A transverse bulkhead structure for large LNG ships
By designing vertically and horizontally arranged transverse bulkhead structures, combined with tic-shaped supports and stiffeners, the instability problem of the LNG ship's transverse bulkhead structure in low temperature environments has been solved, safety and convenience have been improved, and different needs have been met. Regional usage requirements.
Patent Information
- Application Number
- CN202210026331.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-11
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-01-11
AI Technical Summary
The existing transverse bulkhead structure design of existing LNG ships is insufficient and cannot effectively cope with the stress and deformation problems at different locations, causing the structure to be unstable in low temperature environments and increasing safety risks.
Two types of transverse bulkhead structures are designed: vertical arrangement and horizontal arrangement, combined with a tic-tac-shaped support structure and stiffeners, to optimize the structural weight and convenience of personnel passage, and meet the use requirements of different areas.
By differentially designing the transverse bulkhead structure, the requirements for the use of different parts of the LNG ship are met, the stability and safety of the structure are improved, the convenience of personnel passage is enhanced, and the overall weight is reduced.
Smart Images

Figure CN114379705B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to ship construction, in particular to a transverse bulkhead structure used on a large LNG ship. Background Art
[0002] In modern society, liquefied natural gas has become an indispensable energy source for life. The world's natural gas reserves are uneven, which places high demands on the transportation of liquefied natural gas. LNG ship is the abbreviation of liquefied natural gas carrier, which liquefies natural gas at low temperatures and stores it in a liquid state in a containment system, so that natural gas can be transported in large quantities. In the construction of new LNG ships, there are now tank-type and membrane-type containment systems for liquefied natural gas, and more and more shipowners are using membrane-type LNG ships. Now, for the membrane containment system, a new LNG ship can have a storage capacity of 174,000 cubic meters. The transportation of such a large amount of liquefied natural gas must ensure the safety of transportation, and also puts high demands on the structural design of the LNG ship.
[0003] For the structure of LNG ship, it mainly includes the containment system of the bow, stern and middle part, among which the membrane type LNG containment system structure mainly includes liquid cargo tanks, and the liquid natural gas is taken to below -163℃ and stored in the liquid cargo tanks. Such a large volume of liquefied natural gas must be separated and placed in different compartments, so the liquid cargo tank is not a single one, but divided into multiple ones. In the containment system, multiple liquid cargo tanks are generally placed together, and the adjacent liquid cargo tanks are separated by special transverse bulkheads. In view of the physical characteristics of LNG liquid cargo, low temperature and free liquid surface, when it is transported in LNG cargo tanks, the low temperature free liquid surface is too large, which will cause excessive sloshing, thereby damaging the structure and causing LNG ship disasters. It is necessary to set transverse partitions between the liquid cargo tanks of larger LNG ships. In conventional designs, the transverse bulkhead structures between adjacent cargo holds, between the liquid cargo tank and the bow, and between the liquid cargo tank and the stern are the same. Since the height of the transverse bulkhead exceeds 20 meters, the distance between the front and rear end walls exceeds 3 meters, and it is mainly composed of the bulkheads on both sides and the ribs in the middle, and since the middle needs to bear the functions of personnel passage and safety protection, the deformation after completion is often difficult to control, or deformation occurs during use. The stress conditions of various placement positions are also different. Conventional design will cause different stresses and deformations in different positions.
[0004] Chinese invention patent 202011385913.1 discloses a transverse bulkhead support structure for a container ship, wherein a plurality of horizontal platforms are arranged on the transverse bulkhead from top to bottom, and a first reinforcement structure and a second reinforcement structure are provided on both sides of each horizontal platform, and a second vertical girder provided between two adjacent first vertical girder is vertically fixed between the topmost horizontal platform and the hatch cover. The support structure in the existing invention patent reduces the use of girder materials in the transverse bulkhead, effectively reduces the weight of the transverse bulkhead, and is of great help to improve the speed and economy of the container ship. However, the transverse bulkhead of the above-mentioned structure is of conventional design, and the design of the support structure is only for improving strength and reducing weight, and the requirements for application in container ships and LNG ships are very different, which affects its structural design. Summary of the invention
[0005] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and provide a transverse bulkhead structure for large LNG ships. The transverse bulkhead structure of the present invention is designed and applied on LNG ships. The transverse bulkhead structure is designed differently for different positions, and the composition is designed by force analysis, so that the transverse bulkheads at various parts of the LNG ship are different, thereby actually meeting the use requirements of different structures of LNG ships.
