Central heating low-carbon transformation system and method based on mid-deep geothermal energy
By introducing medium-deep geothermal energy heat pump units and underground pipe units into urban-level centralized heating systems, they gradually replace traditional gas boilers for heating, solving the problem of difficulty in low-carbon transformation of urban-level heating systems and achieving low-carbonization. Retrofit and significant reduction in carbon emissions.
Patent Information
- Application Number
- CN202210034968.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-13
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-01-13
AI Technical Summary
It is difficult for urban-level centralized heating systems to achieve low-carbon transformation without affecting actual heating operations, resulting in heating systems that still rely on traditional fossil energy.
Adopt a central heating low-carbon transformation system based on mid- and deep-level geothermal energy. By installing heat pump units and mid- and deep-level geothermal underground pipe units on the heat stations and heat source sides, we will gradually replace traditional gas boilers for heating, using heat pump units and underground pipes. The system realizes low-carbon transformation of heating and retains gas boilers as peak-shaving heat source and safety guarantee.
It has realized the distributed, phased and gradual replacement and low-carbon transformation of central heating sources, significantly reduced the carbon emissions of heating, and achieved the complete replacement of traditional fossil energy by the medium-deep geothermal buried pipe heat pump heating system, and will continue to do so in the near future. While affecting the heating operation, it also improves the clean and low-carbon performance of the system.
Smart Images

Figure CN114183795B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a low-carbon transformation system and method, and in particular to a low-carbon transformation system and method for centralized heating based on mid-deep geothermal energy. Background Art
[0002] Among the forms of heating sources in the field of building heating, traditional fossil energy accounts for the highest proportion, and the carbon emissions it brings are an important part of the current carbon emission structure. In order to achieve continuous energy conservation and emission reduction goals, for the field of building heating, promoting the electrification of heating sources, especially the efficient use of renewable energy based on electric-driven heat pump heating technology, has become the key to achieving zero-carbon heating. However, for the current centralized heating system at the town level, it is often difficult to achieve a one-time energy-saving and low-carbon transformation only through the non-heating season without affecting the actual heating operation due to the large heat source capacity, wide distribution of heating pipelines, large volume of terminal thermal power stations and covered heating demand. As a result, the centralized heating system at the town level still maintains the form of a heating system based on traditional fossil energy.
[0003] In view of the above problems, there is an urgent need to provide a centralized heating low-carbon transformation system and method based on mid-deep geothermal energy, which fully utilizes the mid-deep geothermal buried pipe heat pump heating technology and realizes the centralized heating heat source. Summary of the invention
[0004] In order to solve the shortcomings of the above-mentioned technologies, the present invention provides a low-carbon transformation system and method for centralized heating based on medium-deep geothermal energy.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a low-carbon transformation system for centralized heating based on medium-deep geothermal energy, which is a low-carbon transformation system for centralized heating in the transformation process, and a heat pump unit in the thermal power station transformation is added to the terminal thermal power station, and the heat pump unit in the thermal power station transformation performs primary heating for the secondary network return water of the secondary network return water unit in the transformation; a medium-deep geothermal buried pipe unit is installed on the heat source side, and the medium-deep geothermal buried pipe unit in the transformation heats the primary network return water of the primary network return water unit in the transformation through the heat pump unit unit in the heat source side.
[0006] Furthermore, the working process of the low-carbon transformation system of central heating during the transformation process is as follows:
[0007] The secondary network return water first enters the condenser of the heat pump unit in the thermal power station renovation for primary heating; then, it enters the plate heat exchanger unit to exchange heat with the primary pipe network water supply for secondary heating; then, it is transported to the end users of the renovated building by the secondary network water pump unit in the renovation for heating; the original primary pipe network water supply is cooled by the plate heat exchanger unit and then enters the evaporator of the heat pump unit in the thermal power station renovation to further extract heat and cool it, gradually reducing the primary network return water temperature;
[0008] On the heat source side, the medium-deep geothermal buried pipe units and the heat pump units are gradually installed and renovated. The return water from the primary network after cooling is heated by the condenser of the heat pump unit on the heat source side. Then, it enters the gas boiler unit on the heat source side for secondary heating and finally supplied to the terminal thermal power station.
[0009] In the heat source side transformation, the water pump unit on the heat source side drives the heat source water, which takes heat from the soil through the medium and deep geothermal buried pipe unit in the transformation, and then enters the evaporator of the heat pump unit unit in the heat source side transformation to heat up, and then returns water to the primary network for heat supply.
[0010] The low-carbon transformation system of centralized heating based on mid-deep geothermal energy is a low-carbon transformation system of centralized heating after the transformation. The plate heat exchanger unit is cancelled at the terminal thermal power station, and a heat pump unit after the transformation of the thermal power station is set to heat the secondary network return water of the transformed secondary network return water unit; the heat pump unit after the transformation of the heat source side is set on the heat source side to heat the primary network return water of the transformed primary network return water unit;
[0011] After the transformation of the heat source side, the heat pump unit is heated by the transformed medium-deep geothermal buried pipe unit. After the transformation of the thermal power station, the heat pump unit is heated by the transformed primary pipe network water supply unit and the medium-deep geothermal buried pipe unit.
[0012] Furthermore, after the transformation is completed, the centralized heating low-carbon transformation system is equipped with a backup gas boiler, which is used as a backup heat source.
