A hierarchical control method for virtual power plant communication network under cloud-edge-end architecture

Through the cloud-edge-end architecture of the virtual power plant and the multi-agent hierarchical control method, the high information access cost of the virtual power plant communication network and the "dimensionality disaster" problem of cloud computing are solved, flexibility and security are achieved, and virtual power is satisfied. The multi-business scenario requirements of power plants reduce information access costs.

CN114244679BActive Publication Date: 2024-10-29STATE GRID FUJIAN POWER ELECTRIC CO ECONOMIC RESEARCH INSTITUTE +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111480462.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-07
Publication Date
2024-10-29
Estimated Expiration
2041-12-07

AI Technical Summary

Technical Problem

Under the cloud-edge-end architecture, virtual power plant communication networks face high information access costs and the "curse of dimensionality" of cloud computing. Traditional networks are difficult to meet the needs of flexible scheduling, differentiated business guarantees, and security protection.

Method used

Design the cloud-edge-end architecture of the virtual power plant, including terminal equipment, edge servers and cloud management and control platforms. Through virtual power plant business information flow modeling, remove redundant information models, map business indicators to communication indicators, and adopt multi-agent layering Control method to realize hierarchical control of virtual power plant communication network.

Benefits of technology

It reduces the cost of information access, avoids the "disaster of dimensionality" of cloud computing, improves the flexibility and security of communication networks, meets the needs of multiple business scenarios of virtual power plants, and realizes new transactions in the energy Internet and power Internet of Things. Operational form.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114244679B_ABST
    Figure CN114244679B_ABST
Patent Text Reader

Abstract

The present invention proposes a hierarchical control method for a virtual power plant communication network under a cloud-edge-end architecture, comprising the following steps: step S1, designing a virtual power plant cloud-edge-end architecture, including terminal equipment, an edge server and a cloud management and control platform; the edge server contains a pipeline communication system; step S2, modeling the business information flow of the virtual power plant, analyzing the logical relationship between the virtual power plant information model and the traditional SG-CIM model, and removing redundant information models; step S3, mapping communication indicators between multiple subjects of the virtual power plant under multiple business scenarios, mapping the key business indicators of the virtual power plant to the communication indicators, and forming typical business communication indicators of the virtual power plant; step S4, adopting a multi-agent hierarchical control method for virtual power plants to realize hierarchical control of the virtual power plant communication network; the present invention can solve the "dimensionality disaster" and "communication" problems of such applications in cloud computing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of virtual power plant communication technology, and in particular to a layered control method for a virtual power plant communication network under a cloud-edge-end architecture. Background Art

[0002] As an effective means of aggregating flexible resources (FRs), virtual power plants (VPPs) can achieve energy aggregation, energy storage, energy supply and energy use without changing the grid connection mode and geographical location of FRs, with the help of advanced communication, metering, control and other technologies, effectively connecting FRs with the power system, realizing resource integration and allocation, and gradually participating in the operation of distributed energy in the wholesale power market as an aggregation entity. It is an important way for smart grids to achieve interactivity and intelligence on the energy supply and demand side. Compared with the single energy composition of traditional power plants in the horizontal direction, virtual power plants incorporate a large number of distributed energy sources such as renewable energy, energy storage, and controllable loads, breaking the monopoly from the system and building a power plant architecture that combines horizontal multi-component complementarity and vertical source-grid-load-storage coordination. In addition, the respective advantages of different FRs can be used to provide the power grid with a variety of services such as energy balance, reactive power / voltage support, spinning reserve, frequency regulation and congestion management, showing certain economic value.

[0003] In the energy Internet environment, distributed resources are characterized by large overall number, small single-point capacity, different characteristics, and spatial dispersion. If these resources are directly centrally controlled, extremely high information access costs will be generated, and cloud computing will also face the problem of "dimensionality disaster", which is also not conducive to user privacy protection. Therefore, designing a reasonable cloud-edge-end architecture is the key to reducing access costs and avoiding the "dimensionality disaster" of cloud computing.

