Drilling and interlocking pile construction device and technology

By using drilled hole-hole pile-forming construction device in the construction of curtain wall of deep foundation pits, and fixing the olive molds with olive molds and positioning fixtures, the problems of high solidification time requirements for the bite drilled pile concrete and high construction difficulty are solved, and stability is achieved and cost-reducing effect.

CN114319322BActive Publication Date: 2024-11-19CCCC SECOND HARBOR CONSULTANTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111620873.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-28
Publication Date
2024-11-19
Estimated Expiration
2041-12-28

AI Technical Summary

Technical Problem

In the construction of deep foundation pit curtain walls, the concrete solidification time of the bite drilled pile is high and the construction is difficult, which leads to the loss of concrete of the B pile and the bite quality of the bite, which poses hidden dangers to the project.

Method used

Design a drilling hole-chopping pile-forming construction device, including two olive molds and a removable olive mold positioning fixture, and fix the olive mold to the borehole pile guard port by connecting the pull rod and bidirectional wire-shaped positioning screws to form a stable groove. , convenient for pile A construction, ensure that the olive mold is taken out for concrete pouring of pile B after concrete curing.

Benefits of technology

It effectively improves the biting effect of drilling piles, reduces construction costs, and ensures the stability of project quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114319322B_ABST
    Figure CN114319322B_ABST
Patent Text Reader

Abstract

The present invention relates to a bored occlusal pile construction device and process, the bored occlusal pile construction device comprises two olive molds, a sealing plate is arranged on the top of the olive mold, a support plate is fixedly arranged on the sealing plate, a tension rod is arranged between the support plates, a detachable olive mold positioning fixture is arranged on the outer side of the olive mold, the olive mold fixture is arranged on the casing mouth of the bored pile, the olive mold positioning fixture comprises an outer arc clamp and an inner arc clamp, one end of the outer arc clamp and the inner arc clamp are hinged by a connecting hinge, the connecting hinges are connected by a cross bar, and the other end of the outer arc clamp and the inner arc clamp are connected by a bidirectional threaded positioning screw. The present invention can effectively improve the occlusal effect of the bored pile and reduce the cost under the premise of ensuring the quality of the project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of deep foundation pit foundation water-stop curtain construction, and more particularly to a bored interlocking pile construction device and process. Background Art

[0002] In deep foundation pit curtain walls and other retaining and water retaining structures, interlocking bored pile structures are widely used. At present, in the construction of interlocking piles, pile B is constructed first, and then pile A. However, when pile A is constructed, the concrete of pile B must not have enough strength, otherwise construction cannot be carried out. The setting time of the concrete of pile B is very high, but when the concrete of pile B is not solidified, drilling A is constructed, which will cause the concrete of pile B to be lost. In addition, there is a time difference in the construction of piles on both sides of pile B. Therefore, the construction technology is difficult and the interlocking quality is difficult to guarantee, which will cause hidden dangers to future projects. Summary of the Invention

[0003] The technical problem to be solved by the present invention is to provide a bored pile construction device and process which can ensure the quality of the project, effectively improve the bite effect of bored piles and reduce costs.

[0004] The technical solution adopted by the present invention to solve its technical problems is: constructing a bored interlocking pile construction device, comprising two olive molds, a sealing plate is provided on the top of the olive mold, a support plate is fixedly provided on the sealing plate, a tension rod is provided between the support plates, a detachable olive mold positioning fixture is provided on the outside of the olive mold, the olive mold fixture is provided on the casing mouth of the bored pile, the olive mold positioning fixture comprises an outer arc splint and an inner arc splint, one end portion of the outer arc splint and the inner arc splint are hinged by a connecting hinge, the connecting hinges are connected by a cross bar, and the other end portion of the outer arc splint and the inner arc splint are connected by a bidirectional threaded positioning screw.

[0005] According to the above solution, a sleeve nut is provided in the middle of the tie rod.

[0006] According to the above scheme, the cross section of the olive mold is olive-shaped, the olive mold is fixedly connected by two steel plates of different diameters, and a plurality of olive mold lifting holes are provided on the olive mold, and the adjacent spacing between the olive mold lifting holes is 0.8m-1.2m.

[0007] According to the above solution, the length of the olive mold is 0.8m-1.2m greater than the hole depth of the bored pile.

[0008] According to the above scheme, the thickness of the olive mold is 0.004m-0.006m, the diameter of the olive mold lifting hole is 0.05m-0.07m, and the thickness of the sealing plate is 0.01m.