[0013] Furthermore, the working process of the low-carbon transformation system of central heating after the transformation is completed is as follows:
[0014] The secondary network return water enters the condenser of the heat pump unit after the thermal power station renovation for heating, and then is transported to the end users of the renovated building by the renovated secondary network water pump unit for heating; the renovated heat pump unit of the thermal power station, on the one hand, takes heat from the primary network water supply, and on the other hand, extracts geothermal energy from the renovated deep-layer geothermal buried pipe unit through the No. 2 heat source side water pump unit;
[0015] The cooled primary network return water is heated by the condenser of the heat pump unit after transformation on the heat source side, and then transported to the terminal thermal power station;
[0016] The water pump unit on the No. 1 heat source side drives the heat source water, which takes heat from the soil through the modified medium-deep geothermal buried pipe unit. Then, it enters the evaporator of the modified heat pump unit on the heat source side. After being heated by the modified heat pump unit on the heat source side, it returns water to the primary network for heat supply.
[0017] A design method for a low-carbon transformation system of central heating based on mid-deep geothermal energy includes the following design steps:
[0018] Step 1: Calculate the cumulative heating demand in the future heating season;
[0019] Step 2: Identify the geological conditions of the project site and calculate the recommended value of the cumulative heat extraction of a single deep geothermal buried pipe;
[0020] Step 3: Calculate the number of deep-layer geothermal buried pipes to be mined based on the planned cumulative heating demand in the future heating season;
[0021] Step 4: According to the implementation plan for low-carbon transformation of the central heating system, determine the number of deep-layer geothermal buried pipes to be mined each year, as well as the annual heating installed capacity of heat pump units to be installed at the heating station and heat source side;
[0022] Step 5: According to the installed capacity of the heat pump heating system of the thermal power station, gradually reduce the set value of the primary network return water temperature;
[0023] Step 6: According to the installation of heat pump system in the heating station and heat source side, gradually reduce the output of gas boiler and the set value of primary network water supply temperature;
[0024] Step 7: Completely replace the heat source with a medium-deep geothermal buried pipe heat pump heating system, and retain the gas boiler system as a peak-shaving heat source or safety guarantee.
[0025] Furthermore, in step 1, based on the historical operation data of the central heating system, the target value of heat consumption per unit area in the heating season is q h,a,t , the existing heating area, and the planned additional heating area in the future, and calculate the cumulative heating demand Q in the future heating season h,a,t ; As shown in formula 1;
[0026] Q h,a,t =F h,t *q h,a,t Formula 1
[0027] Among them, Q h,a,t is the cumulative heating demand for the future heating season, in GJ; F h,t is the total heating area in the future, in m 2 ;q h,a,t The target heat consumption per unit area in the future heating season, in GJ / m 2 .
[0028] Furthermore, in step 2, the geothermal geological conditions including soil thermal conductivity and temperature rise gradient are determined. Based on the average soil temperature drop of no more than 0.2°C per year, the recommended value of the cumulative heat extraction of a single deep geothermal buried pipe is calculated, as shown in Formula 2.
[0029] Q a =F g ·q c ·Δτ+F g ·H·ρ·C t ΔT Formula 2
[0030] Among them, Q a The recommended annual cumulative heat value of deep-seated geothermal buried pipes, in GJ; F g is the cross-sectional area of the soil control volume, in m 2 ;q c is the local geothermal heat flux density, unit W / ㎡; Δτ is the time of one year, unit s; H is the depth of the medium-deep geothermal buried pipe, unit m; ρ is the soil density, unit kg / m 3 ; C t is the specific heat capacity of soil, unit is kJ / (kg·℃); ΔT is the annual temperature change of soil control body.
[0031] Furthermore, in step 3, the number of deep-seated geothermal buried pipes to be mined is as shown in formula 3-4:
[0032]
[0033]
[0034] Among them, Q e,a is the total amount of geothermal energy that needs to be extracted during the heating season, in GJ; Q h,a,t Cumulative heating demand for the future heating season, unit GJ; COP h is the heating efficiency of the heat pump system, which can be taken as 5.0; N is the number of deep-layer geothermal buried pipes mined; Q a It is the recommended value of the annual cumulative heat extraction of medium-deep geothermal buried pipes, in GJ.
[0035] Furthermore, in step 5, the calculation of the set value of the primary network return water temperature is shown in Formula 5:
[0036]
[0037] Among them, T r,set,i T is the set value of the primary network return water temperature after the heat pump unit is installed in the thermal power station in the i-th year, unit ℃; r,set,i-1 The return water temperature setting value before the heat pump unit is installed in the thermal power station in the i-th year, unit: °C; Q h,热力站,iis the installed capacity of heat pump units installed in the thermal power station in the i-th year, in kW; G is the primary network circulation flow, in m 3 / h;
[0038] In step 6, the calculation of the gas boiler output and the primary network water supply temperature setting value is shown in formula 6-7:
[0039] Q h,gb,i =Q h,gb,i-1 -Q h,热力站,i -Q h,热源,i Formula 6
[0040]
[0041] Among them, Q h,gb,i is the installed capacity of gas boiler heating used in year i, in kW; Q h,gb,i-1 is the installed capacity of gas boiler heating used in year i-1, in kW; Q h,热源,i The installed capacity of heat pump units for heating in the i-th year, in kW; Q h,热力站,i The installed capacity of heat pump units installed in the thermal power station in year i, in kW; T s,set,i T is the set value of the primary network water supply temperature of the heat pump unit installed on the heat source side in the i-th year, in °C; r,set,i is the set value of the primary network return water temperature after the heat pump unit is installed in the thermal power station in the i-th year, unit ℃; G is the primary network circulation flow, unit m 3 / h.
