Information acquisition method, device, electronic device and computer readable medium
By selecting the starting point and end point from the sequence of path points of the picking task, generating lane occupancy information and obtaining path planning information, the problem of unnecessary data and failure in information acquisition is solved, and the execution efficiency of the picking task is improved.
Patent Information
- Application Number
- CN202110179696.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-08
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-02-08
AI Technical Summary
There are unnecessary data and data acquisition failures in existing information acquisition methods, which increase the execution time of picking tasks and reduce picking efficiency.
By selecting the starting point and end point from the predetermined picking task path point sequence, lane occupancy information is generated, and path planning information is obtained based on the occupancy results, optimizing the information acquisition process and reducing unnecessary data acquisition and processing.
It reduces the information acquisition time, improves the execution efficiency of picking tasks, and avoids the problem that picking tasks cannot be executed normally due to failure in data acquisition.
Smart Images

Figure CN114089736B_ABST
Abstract
Description
Technical Field
[0001] Embodiments of the present disclosure relate to the field of computer technology, and in particular to an information acquisition method, device, electronic device, and computer-readable medium. Background Art
[0002] With the development of various fields, more and more information is generated, and the information acquisition method is becoming more and more important. At present, the commonly used information acquisition method is to initiate a request to obtain information from the server (for example, to initiate a request to obtain information related to the picking task of AGV (Automated Guided Vehicle)), and then receive the relevant information returned by the server (for example, vehicle picking task information and related lane occupancy information).
[0003] However, when using the above method to obtain information, the following technical problems often occur:
[0004] Since the existence of a large amount of unnecessary data and data acquisition failure in the acquired information is not considered, it is necessary to further process the acquired information and the acquisition failure, which results in a longer time consumption, thereby increasing the execution time of the picking task (for example, the time it takes for the AGV to execute the picking task based on the acquired information) and reducing the picking efficiency. Summary of the invention
[0005] The content of this disclosure is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this disclosure is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.
[0006] Some embodiments of the present disclosure propose information acquisition methods, devices, electronic devices, and computer-readable media to solve one or more of the technical problems mentioned in the above background technology section.
[0007] In a first aspect, some embodiments of the present disclosure provide an information acquisition method, the method comprising: selecting a starting point and an end point of a picking path from a predetermined sequence of path points corresponding to a picking task; in response to determining that the starting point is the entrance point of the lane, determining the lane numbers of the lanes corresponding to the starting point and the end point as the starting lane number and the end lane number, respectively; based on the starting lane number and the end lane number, generating first lane occupancy information; based on the first lane occupancy information, acquiring lane occupancy result information, wherein the lane occupancy result information is used to characterize whether the lane is successfully occupied; in response to determining that the lane occupancy result information is information characterizing a failure in lane occupancy, acquiring path planning information based on the starting point.
[0008] Optionally, generating the first lane occupancy information based on the starting lane number and the ending lane number includes: in response to determining that the starting lane number and the ending lane number match, taking the entrance point of the lane corresponding to the starting lane number as the occupancy point to generate the first lane occupancy information.
[0009] Optionally, the generating of the first lane occupation information based on the starting lane number and the ending lane number further includes: in response to determining that the starting lane number and the ending lane number do not match, taking the starting point as an occupation point, and generating the first lane occupation request information.
[0010] Optionally, the above-mentioned obtaining of path planning information based on the above-mentioned starting point includes: taking the entrance point of the alley corresponding to the above-mentioned end point as the occupied point and taking the above-mentioned starting point as the starting point of the path planning, generating path planning request information; based on a preset first sending request number threshold, executing the following path planning request information sending steps: sending the above-mentioned path planning request information to the server to obtain the path planning information; in response to the successful sending of the path planning request information, receiving the path planning information; in response to the failure of the path planning request and the number of times the above-mentioned path planning request information has been sent is less than or equal to the above-mentioned first sending request number threshold, executing the above-mentioned path planning request information sending step again.
[0011] Optionally, the above-mentioned obtaining of path planning information based on the above-mentioned starting point also includes: in response to a failure of the path planning request and the number of times the path planning request information is sent is greater than the above-mentioned first threshold of the number of times the request is sent, saving the lane number corresponding to the above-mentioned lane occupancy result information; using the above-mentioned starting point as the starting point of the cache position path planning, generating the cache position path planning request information and sending it to the server; in response to determining that the above-mentioned cache position path planning request information is sent successfully, obtaining the cache position path planning information.
[0012] Optionally, the cache path planning information includes a path planning end point; and the acquisition of the path planning information based on the starting point also includes: in response to detecting that the picking vehicle has arrived at the path planning end point, using the path planning end point as the starting point of the lane occupation path, and generating a second lane occupation request information; based on a preset second sending request number threshold and the number of sendings of the second lane occupation request information, executing the following second lane occupation request information sending step: sending the second lane occupation request information to the server to make a lane occupation request; increasing the number of sendings of the second lane occupation request information by 1, wherein the initial value of the number of sendings of the second lane occupation request information is 0; in response to determining that the second lane occupation request is successful, acquiring the picking path information; in response to the failure of the second lane occupation request and the number of sendings of the second lane occupation request information is less than or equal to the second sending request number threshold, executing the second lane occupation request information sending step again.
[0013] Optionally, the above-mentioned obtaining of path planning information based on the above-mentioned starting point also includes: in response to the failure of the second lane occupation request and the number of times the second lane occupation request information is sent is greater than the above-mentioned second lane occupation request sending number threshold, generating lane blocking information and sending it to the server; in response to determining that the above-mentioned lane blocking information has failed to be sent, resetting the number of times the second lane occupation request information is sent to the initial value, and executing the above-mentioned second lane occupation request information sending step again.
[0014] Optionally, the acquiring of the path planning information based on the starting point further includes: in response to determining that the lane blocking information is successfully sent, clearing the picking task.
[0015] Optionally, the method further includes: in response to determining that the lane occupation result information is information indicating successful lane occupation, controlling a picking vehicle to enter the lane based on the lane occupation result information and the path point sequence.
