A method for estimating the maximum flood volume of karst tunnel underground river replenished by rainfall surface runoff

By combining statistical data and measured data, considering the relationship between ground runoff replenishment and underground rivers, predicting the maximum flood volume and peak time of karst tunnel underground rivers, the problem of rough calculation process in the existing technology is solved, and karst is achieved Accurate prediction and security design of tunnel rivers.

CN114036750BActive Publication Date: 2024-11-19CCCC FIRST HIGHWAY XIAMEN ENGINEERING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111319022.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-09
Publication Date
2024-11-19
Estimated Expiration
2041-11-09

AI Technical Summary

Technical Problem

When predicting the maximum flooding of karst tunnel underwater, the prior art fails to fully consider the recharge relationship between ground runoff supply and underground underwater and the flood discharge capacity of underground underwater, which leads to the calculation process being too rough and lacks accuracy.

Method used

Using a method combining statistical data and measured data, the relationship between surface runoff and underground runoff is organically connected through rainfall calculation, photogrammetry, digital terrain mapping, and digital terrain surface runoff analysis, especially considering the relationship between ground runoff replenishment and underground rivers. and flood discharge capacity, calculate the maximum flood volume and peak time of the karst tunnel undercurrent.

Benefits of technology

Accurate prediction of surface water supply in karst areas is achieved, and the height of flood control berths during the tunnel construction period and the capacity of dark river water during the operation period are reasonably designed to ensure the safety of tunnel construction and operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_1
    Figure SMS_1
  • Figure SMS_2
    Figure SMS_2
  • Figure SMS_19
    Figure SMS_19
Patent Text Reader

Abstract

The present invention is a method for estimating the maximum flood volume of a karst tunnel underground river replenished by rainfall surface runoff, and the specific steps include: (1) obtaining rainfall statistical parameters; (2) calculating the design rainfall; (3) calculating the design average rainfall distributed over time; (4) calculating the design net rainfall; (5) checking the surface water collection points in the tunnel site area and obtaining terrain data; (6) analyzing the surface runoff; (7) calculating the groundwater collection parameters; (8) calculating the surface runoff replenishing the groundwater runoff; (9) estimating the maximum flood volume of the tunnel underground river. The present invention can accurately predict the maximum flood volume of the tunnel underground river in the karst area due to the surface water collection, so as to reasonably design the height of the flood control embankment during the tunnel construction period and the water flow capacity of the underground river crossing the aqueduct or passing the culvert during the operation period, and can determine the construction time of the tunnel to avoid risks based on the estimated flood peak time, so as to ensure the safety of tunnel construction and operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a method for estimating the maximum flood volume of a karst tunnel underground river supplied by surface runoff. It belongs to the field of karst tunnel design and construction, and in particular to a method for predicting the peak value and peak time of a flood peak of an underground river in a karst tunnel under rainfall conditions. It is suitable for effectively and accurately predicting the maximum flood volume of an underground river in a karst area due to surface water supply to the tunnel when a karst tunnel encounters an underground river, and provides the calculation basis required for the design of the height of the underground river flood control embankment and the water capacity of the upper aqueduct or the lower culvert for treating the underground river. Background Art

[0002] In the design and construction of highway and railway tunnels in karst areas, karst underground river systems are often encountered. Karst underground river systems are usually dominated by various karst cavities such as karst caves. Their flow is not only affected by the recharge of their own groundwater system, but also has a close correlation with surface runoff. During heavy rains, their flow will increase rapidly, the flow rate will accelerate, and a flood peak will form in a short time.

[0003] Tunnel construction has seized the original flow path of the underground river. Whether in the tunnel construction period or the operation period, it is necessary to effectively deal with the impact of the karst underground river on the tunnel. During the tunnel construction, it is necessary to carry out flood forecasts for the underground river, set a reasonable embankment height to ensure flood prevention and disaster reduction, and in terms of tunnel operation safety, reasonably design the water flow capacity of the aqueduct and culvert that cross the underground river into the tunnel.