[0042] The present invention discloses a low-carbon transformation system and method for centralized heating based on medium-deep geothermal energy. The system is based on a medium-deep geothermal buried pipe heat pump heating system, and gives full play to the characteristics of the technology, such as small footprint, flexible distribution, stable system operation, high renewable energy utilization efficiency, and clean and low-carbon. For traditional centralized heating systems represented by gas boilers, the system achieves distributed, phased and gradual replacement and low-carbon transformation of centralized heating heat sources without affecting actual heating operation, and ultimately achieves the complete replacement of traditional fossil energy by the medium-deep geothermal buried pipe heat pump heating system, and retains gas boilers as peak-shaving heat sources and safety guarantees, thereby significantly reducing the goal of carbon emissions from heating. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a schematic diagram of the system composition during the transformation process of the centralized heating low-carbon transformation system based on medium-deep geothermal energy of the present invention.
[0044] Figure 2 This is a schematic diagram of the system composition after the low-carbon transformation system of the centralized heating based on mid-deep geothermal energy of the present invention is completed.
[0045] Figure 3It is a schematic diagram of the transformation method of the centralized heating low-carbon transformation system based on medium-deep geothermal energy of the present invention.
[0046] In the figure: 1. The medium-deep geothermal buried pipe unit in the process of reconstruction; 2. The heat pump unit in the process of reconstruction on the heat source side; 3. The gas boiler unit on the heat source side; 4. The primary pipe network water supply unit in the process of reconstruction; 5. The plate heat exchanger; 6. The heat pump unit in the process of reconstruction of the thermal power station; 7. The primary network return water unit in the process of reconstruction; 8. The secondary network water pump unit in the process of reconstruction; 9. The secondary network return water unit in the process of reconstruction; 10. The end user of the building in the process of reconstruction; 11. The water pump unit in the process of reconstruction on the heat source side;
[0047] 21. The medium-deep geothermal buried pipe unit after renovation; 22. The heat pump unit unit after renovation on the heat source side; 23. The standby gas boiler; 24. The primary pipe network water supply unit after renovation; 25. The heat pump unit unit after renovation on the thermal power station; 26. The primary pipe network return water unit after renovation; 27. The secondary network water pump unit after renovation; 28. The secondary network return water unit after renovation; 29. The end user of the building after renovation; 30. The No. 1 heat source side water pump; 31. The No. 2 heat source side water pump. DETAILED DESCRIPTION
[0048] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0049] The present invention makes full use of the advantages of medium-deep buried pipe heat pump heating technology, such as small footprint, flexible mining location, stable system operation, high performance, green and low-carbon, to achieve distributed, phased and gradual replacement and low-carbon transformation of centralized heating sources;
[0050] like Figure 1 As shown, it is a system schematic diagram of the low-carbon transformation system of the centralized heating during the transformation process, which includes a medium-deep geothermal buried pipe unit 1 in the transformation, a heat pump unit unit 2 in the transformation of the heat source side, a gas boiler unit 3 on the heat source side, a primary pipe network water supply unit 4 in the transformation, a plate heat exchanger unit 5, a heat pump unit unit 6 in the transformation of the thermal power station, a primary network return water unit 7 in the transformation, a secondary network water pump unit 8 in the transformation, a secondary network return water unit 9 in the transformation, a building end user 10 in the transformation, and a heat source side water pump unit 11 in the transformation;
[0051] Among them, the middle-deep geothermal buried pipe unit 1 in the transformation and the heat pump unit 2 in the heat source side transformation are used for heating to gradually replace the heating of the gas boiler unit 3 on the heat source side. The middle-deep geothermal buried pipe unit 1 in the transformation is connected to the heat pump unit 2 in the heat source side transformation through the heat source side water pump unit 11 in the heat source side transformation. The heat pump unit 2 in the heat source side transformation is connected to the heat source side gas boiler unit 3. The heat source side gas boiler unit 3 is connected to the primary pipe network water supply unit 4 in the transformation. The primary pipe network water supply unit 4 is connected to the plate heat exchanger unit 5. The plate heat exchanger unit 5 is connected to the secondary network water pump unit 8 in the transformation and the heat pump unit unit 6 in the thermal power station transformation respectively. The heat pump unit unit 6 in the thermal power station transformation is connected to the secondary network water pump unit 8 in the transformation and the primary network return water unit 7 in the transformation respectively. The primary network return water unit 7 in the transformation is connected to the heat pump unit unit 2 in the transformation on the heat source side. The secondary network water pump unit 8 in the transformation is connected to the building end user 10 in the transformation. The building end user 10 in the transformation is connected to the heat pump unit unit 6 in the transformation of the thermal power station through the secondary network return water unit 9 in the transformation.