[0016] In a second aspect, some embodiments of the present disclosure provide an information acquisition device, the device comprising: a selection unit, configured to select a starting point and an end point of a picking path from a predetermined sequence of path points corresponding to a picking task; a determination unit, configured to, in response to determining that the starting point is an entrance point of the lane, determine the lane numbers of the lanes corresponding to the starting point and the end point as the starting lane number and the end lane number, respectively; a generation unit, configured to generate first lane occupancy information based on the starting lane number and the end lane number; a first acquisition unit, configured to acquire lane occupancy result information based on the first lane occupancy information, wherein the lane occupancy result information is used to characterize whether the lane is successfully occupied; a second acquisition unit, configured to, in response to determining that the lane occupancy result information is information characterizing a failure in lane occupancy, acquire path planning information based on the starting point.
[0017] Optionally, the generation unit is further configured as: a first lane occupation information generation subunit. The first lane occupation information generation unit is configured to: in response to determining that the starting lane number matches the ending lane number, take the entrance point of the lane corresponding to the starting lane number as the occupation point to generate the first lane occupation information.
[0018] Optionally, the generating unit is further configured as: a first lane occupation information generating subunit. The first lane occupation information generating unit is configured to: in response to determining that the starting lane number and the ending lane number do not match, use the starting point as an occupation point and generate first lane occupation request information.
[0019] Optionally, the second acquisition unit is further configured as: a path planning request information generating subunit and a path planning request information sending unit. The path planning request information generating subunit is configured to use the entrance point of the lane corresponding to the end point as the occupied point and the starting point as the starting point of the path planning to generate the path planning request information; the path planning request information sending unit is configured to perform the following path planning request information sending steps based on a preset first sending request number threshold: sending the path planning request information to the server to obtain the path planning information; in response to the successful sending of the path planning request information, receiving the path planning information; in response to the failure of the path planning request and the number of times the path planning request information has been sent is less than or equal to the first sending request number threshold, performing the path planning request information sending step again.
[0020] Optionally, the second acquisition unit is further configured as: a storage unit, a cache position path planning request information generation and sending unit, and a cache position path planning information acquisition unit. The storage unit is configured to save the lane number corresponding to the lane occupancy result information in response to the failure of the path planning request and the number of times the path planning request information is sent is greater than the first sending request number threshold; the cache position path planning request information generation and sending unit is configured to use the above starting point as the starting point of the cache position path planning, generate the cache position path planning request information and send it to the server; the cache position path planning information acquisition unit is configured to acquire the cache position path planning information in response to determining that the cache position path planning request information is sent successfully.
[0021] Optionally, the cache path planning information includes a path planning endpoint; and the second acquisition unit is further configured as: a second lane occupation request information generation unit and a second lane occupation request information sending unit. The second lane occupation request information generation unit is configured to generate the second lane occupation request information in response to detecting that the picking vehicle has arrived at the path planning endpoint, using the path planning endpoint as the starting point of the lane occupation path; the second lane occupation request information sending unit is configured to perform the following second lane occupation request information sending step based on a preset second sending request number threshold and the sending number of the second lane occupation request information: sending the second lane occupation request information to the service end to make a lane occupation request; increasing the sending number of the second lane occupation request information by 1, wherein the initial value of the sending number of the second lane occupation request information is 0; in response to determining that the second lane occupation request is successful, acquiring the picking path information; in response to the failure of the second lane occupation request and the sending number of the second lane occupation request information is less than or equal to the second sending request number threshold, performing the second lane occupation request information sending step again.
[0022] Optionally, the second acquisition unit is further configured to include: a lane blocking information generating and sending unit and a sending times resetting unit. The lane blocking information generating and sending unit is configured to generate lane blocking information and send it to the server in response to the failure of the second lane occupation request and the sending times of the second lane occupation request information being greater than the second sending times threshold; the sending times resetting unit is configured to reset the sending times of the second lane occupation request information to an initial value in response to determining that the sending of the lane blocking information has failed, and execute the second lane occupation request information sending step again.
[0023] Optionally, the second acquisition unit is further configured as a picking task clearing unit, wherein the picking task clearing unit is configured to clear the picking task in response to determining that the lane blocking information is sent successfully.
[0024] Optionally, the information acquisition device further includes: a picking vehicle control unit, wherein the picking vehicle control unit is configured to control the picking vehicle to enter the lane based on the lane occupation result information and the path point sequence in response to determining that the lane occupation result information is information indicating successful lane occupation.
[0025] In a third aspect, some embodiments of the present disclosure provide an electronic device comprising: one or more processors; a storage device on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation manner of the above-mentioned first aspect.
[0026] In a fourth aspect, some embodiments of the present disclosure provide a computer-readable medium having a computer program stored thereon, wherein when the program is executed by a processor, the method described in any implementation manner of the above-mentioned first aspect is implemented.
[0027] The above-mentioned embodiments of the present disclosure have the following beneficial effects: the information obtained by the information acquisition method of some embodiments of the present disclosure can reduce the time consumed by information acquisition. Thus, the execution time of the picking task can be reduced and the picking efficiency can be improved. Specifically, the reason for consuming more time when acquiring information is that because the acquired information contains more unnecessary data and the acquired information contains data acquisition failure, etc., it is necessary to further process the acquired information and the acquisition failure. Based on this, the information acquisition method of some embodiments of the present disclosure first selects the starting point and the end point of the picking path from the path point sequence corresponding to the predetermined picking task. Since only two points are selected from the path point sequence for information acquisition. When acquiring information, it is possible to avoid acquiring relevant information of other path points and reduce the amount of information acquisition. Thus, the time consumed by information acquisition is reduced by reducing the amount of information acquisition. Then, in response to determining that the above-mentioned starting point is the entrance point of the lane, the lane numbers of the lanes corresponding to the above-mentioned starting point and the above-mentioned end point are respectively determined as the starting lane number and the end lane number. Then, based on the above-mentioned starting lane number and the end lane number, the first lane occupancy information is generated. Compared with generating the first lane occupation information by using the lane number corresponding to each point in the path point sequence. Generating the first lane occupation information only by the starting lane number and the end lane number can reduce the complexity of the first row of lane occupation information. Therefore, when using the first row of lane occupation information to obtain the lane occupation result information, the time consumed for further processing the first lane occupation information can be reduced. Thus, the time consumed for obtaining the lane occupation result information can be reduced. Finally, by determining the actual lane occupation situation represented by the lane occupation information (for example, lane occupation success or lane occupation failure), the path planning information corresponding to the picking task is obtained. Therefore, it is considered that there are some data acquisition failures in the acquired information, so that the acquired path planning information can be used to solve the corresponding failure situation. Thus, the problem that the picking task cannot be executed normally due to the data acquisition failure in the acquired information can be avoided to a certain extent. Furthermore, not only can the time consumed by information acquisition be reduced (for example, the time for AGV to perform the picking task according to the acquired information), but also the picking efficiency can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that components and elements are not necessarily drawn to scale.