[0004] Under the cloud-edge-end architecture, "communication" is another key issue for virtual power plants. From the perspective of "communication", on the one hand, the communication network needs to provide sufficiently large bandwidth and sufficiently small latency to ensure the transmission reliability of the existing and future businesses of the virtual power plant; on the other hand, the communication network needs to have an inherent security capability to provide channel-level security protection for massive differentiated energy access and virtual power plant information interaction. Virtual power plants have put forward higher requirements for the flexible scheduling capabilities, differentiated business assurance capabilities, unified management and control capabilities, and network compatibility capabilities of communication networks. In the future, virtual power plants will be geographically distributed, with frequent information interactions and control extending to the end. Traditional networks are no longer able to adapt. Summary of the invention

[0005] The present invention proposes a hierarchical control method for the communication network of a virtual power plant under a cloud-edge-end architecture, which can solve the "dimensionality curse" and "communication" problems of such applications in cloud computing.

[0006] The present invention adopts the following technical solutions.

[0007] A method for hierarchical control of a virtual power plant communication network under a cloud-edge-end architecture comprises the following steps:

[0008] Step S1, designing a virtual power plant cloud-edge-end architecture, including terminal equipment, edge servers and a cloud management and control platform; the edge server includes a pipeline communication system;

[0009] Step S2: Modeling the virtual power plant business information flow, analyzing the logical relationship between the virtual power plant information model and the traditional SG-CIM model, and removing redundant information models;

[0010] Step S3: Mapping communication indicators between multiple subjects of the virtual power plant in multiple business scenarios, mapping key business indicators of the virtual power plant to communication indicators, and forming typical business communication indicators of the virtual power plant;

[0011] Step S4: adopt a multi-agent virtual power plant hierarchical control method to achieve hierarchical control of the virtual power plant communication network.

[0012] In step S1, the physical aggregation, information transmission, and resource control of the flexible resources FRs used to construct the virtual power plant are divided into three parts, and the basic structure of the virtual power plant VPP under the cloud-edge-end architecture is obtained, including terminal equipment, edge servers with pipeline communication systems, and cloud management and control platforms. Under the cloud-edge-end architecture, the VPP uses edge servers to perform data processing at the edge of the network close to the information source of the flexible resources FRs, aggregates scattered resources, and then sends them to the cloud management and control platform through network pipelines, and then uses cloud computing to dispatch resource clusters, interact with the power grid dispatch center and the trading center, and issue optimization instructions to the edge servers.

[0013] In the step S2, based on the business information collection and interaction demand analysis of the virtual power plant, a virtual power plant information model is established to address the problem of missing information models in the virtual power plant in the International Electrotechnical Commission Common Information Model IEC CIM and the State Grid Corporation of China's unified data model SG-CIM; then, the logical relationship between the virtual power plant information model and the traditional SG-CIM model is analyzed, redundant information models are removed, and a new virtual power plant information model is obtained.

[0014] The virtual power plant business information collection and interaction demand analysis refers to collecting the information options required by different objects of the virtual power plant when participating in the power grid's new energy consumption, peak shaving and valley filling, frequency regulation, voltage regulation, and interruptible load control, and subdividing the information options of the collected objects into general information and special information items. On the basis of the good subdivision, it is compared which information options can be obtained by the existing power grid system, the information is classified and integrated, and the information flow between different systems and platforms is clarified;

[0015] The different objects of the virtual power plant include user-side loads, distributed power sources, electric vehicles, and energy storage devices; the information options include energy information and flow information; the energy information includes electrical energy and thermal energy;

[0016] The general information items include equipment factory information, equipment user information, and equipment automation capability information;

[0017] The dedicated information items include equipment working mode, equipment operating status, equipment rated parameters, equipment real-time information, equipment predicted parameters, equipment operating mode and equipment response capability.

[0018] In step S3, the parameters affected by each link in the implementation of the virtual power plant business are determined when the communication indicators change in different business scenarios, and the key communication indicators that will affect the business level when multiple subjects of the virtual power plant interact with each other, as well as the degree of their impact, are analyzed; on this basis, the key business indicators of multiple subjects are mapped to the communication indicators to form the communication indicators of the typical business of the virtual power plant.

[0019] In step S3, typical services of the virtual power plant include power frequency regulation, power peak regulation, large power grid stability control, clean energy consumption, and power market transactions;

[0020] The communication indicators of the typical services of the virtual power plant are a set of indicators including basic information transmission bandwidth, number of access terminals, number of channels, cross-sectional flow, transmission delay, reliability and security;

[0021] In the step S3, mapping the key business indicators of multiple subjects to communication indicators means establishing a mapping relationship from communication indicators to the business level by analyzing the impact of communication indicators at different time and space scales on the operational safety, operational stability, operational reliability, and operational economy of different virtual power plant business scenarios, using machine learning or traditional mathematical analytical expressions to characterize the inherent influence mechanism of indicators and businesses, and finally quantitatively or qualitatively giving the degree of influence of communication indicators on the business level of virtual power plants.