[0052] For the low-carbon transformation system of centralized heating during the transformation process, the specific work flow is as follows:
[0053] 1) In the terminal thermal power station, the electrically driven heat pump unit 6 in the thermal power station renovation is gradually added. The secondary network return water (temperature is about 40°C) first enters the condenser of the heat pump unit 6 in the thermal power station renovation for primary heating (temperature rises to about 45°C after primary heating); then, it enters the plate heat exchanger unit 5 to exchange heat with the primary pipe network water supply (80°C hot water) for secondary heating (temperature rises to about 50°C after secondary heating); then, it is transported to the terminal user 10 of the building being renovated by the secondary network water pump unit 8 for heating. The original primary pipe network water supply is cooled by the plate heat exchanger unit 5 (cooled to about 50°C) and enters the evaporator of the heat pump unit 6 in the thermal power station renovation to further extract heat and cool it (cooled to 30-40°C), thereby gradually reducing the primary network return water temperature.
[0054] 2) On the heat source side, gradually install and transform the medium-deep geothermal buried pipe unit 1 and the heat pump unit 2 on the heat source side. The primary network return water after cooling (cooling to 30-40℃) is heated by the condenser of the heat pump unit 2 on the heat source side (heated to about 50℃ after the first heating); then, it enters the heat source side gas boiler unit 3 for secondary heating (secondary heating to 80℃), and finally supplied to the terminal thermal power station, so as to realize the gradual replacement of gas boilers by the medium-deep geothermal buried pipe heat pump heating system.
[0055] 3) In the heat source side transformation, the heat source water pump unit 11 drives the heat source water to extract heat from the soil through the deep geothermal buried pipe unit 1 in the transformation, and then enters the evaporator of the heat pump unit unit 2 in the heat source side transformation to heat up and then return water to the primary network for heat supply.
[0056] like Figure 2 As shown in the figure, it is the system schematic diagram of the low-carbon transformation system of the central heating after the transformation is completed. Figure 1 On the basis of the centralized heating low-carbon transformation system in the transformation process shown, the terminal thermal power station cancels the plate heat exchanger unit 5, and all the heat pump unit units 25 after the thermal power station transformation are adopted. The heat source side also adopts the heat pump unit unit 22 after the heat source side transformation for heating, and the backup gas boiler 23 is used as a backup heat source.
[0057] Also like Figure 2 As shown, the low-carbon transformation system of the centralized heating after the transformation is completed specifically includes the transformed medium-deep geothermal buried pipe unit 21, the transformed primary pipe network water supply unit 24, the transformed primary network return water unit 26, the transformed secondary network water pump unit 27, the transformed secondary network return water unit 28, and the transformed building end user 29;
[0058] Among them, the transformed medium-deep geothermal buried pipe unit 21 is connected to the transformed heat pump unit unit 22 on the heat source side through the No. 1 heat source side water pump unit 30, and the transformed medium-deep geothermal buried pipe unit 21 is connected to the transformed heat pump unit unit 25 of the thermal power station through the No. 2 heat source side water pump unit 31; the transformed heat pump unit unit 22 on the heat source side is connected to the transformed primary pipe network water supply unit 24, the transformed primary pipe network water supply unit 24 is connected to the transformed heat pump unit unit 25 of the thermal power station, the transformed heat pump unit unit 25 of the thermal power station is connected to the transformed secondary network water pump unit 27 and the transformed primary network return water unit 26 respectively, the transformed primary network return water unit 26 is connected to the transformed heat pump unit unit 22 on the heat source side, the transformed secondary network water pump unit 27 is connected to the transformed building end user 29, and the transformed building end user 29 is connected to the transformed heat pump unit unit 25 of the thermal power station through the transformed secondary return water unit 28.
[0059] For the low-carbon transformation system of central heating after the transformation is completed, the specific work flow is as follows:
[0060] 1) The terminal thermal power station cancels the plate heat exchanger and adopts the heat pump unit 25 after the thermal power station renovation. The secondary network return water (temperature is about 40°C) enters the condenser of the heat pump unit 25 after the thermal power station renovation for heating (heating to about 50°C after heating), and then is transported to the terminal user 29 of the renovated building by the renovated secondary network water pump unit 27 for heating; the heat pump unit 25 after the thermal power station renovation takes heat from the primary pipe network water supply on the one hand, and extracts geothermal energy from the renovated deep-layer geothermal buried pipe unit 21 through the No. 2 heat source side water pump unit 31 on the other hand.
[0061] 2) The heat source side is entirely heated by the heat pump unit 22 after the heat source side transformation, and the gas boiler is used as a backup heat source; the cooled primary network return water (temperature is about 20°C) is heated by the condenser of the heat pump unit 22 after the heat source side transformation (after heating, the temperature rises to about 50°C), and then transported to the terminal thermal power station.
[0062] 3) The No. 1 heat source side water pump unit 30 drives the heat source water to extract heat from the soil through the modified mid-deep geothermal buried pipe unit 21, and then enters the evaporator of the modified heat pump unit 22 on the heat source side. After being heated by the modified heat pump unit 22 on the heat source side, it returns water to the primary network for heat supply.
[0063] At this point, the modified medium-deep geothermal buried pipe unit 21 realizes the heating of the primary network return water and the secondary network return water through the modified heat pump unit unit 22 on the heat source side and the modified heat pump unit unit 25 on the thermal power station.