[0029] Figure 1 is a schematic diagram of an application scenario of the information acquisition method according to some embodiments of the present disclosure;
[0030] Figure 2 is a flow chart of some embodiments of the information acquisition method according to the present disclosure;
[0031] Figure 3 are flow charts of other embodiments of the information acquisition method according to the present disclosure;
[0032] Figure 4 is a flowchart of a clearing picking task in an information acquisition method according to some embodiments of the present disclosure;
[0033] Figure 5 is a schematic diagram of the structure of some embodiments of the information acquisition device according to the present disclosure;
[0034] Figure 6 It is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present disclosure. DETAILED DESCRIPTION
[0035] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.
[0036] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.
[0037] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.
[0038] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0039] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.
[0040] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0041] Figure 1 It is a schematic diagram of an application scenario of the information acquisition method of some embodiments of the present disclosure.
[0042] exist Figure 1 In the application scenario, first, the computing device 101 can select the starting point 1031 and the end point 1032 of the picking path from the predetermined path point sequence 103 corresponding to the picking task 102. As an example, the picking task 102 can be: "Pick up the goods at the destination point". The path point sequence 103 corresponding to the picking task 102 can be: [a, b, c, d]. The starting point 1031 of the selected picking path 103 can be the first path point in the above path point sequence: a. The end point of the selected picking path 103 can be the second path point in the above path point sequence: b. Then, in response to determining that the above starting point 1031 is the entrance point of the lane, the computing device 101 can determine the lane numbers of the lanes corresponding to the above starting point 1031 and the above end point 1032 as the starting lane number 104 and the end lane number 105 respectively. As an example, the starting lane number 104 can be: ①. The end lane number 105 can be: ②. Afterwards, the computing device 101 may generate the first lane occupation information 106 based on the starting lane number 104 and the ending lane number 105. As an example, the first lane occupation information 106 may be: point a is determined as the occupation point. Specifically, since there may be only one entrance point to a channel. When point a is the entrance point of the channel, point a may be determined as the occupation point. Therefore, the first lane occupation information may be information representing a request to occupy the channel corresponding to point a. Then, the computing device 101 may obtain the lane occupation result information 107 based on the first lane occupation information 106, wherein the lane occupation result information 107 is used to represent whether the lane is successfully occupied. As an example, the lane occupation result information may be a successful lane occupation. It may also be a lane occupation failure. Finally, in response to determining that the lane occupation result information 107 is information representing a failed lane occupation, the computing device 101 may obtain the path planning information 108 based on the starting point 1031. As an example, the above-mentioned path planning information may be information including a planned path point sequence (eg, [a1, b1, c1, d]).
[0043] It should be noted that the computing device 101 can be hardware or software. When the computing device is hardware, it can be implemented as a distributed cluster consisting of multiple servers or terminal devices, or as a single server or a single terminal device. When the computing device is embodied as software, it can be installed in the hardware devices listed above. It can be implemented as multiple software or software modules for providing distributed services, or as a single software or software module. No specific limitation is made here.
[0044] It should be understood that Figure 1 The number of computing devices in the embodiment is only illustrative. Any number of computing devices may be provided according to implementation requirements.
[0045] Continue to refer Figure 2 , a flowchart 200 of some embodiments of the information acquisition method according to the present disclosure is shown. The information acquisition method comprises the following steps:
[0046] Step 201 , selecting the starting point and the end point of the picking path from a predetermined path point sequence corresponding to the picking task.
[0047] In some embodiments, the execution subject of the information acquisition method (such as Figure 1 The computing device 101 shown) can select the starting point and the end point of the picking path from the path point sequence corresponding to the predetermined picking task. Among them, the above-mentioned predetermined picking task can be a picking task that the AGV vehicle has obtained from the service end. The path point sequence corresponding to the picking task can be used as the picking path when the AGV vehicle performs the above-mentioned picking task. The first point in the above-mentioned path point sequence can be the starting point of the picking path, and the second point can be the end point of the picking path. Then, selecting the starting point and the end point of the picking path can be selecting the first path point from the above-mentioned path point sequence as the starting point, and selecting the second point as the end point. The above-mentioned starting point can be the current position point of the AGV vehicle. The above-mentioned end point can be the end point corresponding to the above-mentioned picking task, that is, the destination point of the picking task.
[0048] Step 202, in response to determining that the starting point is the entrance point of the lane, the lane numbers of the lanes corresponding to the starting point and the end point are determined as the starting lane number and the end lane number respectively.
[0049] In some embodiments, the execution subject may determine the lane numbers of the lanes corresponding to the starting point and the end point as the starting lane number and the end lane number, respectively, in response to determining that the starting point is the entry point of the lane. The lane may be a lane that the AGV vehicle needs to pass through when performing the picking task. A lane may have only one lane number. Since the starting point is the entry point of the lane, and a lane has only one entry point. Therefore, the lane number of the lane corresponding to the starting point may be determined. The end point is the destination point of the picking task and is within the lane. Therefore, the lane number of the lane corresponding to the end point may be determined. The entry points of all lanes and the corresponding lane numbers may be stored in the memory of the AGV vehicle for use. The lane may be a directional one-way lane. Therefore, there may be only one entry point for the lane. At the same time, there may also be only one lane number for identifying the lane. Determining that the starting point is the entry point of the lane may be determining that the current position of the AGV vehicle is at the entry point of the lane.