[0022] The virtual power plant includes a new type of virtual power plant transaction operation form that can realize the requirements of energy Internet and power Internet of Things. Its control objects include various distributed energy sources, energy storage systems, controllable loads and electric vehicles. In step S4, the communication system architecture of the virtual power plant is designed according to the multi-level business requirements of the virtual power plant, and a multi-agent virtual power plant hierarchical control method is adopted to realize hierarchical control of the virtual power plant communication network and coordinate control of various distributed energy sources.

[0023] In step S4, the communication system architecture of the virtual power plant includes a perception layer, an access layer, a backbone layer, a control center and a dispatching center.

[0024] The method adopted by the virtual power plant communication network hierarchical control is to achieve coordinated control and energy optimization management of the virtual power plant through two-way communication between various agents, thereby overcoming the limitations of existing distributed control methods and meeting the requirements of virtual power plants for plug-and-play and flexible change of operating status.

[0025] Compared with the existing technology, the technical solution provided by the present invention has the following beneficial effects:

[0026] 1. The cloud-edge-end collaborative virtual power plant architecture provides support for solving the internal resource coordination problems of regional energy systems with strong uncertainty and complex energy coupling, provides ideas for coping with the flexibility of high-dynamic, high-dimensional, and multi-mode operations of the energy Internet, and lays the foundation for achieving effective energy allocation and energy consumption guidance.

[0027] 2. Can realize hierarchical control.

[0028] The present invention can simulate a virtual power plant through cloud computing, and can solve the "dimensionality curse" and "communication" problems associated with such applications in cloud computing. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments:

[0030] Attached Figure 1 This is a diagram of the cloud-edge architecture of a virtual power plant;

[0031] Attached Figure 2 It is a multi-objective hierarchical control logic diagram of the virtual power plant communication network;

[0032] Attached Figure 3 It is a schematic diagram of the design of the virtual power plant communication network architecture;

[0033] Attached Figure 4 This is a schematic diagram of the layered architecture of a multi-agent based virtual power plant. DETAILED DESCRIPTION

[0034] As shown in the figure, a method for hierarchical control of a virtual power plant communication network under a cloud-edge-end architecture includes the following steps:

[0035] Step S1, designing a virtual power plant cloud-edge-end architecture, including terminal equipment, edge servers and a cloud management and control platform; the edge server includes a pipeline communication system;

[0036] Step S2: Modeling the virtual power plant business information flow, analyzing the logical relationship between the virtual power plant information model and the traditional SG-CIM model, and removing redundant information models;

[0037] Step S3: Mapping communication indicators between multiple subjects of the virtual power plant in multiple business scenarios, mapping key business indicators of the virtual power plant to communication indicators, and forming typical business communication indicators of the virtual power plant;

[0038] Step S4: adopt a multi-agent virtual power plant hierarchical control method to achieve hierarchical control of the virtual power plant communication network.

[0039] In step S1, the physical aggregation, information transmission, and resource control of the flexible resources FRs used to construct the virtual power plant are divided into three parts, and the basic structure of the virtual power plant VPP under the cloud-edge-end architecture is obtained, including terminal equipment, edge servers with pipeline communication systems, and cloud management and control platforms. Under the cloud-edge-end architecture, the VPP uses edge servers to perform data processing at the edge of the network close to the information source of the flexible resources FRs, aggregates scattered resources, and then sends them to the cloud management and control platform through network pipelines, and then uses cloud computing to dispatch resource clusters, interact with the power grid dispatch center and the trading center, and issue optimization instructions to the edge servers.

[0040] In the step S2, based on the business information collection and interaction demand analysis of the virtual power plant, a virtual power plant information model is established to address the problem of missing information models in the virtual power plant in the International Electrotechnical Commission Common Information Model IEC CIM and the State Grid Corporation of China's unified data model SG-CIM; then, the logical relationship between the virtual power plant information model and the traditional SG-CIM model is analyzed, redundant information models are removed, and a new virtual power plant information model is obtained.