[0064] The reconstructed medium-deep geothermal buried pipe unit 1 and the reconstructed medium-deep geothermal buried pipe unit 21 both contain one or more medium-deep geothermal buried pipes, and the buried pipe depth of each medium-deep geothermal buried pipe is 2 to 3 kilometers.
[0065] Due to the high temperature of mid-deep geothermal energy, it is only suitable for heating in winter and cannot be discharged in summer. Considering the need to restore soil temperature during long-term operation, the recommended cumulative heating amount of a mid-deep geothermal buried pipe under different geothermal geological conditions is different.
[0066] For the heat source side transformation, the water pump unit 11, the first heat source side water pump unit 30, and the second heat source side water pump unit 31 all contain one or more high-efficiency variable frequency water pumps, and the water pump frequency is adjustable from 25 to 50 Hz, achieving a flow rate of 20 to 40 m 3 / h continuously adjustable.
[0067] For the heat pump unit 2 during the heat source side renovation and the heat pump unit 22 after the heat source side renovation, both contain one or more high-efficiency heat pump units; the heating COP under the rated heating conditions (the supply and return water temperature on the condensing side is 50 / 40℃, and the supply and return water temperature on the evaporating side is 30 / 20℃) can reach 7.0.
[0068] The primary pipe network water supply unit 4 during the transformation and the primary pipe network water supply unit 24 after the transformation are primary transmission and distribution pipe networks for producing high-temperature hot water from heat sources, and contain one or more high-efficiency variable-frequency water pumps with an adjustable frequency of 25 to 50 Hz.
[0069] For the heat pump unit 6 in the thermal power station renovation and the heat pump unit 25 after the thermal power station renovation, they both contain one or more high-efficiency heat pump units; the heating COP under the rated heating conditions (supply and return water temperature on the condensing side is 50 / 40℃, supply and return water temperature on the evaporating side is 30 / 20℃) can reach 7.0.
[0070] The primary network return water unit 7 during the transformation and the primary network return water unit 26 after the transformation are the low-temperature return water transmission and distribution pipeline networks after the heat exchange of the thermal power station is completed.
[0071] The secondary network water pump unit 8 during transformation and the secondary network water pump unit 27 after transformation contain one or more high-efficiency variable frequency water pumps, and the water pump frequency is adjustable from 25 to 50 Hz to achieve continuously adjustable flow.
[0072] For the end-user of a building, it is the actual heating end.
[0073] Therefore, for the low-carbon transformation system of centralized heating based on medium-deep geothermal energy disclosed in the present invention, first, the electric-driven heat pump unit is gradually added to the terminal thermal power station, and the return water of the original primary pipe network after heat exchange by the plate heat exchanger enters the evaporator of the heat pump unit of the thermal power station to further extract heat and cool down, thereby gradually reducing the return water temperature of the primary pipe network. Secondly, the medium-deep geothermal buried pipe heat pump heating system is gradually installed on the heat source side, and the return water of the primary pipe network after cooling is heated by the heat pump unit on the heat source side, and then enters the gas boiler for secondary heating and then supplied to the terminal thermal power station, so as to realize the gradual replacement of the gas boiler by the medium-deep geothermal buried pipe heat pump heating system; finally, after the transformation is completed, the heat source side is fully replaced by the medium-deep geothermal buried pipe heat pump heating system, but the gas boiler system is still retained as a peak-shaving heat source or safety guarantee. The terminal thermal power station will eventually replace the plate heat exchanger with a heat pump unit, and at the same time, supplement the waste heat such as medium-deep geothermal energy or sewage sources to heat the terminal of the building. This will enable the low-carbonization and electrification transformation of traditional petrochemical energy centralized heating systems.
[0074] For the low-carbon transformation system of centralized heating based on mid-deep geothermal energy disclosed in the present invention, the specific design method includes the following steps:
[0075] Step 1: Based on the historical operation data of the central heating system, conduct detailed analysis and calculation of the hourly heating load during the heating season to obtain the actual heating area F h , hourly heating demand Q h,h , Daily heating demand Q h,d , cumulative heating demand Q during the heating season h,a And the heat consumption per unit heating area q h,a ; The above data are provided by the system design unit and are used as input conditions in the present invention;
[0076] Step 2: According to the comparison between the actual heat consumption index of the project and the relevant heat consumption index of the standard, formulate the energy-saving transformation and improvement target of the project, that is, the target heat consumption per unit area in the future heating season q h,a,t ; This data is also provided by the system design unit and is used as an input condition in the present invention; the comparison standard uses the "Residential Building Energy Consumption Standard GB / T51161-2016";
[0077] Step 3: Calculate the cumulative heating demand Q in the future heating season based on the actual heating area of the project and the planned additional heating area in the future h,a,t ; As shown in formula 1;
[0078] Q h,a,t =F h,t *q h,a,t Formula 1
[0079] Among them, Q h,a,t is the cumulative heating demand for the future heating season, in GJ; F h,t is the total heating area in the future, in m 2 ;q h,a,t The target heat consumption per unit area in the future heating season, in GJ / m 2 ;
[0080] Step 4: Clarify the geothermal geological conditions of the project site, including soil thermal conductivity and temperature rise gradient. Based on the average soil temperature drop of no more than 0.2°C per year, calculate the recommended value of the cumulative heat extraction of a single deep geothermal buried pipe, as shown in Formula 2.