[0050] Specifically, by determining that the starting point is the entrance point of the lane, information related to the entrance point can be obtained in a targeted manner to avoid obtaining unnecessary information (for example, information of a path point that is not the starting point in the path point sequence). Thus, the amount of information obtained can be reduced, and the time consumed for information acquisition can be reduced to a certain extent.
[0051] Step 203: Generate first lane occupation information based on the starting lane number and the ending lane number.
[0052] In some embodiments, the execution entity may generate the first lane occupation information based on the starting lane number and the ending lane number. The generation of the first lane occupation information may be to use the entry points of the passages corresponding to the starting lane number and the ending lane number as points to be occupied. For example, the entry point is: R. Then, the first lane occupation information may be: "Lane Occupancy: R". Specifically, the generated first lane occupation information may be used to request lane occupation information from the server. Since only the lane corresponding to the current starting point and the lane corresponding to the ending point are requested, rather than the entry points of all lanes that the picking task needs to pass through as the requested occupation information. Therefore, the first lane occupation information may be generated only for the lane corresponding to the current starting point and the lane number corresponding to the ending point.
[0053] In some optional implementations of some embodiments, the execution subject generates the first lane occupation information based on the starting lane number and the ending lane number, which may include the following steps:
[0054] In response to determining that the starting lane number and the terminal lane number match, the entrance point of the lane corresponding to the starting lane number is used as the occupied point, and the first lane occupation information is generated. Among them, the above-mentioned match can be that the starting lane number and the terminal lane number are the same. Then, generating the first lane occupation information can be to determine the information requesting to occupy the above-mentioned entry point as the first lane occupation information. Specifically, the sameness of the above-mentioned starting lane number and the above-mentioned terminal lane number can indicate that the current position of the AGV vehicle is in the lane number of the lane where the picking task terminal is located. Therefore, the information occupying the above-mentioned entry point can be used as the first lane occupation information. For example, the first lane occupation information can be: Lane occupation: a entry point.
[0055] In some optional implementations of some embodiments, the execution subject generates the first lane occupation information based on the starting lane number and the ending lane number, which may include the following steps:
[0056] In response to determining that the starting lane number and the terminal lane number do not match, the starting point is used as the occupied point to generate the first lane occupation information. The mismatch may be that the starting lane number and the terminal lane number are not the same. Then, the information requesting to occupy the starting point (for example, the starting point is: a. Then, the information requesting to occupy the starting point may be: "Request to occupy starting point a") is determined as the first lane occupation information. Specifically, the starting lane number and the terminal lane number are not the same, which may indicate that the lane corresponding to the current position of the AGV vehicle is different from the lane corresponding to the terminal. Therefore, only the request information to occupy the lane corresponding to the current position may be generated as the first lane occupation information.
[0057] Step 204: Acquire lane occupation result information based on the first lane occupation information.
[0058] In some embodiments, the execution entity may obtain lane occupation result information based on the first lane occupation information. The lane occupation result information may be used to indicate whether the lane is successfully occupied. Obtaining the lane occupation result information may be sending the first lane occupation information to the server, and then obtaining the lane occupation result information returned by the server. In addition, the lane occupation result information indicating the successful occupation of the lane may be: "Successful occupation of the lane". The lane occupation result information indicating the failure to occupy the lane may be: "Failed to occupy the lane". Specifically, the first lane occupation information may be sent to the server to obtain the corresponding lane occupation result information.
[0059] Step 205 , in response to determining that the lane occupation result information is information indicating a lane occupation failure, path planning information is obtained based on the starting point.
[0060] In some embodiments, the execution subject may obtain path planning information based on the above starting point in response to determining that the above lane occupation result information is information that characterizes the failure of lane occupation. Among them, the path planning information can be obtained in the following manner: the information corresponding to the above starting point (for example, the starting point coordinates) is sent to the server as the starting point information of the path planning, and then the path planning information returned by the server is obtained. The path planning information may include path information from the above starting point to the end point corresponding to the picking task. Specifically, since the lane occupation result information is added as information that characterizes the failure of lane occupation, it can be characterized that the current lane has been occupied. Therefore, for this situation, the planning information of other paths can be obtained from the server. Thus, the above occupied lanes can be avoided. In the case of the above lane occupation failure, the AGV vehicle can also perform the above picking task. Compared with the situation of sending the request channel occupancy information to the server all the time, a large amount of information acquisition time can be reduced, thereby improving the efficiency of the AGV vehicle in performing the picking task.
[0061] Optionally, the execution subject may also control the picking vehicle to enter the lane in response to determining that the lane occupation result information is information indicating successful lane occupation, based on the lane occupation result information and the path point sequence. Specifically, in response to determining that the lane occupation result information is information indicating successful lane occupation, the execution subject may control the AGV vehicle to move according to the path points in the path point sequence and enter the lane corresponding to the lane number included in the lane occupation result information.