[0041] The virtual power plant business information collection and interaction demand analysis refers to collecting the information options required by different objects of the virtual power plant when participating in the power grid's new energy consumption, peak shaving and valley filling, frequency regulation, voltage regulation, and interruptible load control, and subdividing the information options of the collected objects into general information and special information items. On the basis of the good subdivision, it is compared which information options can be obtained by the existing power grid system, the information is classified and integrated, and the information flow between different systems and platforms is clarified;

[0042] The different objects of the virtual power plant include user-side loads, distributed power sources, electric vehicles, and energy storage devices; the information options include energy information and flow information; the energy information includes electrical energy and thermal energy;

[0043] The general information items include equipment factory information, equipment user information, and equipment automation capability information;

[0044] The dedicated information items include equipment working mode, equipment operating status, equipment rated parameters, equipment real-time information, equipment predicted parameters, equipment operating mode and equipment response capability.

[0045] In step S3, the parameters affected by each link in the implementation of the virtual power plant business are determined when the communication indicators change in different business scenarios, and the key communication indicators that will affect the business level when multiple subjects of the virtual power plant interact with each other, as well as the degree of their impact, are analyzed; on this basis, the key business indicators of multiple subjects are mapped to the communication indicators to form the communication indicators of the typical business of the virtual power plant.

[0046] In step S3, typical services of the virtual power plant include power frequency regulation, power peak regulation, large power grid stability control, clean energy consumption, and power market transactions;

[0047] The communication indicators of the typical services of the virtual power plant are a set of indicators including basic information transmission bandwidth, number of access terminals, number of channels, cross-sectional flow, transmission delay, reliability and security;

[0048] In the step S3, mapping the key business indicators of multiple subjects to communication indicators means establishing a mapping relationship from communication indicators to the business level by analyzing the impact of communication indicators at different time and space scales on the operational safety, operational stability, operational reliability, and operational economy of different virtual power plant business scenarios, using machine learning or traditional mathematical analytical expressions to characterize the inherent influence mechanism of indicators and businesses, and finally quantitatively or qualitatively giving the degree of influence of communication indicators on the business level of virtual power plants.

[0049] The virtual power plant includes a new type of virtual power plant transaction operation form that can realize the requirements of energy Internet and power Internet of Things. Its control objects include various distributed energy sources, energy storage systems, controllable loads and electric vehicles. In step S4, the communication system architecture of the virtual power plant is designed according to the multi-level business requirements of the virtual power plant, and a multi-agent virtual power plant hierarchical control method is adopted to realize hierarchical control of the virtual power plant communication network and coordinate control of various distributed energy sources.

[0050] In step S4, the communication system architecture of the virtual power plant includes a perception layer, an access layer, a backbone layer, a control center and a dispatching center.

[0051] The method adopted by the virtual power plant communication network hierarchical control is to achieve coordinated control and energy optimization management of the virtual power plant through two-way communication between various agents, thereby overcoming the limitations of existing distributed control methods and meeting the requirements of virtual power plants for plug-and-play and flexible change of operating status.

[0052] Embodiment 1:

[0053] In this example, the method Figure 1 As shown, the specific implementation steps are as follows:

[0054] Step 1: Design the cloud-edge-end architecture of the virtual power plant.

[0055] The physical aggregation, information transmission, and resource regulation of flexible resources (FRs) are divided into three parts, and the basic structure of VPP under the cloud-edge-device architecture is obtained, as shown in Figure 1 As shown in the figure. The overall structure includes terminal devices, edge servers (and pipeline communication systems), and cloud management and control platforms. In the cloud-edge-end architecture, VPP uses edge servers to perform data processing at the edge of the network close to the source of flexible resources (FRs) information, aggregate distributed resources, and then send them to the cloud management and control platform through network pipelines. Then, with the help of cloud computing, resource clusters are dispatched, interacting with the power grid dispatch center and trading center, and optimization instructions are issued to edge servers.

[0056] Step 2: Virtual power plant business information flow modeling

[0057] Collect the information options required by different objects of the virtual power plant, such as user-side loads, distributed power sources, electric vehicles, and energy storage devices when participating in the consumption of new energy in the power grid, peak shaving and valley filling, frequency regulation, voltage regulation, and interruptible load control. Such as energy information, flow information, operation information, and metering information. Energy information includes energy utilization information such as electric energy and thermal energy, which is the remote pulse data in the power system; flow information is information such as voltage, frequency, active power, reactive power, and power quality, which is the telemetry data in the power system; operation information refers to the protection, control, system status, meteorology, and other information in the operation of the virtual power plant, which is the remote signal and event sequence record data in the power system. Dispatch information includes control signals of energy supply units, energy storage units, and load units, which are remote control, remote adjustment, and set value data in the power system. Metering information is metering data obtained from electricity meters and heat meters.