[0004] At present, the methods for predicting tunnel water inflow include atmospheric rainfall infiltration method, groundwater runoff modulus method, groundwater drainage static water volume method, spring flow summary method, groundwater dynamics method, numerical analysis method, data mining method, etc.

[0005] Subsurface runoff modulus method:

[0006] Q = 86.4M·A, where M is the runoff modulus; A is the catchment area;

[0007] Atmospheric rainfall infiltration method:

[0008] Calculate the rainfall infiltration coefficient η based on the water balance principle

[0009]

[0010] Where: ΔQ+Q out is the rainfall infiltration recharge; Q out is the average flow rate monitored at the discharge point of the groundwater system; ΔQ can be solved according to the spring flow attenuation equation; A is the catchment area; P is the rainfall;

[0011] Q i =2.74η i ·h·A i Q=∑Q i

[0012] Where: Q is the total water inflow of the tunnel; Q i is the water inflow of each geological section of the tunnel; i is the infiltration coefficient of each geological segment of the tunnel; h is the maximum annual rainfall in the region; A i is the catchment area of ​​each geological segment;

[0013] Groundwater dynamics method:

[0014] The principle formula is:

[0015]

[0016] Where: B is the length through the aquifer; K is the permeability coefficient; H is the thickness of the aquifer; R is the influence radius;

[0017] Many scholars have proposed hydrodynamic formulas under their own assumptions, as follows:

[0018] Qiu Buyi theory formula:

[0019] Kuniaki Sato formula: Q s =Q max -0.584ε·K·r

[0020] Ochiai Toshiro formula:

[0021] Kosyakov formula:

[0022] Goodman's empirical formula:

[0023] Oshima Hiroshi formula:

[0024] Gilinsky formula: y=26.89K 0.5709

[0025] Railway survey specification empirical formula: Q max =(0.0255+1.9224KH)L;Q s =KLH(0.676- 0.06K)

[0026] Where: Q max —Predict the maximum possible water inflow when the tunnel passes through the water-bearing body (m3 / d); Q s—Prediction of stable water inflow through the tunnel through the water-bearing body (m3 / d); K—Permeability coefficient of the rock mass (m / d); H—Vertical distance from the original static water level in the aquifer to the tunnel floor (m); H0—Distance from the original static water level to the center of the equivalent circle of the tunnel cross section (m); S—Drawdown of the groundwater level (m); h—Assumed water depth of the drainage ditch in the tunnel, which is 1m based on experience; h c —Thickness of water body (m); h0—Distance from tunnel bottom to underlying aquiclude (m); L—Length of tunnel through aquifer (m); R—Radius of influence of water inrush in tunnel (m); r—Equivalent circle radius of tunnel cross section (m), (the empirical value for single tunnel is 3.5m, the empirical value for double tunnel is 7m); d—Equivalent circle diameter of tunnel cross section (m), d=2r; ε—Test coefficient, generally 12.8; m—Conversion coefficient, generally 0.86; i—Empirical coefficient (d / m), 0.0105.

[0027] Numerical analysis method:

[0028] Mainly includes finite element method (FEFLOW, FEMWATER), finite difference method (MODFLOW, GMS), etc.

[0029] Data Mining Method:

[0030] Mainly includes nonlinear theoretical methods (neural network, system identification method), random mathematical methods (fuzzy mathematical method, multivariate statistical method, time series analysis method);

[0031] Among them, although the atmospheric rainfall infiltration method takes into account the factor of rainfall recharge, it is only a rough estimate of the total amount of rainfall reduction, and cannot calculate the surface runoff caused by rainfall, which in turn recharges the underground river and forms a flood peak in the underground river. Other methods do not take into account the recharge effect of rainfall. At the same time, the above-mentioned methods are all based on the concepts of groundwater seepage or groundwater pumping and recharge, and do not involve the principle of flood peak formation caused by the time effect in runoff convergence.