[0062] The above-mentioned embodiments of the present disclosure have the following beneficial effects: the information obtained by the information acquisition method of some embodiments of the present disclosure can reduce the time consumed by information acquisition. Thus, the execution time of the picking task can be reduced and the picking efficiency can be improved. Specifically, the reason for consuming more time when acquiring information is that because the acquired information contains more unnecessary data and the acquired information contains data acquisition failure, etc., it is necessary to further process the acquired information and the acquisition failure. Based on this, the information acquisition method of some embodiments of the present disclosure first selects the starting point and the end point of the picking path from the path point sequence corresponding to the predetermined picking task. Since only two points are selected from the path point sequence for information acquisition. When acquiring information, it is possible to avoid acquiring relevant information of other path points and reduce the amount of information acquisition. Thus, the time consumed by information acquisition is reduced by reducing the amount of information acquisition. Then, in response to determining that the above-mentioned starting point is the entrance point of the lane, the lane numbers of the lanes corresponding to the above-mentioned starting point and the above-mentioned end point are determined as the starting lane number and the end lane number respectively. By judging the above-mentioned starting point, it is possible to avoid the situation where information acquisition needs to be performed again due to information acquisition errors. Thus, the time consumed by information acquisition can be reduced to a certain extent. Next, based on the above-mentioned starting lane number and the end lane number, the first lane occupancy information is generated. Compared with the generation of the first lane occupancy information using the lane number corresponding to each point in the path point sequence. The complexity of the first row of lane occupancy information can be reduced by only generating the first lane occupancy information using the starting lane number and the end lane number. Thus, when the first row of lane occupancy information is used to obtain the lane occupancy result information, the time consumed for further processing the first lane occupancy information can be reduced. Thus, the time consumed for obtaining the lane occupancy result information can be reduced. Finally, by determining the actual lane occupancy situation represented by the lane occupancy information (for example, lane occupancy success or lane occupancy failure), the path planning information corresponding to the picking task is obtained. Therefore, it is considered that there are some data acquisition failures in the acquired information, so that the acquired path planning information can be used to solve the corresponding failures. Thus, the problem that the picking task cannot be executed normally due to the data acquisition failure in the acquired information can be avoided to a certain extent. Furthermore, not only can the time consumed in obtaining information be reduced (for example, the time taken by the AGV to perform a picking task based on the obtained information), but also the picking efficiency can be improved.
[0063] Continue to refer Figure 3 , Figure 3 The process 300 of some embodiments of the information acquisition method according to the present disclosure is shown. The information acquisition method comprises the following steps:
[0064] Step 301, selecting the starting point and the end point of the picking path from the predetermined path point sequence corresponding to the picking task.
[0065] Step 302: In response to determining that the starting point is the entrance point of the lane, the lane numbers of the lanes corresponding to the starting point and the end point are determined as the starting lane number and the end lane number, respectively.
[0066] In some embodiments, the specific implementation of steps 301-302 and the technical effects brought about can be referred to Figure 2 The corresponding steps 201-202 in the embodiments are not described in detail here.
[0067] Step 303: Taking the entrance point of the lane corresponding to the end point as the occupied point and the starting point as the starting point of the path planning, the path planning request information is generated.
[0068] In some embodiments, the execution entity may use the entrance point of the lane corresponding to the end point as an occupied point and the starting point as the starting point of the path planning to generate path planning request information. The entry point of the lane corresponding to the end point as an occupied point may be to occupy the entrance point of the lane where the end point of the picking path is located, so as to avoid the occupation of the lane by other AGV vehicles, so as to ensure that the current picking task can be executed smoothly. The path planning request information may be generated by using the information corresponding to the starting point and the end point (for example, the starting point coordinates and the end point coordinates) as the path planning request information.
[0069] Step 304: Based on the preset first request sending number threshold, the following path planning request information sending steps are performed:
[0070] Step 3041, sending the path planning request information to the server to obtain the path planning information.
[0071] In some embodiments, the above-mentioned execution entity can send the path planning request information to the server via wired or wireless means, and obtain the path planning information from the server.
[0072] Step 3042, in response to the successful sending of the path planning request information, receiving the path planning information.
[0073] In some embodiments, the execution subject may receive the path planning information in response to the successful sending of the path planning request information. The preset first request sending times threshold may be a threshold (e.g., 10) for limiting the number of times the path planning request information is sent. Specifically, if there is a failure in sending information to the server due to network or other reasons, the information may be sent to the server again.
[0074] Step 305, in response to the failure of the path planning request and the number of times the path planning request information has been sent is less than or equal to the first request sending number threshold, the path planning request information sending step is performed again.
[0075] In some embodiments, the execution subject may execute the step of sending the path planning request information again in response to the failure of the path planning request and the number of times the path planning request information has been sent is less than or equal to the first threshold of the number of times the path planning request information has been sent. The number of times the path planning request information has been sent may be the number of times the path planning request information has been sent to the server.
[0076] In some optional implementations of some embodiments, the execution subject acquires the path planning information based on the starting point, and may further include the following steps:
[0077] The first step is to save the lane number corresponding to the lane occupancy result information in response to the failure of the path planning request and the number of times the path planning request information is sent is greater than the first threshold of the number of times the request is sent. The lane number corresponding to the lane occupancy result information can be saved in a database. For example, redis (Remote Dictionary Server), MySQL (Relational Database Management System). Specifically, after the failure to obtain the path planning information, the lane number corresponding to the lane occupancy result information can be saved, and the saved lane number can be used to record the lane where the picking task is located. So that the AGV vehicle can perform the above picking task again.
[0078] The second step is to use the above starting point as the starting point of the cache position path planning, generate the cache position path planning request information and send it to the server. The cache position path planning request information can be used to request a location for suspending the picking task and the path to the location from the server when the lane occupancy fails and the number of times the path planning request information is sent is greater than the first sending request number threshold. Thereby, it can avoid affecting the execution of tasks by other AGV vehicles. Generating the cache position path planning request information can be to use the starting point of the AGV as the cache position path planning request information.
[0079] The third step is to obtain the cache position path planning information in response to determining that the cache position path planning request information is sent successfully. The cache position path planning information can be obtained in response to determining that the cache position path planning request information is sent successfully, and the cache position path planning information sent by the server is obtained. The cache position path planning information can include a path from the starting point to the cache position, which can be used to guide the AGV vehicle to move to the cache position.
[0080] In some optional implementations of some embodiments, the cache path planning information may include a path planning end point. The execution subject obtains the path planning information based on the starting point, and may further include the following steps:
[0081] In the first step, in response to detecting that the picking vehicle has arrived at the destination of the path planning, the destination of the path planning is used as the starting point of the lane occupation path, and a second lane occupation request information is generated. The location of the cache position corresponding to the destination of the path planning may be corresponded to. The second lane occupation request information may be used to request the server to occupy the lane corresponding to the lane number of the starting point. Generating the second lane occupation request may be: determining the location information corresponding to the cache position and the lane occupation request information corresponding to the lane number of the starting point as the second lane occupation request.
[0082] In the second step, based on the preset second request sending times threshold and the sending times of the second lane occupation request information, the following second lane occupation request information sending steps are performed:
[0083] The first sub-step is to send the second lane occupation request information to the server to make a lane occupation request.
