A monitoring system for long-distance pipeline transportation
By building a data collection, processing and application system on the dredging vessel, the problem of high energy consumption and complex data processing of the hydraulic conveying system in the dredging project was solved, accurate analysis of the conveying characteristics of the dredging pipeline and optimization of friction calculation were achieved, which improved the efficiency of the dredging project. Construction efficiency and safety.
Patent Information
- Application Number
- CN202111097515.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-18
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-09-18
AI Technical Summary
In dredging projects, traditional hydraulic transportation systems have problems such as high energy consumption during pipeline transportation, improper flow rates, increased friction or sedimentation, leading to pipe blockage, and on-site data processing cannot effectively reflect the actual transportation characteristics, affecting construction efficiency. .
Design a data collection, processing and application system, including on-site facilities and sensor acquisition equipment, marine servers and ship control platforms. It collects concentration, flow rate and pressure difference data through sensors and performs data processing to obtain concentration distribution for analysis and research. The dredging pipeline transportation characteristics overcome the problems of high cost and difficult installation of traditional physical concentration sensors.
It achieves effective collection and processing of dredging ship pipeline transportation data, provides more accurate analysis of transportation characteristics, optimizes the friction calculation model, improves construction efficiency and safety, and reduces energy consumption.
Smart Images

Figure CN113934981B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of dredging engineering. Background Art
[0002] In dredging projects, the main form of sediment transportation is hydraulic transportation, especially long-distance pipeline transportation of solid-liquid mixed multiphase flow, and multi-pump systems are often used. Pipeline transportation has a great impact on the efficiency of dredging construction and consumes a lot of energy. For example, pipeline transportation energy consumption accounts for more than 80% of the total energy consumption in the construction of a cutter suction dredger. Too fast slurry flow rate often increases friction and wastes power, while too slow flow rate causes sediment deposition, leading to a series of problems such as pipe blockage and pipe burst. Achieving efficient, stable and safe hydraulic transportation has always been the goal pursued.
[0003] Considering the volatility of the actual operation data of dredging pipelines over time and along the route, conventional field test data are mostly processed by averaging by time period (such as 1 hour, 1 day, etc.), which makes the processed data tend to be concentrated in velocity and concentration distribution and cannot effectively reflect the actual transportation characteristics. The data obtained on site are different from the stable and controllable data in the laboratory. They are highly volatile and complex, and the real-time changing velocity, concentration and pressure difference data are interrelated.
[0004] These data are the basis for further research on pipeline transportation mechanism, improvement of transportation theory, establishment of transportation theory model and other research work. Field test data can only be effectively used after being processed by scientific methods. For example, over the years, experts and scholars in related fields at home and abroad have carried out a lot of tests and research on the friction loss and critical flow velocity of pipeline hydraulic transportation. Early research was mostly based on the macro level. Based on certain theoretical assumptions and indoor small-diameter pipeline transportation tests or field small and medium-diameter pipeline transportation test results, a large number of empirical or semi-empirical semi-theoretical calculation models were established. In the dredging industry and related fields, the research results of Durand, Newitt, Wasp, Fei Xiangjun, Wang Shaozhou and others are representative. These calculation models are used for the performance analysis and calculation of dredging and transportation systems under modern large-diameter pipelines, high-concentration transportation, coarse particles or complex soil conditions, and there may be large deviations. Reasonably processed field data can better correct and optimize these empirical models, and even propose more reasonable calculation models. This field has not yet built a corresponding data collection, data processing, and data application research system for dredging vessels. Summary of the invention
[0005] The present invention aims to disclose a research system which is built on a dredging vessel to collect, process and apply the transportation data of the dredging vessel pipeline.
[0006] After the data processing module in the system of the present invention processes the basic pipeline data from the site through a certain algorithm, the concentration distribution on the entire pipeline can be obtained, so as to effectively replace the dense distribution of physical concentration sensors to obtain basic pipeline data, so as to solve the limitation of the high price of traditional concentration sensors, and overcome the problem of difficult layout and installation on the surface pipeline, so as to fundamentally solve the bottleneck of the high cost and difficulty of laying out a large number of physical concentration sensors to collect effective data, and the difficulty of promotion and engineering application. At the same time, the data processing module further processes the field data to obtain a data group with one-to-one correspondence between concentration, flow rate and pressure difference, which can be used to analyze and study the transportation characteristics and engineering applications of dredging pipelines.