[0032] Patent CN 107730151 B provides a method for calculating basin design floods based on a conceptual hydrological model. This method is mainly suitable for the formation of river flood peaks, and does not involve the formation of runoff flood peaks and the recharge of underground rivers.

[0033] Patent CN 102289570 B provides a flood forecasting method based on rainfall-runoff-flood evolution calculation. This method is mainly based on the deduction and regression of measured rainfall and water conditions data, and cannot be estimated based on historical data or actual terrain data, and does not involve the relationship between surface flood peaks and underground river recharge.

[0034] Patent CN 102930357 B provides a method for predicting the peak value and peak time of karst underground river flooding during heavy rain. This method is based on a conceptual formula and lacks corrections based on actual measurements and empirical data. The accuracy of the calculation results is questionable. At the same time, the peak flood calculation is simply the addition of surface runoff and underground runoff, without fully considering the relationship between surface runoff recharge and underground river recharge, as well as the flood discharge capacity of underground rivers.

[0035] Therefore, when using the traditional hydrogeological tunnel water inflow prediction method to realize the peak value and peak time of karst tunnel water inflow, the calculation process is too rough, and the relationship between surface runoff recharge and underground river recharge and the flood discharge capacity of underground river are not considered in the calculation. It is necessary to organically connect the key steps such as rainfall calculation, photogrammetry digital terrain mapping, digital terrain surface runoff analysis, and the relationship between surface runoff and underground runoff, and provide a peak estimation method for the maximum flood volume of karst tunnel underground river recharged by surface runoff combining experience and measured data. Summary of the invention

[0036] Technical problem: The purpose of the present invention is to provide a method for estimating the maximum flood volume of underground rivers in karst tunnels replenished by rainfall surface runoff. On the basis of combining statistical data with measured data, the key steps of rainfall calculation, photogrammetric digital terrain mapping, digital terrain surface runoff analysis, and the relationship between surface runoff and underground runoff are organically connected in series, especially taking into full account the relationship between surface runoff replenishment and underground underground rivers, which have not been involved in existing work, as well as the flood discharge capacity of underground underground rivers. In this way, the maximum flood volume of underground rivers in karst areas replenished by surface water can be accurately predicted, and the height of flood control embankments during tunnel construction and the water flow capacity of underground rivers crossing aqueducts or passing culverts during operation can be reasonably designed. In addition, the construction time of tunnels to avoid risks can be determined based on the estimated flood peak time, thereby ensuring the safety of tunnel construction and operation.

[0037] Technical solution: The present invention is a method for estimating the maximum flood volume of a karst tunnel underground river supplied by rainfall surface runoff, the method comprising the following steps:

[0038] Step 1: Get rainfall statistics parameters:

[0039] Collect data from rainfall stations near the tunnel site. If the local rainfall stations are evenly distributed and have long-term rainfall data, use the direct method to calculate rainfall statistical parameters; otherwise, use the indirect method to look up the table to obtain rainfall statistical parameters;

[0040] Step 2: Calculate the design rainfall:

[0041] According to the Pearson III frequency curve, the rainstorm frequency curve is determined by the mean value of rainfall, coefficient of variation, and coefficient of skewness. The deviation coefficient Φ is determined according to the rainstorm frequency P value; the modulus coefficient K P,i =Φi ·C v,i +1, so the design rainfall of the design rainstorm frequency P for 1 hour, 6 hours, 24 hours and 3 days is the mean rainfall value in the corresponding rainstorm statistical period i; C v,i is the coefficient of variation corresponding to the heavy rain statistical period i;

[0042] Step 3: Calculate the design average rainfall distributed over time:

[0043] Design average rainfall distributed over time h i The decay index n is calculated as follows:

[0044] (4)t i = Between 1 and 6 hours

[0045] or

[0046] (5)t i = Between 6 and 24 hours

[0047] or

[0048] (6)t i = Between 1 and 3 days

[0049] or

[0050] in,

[0051] n 1,6 =1+α 1,6 lg(H1 / H6)