[0084] In the second sub-step, the number of times the second lane occupation request information is sent is increased by 1, wherein the initial value of the number of times the second lane occupation request information is sent is 0.
[0085] The third sub-step is to obtain the picking path information in response to determining that the second lane occupation request is successful. The obtaining of the picking path information may be obtaining the picking path information returned from the service end. The picking path information may include a path from the location of the cache position to the end point of the picking task.
[0086] Specifically, after the AGV vehicle reaches the cache position, it can request lane occupation from the server again. Then, if the request is successful, the picking task can be continued along the path from the cache position to the end point of the picking task.
[0087] In the third step, in response to the failure of the second lane occupation request and the number of times the second lane occupation request information is sent is less than or equal to the second sending request number threshold, the second lane occupation request information sending step is performed again. The second sending request number threshold can be used to limit the number of times the second lane occupation request information is sent to the server (for example, the first sending request number threshold can be: 10 threshold).
[0088] In some optional implementations of some embodiments, the cache path planning information may include a path planning end point. The execution subject obtains the path planning information based on the starting point, and may further include the following steps:
[0089] In the first step, in response to the failure of the second lane occupation request and the number of times the second lane occupation request information is sent is greater than the second request sending number threshold, lane blocking information is generated and sent to the server. The lane blocking information may be generated by using the lane number corresponding to the second lane occupation request information as the lane blocking information. The lane blocking information is sent to the server to notify the server that the lane is blocked.
[0090] In the second step, in response to determining that the lane blocking information fails to be sent, the number of times the second lane occupation request information is sent is reset to an initial value, and the second lane occupation request information sending step is performed again. The failure to send the lane blocking information may be due to factors such as the network causing a failure to send the lane blocking information to the server.
[0091] In some optional implementations of some embodiments, the cache path planning information may include a path planning end point. The execution subject obtains the path planning information based on the starting point, and may further include the following steps:
[0092] In response to determining that the aisle blocking information is sent successfully, the picking task is cleared.
[0093] Specifically, clearing the above-mentioned picking task may be clearing the above-mentioned picking task after successfully sending the lane blocking information to the server. Figure 4 As shown, the lane blocking information 401 may also be sent to the server 402. In response to determining that the lane blocking information 401 is sent successfully, the server 401 returns a clearing instruction 403 for clearing the picking task 102, so as to clear the picking task 102.
[0094] Step 306: Acquire lane occupation result information based on the first lane occupation information.
[0095] In some embodiments, the execution subject may obtain lane occupation result information based on the first lane occupation information. The lane occupation result information is used to indicate whether the lane is successfully occupied. The starting lane number in the first lane occupation information may be compared with the occupiable lane number stored in the memory of the AGV vehicle, and then the comparison result may be used as the lane occupation result information.
[0096] Step 307 , in response to determining that the lane occupation result information is information indicating a lane occupation failure, path planning information is obtained based on the starting point.
[0097] In some embodiments, the specific implementation of step 306 and the technical effects brought about can be referred to Figure 2 The corresponding step 205 in the embodiments will not be described in detail here.
[0098] from Figure 3It can be seen that Figure 2 Compared with the description of some corresponding embodiments, Figure 3 In the process 300 of the information acquisition method in some corresponding embodiments, in the process of acquiring the lane occupation result information based on the above-mentioned first lane occupation information, further refinement and adjustment are made to the situation where there is a failure in acquiring the lane occupation result information. First, after failing to obtain the lane occupation result information, the path can be adjusted by requesting path planning to occupy other lanes, so as to avoid the long waiting caused by the lane occupation to a certain extent. Then, considering the situation of network fluctuation or signal interference, the above-mentioned failure to send the path planning request to the server side leads to the need to send the path planning request to the server side multiple times. Since the number of times the path request is sent to the server side is too many, it will also increase a lot of occupation time. Therefore, the first sending request number threshold is introduced to limit the number of times the path request is sent to the server side. Considering the situation that the path request fails to be sent to the server side within a certain number of times. Then, the cache position path planning information is requested to the server side. This allows the AGV vehicle to continue to send the lane occupation request to the server side in the cache position without affecting other AGV vehicles. At the same time, the situation of increasing a lot of occupation time due to the number of times the request is sent to the server side is considered again. Therefore, a second threshold of the number of times of sending requests is introduced to limit the number of times the second lane occupation information request is sent to the server. Next, it is considered that the number of times the second lane occupation information request is sent to the server exceeds the second threshold of the number of times of sending requests, so that the lane blocking information can be sent to the server to clear the above-mentioned picking task. Therefore, the above method further refines and adjusts the situation in which there is a failure when obtaining the lane occupation result information. Therefore, the efficiency of executing the picking task can be improved while reducing the time consumed in obtaining information.
[0099] Further references Figure 5 As an implementation of the methods shown in the above figures, the present disclosure provides some embodiments of an information acquisition device, and these device embodiments are Figure 2 Corresponding to the method embodiments shown, the device can be specifically applied to various electronic devices.
[0100] like Figure 5As shown, the information acquisition device 500 of some embodiments includes: a selection unit 501, a determination unit 502, a generation unit 503, a first acquisition unit 504 and a second acquisition unit 505. The selection unit 501 is configured to select the starting point and the end point of the picking path from the predetermined path point sequence corresponding to the picking task; the determination unit 502 is configured to, in response to determining that the starting point is the entrance point of the lane, determine the lane numbers of the lanes corresponding to the starting point and the end point as the starting lane number and the end lane number respectively; the generation unit 503 is configured to generate first lane occupation information based on the starting lane number and the end lane number; the first acquisition unit 504 is configured to acquire lane occupation result information based on the first lane occupation information, wherein the lane occupation result information is used to indicate whether the lane is successfully occupied; the second acquisition unit 505 is configured to, in response to determining that the lane occupation result information is information indicating a lane occupation failure, acquire path planning information based on the starting point.