[0058] The information options of the collected objects are subdivided into general and special information items, and the information is classified and integrated. Specifically, the general information items may include the factory information of the equipment (such as the general name of the equipment, the name of the manufacturer, etc.), the user information of the equipment (such as the user name, user type, the industry of the user, the meter number, etc.), and the equipment automation capability information (such as the equipment interaction protocol, the communication method of the equipment to interact with the outside world, whether the equipment has a third-party master station platform connected to it, etc.). The dedicated information items may include equipment working mode (active power, reactive power, apparent power, voltage, current, power angle), equipment operating status (such as equipment operation, shutdown, gear status, etc.), equipment rated parameters (such as the number of phases of the wind turbine, rated wind speed, cut-in wind speed, cut-out wind speed, maximum output active power, equipment normal operation rated voltage, equipment normal operation rated current, equipment normal operation rated frequency), equipment real-time information (three voltages, three currents, real-time active power, real-time reactive power, and the ratio of equipment active power to apparent power), equipment prediction parameters, equipment operating mode (such as whether the equipment is controllable, whether the equipment is working in a normal state, equipment normal operation voltage fluctuation range, equipment normal operation frequency fluctuation range) and equipment response capability (such as response time, response speed, response duration and response unit cost, etc.). Finally, on the basis of good segmentation, compare which information options are available in the existing power grid system, classify and summarize the information options, and clarify the information flow between different systems and platforms.

[0059] Then, aiming at the missing information model of virtual power plant in International Electrotechnical Commission Common Information Model (IEC CIM) and State Grid Corporation of China Unified Data Model (SG-CIM), a new virtual power plant information model is established. Finally, the logical relationship between the virtual power plant information model and the traditional SG-CIM model is analyzed, the redundant information model is removed, and finally a new virtual power plant information model is obtained.

[0060] Specifically, the new virtual power plant information modeling method is based on the business scenario requirements of virtual power plant regulation, and uses models such as grey correlation analysis to select the common and characteristic information required to be transmitted by different virtual power plant terminals, and determine the one-to-one mapping relationship between terminal information and high-level business. An evaluation model for the common and characteristic information transmitted by typical virtual power plant equipment is proposed, and the core transmission information content options are selected based on the evaluation model and information value theory, and the core virtual power plant information model is established using information modeling standardization methods and extension technologies.

[0061] Further analyze the logical relationship between the newly established virtual power plant information model and the traditional SG-CIM model, and sort out the relationship between the two from the perspective of domain, package, and class. Ensure that the newly established virtual power plant information model has basic information model inheritance, parallel, association, aggregation and other characteristics. Finally, after de-redundancy, use EA software to obtain a unified virtual power plant information model to solve the interface adaptation and information model missing problems in the process of virtual power plant energy terminals participating in the grid business interaction.

[0062] Step 3: Mapping of communication indicators between multiple entities in virtual power plants under multiple business scenarios.

[0063] Typical virtual power plant businesses include power frequency regulation, power peak regulation, large power grid stability control, clean energy consumption, and power market transactions. For these typical virtual power plant businesses, determine the parameters affected by each link in the implementation of virtual power plant business when communication indicators change in different business scenarios, and analyze the key communication indicators that will affect the business level when multiple subjects of the virtual power plant interact with each other, as well as the degree of their impact. On this basis, map the key business indicators to the communication indicators to form the communication indicators of typical virtual power plant businesses.

[0064] Specifically, the typical business communication indicators of virtual power plants include a set of indicators such as basic information transmission bandwidth, number of access terminals, number of channels, cross-sectional flow, transmission delay, reliability and security. A qualitative or quantitative quantification method is proposed for the indicator set in the communication indicator system to quantify the values ​​of information transmission communication indicators under different services. Finally, an evaluation method for information transmission communication indicators is established, and the rationality of indicator settings is evaluated and corrected based on actual engineering application data.

[0065] The mapping of communication indicators between multiple subjects in a virtual power plant refers to the establishment of a mapping relationship from communication indicators to the business level by analyzing the impact of communication indicators at different time and space scales on the operational safety, operational stability, operational reliability, and operational economy of different virtual power plant business scenarios, and using machine learning or traditional mathematical analytical expressions to characterize the inherent influence mechanism of indicators and businesses. Finally, the degree of impact of communication indicators on the business level of virtual power plants is quantitatively or qualitatively given.