[0007] The present invention requires protection of the following technical solutions:
[0008] A data collection, processing and application system for long-distance pipeline transportation, characterized in that it includes field facilities and sensor collection equipment, a ship server, and a ship control platform (crew user application terminal). The ship server includes a data storage module and a data processing module. The data processing module processes the data in the data storage module. The data storage module includes static data and dynamic data, wherein:
[0009] On-site facilities include delivery pipelines and pumps, acquisition cards;
[0010] The sensing and acquisition equipment deployed on site includes three types of sensors: pressure gauge, concentration meter, and flow meter. The sensors are deployed on the transmission pipeline to collect long-distance pipeline transportation construction data. The pressure gauge, concentration meter, and flow meter convert analog signals into digital signals through the acquisition card, and provide the collected pipeline transportation dynamic data to the data storage module of the ship server; the collected pipeline transportation dynamic data, that is, data that changes in real time over time, includes the concentration at the starting point of the transportation, the flow rate, and the test target section pipeline pressure. These three physical quantities are also the most important physical quantities of long-distance pipeline transportation in dredging projects, and are the key parameters for ship control platforms to analyze and study. When the platform studies pipeline transportation problems, the pressure on a single pipeline cross section is not very meaningful. It is often necessary to analyze the degree of pressure loss after the fluid flows through a section of the pipeline, that is, the pressure difference between the beginning and the end of this section of the pipeline. Therefore, in actual measurement, the absolute pressure values at the starting and ending positions of this section of the pipeline (test target section) are measured.
[0011] The data storage module stores static data collected from pipeline transportation, that is, data that does not change with time within a certain period of time. These data often do not change in a short period of time during engineering construction, such as the length, diameter, type, roughness of the transportation pipeline, the particle size and bulk density of the transported sediment, as well as the excavation depth and elevation. These data will be used in the data processing of the data processing module and the application examples of the ship control platform.
[0012] The data processing module includes a pre-processing module, a concentration distribution deduction calculation module, an average concentration Module, data group acquisition module, data screening and elimination module, data post-processing module, among which:
[0013] The pre-processing module is used to pre-process the dynamic data of long-distance pipeline transportation, including pre-processing of three types of data: speed data, concentration data, and pressure data, as well as clock matching, which is to perform clock matching on the time displayed and recorded by the installed sensor.
[0014] The deduction calculation module of the concentration distribution is based on the slurry microelement at the pipe suction port at a certain moment, and the particle volume concentration of the slurry microelement is C vd , the slurry flow rate V changes with time and is a function of time t. After Δt time, the slurry is located at a distance x from the starting point, which can be expressed as:
[0015]
[0016] For the slurry microelement, the distance from the starting point at any time is calculated by integration. Similarly, for any slurry microelement, its moving distance can be calculated by this integration method. In this way, the concentration distribution of the slurry at any time on the entire pipeline is obtained, which is used to provide the average concentration module.
[0017] The data set acquisition module is composed of a data set α with one-to-one correspondence of (flow rate-average concentration-pressure difference) and is used to provide it to the data screening and elimination module. The average concentration at all times calculated on the target pipe segment in the module The data sets consisting of the flow velocity V and the pressure difference P corresponding to each moment are collected together to form a data set set α. If α has n data sets, it can be expressed as
[0018] The data screening and elimination module eliminates the entire data group from the data group set. The data group set after elimination is β. Suppose there are m data groups, then
[0019] The data post-processing module is to sort and classify the flow rate and concentration, and average the data in the same category, so as to weaken the data error and data neutrality, so that the processed new data group is more representative and authentic.
[0020] The ship control platform is used for data post-processing, displaying and utilizing the acquired data, and analyzing and presenting it according to specific applications.
[0021] The data processing module in the system of the present invention can classify and average the data according to the size of the flow rate and concentration to form a final test condition data group, which can obtain the test results under the wider flow rate and concentration distribution of the actual construction, and reduce the deviation of the test results caused by a few data tests and various abnormal situations by averaging. The system of the present invention considers adopting a processing method of classifying and averaging according to the flow rate and concentration. First, the measured flow rate, concentration, and pressure data are pre-processed, and then combined with the layout of the pipeline and the measuring point, the real-time concentration data of the test pipe section is deduced under reasonable assumptions. Subsequently, the test condition data combination (flow rate, concentration, and pressure difference) is classified and sorted according to the flow rate and concentration, and divided according to a certain number (generally not less than 500 data combinations). Finally, the average value of each data group after division is taken to form the final test condition data group. Through the above processing method, the test results under the wider flow rate and concentration distribution of the actual construction can be obtained, and the deviation of the test results caused by the test deviation of a few data tests and various abnormal situations can be reduced by averaging.