[0101] In some optional implementations of some embodiments, the generating unit 503 is further configured to: a first lane occupation information generating subunit (not shown in the figure). The first lane occupation information generating unit is configured to: in response to determining that the starting lane number and the ending lane number match, take the entrance point of the lane corresponding to the starting lane number as the occupation point, and generate the first lane occupation information.
[0102] In some optional implementations of some embodiments, the generating unit 503 is further configured to: a first lane occupation information generating subunit (not shown in the figure). The first lane occupation information generating unit is configured to: in response to determining that the starting lane number and the end lane number do not match, take the starting point as the occupation point, and generate the first lane occupation request information.
[0103] In some optional implementations of some embodiments, the second acquisition unit 505 is further configured to: a path planning request information generation subunit (not shown in the figure) and a path planning request information sending unit (not shown in the figure). The path planning request information generation subunit is configured to use the entrance point of the lane corresponding to the above-mentioned end point as the occupied point and the above-mentioned starting point as the starting point of the path planning to generate the path planning request information; the path planning request information sending unit is configured to perform the following path planning request information sending steps based on the preset first sending request number threshold: send the above-mentioned path planning request information to the server to obtain the path planning information; in response to the successful sending of the path planning request information, receive the path planning information; in response to the failure of the path planning request and the number of times the above-mentioned path planning request information has been sent is less than or equal to the above-mentioned first sending request number threshold, perform the above-mentioned path planning request information sending step again.
[0104] In some optional implementations of some embodiments, the second acquisition unit 505 is further configured to include: a storage unit (not shown in the figure), a cache position path planning request information generation and sending unit (not shown in the figure), and a cache position path planning information acquisition unit (not shown in the figure). The storage unit is configured to save the lane number corresponding to the lane occupation result information in response to the failure of the path planning request and the number of times the path planning request information is sent is greater than the first sending request number threshold; the cache position path planning request information generation and sending unit is configured to use the above starting point as the starting point of the cache position path planning, generate the cache position path planning request information and send it to the server; the cache position path planning information acquisition unit is configured to acquire the cache position path planning information in response to determining that the cache position path planning request information is sent successfully.
[0105] In some optional implementations of some embodiments, the above-mentioned cache path planning information includes the path planning end point; and the above-mentioned second acquisition unit 505 is further configured to: a second lane occupancy request information generating unit (not shown in the figure) and a second lane occupancy request information sending unit (not shown in the figure). Among them, the second lane occupation request information generating unit is configured to generate the second lane occupation request information in response to detecting that the above-mentioned picking vehicle has arrived at the above-mentioned path planning end point, using the above-mentioned path planning end point as the starting point of the lane occupation path; the second lane occupation request information sending unit is configured to perform the following second lane occupation request information sending steps based on a preset second sending request number threshold and the number of sending times of the above-mentioned second lane occupation request information: sending the above-mentioned second lane occupation request information to the service end to make a lane occupation request; increasing the number of sending times of the second lane occupation request information by 1, wherein the initial value of the number of sending times of the above-mentioned second lane occupation request information is 0; in response to determining that the second lane occupation request is successful, obtaining the picking path information; in response to the failure of the second lane occupation request and the number of sending times of the second lane occupation request information is less than or equal to the above-mentioned second sending request number threshold, executing the above-mentioned second lane occupation request information sending step again.
[0106] In some optional implementations of some embodiments, the second acquisition unit 505 is further configured to: a lane blocking information generating and sending unit (not shown in the figure) and a sending times resetting unit (not shown in the figure). The lane blocking information generating and sending unit is configured to generate lane blocking information and send it to the server in response to the failure of the second lane occupation request and the sending times of the second lane occupation request information being greater than the second sending times threshold; the sending times resetting unit is configured to reset the sending times of the second lane occupation request information to the initial value in response to determining that the sending of the lane blocking information has failed, and execute the second lane occupation request information sending step again.
[0107] In some optional implementations of some embodiments, the second acquisition unit 505 is further configured as a picking task clearing unit (not shown in the figure). The picking task clearing unit is configured to clear the picking task in response to determining that the lane blocking information is sent successfully.
[0108] In some optional implementations of some embodiments, the information acquisition device 500 further includes: a picking vehicle control unit (not shown in the figure). The picking vehicle control unit is configured to control the picking vehicle to enter the lane based on the lane occupation result information and the path point sequence in response to determining that the lane occupation result information is information indicating successful lane occupation.
[0109] It is understood that the units described in the device 500 are similar to those described in the reference Figure 2 Therefore, the operations, features and beneficial effects described above for the method are also applicable to the device 500 and the units included therein, and will not be described in detail here.
[0110] like Figure 6 As shown, the electronic device 600 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 601, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 602 or a program loaded from a storage device 608 into a random access memory (RAM) 603. In the RAM 603, various programs and data required for the operation of the electronic device 600 are also stored. The processing device 601, the ROM 602, and the RAM 603 are connected to each other via a bus 604. An input / output (I / O) interface 605 is also connected to the bus 604.
[0111] Typically, the following devices may be connected to the I / O interface 605: an input device 606 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 607 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 608 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 609. The communication device 609 may allow the electronic device 600 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 6 The electronic device 600 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 6 Each block shown in the figure may represent one device, or may represent multiple devices as required.
[0112] In particular, according to some embodiments of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present disclosure include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In some such embodiments, the computer program can be downloaded and installed from the network through the communication device 609, or installed from the storage device 608, or installed from the ROM 602. When the computer program is executed by the processing device 601, the above-mentioned functions defined in the method of some embodiments of the present disclosure are executed.
[0113] It should be noted that the computer-readable medium in some embodiments of the present disclosure may be a computer-readable signal medium or a computer-readable storage medium or any combination of the two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present disclosure, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In some embodiments of the present disclosure, the computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.
[0114] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.
[0115] The computer-readable medium may be included in the electronic device; or it may exist independently without being installed in the electronic device. The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device: selects the starting point and the end point of the picking path from the predetermined path point sequence corresponding to the picking task; in response to determining that the starting point is the entrance point of the lane, determines the lane numbers of the lanes corresponding to the starting point and the end point as the starting lane number and the end lane number respectively; based on the starting lane number and the end lane number, generates the first lane occupation information; based on the first lane occupation information, obtains the lane occupation result information, wherein the lane occupation result information is used to indicate whether the lane is successfully occupied; in response to determining that the lane occupation result information is information indicating that the lane occupation fails, obtains the path planning information based on the starting point.