[0066] Embodiment 2:

[0067] Using the method in Example 1, for five typical businesses, namely, power frequency regulation, power peak regulation, large power grid stability control, clean energy consumption, and power market trading, a typical business communication indicator mapping of a virtual power plant is established as follows:

[0068] (1) Power frequency modulation:

[0069] Features: The frequency modulation service has high real-time requirements, and a frequency modulation operation usually takes seconds or even milliseconds.

[0070] Communication network: Terminals report regulation potential and operating parameters in seconds, and control instructions are issued in milliseconds. Based on 100 terminals per km2 area, 30% of which participate in frequency modulation, the peak bandwidth required for frequency modulation is 4.8Mbps.

[0071] Reliability: Primary frequency modulation requires the communication network reliability to be 99.999%; secondary frequency modulation requires the communication network reliability to be 99.99%.

[0072] System delay: Primary frequency modulation requires a communication network delay of less than 50ms; secondary frequency modulation requires a communication network delay of less than 3s.

[0073] (2) Power peak load regulation:

[0074] Features: Terminal deployment is similar to frequency modulation, with a large number of control-related terminal devices deployed outdoors or in non-controllable physical environments on the user side.

[0075] Communication network: Based on 100 terminals per km2 area, second-level status reporting, minute-level peak load control, the required bandwidth is 0.82Mbps.

[0076] Reliability: The communication network reliability is required to be 99.99%.

[0077] System delay: Communication network delay is required to be less than 3s.

[0078] (3) Large power grid stability control:

[0079] Features: In response to frequency emergency control requirements, interruptible loads can be quickly removed in milliseconds. In response to demand-side management goals, interruptible loads can be removed in seconds or minutes to achieve power generation and consumption balance.

[0080] Communication network: In terms of millisecond-level rapid load shedding, based on 100 network-load interaction terminals per km2 area and a communication delay of 50ms, the bandwidth requirement is about 16Mbps; in terms of demand-side management, based on 150 demand response terminals per km2 office area in A+ area, a polling mechanism, minute-level data reporting, and a concurrency rate of 80%, the bandwidth requirement is about 2.74Mbps. The total bandwidth requirement is 18.74 Mbps.

[0081] Reliability: The communication network reliability is required to be 99.999%.

[0082] System delay: The communication network delay is required to be less than 50ms.

[0083] (4) Clean energy consumption:

[0084] Features: Involves coordinated control of various distributed power sources, energy storage systems, controllable loads, and electric vehicles.

[0085] Communication network: The communication access methods and control protocols of sources, loads, and storage are different, so it is necessary to strengthen the research on multiple communication access methods and unified control of multi-protocol services. Based on 150 control terminals per km2 area, the bandwidth requirement is about 2.74Mbps.

[0086] Reliability: The communication network reliability is required to be 99.99%.

[0087] System delay: Communication network delay is required to be less than 3s.

[0088] (5) Electricity market transactions:

[0089] Features: Involving a large amount of sensitive data such as electricity consumption and price information declared by users before the bid opening, user contact ID number, mobile phone number, etc.

[0090] Communication network: It needs to have effective channel isolation capabilities to ensure independent transmission of sensitive data, non-blocking communication capabilities in the event of business emergencies, and support high-frequency transactions of a large number of users. Based on 1,000 trading members, the required bandwidth is about 1.33Mbp.

[0091] Reliability: The communication network reliability is required to be 99.99%.

[0092] System delay: The communication network delay is required to be less than 10s.

[0093] Step 4: Design of hierarchical control method for virtual power plant communication network.

[0094] Virtual power plants have problems such as long data collection cycle, huge data volume and few data collection dimensions. In order to realize the new virtual power plant transaction operation form required by the energy Internet and the power Internet of Things, the communication system architecture of the virtual power plant is designed according to the multi-level business needs of the virtual power plant. The control objects of the virtual power plant mainly include various distributed energy sources, energy storage systems, controllable loads and electric vehicles. In order to achieve coordinated control of various distributed energy sources, a multi-agent virtual power plant hierarchical control method is adopted to realize hierarchical control of the virtual power plant communication network.

[0095] Specifically, the communication system architecture of the virtual power plant includes the perception layer, access layer, backbone layer, control center and dispatch center. Figure 2 shown.