[0009] The present invention also provides a bored interlocking pile construction process, comprising the following steps:

[0010] S1, processing the olive mold and the olive mold positioning fixture, and drilling holes;

[0011] S2. Place the two single-piece olive molds into the drilled holes according to the designed positions and place them to the bottom. Before placing them, plug the olive mold lifting holes with a foam plastic stick and seal the two sides of the opening with plastic sealing tape;

[0012] S3, the olive mold positioning fixture is put on the two olive molds, placed on the casing mouth of the bored pile, and the bidirectional thread positioning screw is adjusted so that the position of the two olive molds at the hole mouth meets the design requirements;

[0013] S4, installing the tie rods, placing both ends of the tie rods on the outside of the support plate, and tightening the tie rods to open the lower side of the olive mold outward so that the olive mold is close to the wall of the pile hole;

[0014] S5, using the conduit method to pour the concrete of the bored pile B pile, when the concrete solidifies and meets the conditions for slip form, remove the olive mold positioning fixture and the tie rod, and use a jack and a crane to respectively take out the two olive molds;

[0015] S6. Construct the adjacent A hole in the normal way. After drilling, use a hole brush to clean the groove of pile B. Then construct pile A in the normal way.

[0016] The bored interlocking pile construction device and process of the present invention have the following beneficial effects:

[0017] The bored pile construction device and process of the present invention utilizes a draw-out olive mold to form a hole. After the B pile is constructed, a stable groove can be formed, which facilitates the construction of the A pile at any time, ensures the quality of the project, and can effectively improve the bite effect of the bored pile and reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0019] Figure 1 It is a structural schematic diagram of the bored interlocking pile construction device of the present invention;

[0020] Figure 2 yes Figure 1 Middle AA section view;

[0021] Figure 3 yes Figure 1 A top view of

[0022] Figure 4 This is a diagram of the layout of the occlusal piles. DETAILED DESCRIPTION

[0023] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0024] like Figure 1-4 As shown, the bored interlocking pile construction device of the present invention includes two olive molds 2, with a sealing plate 7 provided on the top of the olive mold 2, a support plate 4 fixedly provided on the sealing plate 7, a tie rod 5 provided between the support plates 4, and a sleeve nut 8 provided in the middle of the tie rod 5. A detachable olive mold positioning fixture 3 is provided on the outside of the olive mold 2, and the olive mold positioning fixture 3 is set on the casing mouth of the bored pile 1. The olive mold positioning fixture 3 includes an outer arc clamp 301 and an inner arc clamp 302. One end of the outer arc clamp 301 and the inner arc clamp 302 are hinged by a connecting hinge 304, and the two connecting hinges 304 are connected by a cross bar 303. The other end of the outer arc clamp 301 and the inner arc clamp 302 are connected by a bidirectional threaded positioning screw 305. The olive mold positioning fixture 3 is mainly used to control the spatial position of the olive mold 2, and is composed of an outer arc splint 301, an inner arc splint 302, and a cross bar 303; the end of the outer arc splint 301, the end of the inner arc splint 302 and the cross bar 303 are connected together by a connecting hinge 304, and the other ends of the outer arc splint 301 and the inner arc splint 302 are connected by a bidirectional threaded positioning screw 305. The olive mold positioning fixture 3 is placed on the casing mouth of the bored pile 1.

[0025] The olive mold 2 is welded together from two steel plates of different diameters, each piece being machined as a single piece. Its cross-section is olive-shaped, and both pieces are fitted with support plates 4. Tie rods 5 are mounted on these support plates at both ends. Tightening the sleeve nuts 8 in the middle of the tie rods 5 allows the lower ends of the two olive molds 2 to splay outward. The olive mold 2 is secured in place by the olive mold positioning fixture 3 and the tie rods 5. Multiple olive mold lifting holes 6 are provided on the olive mold 2, spaced 0.8m to 1.2m apart. The length of the olive mold 2 is 0.8m to 1.2m greater than the depth of the bored pile 1. The thickness of the olive mold 2 is 0.004m to 0.006m, the diameter of the olive mold lifting holes 6 is 0.05m to 0.07m, and the sealing plate 7 is 0.01m thick.

[0026] The present invention also provides a bored interlocking pile construction process, comprising the following steps:

[0027] S1, processing the olive mold 2 and the olive mold positioning fixture 3, drilling holes;

[0028] S2, the two single-piece olive mold 2 are placed in the drilled holes according to the design position, placed to the bottom, before placement with a foam plastic stick to plug the olive mold jacking hole 6, the two sides of the opening are sealed with plastic sealing tape;

[0029] S3. Sleeve the olive mold positioning fixture 3 on the two olive molds 2, place it on the casing mouth of the bored pile 1, and adjust the bidirectional thread positioning screw 305 so that the position of the two olive molds 2 at the hole mouth meets the design requirements.