[0081] Q a =F g ·q c ·Δτ+F g ·H·ρ·C t ΔT Formula 2
[0082] Among them, Q a The recommended annual cumulative heat value of deep-seated geothermal buried pipes, in GJ; F g is the cross-sectional area of the soil control volume, in m 2 ;q c is the local geothermal heat flux density, unit W / ㎡; Δτ is the time of one year, unit s; H is the depth of the medium-deep geothermal buried pipe, unit m; ρ is the soil density, unit kg / m 3 ; C t is the specific heat capacity of soil, in kJ / (kg·℃); ΔT is the annual temperature change of the soil control body;
[0083] Step 5: Calculate the number of deep-layer geothermal buried pipes to be mined based on the planned cumulative heating demand in the future heating season. The calculation is shown in Formula 3-4:
[0084]
[0085]
[0086] Among them, Q e,a is the total amount of geothermal energy that needs to be extracted during the heating season, in GJ; Qh,a,t Cumulative heating demand for the future heating season, unit GJ; COP h is the heating efficiency of the heat pump system, which can be taken as 5.0; N is the number of deep-layer geothermal buried pipes mined; Q a The recommended annual cumulative heat extraction value of deep-seated geothermal buried pipes, in GJ;
[0087] Step 6. After clarifying the number of deep-layer geothermal buried pipes to be mined and the installed capacity of the heat pump heating system to be installed, the number of mining and construction works per year and the annual installed capacity of heat pump units Q at the thermal power station and heat source side can be determined according to the implementation plan for low-carbon transformation of the centralized heating system. h,热力站 , Q h,热源 ;
[0088] Step 7: According to the installed capacity of the heat pump heating system of the thermal power station, gradually reduce the set value of the primary network return water temperature, as shown in Formula 5:
[0089]
[0090] Among them, T r,set,i T is the set value of the primary network return water temperature after the heat pump unit is installed in the thermal power station in the i-th year, unit ℃; r,set,i-1 The return water temperature setting value before the heat pump unit is installed in the thermal power station in the i-th year, unit: °C; Q h,热力站,i is the installed capacity of heat pump units installed in the thermal power station in the i-th year, in kW; G is the primary network circulation flow, in m 3 / h;
[0091] Step 8: According to the installation of heat pump system in the heating station and heat source side, gradually reduce the gas boiler output and the set value of primary network water supply temperature, as shown in formula 6-7:
[0092] Q h,gb,i =Q h,gb,i-1 -Q h,热力站,i -Q h,热源,i Formula 6
[0093]
[0094] Among them, Q h,gb,i is the installed capacity of gas boiler heating used in year i, in kW; Q h,gb,i-1 is the installed capacity of gas boiler heating used in year i-1, in kW; Q h,热源,i The installed capacity of heat pump units for heating in the i-th year, in kW; Q h,热力站,i The installed capacity of heat pump units installed in the thermal power station in year i, in kW; T s,set,i T is the set value of the primary network water supply temperature of the heat pump unit installed on the heat source side in the i-th year, in °C; r,set,iis the set value of the primary network return water temperature after the heat pump unit is installed in the thermal power station in the i-th year, unit ℃; G is the primary network circulation flow, unit m 3 / h;
[0095] Step 9: Finally, the heat source side will be completely replaced by the medium-deep geothermal buried pipe heat pump heating system, but the gas boiler system will still be retained as a peak-shaving heat source or safety guarantee; and the terminal thermal power station will eventually replace the plate heat exchanger with a heat pump unit, while supplementing the waste heat from the medium-deep geothermal energy or sewage source to heat the terminal of the building. In this way, the low-carbon and electrification transformation of the traditional fossil energy centralized heating system will be achieved.
[0096] Compared with the prior art, the present invention has the following technical advantages:
[0097] 1) Compared with conventional heating technology, the medium-deep geothermal buried pipe heat pump heating technology has the advantages of high heat source temperature, large heat extraction, stable system operation, high efficiency, small footprint, protection of groundwater resources, etc., and is not affected by ground climatic conditions. It can realize the clean, efficient and sustainable utilization of medium-deep geothermal energy. It is a higher-quality renewable energy clean and efficient heating technology. In heating applications, renewable energy accounts for more than 80%, realizing heating electrification, and carbon dioxide emissions per unit of heating are only 30-40kg / GJ. Driven by clean electricity, the goal of zero-carbon heating can be achieved.
[0098] 2) While implementing the low-carbon transformation of heat sources, the present invention simultaneously carries out energy-saving optimization and improvement of heating terminals and buildings, so that the heating demand of buildings is reduced year by year and reaches the guiding value of relevant national standards, which plays a further role in energy conservation and emission reduction.
[0099] 3) The present invention can make full use of the 7-8 months in the non-heating season to implement gradual transformation, mining deep geothermal buried pipes in batches and at different times, transforming the heat pump heating system of the thermal power station, and transforming the heat pump heating system on the heat source side. There is no need to replace the original centralized heating system at one time. During the transformation process, the heating season can still fully guarantee the heating demand of the project. At the same time, it can realize the gradual clean replacement of traditional heating sources, and provide a clear low-carbon transformation timetable and effect diagram.