[0096] In the communication system architecture of the virtual power plant, the perception layer is composed of the virtual power plant collection and control terminals, including user-side energy storage devices, industrial user loads, distributed photovoltaics, etc. The access layer is mainly composed of communication equipment such as edge routers, aggregation routers and gateways, which are responsible for the collection, processing and forwarding of distributed energy equipment terminal data within the jurisdiction. The access layer equipment is compatible with multiple communication protocols and adapts to multiple perception layer equipment. It uses 230M power wireless private network, 4 / 5G and other technologies to transmit various types of business data information collected by the perception layer, and classifies and marks each business data and supervises the flow. At the same time, it has self-check maintenance, fault alarm and abnormal self-reset and other repair functions. The backbone layer carries the communication backbone network of the virtual power plant system, and is interconnected with the dispatching automation system and the data collection and monitoring system through optical fiber Ethernet communication technology to realize the real-time interaction of distributed energy equipment analog quantity, state quantity and other data and remote control, remote adjustment, synchronous grid connection and other control operation information. The control center is responsible for dispatching automation management such as coordinated control of multi-point distributed energy and external power grids, power distribution and control of distributed energy generation, coordinated control of distributed energy and energy storage systems, as well as advanced application management such as event recording, fault isolation, and human-computer interaction.

[0097] Specifically, the multi-agent-based hierarchical control method of virtual power plants achieves coordinated control and energy optimization management of virtual power plants through two-way communication between agents, thereby overcoming the limitations of existing distributed control methods and meeting the requirements of virtual power plants for plug-and-play and flexible change of operating status.

[0098] Figure 3 The multi-objective hierarchical control logic relationship of the virtual power plant communication network is given. The control coordination center of the virtual power plant at the lower level controls the power generation or power consumption units within the jurisdiction, and the control coordination center of the virtual power plant at this level feeds back information to the control coordination center of the virtual power plant at the upper level, thus forming an overall hierarchical structure. The virtual power plant also needs to provide some auxiliary services including: active frequency control, congestion management, improving power quality, reducing network losses, black start, etc. The realization of each function requires the virtual power plant to provide different integration parameters. Therefore, in order to realize these functions, there are also multiple ports for handling different problems in the control of the virtual power plant. These ports select the required data from the operating information fed back by the resources connected to the VPP. Therefore, the design of the multi-objective hierarchical control architecture of the virtual power plant communication network needs to consider two issues. One is to get rid of the limitations of the existing distributed control method, and the other is that the control architecture should be able to meet the requirements of plug-and-play and flexible change of operating status of the virtual power plant.

[0099] In order to solve the above problems, a multi-agent virtual power plant hierarchical control architecture is adopted, such as Figure 4As shown in the figure. The multi-agent system consists of a control agent, a distributed energy agent, and a user agent. The control agent is responsible for monitoring and monitoring the system voltage and frequency as well as grid faults. The distributed energy agent stores relevant distributed energy information, including distributed energy identification information, types (solar power generation, micro gas turbine power generation, fuel cells, etc.), power, and distributed energy availability. The user agent provides users with real-time information and monitors load power consumption.

[0100] Coordinated control of virtual power plants based on multi-agent systems. Multi-agent systems are composed of multiple independent intelligent agents that can communicate bidirectionally. By determining the role of each agent in the system and the code of conduct when cooperating with each other, the system is easy to control and manage. Through bidirectional communication between agents, coordinated control and energy optimization management of virtual power plants can be achieved. The behavior of each agent is autonomous and independent, and can be appropriately changed according to the environment of the power grid to meet the needs of the power grid and fully improve the utilization rate of distributed power sources.