[0022] The platform in the system of the present invention can use the data processed by the data processing module to study the pipeline transportation mechanism, improve the transportation theory, establish the transportation theory model, etc. For example, it can study the matching of different friction resistance empirical formulas with the transportation project, and modify and optimize them or even propose new calculation formulas, which can provide more accurate calculation results in related calculations and have practical engineering significance. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 (a) On-site diagram of the long-distance pipeline transportation field data processing system; (b) Schematic diagram of the system modules;
[0024] Figure 2 Shown is the concentration distribution diagram on the pipeline at a certain moment;
[0025] Figure 3 Shown is a two-dimensional schematic diagram of data classification;
[0026] Figure 4 The figure shows the comparison between the friction loss calculated by the common formula and the measured value of a steel pipe section;
[0027] Figure 5 The figure shows a comparison between the friction loss calculated using the new formula for a steel pipe section and the actual measured value. DETAILED DESCRIPTION
[0028] In order to further understand the content, features and effects of the present invention, a certain construction condition of a cutter suction dredger is taken as an example, and the present invention is described in detail as follows in conjunction with the accompanying drawings:
[0029] The method is not limited to the cutter suction dredger pipeline transportation in the present embodiment, but is also applicable to other multi-pump-pipeline solid-liquid two-phase flow transportation processes. In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention can also be implemented in other ways different from those described herein, so the protection scope of the present invention is not limited by the specific embodiments disclosed below.
[0030] Example 1
[0031] First, the sensor installation measurement instructions
[0032] The suction dredger and the mud discharge pipeline described in Example 1 are installed with concentration meters, flow meters and pressure sensors and their data collection and transmission equipment. These sensors and data collection and transmission equipment are used in coastal construction areas with relatively harsh conditions. They must be resistant to high temperatures, have good waterproof properties and good stability. The sensors are arranged at a relatively far distance from the data processing unit, and problems such as difficulty in power supply and long signal transmission distance must be considered. Therefore, there are certain requirements for installation and measurement.
[0033] (1) Installation and measurement of concentration meters and flow meters
[0034] Radioactive concentration meters and electromagnetic flow meters are used for measurement. They are installed on the conveying pipeline near the stern of the cutter suction dredger. Sampling is carried out by opening a branch pipe on the ship pipe to calibrate the sensor and analyze the physical properties such as particle grading and dry density. The use and storage of radioactive concentration meters must strictly comply with relevant requirements.
[0035] (2) Installation and measurement of pressure sensors along the shore pipeline
[0036] In order to ensure the continuity and stability of the shore pipe testing process, the shore pipe should try to choose a relatively fixed main line. In the process of pipeline arrangement, the horizontal and vertical directions should be as straight as possible. Before the test, the arrangement form and composition status of shore pipes of different materials are counted, such as: pipeline length, connection form and quantity of steel pipes and rubber short pipes, etc. At the same time, the backpack RTK is used to measure the pipeline elevation for pressure difference compensation between each pressure measuring point. In addition to the pressure sensor itself, auxiliary supplies such as battery packs, inverters and low-power high-fidelity transmission cables are also required for pressure measurement along the shore pipe. The pressure sensor used is a push-plate anti-silt special pressure transmitter. The pressure test system adopts a bus solution to ensure the synchronization of the test pressure value.
[0037] (3) Installation and measurement of pressure sensors along the floating tube
[0038] The floating tube pressure test along the way, due to the particularity of its measurement environment, puts forward higher requirements for the test instruments and data acquisition equipment. First, because the floating tube pressure test system is close to the water surface and is affected by the splash, a higher waterproof level is required; second, because the floating tube floats on the water surface, there will be a large range of drift and fluctuations with the tide and waves, so it is necessary to accurately grasp the posture of the floating tube during the measurement, and the test and acquisition instruments must be installed and fixed in a safe and reliable position. While ensuring the pressure sensor range of 0-1.8MPa, accuracy of 0.05% and overload protection of 150%, it is necessary to consider the high temperature resistance and waterproof performance of components such as pressure sensors, data acquisition equipment, and power supply batteries. In addition, it is necessary to set obvious warning signs on the test tube to avoid damage to the test tube section during anchor removal or other operations. Independent battery packs are arranged at each measuring point to provide power for the test system at the measuring point, and the battery pack life is guaranteed to be more than 60 days.