[0052] n 6,24 =1+α 6,24 lg(H6 / H 24 )

[0053] n 24,3 =1+α 24,36 lg(H 24 / H3)

[0054] α 1,6 , α 6,24 , α 24,36 is the regional distribution coefficient of rainfall, which can be obtained by referring to the hydrological manual of the area where the tunnel site is located;

[0055] Step 4: Calculate the design net rainfall;

[0056] The loss parameter method is used, and the loss parameter μ is the flow duration t cThe average loss intensity can be obtained by referring to the Hydrological Manual of each province, city and region, and the designed net rainfall H' i According to the following formula:

[0057] When H i <μ, H' i =0;

[0058] When H i >μ, H' i =H i -μ;

[0059] Step 5: Check the surface water collection points and obtain terrain data in the tunnel site area;

[0060] Obtain the digital elevation model (DEM) data of the tunnel site area at a scale of 1:50,000 or a resolution of 30m from the local surveying and mapping bureau or the website www.gscloud.cn, and investigate the location of the surface watershed in the tunnel site based on the depression analysis; if the digital elevation model data of the tunnel site area at a scale of 1:50,000 or a resolution of 30m does not meet the accuracy requirements of the micro-topography surface runoff and watershed analysis, carry out micro-topography drone photogrammetry and topographic mapping of the watershed area based on the location of the surface watershed obtained, and obtain high-precision DEM topographic data of the tiankengwa area;

[0061] Step 6: Surface runoff water analysis;

[0062] Based on the high-precision digital elevation model terrain data, the digital terrain hydrological analysis priority flooding algorithm is used to carry out the analysis of the flow direction, cumulative flow, water flow length, river network, river network classification, and watershed segmentation of surface runoff, and finally the watershed range of surface runoff is obtained; then according to the designed net rainfall in the fourth step and the corresponding net rain duration allocation time period in the third step, the hydrological watershed analysis method is used to calculate the flow of the outlet section of the watershed point for each unit time period within the watershed; finally, according to the superposition assumption and the inundation iteration method, the partial flow process formed by the net rainfall in each time period is staggered and superimposed to obtain the flow process line of the outlet section of the watershed point.

[0063] Step 7, calculating groundwater confluence parameters;

[0064] Step 8: Calculation of surface runoff recharging groundwater runoff;

[0065] Step 9: Estimation of the maximum flood volume of the tunnel underground river;

[0066] Peak value of surface runoff recharging groundwater Q g,i,Max Daily flow of underground river Q g0 The sum is the maximum flood volume of the tunnel underground river Q H,Max , which is Q H,Max =Q g,i,Max +Q g0; The peak time of surface runoff to groundwater runoff is the peak flood time of the tunnel underground river.

[0067] in,

[0068] The direct method is as follows: according to the spatial distribution of each rain gauge, the Thiessen polygon method is used to determine the corresponding rain gauge for the tunnel site, the rainfall data of the selected rain gauge is counted, the surface rainfall of each heavy rainstorm each year is calculated, and four rainstorm statistical periods of 1 hour, 6 hours, 24 hours and 3 days are selected. According to the principle of independent sampling, the surface rainfall of different periods is specifically counted. Then, according to the random variable statistical method, the mean rainfall of 1 hour, 6 hours, 24 hours and 3 days is calculated with the rainfall data of the selected rain gauge as the sample. And the corresponding coefficient of variation C v,1 , C v,6 , C v,24 , C v,3 ; Skewness coefficient C s,1 , C s,6 , C s,24 , C s,3 ; These parameters are the basic parameters for calculating design rainfall.

[0069] The indirect method is as follows: consult the 1-hour, 6-hour, 24-hour, and 3-day rainstorm statistical parameter contour maps in the provincial, municipal, and district hydrological manuals and the "Rainstorm Runoff Calculation Chart" to find the annual maximum 1-hour, 6-hour, 24-hour, and 3-day rainfall averages in the tunnel site area. And the corresponding coefficient of variation C v,1 , C v,6 , C v,24 , C v,3 ; Skewness coefficient C s,1 , C s,6 , C s,24 , C s,3 .

