Computer cluster management method, computer and computer cluster

A computer cluster and management method technology, applied in the field of computers, computer clusters, and computer cluster management methods, can solve the problems of complex management of computer clusters and high usage costs, and achieve the effects of low cost and simple management.

CN114218035APending Publication Date: 2022-03-22UBTECH ROBOTICS CORP LTD
0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2022-03-22

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention is suitable for the technical field of computers, and provides a computer cluster management method, a computer and a computer cluster.The method comprises the steps that after a first computer receives an online message of a second computer, if the first computer is a host in a first computer cluster, the first computer determines the host in the second computer cluster; if it is determined that the host of the second computer cluster is the second computer, the first computer broadcasts a first message, so that the second computer broadcasts first cluster data; after the first computer receives the first cluster data, updating the cluster data stored by the first computer into the first cluster data; according to the method, the computer cluster does not need to be managed by the master controller, and the computers in the computer cluster can be managed by using the computers in the computer cluster, so that the management of the computer cluster is simpler, and the cost is lower.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The application belongs to the field of computer technology, and in particular relates to a method for managing a computer cluster, a computer and a computer cluster. Background technique

[0002] A computer cluster consists of multiple computers. Different computers in the computer cluster can run and process different data at the same time, increasing the speed of data processing.

[0003] Since there are multiple computers in the computer cluster, in order to ensure the orderly operation of each computer, it is necessary to perform unified management on the computers in the computer cluster. At present, each computer in the computer cluster is often managed through a general controller, for example, the master controller and the slaves in the computer cluster are determined by using the general controller. Since the general controller is required to manage the computer cluster, it is necessary to install not only each computer but also a general c...

Examples

Embodiment Construction

[0025] In the following description, specific details such as specific system structures and technologies are presented for the purpose of illustration rather than limitation, so as to thoroughly understand the embodiments of the present application. It will be apparent, however, to one skilled in the art that the present application may be practiced in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, devices, circuits, and methods are omitted so as not to obscure the description of the present application with unnecessary detail.

[0026] It should be understood that when used in this specification and the appended claims, the term "comprising" indicates the presence of described features, integers, steps, operations, elements and / or components, but does not exclude one or more other Presence or addition of features, wholes, steps, operations, elements, components and / or collections thereof.

[0027] It should...