[0039] The data processing module includes a pre-processing module, a concentration distribution deduction calculation module, an average concentration Module, data group acquisition module, data screening and elimination module, data post-processing module, among which:
[0040] The pre-processing module is used to pre-process the dynamic data of long-distance pipeline transportation, including pre-processing of three types of data: speed data, concentration data, and pressure data, as well as clock matching, which is to perform clock matching on the time displayed and recorded by the installed sensor.
[0041] Specifically, the pre-processing of flow rate data is to obtain the accurate value of flow rate through the color tracing method and calibrate the flow rate sensor; during construction operations, there are cases where data is lost at individual moments or in individual very short periods when collecting signals on the suction dredger, and the data changes are often not sudden, so they can be corrected by the data measured at the previous and next moments. The pre-processing of concentration data is the same as above. First, the lost concentration data needs to be corrected, and then the wet concentration (also called ship-displayed concentration) measured by the sensor is converted into particle volume concentration. The wet concentration is a professional term for pipeline transportation in dredging projects; when the dredger is digging soil, the original soil is loose, and the concentration directly measured at this time is the wet concentration, which is larger than the particle volume concentration. The pre-processing of pressure data is to calculate the pressure difference between the starting position and the end position of the measurement target section, and record missing or obviously erroneous data as NaN.
[0042] The concentration distribution deduction calculation module:
[0043] It is impossible to install concentration meters on the entire pipeline for on-site measurement, as the cost and installation difficulty are very high and not realistic. Therefore, in engineering, slurry concentration and flow measurements are often carried out on a suitable section of pipeline on the ship deck. The flow rate is basically consistent in all sections of the pipeline, but the concentration changes are more complicated due to many factors such as the dredger's operating mode, underwater terrain, soil conditions, etc., and its distribution in the entire pipeline is also very uneven. It is necessary to extrapolate the concentration obtained at a single measurement point on the ship to the spatial distribution of the entire transmission pipeline to obtain the concentration distribution of the entire pipeline.
[0044] For safety reasons, the slurry flow rate is often controlled within a range higher than the critical flow rate to reduce sediment deposition and prevent pipe blockage. Therefore, the present invention assumes that the concentration of the slurry does not change with the change of spatial position during the transportation process. Take the slurry microelement at the pipe suction port at a certain moment as an example. The particle volume concentration of the slurry microelement is C vd Since the slurry flow rate V changes with time, it can be considered as a function of time t, so the concentration value is C vd The distances moved by the slurry microelement at different times are different. After Δt time, the slurry is located at a distance x from the starting point, which can be expressed as:
[0045]
[0046] For the slurry microelement, its distance from the starting point at any time can be calculated by integration. Similarly, for any slurry microelement, its moving distance can be calculated by this integration method. In this way, the concentration distribution of the slurry at any time in the entire pipeline can be obtained to provide the average concentration Module. The present invention discretizes time in seconds, and tracks each concentration value and its displacement distance on the pipeline at each moment. Therefore, the interval distances between the tracked concentration values are different, and the concentration at the interval length between two concentrations is obtained by interpolation. The present invention uses the concentration and flow rate measurement position as the starting zero point of the pipeline, and based on the concentration and flow rate measurement values measured at this point, sequentially calculates the concentration distribution of the entire pipeline at different moments. This embodiment selects data within a certain 25000s for analysis. Taking the 14000s moment of this period as an example, the calculated concentration distribution result is as follows: Figure 3 shown.
[0047] The average concentration Module for calculating the average concentration of the target pipe segment The concentration distribution on the entire pipeline at different times has been calculated in the concentration distribution deduction calculation module. The target pipe section is a small section of the entire pipeline. Since the data is discretized, the average concentration The module needs to calculate the average concentration of the target pipe segment by numerical integration method. In this way, the system of the present invention can calculate the corresponding average concentration of the target pipe segment at all times.
[0048] It is worth noting that the average concentration of the target pipe section studied by the system of the present invention at any time is The three physical quantities of mud flow rate V and pipeline head-to-tail pressure difference P constitute a data group The data in a data group are interrelated and correspond one to one (the data processing below is all performed on the data group).