[0100] 4) The present invention simultaneously realizes the reduction of the primary network water supply temperature and return water temperature by synchronously modifying the heat pump heating system at the thermal power station and the heat source side, and maintains the supply and return water temperature difference consistent with that before the transformation. Therefore, the original primary pipe network can be fully retained and utilized, greatly reducing the difficulty and cost of transformation. At the same time, with the overall reduction of the primary network supply and return water temperature, the heat leakage loss of the pipe network is greatly reduced, which also plays a role in reducing the heat supply.
[0101] 5) The present invention makes full use of the small horizontal footprint of the medium-deep geothermal buried pipe (the pipe diameter is only 200-300mm) and the flexible mining layout. The medium-deep geothermal buried pipe can be mined in a dispersed manner close to the building red line, which solves the problem of insufficient renovation space in the renovation of the existing centralized heating system. At the same time, it also avoids the mutual influence of heat exchange in the centralized mining of medium-deep geothermal buried pipes, and on the other hand, it avoids the problems of heat leakage loss in the pipe network, hydraulic imbalance, etc., and reduces the transportation energy consumption.
[0102] The above implementation modes are not limitations of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the scope of the technical solution of the present invention also belong to the protection scope of the present invention.
Claims
1. Low-carbon transformation system of central heating based on medium-deep geothermal energy, Features: Including the low-carbon transformation system of central heating during the transformation process and the low-carbon transformation system of central heating after the transformation is completed; The centralized heating low-carbon transformation system in the transformation process adds a heat pump unit (6) for transformation of the heat station at the terminal heat station, and installs a transformation medium-deep geothermal buried pipe unit (1) and a transformation heat pump unit unit (2) on the heat source side; The secondary network return water first enters the condenser of the heat pump unit (6) in the thermal power station renovation for primary heating; then, it enters the plate heat exchanger unit (5) to exchange heat with the primary pipe network water supply for secondary heating; then, it is transported by the secondary network water pump unit (8) in the renovation to the end user (10) of the building under renovation for heating; the original primary pipe network water supply is cooled by the plate heat exchanger unit (5) and then enters the evaporator of the heat pump unit (6) in the thermal power station renovation to further extract heat and cool it, thereby gradually reducing the primary network return water temperature; The primary network return water after cooling is heated by the condenser of the heat pump unit (2) in the heat source side transformation; then, it enters the heat source side gas boiler unit (3) for secondary temperature increase, and finally supplied to the terminal thermal power station; The heat source side water pump unit (11) in the heat source side transformation drives the heat source water to extract heat from the soil through the deep geothermal buried pipe unit (1) in the transformation, and then enters the evaporator of the heat pump unit (2) in the heat source side transformation to heat up and then return water to the primary network for heat supply; After the transformation, the low-carbon transformation system of the centralized heating system cancels the plate heat exchanger unit at the terminal thermal power station, sets a heat pump unit unit (25) after the transformation of the thermal power station, sets a heat pump unit unit (22) after the transformation on the heat source side, and sets a standby gas boiler (23) as a standby heat source; The secondary network return water enters the condenser of the heat pump unit (25) after the thermal power station transformation to be heated, and then is transported to the end user (29) of the transformed building by the transformed secondary network water pump unit (27) for heating; the heat pump unit (25) after the thermal power station transformation extracts heat from the primary pipe network water supply on the one hand, and extracts geothermal energy from the transformed middle-deep geothermal buried pipe unit (21) on the other hand through the second heat source side water pump unit (31); The cooled primary network return water is heated by the condenser of the heat pump unit (22) after the heat source side transformation, and then transported to the terminal thermal power station; The first heat source side water pump unit (30) drives the heat source water to extract heat from the soil through the modified mid-deep geothermal buried pipe unit (21), and then enters the evaporator of the modified heat pump unit (22) on the heat source side, and after being heated by the modified heat pump unit (22) on the heat source side, returns the water to the primary network for heat supply; The heat pump unit (6) in the thermal power station renovation performs primary heating for the secondary network return water of the secondary network return water unit (9) in the renovation; the deep-layer geothermal buried pipe unit (1) in the renovation provides heat for the primary network return water of the primary network return water unit (7) in the renovation through the heat pump unit unit (2) in the heat source side renovation; After the transformation, firstly, electric-driven heat pump units are gradually added to the terminal thermal power station. The return water of the original primary pipe network after heat exchange through the plate heat exchanger enters the evaporator of the heat pump unit of the thermal power station to further extract heat and cool it down, thereby gradually reducing the return water temperature of the primary network; secondly, medium-deep geothermal buried pipe heat pump heating system is gradually installed on the heat source side. The return water of the primary network after cooling is heated by the heat pump unit on the heat source side for the first stage, and then enters the gas boiler for secondary temperature increase and then supplied to the terminal thermal power station, thereby realizing the gradual replacement of gas boilers by medium-deep geothermal buried pipe heat pump heating system; finally, after the transformation is completed, the heat source side is fully replaced by the medium-deep geothermal buried pipe heat pump heating system, but the gas boiler is still retained as a peak-shaving heat source or safety guarantee; and the terminal thermal power station will eventually replace the plate heat exchanger with a heat pump unit, and at the same time, supplement the medium-deep geothermal energy or waste heat from sewage sources to provide heating for the building terminal.