[0070] The step 7 of calculating groundwater confluence parameters is specifically as follows:

[0071] Carry out actual measurement of underground river flow in tunnels during the rainy season, and record the daily flow of underground rivers without rainfall, Q g0 , peak flow of underground river during rainfall period Q g1 , Stable flow of underground river after rain stops during rainy season Q g2 , and Q g1 With Q g2 The duration between g Hour meter; use the following formula to deduce the groundwater confluence parameter K g :

[0072]

[0073] The rainfall measured should be in the tunnel site area where the rainfall should exceed the average monthly rainfall in the region during the rainy season over the years.

[0074] The step eight, the calculation of surface runoff replenishing groundwater runoff is specifically as follows:

[0075] According to the flow process line of the outlet section of the water confluence point, the surface runoff recharge I with time t is obtained. g,i , the corresponding groundwater runoff with time t is Q g,i , then according to I g,i The change process of ~t is calculated iteratively according to the following formula:

[0076]

[0077] Where Δt is the calculation period, measured in hours; K g According to step 7, Q g,i The initial value of the daily flow Q without rainfall according to step 7 g0 calculate;

[0078] Finally, get Q g,i The time variation process line of the surface runoff recharging groundwater flow from 2000 to 2000 t is used. Through this process line, the peak value of the surface runoff recharging groundwater flow and its corresponding peak time can be obtained.

[0079] Beneficial effects: The present invention realizes the organic connection of key steps such as rainfall calculation, photogrammetry digital terrain mapping, digital terrain surface runoff analysis, and the relationship between surface runoff and underground runoff on the basis of combining statistical data with measured data, and in particular fully considers the relationship between surface runoff recharge and underground river recharge, which are not involved in existing work, as well as the flood discharge capacity of underground rivers. This can accurately predict the maximum flood volume of underground rivers in tunnels in karst areas due to surface water recharge, reasonably design the height of flood control embankments during tunnel construction and the water flow capacity of underground rivers crossing aqueducts or passing culverts during operation, and determine the construction time of tunnels to avoid risks based on the estimated flood peak time, thereby ensuring the safety of tunnel construction and operation. DETAILED DESCRIPTION

[0080] The technical solution of the present invention is described in detail with examples below:

[0081] The present invention is a method for estimating the maximum flood volume of a karst tunnel underground river supplied by surface runoff. The specific steps include: (1) obtaining rainfall statistical parameters; (2) calculating the design rainfall; (3) calculating the design average rainfall distributed over time; (4) calculating the design net rainfall; (5) checking the surface water collection points in the tunnel site and obtaining terrain data; (6) analyzing the surface runoff; (7) calculating the groundwater collection parameters; (8) calculating the groundwater runoff supplied by surface runoff; and (9) estimating the maximum flood volume of the tunnel underground river.

[0082] The details are as follows:

[0083] Step 1: Obtain rainfall statistical parameters

[0084] Collect data from local rain gauges near the tunnel site, and use the indirect method to look up tables to obtain rainfall statistical parameters. Consult the provincial (regional, municipal) hydrological manual and the "Rainstorm Runoff Calculation Chart" for 1-hour, 6-hour, 24-hour, and 3-day rainstorm statistical parameter contour maps to find the annual maximum 1-hour, 6-hour, 24-hour, and 3-day rainfall averages in the tunnel site. And the corresponding coefficient of variation C v,1 =0.42, C v,6 =0.44, C v,24 =0.46, C v,3 =0.48; skewness coefficient C s,1 =1.47, C s,6 =1.54, C s,24 =2.1, C s,3 =1.68;

[0085] Step 2: Calculate the design rainfall

[0086] According to the Pearson III frequency curve, the rainstorm frequency can be determined to be P = 0.3% based on the rainfall mean, coefficient of variation, and skewness coefficient. Based on the rainstorm frequency P value, the deviation coefficients Φ1 = 2.44, Φ6 = 2.43, and Φ 24 =2.32, Φ3 = 2.40. Calculation formula for modulus ratio K P,i =Φ i ·C v,i +1, i=1,6,24,3, get K P,1 =2.02, K P,6 =2.07, K P,24 =2.07, K P,3 =2.15. Design rainfall for design rainstorm frequency P of 1 hour, 6 hours, 24 hours and 3 days Get H P,1 =82.82, H P,6 =140.76, H P,24 =254.61, H P,24 =406.35.