[0049] The data set acquisition module is composed of a data set α with one-to-one correspondence of (flow rate-average concentration-pressure difference) and is used to provide it to the data screening and elimination module. The average concentration at all times calculated on the target pipe segment in the module The data sets consisting of the flow velocity V and the pressure difference P corresponding to each moment are collected together to form a data set set α. If α has n data sets, it can be expressed as
[0050] The data screening and elimination module eliminates the entire data group from the data group set. The data group set after elimination is β. Suppose there are m data groups, then
[0051] The data set obtained in the data set acquisition module is not a completely ideal data set. There are many "problem data" that will affect subsequent research. It is necessary to identify and screen the obtained data set in combination with actual working conditions, data acquisition characteristics, data correlation within the data set, and relevant theoretical knowledge. If there is a problem with any data in the data set, or there is a contradiction between the data in the data set, the entire data set needs to be removed from the data set set. The set of data sets after removal is β. Suppose there are m data sets, then There may be various problems with the data measured on site. Screening and eliminating these problematic data can improve the accuracy and effectiveness of the data.
[0052] The following is an example of "problem data":
[0053] For the data set with low concentration and large pressure difference, the dredging vessel's cutter head swings horizontally and needs to turn around when it swings to the edge. At this time, the soil is no longer cut, and the concentration is very small, and even many data are close to zero. The corresponding pressure difference value should also be very small, but sometimes the measured pressure difference is still not small. This is due to the sensor signal problem. The data collected in the project will not become smaller instantly.
[0054] For data sets with high concentrations and normal differential pressure, the concentration meter has a range limit. When the actual concentration exceeds the maximum range of the concentration meter, the concentration meter only records the maximum value. At this time, the differential pressure measurement is accurate. This is also a kind of "problematic data";
[0055] In the previous calculation process, some pressure difference data were set to NaN, which is problematic data. In this step, the corresponding data groups should also be eliminated.
[0056] The data post-processing module sorts and classifies the flow rate and concentration, and averages the data of the same category, weakening the data error and data neutrality, making the processed new data group more representative and authentic, and providing reliable engineering data for subsequent research. In contrast, conventional field test data mostly adopts the processing scheme of averaging by time period (such as 1 hour, 1 day, etc.), which makes the processed data tend to be concentrated in flow rate and concentration distribution, and cannot effectively reflect the actual transportation characteristics.
[0057] The data post-processing module sorts the m data groups in the data group set β according to the speed in the data group, and keeps the corresponding relationship between the other two physical quantities and the speed. After sorting, each i data is classified into a large category in sequence; then, in each large category, the data groups are sorted according to the concentration in the data group, and each j data groups is classified into a small category in sequence; in this way, the huge data group is divided into two-dimensional space with speed as the horizontal axis and concentration as the vertical axis; finally, the new data group is The groups are merged into a set γ as the final data set. Assuming γ has k data sets, it can be expressed as
[0058] To facilitate understanding of the large data set, the data are divided into two dimensions with velocity as the horizontal axis and concentration as the vertical axis. Figure 3 To explain:
[0059] Assume that there are 98,000 data groups in the set β. After sorting by speed, from small to large, each 7,000 data groups form a large category, so there are 14 large categories in total. Figure 3 The coordinate space is divided into 14 vertical columns. In actual construction, the slurry flow rate is more concentrated near the flow rate of 5m / s, so the velocity variation range of the class close to 5m / s is small. Similarly, for the data groups in the same category, after sorting by concentration, from small to large, every 500 data groups are a small category, and there are a total of 14 small categories in the same category. Figure 3 The space is divided into 14 horizontal columns, and the vertical and horizontal columns divide the 98,000 data groups into 196 subcategories. In other words, Figure 3Each grid in the data set is equivalent to a small category, and each small category has 500 data sets. We believe that the data sets in this small category have similar characteristics and reflect similar physical phenomena. Next, we average the data sets in the same category, that is, we average the three physical quantities of flow rate, average pipeline concentration, and pressure difference between the beginning and the end of the pipeline, and we can get a new processed data set.
