved by adjusting the simulated load: estimating the impedance of the device under test; performing impedance compensation on the device under test; and simulating a fault on the device under test; The converter device includes an IGBT converter module, a step-down transformer and a processor; The input end of the IGBT converter module is connected to the mains power supply, and the output end is connected to the step-down transformer, and the other end of the step-down transformer is connected to the device to be tested; The IGBT converter module is used to convert the mains electricity into the voltage and current required for the test and output it to the step-down transformer; The step-down transformer is used to output a stable load current or a pulse current; The processor is used to automatically read the current, voltage and active power values, and calculate the load capacity of the test device; The IGBT converter module adopts PWM control mode and can convert the mains electricity into continuously adjustable output voltage and output current.

2. The distribution network relay protection vector inspection and action logic verification test device according to claim 1, It is characterized in that The inductive simulated load is connected in star connection, and the capacitive simulated load is connected in delta connection; the simulated load is continuously adjustable.

3. A method for checking the relay protection vector and verifying the action logic of a distribution network. It is characterized in that Applicable to the distribution network testing device according to any one of claims 1 to 2, the method comprising: Adjusting the simulated load so that the test inductor is connected to the device under test, and adjusting the output current and output voltage of the converter device to preset test values; The processor reads the current, voltage and active power at the output end of the converter device, and estimates the impedance of the device to be tested according to the current, voltage, active power and the inductive reactance value of the test inductor; According to the impedance of the device under test and the test type, the output voltage, output current and the simulated load of the converter device are adjusted so that the simulated load reaches a preset value, and the simulated load is the total value of the impedance of the device under test and the load of the simulated load; the test types include busbar through short circuit test, transmission line through short circuit test, distribution transformer through short circuit test and simulated line fault test; Starting the test device, the equipment to be tested, the protection device and the self-healing device; According to the data and action status of the protection device and the self-healing device, at least one of the following actions is performed: obtaining a vector check result of the device under test, and verifying the correctness of the action logic of the protection device and the self-healing device.

4. The method for checking the relay protection vector and verifying the action logic of the distribution network according to claim 3, It is characterized in that The estimating the impedance of the device to be tested according to the current, voltage, active power and the inductive reactance value of the test inductor comprises: The processor reads the current, voltage and active power of the output end of the converter device, and calculates the load XL of the test device according to the current, voltage and active power; the load XL is the sum of the impedance Xd of the device to be tested and the inductive reactance Xs of the test inductor; The impedance Xd of the device under test is calculated according to Xd=XL-Xs.

5. The method for checking the relay protection vector and verifying the action logic of the distribution network according to claim 3, It is characterized in that The test type includes a busbar through-short circuit test, and the step of adjusting the simulated load according to the impedance of the device under test and the test type so that the simulated load reaches a preset value includes: When the busbar through-short-circuit test is performed, the device under test is a busbar, and the simulated load is adjusted so that the inductive simulated load is connected to the device under test; According to the estimated impedance value of the busbar, the inductive simulated load is adjusted to compensate for the impedance of the device under test, and the simulated load is compensated to a preset value, wherein the simulated load is an inductive simulated load.

6. The method for checking the relay protection vector and verifying the action logic of the distribution network according to claim 3, It is characterized in that The test type includes a transmission line short-circuit test, and the step of adjusting the simulated load according to the impedance of the device under test and the test type so that the simulated load reaches a preset value includes: When performing a transmission line short-circuit test, the device under test is a transmission line, and the simulated load is adjusted so that the inductive simulated load is connected to the device under test; According to the estimated impedance value of the power transmission line, the inductive simulated load is adjusted to compensate for the impedance of the device under test, and the simulated load is compensated to a preset value, and the simulated load is an inductive simulated load.

7. The method for checking the relay protection vector and verifying the action logic of the distribution network according to claim 3, It is characterized in that The test type includes a distribution transformer ride-through short circuit test, and the step of adjusting the simulated load according to the impedance of the device under test and the test type so that the simulated load reaches a preset value includes: When performing a distribution transformer ride-through short-circuit test, the device under test is a distribution transformer, and the simulated load is adjusted so that the capacitive simulated load is connected to the device under test; According to the impedance estimation value of the distribution transformer, the capacitive simulated load is adjusted to compensate the impedance of the device under test, and the simulated load is compensated to a preset value. The simulated load is an inductive simulated load or a capacitive simulated load.

8. The method for checking the relay protection vector and verifying the action logic of the distribution network according to claim 3, It is characterized in that The test type includes a simulated line fault test, and the step of adjusting the simulated load according to the impedance of the device under test and the test type so that the simulated load reaches a preset value includes: When performing a simulated line fault test, the three phases of the output end of the converter device are connected in parallel as one phase in series to the input end of the device under test, and a simulated grounding wire is connected in parallel inside or outside the protection zone of the device under test to simulate a single-phase fault; The triggering threshold of the protection device and the self-healing device is set below the maximum simulated fault current, the output current of the converter device is adjusted to the maximum simulated fault current value, the converter device is turned on, and maintained for a preset time, the preset time is set according to the action logic events of the protection device and the self-healing device; the maximum simulated fault current is the maximum value of the output current determined according to the actual performance of the converter device; Whether the action logics of the self-healing device and the protection device are correct is determined according to the action conditions of the protection device and the self-healing device.

Citation Information

Patent Citations

  • Method for checking and testing relay protection vector before operation of newly-built transformer station

    CN102510010A

  • Method for checking and testing relay protection vectors before commissioning of capacitance-compensated transformer substation

    CN102593737A

  • High-capacity three-phase and single-phase relay protection vector simulating system

    CN102914710A

  • Tester for affection of alternating-current crosstalk and voltage fluctuation of direct-current system on relay

    CN104251978A

  • Current supply device, and power equipment vector testing device and system

    CN110850223A