[0116] Computer program code for performing the operations of some embodiments of the present disclosure may be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, Smalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0117] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0118] The units described in some embodiments of the present disclosure may be implemented by software or by hardware. The described units may also be provided in a processor, for example, may be described as: a processor including a selection unit, a determination unit, a generation unit, a first acquisition unit, and a second acquisition unit. The names of these units do not, in some cases, constitute limitations on the units themselves, for example, the selection unit may also be described as "a unit for selecting the starting point and the end point of a picking path from a predetermined sequence of path points corresponding to a picking task".
[0119] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0120] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present disclosure (but not limited to) and the technical solutions formed.
Claims
1. A method for obtaining information, comprising: Selecting the starting point and the end point of the picking path from the predetermined path point sequence corresponding to the picking task; In response to determining that the starting point is an entry point of a lane, determining lane numbers of lanes corresponding to the starting point and the end point as a starting lane number and an end lane number, respectively; Based on the starting lane number and the ending lane number, generating first lane occupation information; Based on the first lane occupation information, acquiring lane occupation result information, wherein the lane occupation result information is used to indicate whether the lane is successfully occupied; In response to determining that the lane occupation result information is information indicating a lane occupation failure, acquiring path planning information based on the starting point; Wherein, obtaining the path planning information based on the starting point includes: The entrance point of the lane corresponding to the end point is used as the occupied point and the starting point is used as the starting point of the path planning, and the path planning request information is generated; Based on a preset first request sending times threshold, the following path planning request information sending steps are performed: the path planning request information is sent to the server to obtain the path planning information; in response to the path planning request information being sent successfully, the path planning information is received.
2. The method according to claim 1, wherein: The generating first lane occupation information based on the starting lane number and the ending lane number includes: In response to determining that the starting lane number matches the ending lane number, an entry point of the lane corresponding to the starting lane number is used as an occupied point to generate first lane occupation information.
3. The method according to claim 1, wherein: The generating first lane occupation information based on the starting lane number and the ending lane number also includes: In response to determining that the starting lane number and the ending lane number do not match, the starting point is used as an occupied point and first lane occupation information is generated.
4. The method according to claim 1, wherein: The acquiring of path planning information based on the starting point includes: In response to the failure of the path planning request and the number of times the path planning request information has been sent is less than or equal to the first request sending number threshold, the path planning request information sending step is performed again.
5. The method according to claim 4, wherein: The acquiring of path planning information based on the starting point further includes: In response to a failure of the path planning request and the number of times the path planning request information is sent is greater than the first request sending number threshold, saving the lane number corresponding to the lane occupation result information; Using the starting point as the starting point of cache path planning, generating cache path planning request information and sending it to the server; In response to determining that the cache bit path planning request information is sent successfully, cache bit path planning information is acquired.
6. The method according to claim 5, wherein: The cache path planning information includes a path planning endpoint; as well as The acquiring of path planning information based on the starting point further includes: In response to detecting that the picking vehicle has arrived at the planned path end point, taking the planned path end point as the starting point of the lane occupation path, and generating second lane occupation request information; Based on the preset second request sending times threshold and the second lane occupation request information sending times, the following second lane occupation request information sending steps are performed: Sending the second lane occupation request information to the server to make a lane occupation request; Increase the number of times the second lane occupation request information is sent by 1, wherein the initial value of the number of times the second lane occupation request information is sent is 0; In response to determining that the second lane occupation request is successful, obtaining picking path information; In response to the second lane occupation request failing and the number of times the second lane occupation request information is sent is less than or equal to the second request sending number threshold, the second lane occupation request information sending step is performed again.
7. The method according to claim 6, wherein: The acquiring of path planning information based on the starting point further includes: In response to the second lane occupation request failing and the number of times the second lane occupation request information is sent being greater than the second request sending number threshold, generating lane blocking information and sending it to the server; In response to determining that the lane blocking information has failed to be sent, the number of times the second lane occupation request information is sent is reset to an initial value, and the second lane occupation request information sending step is performed again.
8. The method according to claim 7, wherein: The acquiring of path planning information based on the starting point further includes: In response to determining that the aisle blocking information is sent successfully, clearing the picking task.
9. The method according to claim 1, wherein: The method further comprises: In response to determining that the lane occupation result information is information indicating successful lane occupation, the picking vehicle is controlled to enter the lane based on the lane occupation result information and the waypoint sequence.
10. An information acquisition device, comprising: A selection unit is configured to select a starting point and an end point of a picking path from a predetermined sequence of path points corresponding to a picking task; a determining unit configured to, in response to determining that the starting point is an entry point of the lane, determine lane numbers of lanes corresponding to the starting point and the end point as a starting lane number and an end lane number, respectively; A generating unit configured to generate first lane occupation information based on the starting lane number and the ending lane number; A first acquisition unit is configured to acquire lane occupation result information based on the first lane occupation information, wherein the lane occupation result information is used to indicate whether the lane is successfully occupied; The second acquisition unit is configured to, in response to determining that the lane occupation result information is information representing a lane occupation failure, acquire path planning information based on the starting point, wherein the coordinates corresponding to the starting point are sent to the server as the starting point information of the path planning to obtain the path planning information returned by the server, and the path planning information includes the path information from the starting point to the end point corresponding to the picking task; wherein, acquiring the path planning information based on the starting point includes: taking the entrance point of the lane corresponding to the end point as the occupation point and taking the starting point as the starting point of the path planning to generate path planning request information; based on a preset first request sending number threshold, executing the following path planning request information sending steps: sending the path planning request information to the server to obtain the path planning information; and receiving the path planning information in response to the successful sending of the path planning request information.
11. An electronic device, comprising: one or more processors; a storage device having one or more programs stored thereon, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 9.
12. A computer readable medium having a computer program stored thereon, wherein: When the program is executed by a processor, the method according to any one of claims 1 to 9 is implemented.