[0060] In summary, the system of the present invention uses mathematical means to select a certain monitoring point, and deduce the concentration value of the monitoring point that changes with time to the concentration distribution on the entire transmission pipeline at any time, so as to facilitate the pressure difference matching of the target pipe section and construct a data group; according to the construction characteristics of dredging ships and related theories, the existing "problem data" is analyzed and identified, and the data group is cleaned to improve the reliability of the final data group; for the first time, it is proposed to treat the data as two-dimensional spatial data, sort, group and average according to their size, which weakens the centralization of the data, making the processed new data group more representative and authentic, and providing reliable engineering data for subsequent research. It is worth noting that the connection relationship between the various modules of the system of the present invention is strict and the order cannot be reversed. For example, when deducing the concentration, the concentration and flow rate data recorded at continuous moments are required. Therefore, even if there is "problem data", it cannot be eliminated in the process. This is an interlocking and complete set of data processing methods. Leaving any link will affect the reliability of the final data group.
[0061] Example 2
[0062] Based on the system of Example 1, the ship control platform displays the data processed by the ship server and performs data analysis and other applications.
[0063] The platform of this embodiment studies the pipeline transmission mechanism of the data processed by the server, improves the transmission theory, establishes the transmission theory model, etc.
[0064] In this embodiment, the establishment of a new friction calculation formula is used as an application example for explanation. Regarding friction calculation, most researchers have established empirical or semi-empirical and semi-theoretical calculation models based on certain theoretical assumptions and indoor small-diameter pipeline transportation tests or on-site small and medium-diameter pipeline transportation test results. In the dredging industry and related fields, the research results of Durand, Newitt, Wasp, Fei Xiangjun, Wang Shaozhou and others are representative. These calculation models are used for performance analysis and calculation of dredging and transportation systems under modern large-diameter pipelines, high-concentration transportation, coarse particles or complex soil conditions, and there may be large deviations. The field data after reasonable processing can better correct and optimize these empirical models, and even propose more reasonable calculation models. This is the main problem to be solved in this embodiment.
[0065] In this embodiment, three friction empirical formulas, namely Durand formula, Jufin formula and Fei Xiangjun formula, are first applied to the transportation project to calculate the friction. Figure 4 As shown, the horizontal axis is the field data obtained by S1-S7, that is, the measured value, and the vertical axis is the theoretical value calculated by the empirical formula. The closer these scattered points are to the straight line in the middle, the higher the matching degree between the theoretical calculated value and the field measured value. Obviously, the matching degree between the calculation results of these empirical formulas and the project is poor. If it can be corrected, optimized, or even a new calculation formula is proposed, more accurate calculation results can be provided in related calculations, which has practical engineering significance. To this end, the present invention has done the following processing:
[0066]
[0067] The existing Fei Xiangjun formula divides the friction resistance into two parts: carrier friction resistance and bottom bed friction resistance.
[0068] In formula (2), I m is the friction loss of the transported slurry (mH2O / m); α is the correction coefficient related to the relative viscosity of the slurry; λ is the resistance coefficient along the pipeline when transporting clean water; V is the transport flow rate (m / s); g is the acceleration due to gravity (m / s 2 ); D is the inner diameter of the pipe (m); γ m is the bulk density of the slurry (t / m 3 ); γ w is the bulk density of the transport medium. In this example, it is mainly seawater, so 1.025t / m 3 ; γ s is the bulk density of the solid material being transported. The working conditions used in this embodiment are mainly medium-coarse sand, and 2.65t / m 3 ; K m is the test coefficient; μ s is the friction coefficient, generally taken as 0.44; C vd is the volume concentration of solid particles in the slurry, V c is the critical velocity (m / s), and the standard formula (JTS 181-5-2012) is used for calculation; V ss is the sediment particle settling velocity. In this working condition, in this embodiment working condition, the conveying medium is medium-coarse sand. After testing, the median particle size d 50 It is 0.7 mm. This embodiment uses Wu Shui’s formula for calculation, see formula (3).
[0069]
[0070] Where v is the fluid dynamic viscosity coefficient, which is 10 6 m 2 / s.