[0087] Table 1: Deviation coefficient of Pearson type III frequency curve

[0088]

[0089]

[0090] Step 3: Calculate the design average rainfall distributed over time

[0091] The calculation formula of the design average rainfall and attenuation index for the duration distribution is as follows:

[0092] α 1,6 , α 6,24 , α 24,3 The hydrological manual for the area where the tunnel is located can be consulted. 1,6 =0.879,α 6,24 =0.966,

[0093] α 24,3 =0.99

[0094] (1)t i = Between 1 and 6 hours

[0095] n 1,6 =1+α 1,6 lg(H1 / H6)

[0096]

[0097] (2)t i = Between 6 and 24 hours

[0098] n 6,24 =1+α 6,24 lg(H6 / H 24 )

[0099]

[0100] (3)t i = Between 1 and 3 days

[0101] n 24,3 =1+α 24,36 lg(H 24 / H3)

[0102]

[0103] See Table 2 for specific results.

[0104] Table 2: Design average rainfall distributed over time

[0105]

[0106]

[0107] Step 4: Calculate the design net rainfall

[0108] The loss parameter method is used, and the loss parameter μ is the flow duration t cThe average loss intensity can be obtained from the Hydrological Manual of each province and city, and the loss parameter μ=82.44. Design net rainfall H' i You can follow the following formula:

[0109] When H i <μ, H' i =0;

[0110] When H i >μ, H' i =H i -μ;

[0111] See Table 3 for specific results.

[0112] Table 3: Design Net Rainfall

[0113]

[0114]

[0115] Step 5: Check the water catchment points in the tunnel area and obtain terrain data

[0116] Based on the locations of surface watershed points obtained through investigation, micro-topography drone photogrammetry and topographic mapping of the watershed area are carried out to obtain high-precision DEM topographic data of the tiankeng area.

[0117] Step 6: Surface runoff analysis

[0118] According to the designed net rainfall in the fourth step and the corresponding net rainfall duration distribution period in the third step, the DEM hydrological watershed analysis method is used to calculate the flow of the outlet section of the watershed point in each unit period within the basin. Finally, according to the superposition assumption and the inundation iteration method, the partial flow process formed by the net rainfall in each period is staggered and superimposed to obtain the flow process line of the outlet section of the watershed point.

[0119] Table 4: Flow rate at the outlet of the water confluence point

[0120]

[0121]

[0122] Step 7: Calculate groundwater flow parameter K g

[0123] Carry out actual measurement of underground river flow in tunnels during the rainy season, and record the daily flow of underground rivers without rainfall, Q g0 =25391m 3 , peak flow of underground river during rainfall period Q g1 =101564m 3 , Stable flow of underground river after rain stops during rainy season Q g2= 97205m 3 , and Q g1 With Q g2 The duration between g = 10. The groundwater confluence parameter K is calculated using the following formula: g =228.