[0030] S4. Install the tie rod 5, place both ends of the tie rod 5 outside the support plate 4, tighten the tie rod 5 to open the lower side of the olive mold 2 outward, so that the olive mold 2 is close to the wall of the pile hole.

[0031] S5. Use the conduit method to pour concrete for bored pile B. When the concrete solidifies and meets the conditions for slip form, remove the olive form positioning fixture 3 and the tie rod 5, and use a jack and a crane to take out the two olive forms 2 respectively.

[0032] S6. Construct the adjacent A hole in the normal way. After drilling, use a hole brush to clean the groove of pile B. Then construct pile A in the normal way.

[0033] The bored interlocking pile construction device of the present invention includes an olive-shaped steel mold, that is, an olive mold 2. The length of the olive mold 2 should be about 1m larger than the hole depth. The olive mold positioning fixture 3 has the functions of fixing and expanding. The two olive molds 2 are hinged and connected by the olive mold positioning fixture 3. The steps are as follows: first, use drilling equipment to drill holes according to the drilling process, fix the two processed olive-shaped steel molds with the olive mold positioning fixture 3, the radius of the olive mold 2 should be smaller than the hole radius, and use a crane to put it into the drilled hole. The exposed height of the olive mold 2 is about 1m, and the olive mold positioning fixture 3 is located at the drilling hole. After the casing of the bored pile 1 is placed at the bottom of the hole, the tension rod 5 on the top of the olive mold 2 is installed, and then the olive mold 2 is made close to the wall of the drilled hole by adjusting the tension rod 5 and the olive mold positioning fixture 3, and then the concrete of the bored pile 1 is poured using the catheter method. When the concrete in the hole meets the slip form conditions, the olive mold 2 is pulled out of the hole using jacking equipment and a crane, and the surface height is supplemented with mud. After the concrete in the borehole has a certain strength, the interlocking pile hole can be drilled to form an interlocking of two piles. This method can effectively improve the interlocking effect of the bored pile 1 and reduce costs.

[0034] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are protected by the present invention.

Claims

1. A construction process for a bored pile construction device, characterized in that: The bored interlocking pile construction device comprises two olive molds, a sealing plate is arranged on the top of the olive mold, a support plate is fixedly arranged on the sealing plate, a tension rod is arranged between the support plates, a detachable olive mold positioning fixture is arranged on the outer side of the olive mold, the olive mold fixture is arranged on the casing mouth of the bored pile, the olive mold positioning fixture comprises an outer arc clamp and an inner arc clamp, one end of the outer arc clamp and the inner arc clamp are hinged by a connecting hinge, the connecting hinges are connected by a cross bar, and the other end of the outer arc clamp and the inner arc clamp are connected by a bidirectional thread positioning screw; A sleeve nut is arranged in the middle of the tie rod; The olive mold has an olive-shaped cross section, and the olive mold is fixedly connected by two steel plates of different diameters. A plurality of olive mold lifting holes are provided on the olive mold, and the spacing between adjacent olive mold lifting holes is 0.8m-1.2m; The length of the olive mold is 0.8m-1.2m greater than the hole depth of the bored pile; The thickness of the olive mold is 0.004m-0.006m, the diameter of the olive mold lifting hole is 0.05m-0.07m, and the thickness of the sealing plate is 0.01m; The construction process comprises the following steps: S1, processing the olive mold and the olive mold positioning fixture, and drilling holes; S2, placing two single-piece olive molds into the drilled holes according to the designed positions, placing them to the bottom, plugging the olive mold lifting holes with foam plastic sticks before placing them, and sealing the two sides of the opening with plastic sealing tape; S3, the olive mold positioning fixture is put on the two olive molds, placed on the casing mouth of the bored pile, and the bidirectional thread positioning screw is adjusted to make the positions of the two olive molds at the hole mouth meet the design requirements; S4, installing the tie rods, placing the two ends of the tie rods on the outside of the support plate, and tightening the tie rods to open the lower side of the olive mold outward so that the olive mold is close to the wall of the pile hole; S5, pouring the concrete of bored pile B by the conduit method, when the concrete is solidified and ready for slip form, removing the olive mold positioning fixture and the tie rod, and using a jack and a crane to respectively take out the two olive molds; S6. Construct the adjacent A hole in the normal way. After drilling, use a hole brush to clean the groove of pile B, and then construct pile A in the normal procedure.