[0071] It is well known in the art that Fei Xiangjun's formula is more suitable for solid-liquid two-phase flow pipeline transportation in the presence of a thin layer of bottom bed. When the flow rate is high and there is no bottom bed, there may be a large deviation. For this reason, the present invention considers improving Fei Xiangjun's formula from the perspective of flow morphology, that is, taking the presence of a bottom bed as a critical condition. When it is lower than the critical condition, the existing Fei Xiangjun formula is used; when it is higher than the critical condition, the carrier friction resistance remains unchanged and the bottom bed friction resistance tends to disappear. Based on the above considerations, the following modified Fei Xiangjun formula is established:
[0072]
[0073] Where V c is the critical velocity of slurry (m / s), and the standard formula (JTS 181-5-2012) is used here:
[0074] V c =(90C vd ) 1 / 3 ·g 1 / 4 ·D 1 / 2 ·ω 1 / 2 ·d 50 -1 / 4 (4)
[0075] The data set obtained by S7 is collected Substitute into formula (3), fit the coefficient Km, and plot the calculation result of the fitted corrected formula as Figure 5 , in the figure, the friction loss value calculated by the correction formula is in good agreement with the measured value under most working conditions, with an overall deviation within ±15%, and only in the smaller value area is there a large deviation from the measured value. Figure 4 Compared with the calculation results of empirical formulas (Durand formula, Jufin formula, original Fei Xiangjun formula, etc.), it can be found that the revised formula (3) has higher calculation accuracy. Although the revised formula is an improvement based on the original Fei Xiangjun empirical formula, the principle has changed, the formula structure has changed significantly, and the calculation results have good matching, so it can be considered as a new formula. Then, in actual construction, when encountering similar working conditions, this formula can be used to calculate the friction resistance of the transmission pipeline and guide on-site operations, which has a high application value.
Claims
1. A data collection, processing and application system for long-distance pipeline transportation, characterized in that: It includes on-site facilities and sensor collection equipment, a ship server, and a ship control platform. The ship server includes a data storage module and a data processing module. The data processing module processes the data in the data storage module. The data storage module includes static data and dynamic data, among which: On-site facilities include delivery pipelines and pumps, acquisition cards; The sensing and acquisition equipment deployed on site includes three types of sensors: pressure gauge, concentration meter and flow meter. The sensors are deployed on the transmission pipeline to collect long-distance pipeline transportation construction data. The pressure gauge, concentration meter and flow meter convert analog signals into digital signals through the acquisition card, and provide the collected pipeline transportation dynamic data to the data storage module of the ship server; the collected pipeline transportation dynamic data, that is, the data that changes in real time over time, includes the concentration at the starting point of the transmission, the flow rate, and the pipeline pressure of the test target section; The data storage module stores static data of pipeline transportation, which is provided to the data processing module and the ship control platform; The data processing module includes a pre-processing module, a concentration distribution deduction calculation module, an average concentration Module, data group acquisition module, data screening and elimination module, data post-processing module, among which: The pre-processing module is used to pre-process the dynamic data of long-distance pipeline transportation, including pre-processing of three types of data: velocity data, concentration data, and pressure data, as well as clock matching, which is used to match the time displayed and recorded by the installed sensor; the concentration distribution deduction calculation module is used to calculate the particle volume concentration of the slurry microelement at the pipeline suction port at a certain moment, C vd , the slurry flow rate V changes with time and is a function of time t. After Δt time, the slurry is located at a distance x from the starting point, which can be expressed as: For the slurry microelement, the distance from the starting point at any time is calculated by integration. Similarly, for any slurry microelement, its moving distance is calculated by integration. In this way, the concentration distribution of the slurry at any time on the entire pipeline is obtained, which is used to provide the average concentration Module; the data set acquisition module is composed of a data set α corresponding to flow rate-average concentration-pressure difference, which is used to provide data screening and elimination modules; the average concentration The average concentration at all times calculated on the target pipe segment in the module The data sets consisting of the flow velocity V and the pressure difference P corresponding to each moment are collected together to form a data set set α. If α has n data sets, it can be expressed as The data screening and elimination module eliminates the entire data group from the data group set. The data group set after elimination is β. Suppose there are m data groups, then The data post-processing module is used to sort and classify the flow rate and concentration, and average the data within the same category; The ship control platform is used for data post-processing, displaying and utilizing the acquired data, and analyzing and presenting it according to specific applications.
2. The system according to claim 1, characterized in that: The data processing module classifies and averages the data according to the flow rate and concentration to form a final test condition data group; the processing method of classifying and averaging according to the flow rate and concentration is adopted: First, the measured flow rate, concentration, and pressure data are pre-processed, and then combined with the pipeline and measurement point layout, the real-time concentration data of the test pipe section is deduced under assumptions; then, the test condition data combination flow rate, concentration, and pressure difference are classified and sorted according to flow rate and concentration, and divided into a certain number; finally, the average value of each divided data group is taken to form the final test condition data group.