[0006] In order to achieve the above-mentioned object of the invention, the technical solution provided by the present invention is as follows:
[0007] A transverse bulkhead structure for a large LNG ship, wherein the large LNG ship is provided with a liquefied natural gas containment system, wherein the containment system is provided with a plurality of liquid cargo tanks, wherein a vertically arranged transverse bulkhead is provided between a bow area and the liquid cargo tank, wherein a horizontally arranged transverse bulkhead is provided between adjacent liquid cargo tanks in a midship area, and wherein a vertically arranged transverse bulkhead is provided between a stern area and the liquid cargo tank, wherein the transverse bulkhead structure includes two types: a vertically arranged transverse bulkhead and a horizontally arranged transverse bulkhead, wherein the main beam arrangement direction of the vertically arranged transverse bulkhead is vertical so as to arrange a vertical passage and a ventilation duct inside, and wherein the main beam arrangement direction of the horizontally arranged transverse bulkhead is horizontal so as to optimize the structural weight;
[0008] The structure of the vertically arranged transverse bulkhead includes a front end wall, a rear end wall, a horizontal girder, a vertical girder, a vertical frame and a horizontal stiffener. A plurality of vertically arranged vertical frames are arranged on the rear side surface of the front end wall, and a plurality of vertically arranged vertical frames are correspondingly arranged on the front side surface of the rear end wall. The plurality of vertical girders and the plurality of horizontal girders are vertically intersected with each other to form a tic-tac-toe support structure. The front end wall and the rear end wall are connected together through the tic-tac-toe support structure to form an octagonal transverse bulkhead. The vertical frames on the front end wall correspond to the vertical frames on the rear end wall. End brackets are respectively arranged at the upper end surface and the lower end surface of the corresponding two vertical frames. The two ends of the end brackets are respectively connected to the vertical frames on the front end wall and the vertical frames on the rear end wall. A manhole is opened on the vertical girder near the upper part of each horizontal girder. The horizontal stiffener is vertically fixed between a plurality of adjacent vertical girders. The horizontal stiffener is close to the manhole and parallel to the horizontal girder.
[0009] The structure of the horizontally arranged transverse bulkhead comprises a front end wall, a rear end wall, a horizontal girder, a vertical girder, a horizontal frame and a bracket at the end of the horizontal frame. A plurality of horizontally arranged horizontal frames are arranged on the rear side surface of the front end wall, and a plurality of horizontally arranged horizontal frames are correspondingly arranged on the front side surface of the rear end wall. The plurality of vertical girder and the plurality of horizontal girder are vertically intersected with each other to form a well-shaped support structure. The front end wall and the rear end wall are connected together through the well-shaped support structure to form an octagonal transverse bulkhead. The horizontal frames on the front end wall correspond to the horizontal frames on the rear end wall in position. Vertical reinforcing ribs are respectively arranged at the end surfaces of the corresponding two horizontal frames. The two ends of the vertical reinforcing ribs are respectively connected to the horizontal frames on the front end wall and the horizontal frames on the rear end wall. A manhole is opened on the vertical girder near the upper part of each horizontal girder.
[0010] In a transverse bulkhead structure used on a large LNG ship of the present invention, a plurality of cutouts are provided on the edge of the horizontal girder on the vertically arranged transverse bulkhead, each cutout corresponding to the vertical frame material on the front end wall and the rear end wall so that the criss-cross support structure is tightly fixed to the front end wall and the rear end wall.
[0011] In a transverse bulkhead structure used on a large LNG ship of the present invention, a plurality of cutouts are provided on the edge of the vertical girder on the horizontally arranged transverse bulkhead, each cutout corresponding to the horizontal frame material on the front end wall and the rear end wall so that the crisscross support structure is tightly fixed to the front end wall and the rear end wall.