Claims

1. A hierarchical control method for virtual power plant communication network under cloud-edge-end architecture, Features: The following steps are involved: Step S1: Design a virtual power plant cloud-edge-end architecture, including terminal devices, edge servers, and a cloud management and control platform; The edge server includes a pipeline communication system; Step S2: Modeling the virtual power plant business information flow, analyzing the logical relationship between the virtual power plant information model and the traditional SG-CIM model, and removing redundant information models; Step S3: Mapping communication indicators between multiple subjects of the virtual power plant in multiple business scenarios, mapping key business indicators of the virtual power plant to communication indicators, and forming typical business communication indicators of the virtual power plant; Step S4: adopting a multi-agent virtual power plant hierarchical control method to realize hierarchical control of the virtual power plant communication network; In the step S2, based on the business information collection and interaction demand analysis of the virtual power plant, a virtual power plant information model is established to solve the problem of missing information models in the virtual power plant by the International Electrotechnical Commission Common Information Model IEC CIM and the State Grid Corporation of China's unified data model SG-CIM; then, the logical relationship between the virtual power plant information model and the traditional SG-CIM model is analyzed, redundant information models are removed, and a new virtual power plant information model is obtained; The virtual power plant business information collection and interaction demand analysis refers to collecting the information options required by different objects of the virtual power plant when participating in the power grid's new energy consumption, peak shaving and valley filling, frequency regulation, voltage regulation, and interruptible load control, and subdividing the information options of the collected objects into general information items and special information items. On the basis of the good subdivision, it is compared which information options can be obtained by the existing power grid system, the information is classified and integrated, and the information flow between different systems and platforms is clarified; The different objects of the virtual power plant include user-side loads, distributed power sources, electric vehicles, and energy storage devices; the information options include energy information and flow information; the energy information includes electrical energy and thermal energy; The general information items include equipment factory information, equipment user information, and equipment automation capability information; The dedicated information items include equipment working mode, equipment operating status, equipment rated parameters, equipment real-time information, equipment predicted parameters, equipment operating mode and equipment response capability.

2. According to the method for hierarchical control of a virtual power plant communication network under a cloud-edge-end architecture according to claim 1, Features: In the step S1, the flexible resources FRs used to construct the virtual power plant are divided into three parts: physical aggregation, information transmission, and resource regulation, and the basic structure of the virtual power plant VPP under the cloud-edge-end architecture is obtained, including terminal equipment, edge servers with pipeline communication systems, and cloud management and control platforms; Under the cloud-edge architecture, VPP uses edge servers to perform data processing at the edge of the network close to the information source of flexible resources FRs, aggregate distributed resources, and then send them to the cloud management and control platform through network pipelines. It then uses cloud computing to schedule resource clusters, interact with the power grid dispatching center and trading center, and issue optimization instructions to edge servers.

3. According to the method for hierarchical control of a virtual power plant communication network under a cloud-edge-end architecture according to claim 1, Features: In step S3, the parameters affected by each link in the implementation of the virtual power plant business are determined when the communication indicators change in different business scenarios, and the key communication indicators that will affect the business level when multiple subjects of the virtual power plant interact with each other, as well as the degree of their impact, are analyzed; on this basis, the key business indicators of multiple subjects are mapped to the communication indicators to form the communication indicators of the typical business of the virtual power plant.

4. According to the method for hierarchical control of a virtual power plant communication network under a cloud-edge-end architecture according to claim 3, Features: In step S3, typical services of the virtual power plant include power frequency regulation, power peak regulation, large power grid stability control, clean energy consumption, and power market transactions; The communication indicators of the typical services of the virtual power plant are a set of indicators including basic information transmission bandwidth, number of access terminals, number of channels, cross-sectional flow, transmission delay, reliability and security; In the step S3, mapping the key business indicators of multiple subjects to communication indicators means establishing a mapping relationship from communication indicators to the business level by analyzing the impact of communication indicators at different time and space scales on the operational safety, operational stability, operational reliability, and operational economy of different virtual power plant business scenarios, using machine learning or traditional mathematical analytical expressions to characterize the inherent influence mechanism of indicators and businesses, and finally quantitatively or qualitatively giving the degree of influence of communication indicators on the business level of virtual power plants.

5. According to the method for hierarchical control of a virtual power plant communication network under a cloud-edge-end architecture according to claim 1, Features: The virtual power plant includes a new type of virtual power plant transaction operation form that can realize the requirements of energy Internet and power Internet of Things. Its control objects include various distributed energy sources, energy storage systems, controllable loads and electric vehicles. In step S4, the communication system architecture of the virtual power plant is designed according to the multi-level business requirements of the virtual power plant, and a multi-agent virtual power plant hierarchical control method is adopted to realize hierarchical control of the virtual power plant communication network and coordinate control of various distributed energy sources.

6. According to the method for hierarchical control of a virtual power plant communication network under a cloud-edge-end architecture according to claim 5, Features: In step S4, the communication system architecture of the virtual power plant includes a perception layer, an access layer, a backbone layer, a control center and a dispatching center.

7. According to claim 6, a virtual power plant communication network hierarchical control method under a cloud-edge-end architecture, Features: The method adopted by the virtual power plant communication network hierarchical control is to achieve coordinated control and energy optimization management of the virtual power plant through two-way communication between various agents, thereby overcoming the limitations of existing distributed control methods and meeting the requirements of virtual power plants for plug-and-play and flexible change of operating status.