2. A design method for a low-carbon transformation system for centralized heating based on mid-deep geothermal energy as claimed in claim 1, Features: The design steps include: Step 1: Calculate the cumulative heating demand in the future heating season; Step 2: Identify the geological conditions of the project site and calculate the recommended value of the cumulative heat extraction of a single deep geothermal buried pipe; Step 3: Calculate the number of deep-layer geothermal buried pipes to be mined based on the planned cumulative heating demand in the future heating season; Step 4: According to the implementation plan cycle of the low-carbon transformation of the centralized heating system, determine the number of deep geothermal buried pipes to be mined each year, as well as the annual heating installed capacity of heat pump units to be installed at the thermal power station and heat source side; Step 5: According to the installed capacity of the heat pump heating system of the thermal power station, gradually reduce the set value of the primary network return water temperature; Step 6: According to the installation of heat pump system in the heating station and heat source side, gradually reduce the output of gas boiler and the set value of primary network water supply temperature; Step seven: On the heat source side, the medium-deep geothermal buried pipe heat pump heating system is used to completely replace the heat source, and the gas boiler system is retained as a peak-shaving heat source or safety guarantee; the terminal thermal power station replaces the plate heat exchanger with a heat pump unit, and supplements with a low-temperature heat source to provide heating for the terminal users of the building.
3. According to claim 2, the design method of the low-carbon transformation system of central heating based on mid-deep geothermal energy, Features: In step 1, based on the historical operation data of the central heating system, the actual heating area F of the project is calculated. h , hourly heating demand Q h,h , Daily heating demand Q h,d , cumulative heating demand Q during the heating season h,a And the heat consumption per unit heating area q h,a ; According to the comparison between the actual heat consumption index of the project and the standard, the target heat consumption per unit area in the future heating season is formulated. h,a,t ; According to the actual heating area and the planned additional heating area in the future, calculate the cumulative heating demand Q in the future heating season h,a,t ; As shown in formula 1; Q h,a,t =F h,t *q h,a,t Formula 1 Among them, Q h,a,t is the cumulative heating demand for the future heating season, in GJ; F h,t is the total heating area in the future, in m 2 ; q h,a,t The target heat consumption per unit area in the future heating season, in GJ / m 2 .
4. According to claim 3, the design method of the low-carbon transformation system of central heating based on mid-deep geothermal energy, Features: In step 2, the geothermal geological conditions, including soil thermal conductivity and temperature rise gradient, are clarified. Based on the annual average soil temperature drop of no more than 0.2°C, the recommended value of the cumulative heat extraction of a single deep geothermal buried pipe is calculated, as shown in Formula 2. Q a = F g ·q c ·Δτ + F g ·H·ρ·C t ·ΔT Formula 2 Among them, Q a The recommended annual cumulative heat value of deep-seated geothermal buried pipes, in GJ; F g is the cross-sectional area of the soil control volume, in m 2 ;q c is the local geothermal heat flux density, unit W / ㎡; Δτ is the time of one year, unit s; H is the depth of the medium-deep geothermal buried pipe, unit m; ρ is the soil density, unit kg / m 3 ; C t is the specific heat capacity of soil, unit is kJ / (kg·℃); ΔT is the annual temperature change of soil control body.
5. According to the design method of the low-carbon transformation system of central heating based on mid-deep geothermal energy according to claim 4, Features: In step 3, the number of deep-seated geothermal buried pipes to be mined is shown in Formula 3-4: Among them, Q e,a is the total amount of geothermal energy that needs to be extracted during the heating season, in GJ; Q h,a,t Cumulative heating demand for the future heating season, unit GJ; COP h is the heating efficiency of the heat pump system, which can be taken as 5.0; N is the number of deep-layer geothermal buried pipes mined; Q a It is the recommended value of the annual cumulative heat extraction of medium-deep geothermal buried pipes, in GJ.
6. According to claim 5, the design method of the low-carbon transformation system of central heating based on mid-deep geothermal energy, Features: In step 5, the calculation of the set value of the primary network return water temperature is shown in formula 5: Among them, T r,set,i T is the set value of the primary network return water temperature after the heat pump unit is installed in the thermal power station in the i-th year, unit ℃; r,set,i-1 The return water temperature setting value before the heat pump unit is installed in the thermal power station in the i-th year, unit: °C; Q h,热力站 ,i is the heating capacity of the heat pump unit installed in the thermal power station in the i-th year, unit kW; G is the primary network circulation flow, unit m 3 / h; In step 6, the calculation of the gas boiler output and the primary network water supply temperature setting value is shown in formula 6-7: Q h,gb,i =Q h,gb,i-1 -Q h,热力站,i -Q h,热源,i Formula 6 Among them, Q h,gb,i is the installed capacity of gas boiler heating used in year i, in kW; Q h,gb,i-1 is the installed capacity of gas boiler heating used in year i-1, in kW; Q h,热源 ,i is the installed heating capacity of the heat pump unit installed by the heat source in the i-th year, unit kW; Q h,热力站 ,i is the heating capacity of the heat pump unit installed in the thermal power station in the i-th year, unit kW; T s,set,i T is the set value of the primary network water supply temperature of the heat pump unit installed on the heat source side in the i-th year, in °C; r,set,i is the set value of the primary network return water temperature after the heat pump unit is installed in the thermal power station in the i-th year, unit ℃; G is the primary network circulation flow, unit m 3 / h.
Citation Information
Patent Citations
Central heating low-carbon transformation system based on medium-deep geothermal energy
CN216667785U