[0124]

[0125] Step 8: Calculation of groundwater runoff from karst tiankeng surface runoff

[0126] According to the flow process line of the outlet section of the water confluence point, the surface runoff recharge I with time t is obtained. g,i , the corresponding groundwater runoff with time t is Q g,i , then we can use I g,i The change process of ~t is calculated iteratively according to the following formula:

[0127]

[0128] Where Δt is the calculation period, measured in hours; K g According to step 7, Q g,i The initial value of is based on the daily flow Q without rainfall in step 7. g0 calculate;

[0129] Table 5: Groundwater runoff Q over time t g,i

[0130] Duration <![CDATA[Qg ,i (m 3 )]]> Duration <![CDATA[Qg ,i (m 3 )]]> 1 25391 14 31028.96 2 25430.33 15 30980.17 3 25621.83 16 30930.69 4 25904.52 17 30801.79 5 26230.53 18 30673.93 6 26605.37 19 30545.83 7 27030.44 20 30417.48 8 27447.69 21 30288.35 9 27938.14 22 30159.21 10 28476.04 23 30029.99 11 29047.15 24 29899.97 12 29672.25 48 29770.64 13 30345.90 72 29640.84

[0131] Finally, get Q g,i The time variation process line of surface runoff replenishing groundwater flow from 2000 to 2000 t. Through this process line, we can get the peak value of surface runoff replenishing groundwater flow, which is 31028.96m 3 .

[0132] Step 9: Estimation of the maximum flood volume of the tunnel underground river

[0133] Peak value of surface runoff recharging groundwater Q g,i,Max Daily flow of underground river Q g0 The sum is the maximum flood volume of the tunnel underground river Q H,Max , which is Q H,Max =Q g,i,Max +Q g0 =56419.96(m 3 ). The peak time of surface runoff to groundwater runoff is the flood peak time of the tunnel underground river.

Claims

1. A method for estimating the maximum flood volume of a karst tunnel underground river supplied by rainfall surface runoff, characterized in that: The method comprises the following steps: Step 1: Get rainfall statistics parameters: Collect data from rainfall stations near the tunnel site. If the local rainfall stations are evenly distributed and have long-term rainfall data, use the direct method to calculate rainfall statistical parameters; otherwise, use the indirect method to look up the table to obtain rainfall statistical parameters; Step 2: Calculate the design rainfall: According to the Pearson III frequency curve, the rainstorm frequency curve is determined by the mean value of rainfall, coefficient of variation, and coefficient of skewness. The deviation coefficient Φ is determined according to the rainstorm frequency P value; the modulus coefficient K P,i =Φ i ·C v,i +1, so the design rainfall of the design rainstorm frequency P for 1 hour, 6 hours, 24 hours and 3 days is the mean rainfall value in the corresponding rainstorm statistical period i; C v,i is the coefficient of variation corresponding to the heavy rain statistical period i; Step 3: Calculate the design average rainfall distributed over time: Design average rainfall distributed over time h i The decay index n is calculated as follows: (1)t i = Between 1 and 6 hours or (2)t i = Between 6 and 24 hours or (3)t i = Between 1 and 3 days or in, n 1,6 =1+α 1,6 lg(H1 / H6) n 6,24 =1+α 6,24 lg(H6 / H 24 ) n 24,3 =1+α 24,36 lg(H 24 / H3) α 1,6 , α 6,24 , α 24,36 is the regional distribution coefficient of rainfall, which can be obtained by referring to the hydrological manual of the area where the tunnel site is located; Step 4: Calculate the design net rainfall; The loss parameter method is used, and the loss parameter μ is the flow duration t c The average loss intensity can be obtained by referring to the Hydrological Manual of each province, city and region, and the designed net rainfall H' i According to the following formula: When H i <μ, H' i =0; When H i >μ, H' i =H i -μ; Step 5: Check the surface water collection points and obtain terrain data in the tunnel site area; Obtain the digital elevation model (DEM) data of the tunnel site area at a scale of 1:50,000 or a resolution of 30m from the local surveying and mapping bureau or the website www.gscloud.cn, and investigate the location of the surface watershed in the tunnel site based on the depression analysis; if the digital elevation model data of the tunnel site area at a scale of 1:50,000 or a resolution of 30m does not meet the accuracy requirements of the micro-topography surface runoff and watershed analysis, carry out micro-topography drone photogrammetry and topographic mapping of the watershed area based on the location of the surface watershed obtained, and obtain high-precision DEM topographic data of the tiankengwa area; Step 6: Surface runoff water analysis; Based on the terrain data of high-precision digital elevation model, the digital terrain hydrological analysis priority flooding algorithm is used to carry out the analysis of the flow direction, cumulative flow, water flow length, river network, river network classification, and watershed segmentation of surface runoff, and finally obtain the watershed range of surface runoff; then according to the designed net rainfall in the fourth step and the corresponding net rain duration allocation period in the third step, the hydrological watershed analysis method is used within the watershed to calculate the flow of the outlet section of the watershed point in each unit time period; finally, according to the superposition assumption and the flooding iteration method, the partial flow process formed by the net rainfall in each time period is staggered and superimposed to obtain the flow process line of the outlet section of the watershed point; Step 7, calculating groundwater confluence parameters; Carry out actual measurement of underground river flow in tunnels during the rainy season, and record the daily flow of underground rivers without rainfall, Q g0 , peak flow of underground river during rainfall period Q g1 , Stable flow of underground river after rain stops during rainy season Q g2 , and Q g1 With Q g2 The duration between g Hour meter; use the following formula to deduce the groundwater confluence parameter K g : The rainfall measured in the tunnel site should exceed the average monthly rainfall in the rainy season in the region over many years. Step 8: Calculation of surface runoff recharging groundwater runoff; According to the flow process line of the outlet section of the water confluence point, the surface runoff recharge I with time t is obtained. g,i , the corresponding groundwater runoff with time t is Q g,i , then according to I g,i The change process of ~t is calculated iteratively according to the following formula: Where Δt is the calculation period, measured in hours; K g According to step 7, Q g,i The initial value of the daily flow rate of the underground river without rainfall Q according to step 7 g0 calculate; Finally, get Q g,i The time variation process line of the surface runoff recharging groundwater from 2000 to 2000 t, through which the peak value of the surface runoff recharging groundwater and its corresponding peak time are obtained; Step 9: Estimation of the maximum flood volume of the tunnel underground river; Peak value of surface runoff recharging groundwater Q g,i,Max The daily flow rate of underground river without rainfall Q g0 The sum is the maximum flood volume of the tunnel underground river Q H,Max , which is Q H,Max =Qg ,i,Max +Q g0 ; The peak time of surface runoff to groundwater runoff is the peak flood time of the tunnel underground river.

2. The method for estimating the maximum flood volume of a karst tunnel underground river supplied by rainfall surface runoff according to claim 1 is characterized in that: The direct method is as follows: according to the spatial distribution of each rain gauge, the Thiessen polygon method is used to determine the corresponding rain gauge for the tunnel site, the rainfall data of the selected rain gauge is counted, the surface rainfall of each heavy rainstorm each year is calculated, and four rainstorm statistical periods of 1 hour, 6 hours, 24 hours and 3 days are selected. According to the principle of independent sampling, the surface rainfall of different periods is specifically counted; then, according to the random variable statistical method, the mean rainfall of 1 hour, 6 hours, 24 hours and 3 days is calculated with the rainfall data of the selected rain gauge as the sample. And the corresponding coefficient of variation C v,1 , C v,6 , C v,24 , C v,3 ; Skewness coefficient C s,1 , C s,6 , C s,24 , C s,3 ; These parameters are the basic parameters for calculating design rainfall.

3. The method for estimating the maximum flood volume of a karst tunnel underground river supplied by rainfall surface runoff according to claim 1, characterized in that: The indirect method is as follows: consult the 1-hour, 6-hour, 24-hour, and 3-day rainstorm statistical parameter contour maps in the provincial, municipal, and district hydrological manuals and the "Rainstorm Runoff Calculation Chart" to find the annual maximum 1-hour, 6-hour, 24-hour, and 3-day rainfall averages in the tunnel site area. And the corresponding coefficient of variation C v,1 , C v,6 、Cv, 24 , C v,3 ; Skewness coefficient C s,1 , C s,6 , C s,24 , C s,3 .