[0012] In a transverse bulkhead structure used on a large LNG ship of the present invention, reinforcing ribs for strengthening strength are provided around the edges of each of the manholes.
[0013] In a transverse bulkhead structure used on a large LNG ship of the present invention, a ladder hole for realizing up and down passage of the transverse bulkhead is provided on the horizontal girder.
[0014] In a transverse bulkhead structure used on a large LNG ship of the present invention, electrical openings and vertical lifesaving passage holes are provided on the horizontal girder.
[0015] Based on the above technical solution, the transverse bulkhead structure used on large LNG ships of the present invention has the following technical advantages compared with the prior art.
[0016] 1. The transverse bulkhead structure used on large LNG ships of the present invention takes into account the structural characteristics of LNG ships, mixes the vertical and horizontal arrangements of the transverse bulkhead structure, adopts the vertical arrangement form of the ship's transverse bulkhead structure in areas where it is inconvenient for personnel to pass, and adopts the horizontal arrangement form of the transverse bulkhead structure in the midship area, which is more conducive to the actual application of LNG ships in practice and improves the convenience of subsequent use.
[0017] 2. In the transverse bulkhead structure used on large LNG ships of the present invention, under the premise of meeting the structural strength requirements, the effective space between the front and rear wall panels is increased by vertically arranging the main beams, which is beneficial to the arrangement of vertical passages and ventilation ducts. At the same time, by arranging a manhole above the intersection of the vertical girder and the horizontal girder, the passage of personnel inside the transverse bulkhead is more convenient.
[0018] 3. In the transverse bulkhead structure used on large LNG ships of the present invention, the effective space between the front and rear wall panels is increased by horizontally arranging the main beams between the front and rear end walls of the transverse bulkhead, which is beneficial to the arrangement of vertical passages and ship-mounted heating coils. By arranging a manhole above the intersection of the vertical girder and the horizontal girder, the passage of personnel inside the transverse bulkhead is also made more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the distribution position of the transverse bulkhead structure used on a large LNG ship of the present invention.
[0020] Figure 2 The present invention is a schematic diagram of a transverse bulkhead structure with vertical frames in a transverse bulkhead structure used on a large LNG ship.
[0021] Figure 3 The present invention is a schematic diagram of a transverse bulkhead structure with horizontal frame members in a transverse bulkhead structure used on a large LNG ship. DETAILED DESCRIPTION
[0022] The transverse bulkhead structure for large LNG ships of the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments, so as to more clearly understand its structural composition and working mode, but this shall not limit the protection scope of the present invention.
[0023] The present invention is a transverse bulkhead structure for a large LNG ship. The large LNG ship is provided with a liquefied natural gas containment system, in which a plurality of liquid cargo tanks C are provided, a vertically arranged transverse bulkhead A is provided between the bow area and the liquid cargo tanks C, a horizontally arranged transverse bulkhead B is provided between adjacent liquid cargo tanks C in the midship area, and a vertically arranged transverse bulkhead A is provided between the stern area and the liquid cargo tanks C. Figure 1 As shown, the containment system on this type of LNG ship is equipped with four cargo holds and five transverse bulkheads. The transverse bulkheads are located between the two cargo holds of the LNG ship. The present invention combines the advantages of vertically arranged transverse bulkheads and horizontally arranged transverse bulkheads. Vertically arranged transverse bulkheads are arranged in places with larger bow and stern lines, and horizontally arranged transverse bulkheads are arranged in the midship area.
[0024] Therefore, for the present invention, the transverse bulkhead structure of the present invention includes two types: a vertically arranged transverse bulkhead A and a horizontally arranged transverse bulkhead B. The main beam arrangement direction of the vertically arranged transverse bulkhead A is vertical so as to arrange vertical passages and ventilation ducts inside, and the main beam arrangement direction of the horizontally arranged transverse bulkhead B is horizontal so as to optimize the structural weight.
[0025] like Figure 2 As shown in the figure, the structure of the vertically arranged transverse bulkhead includes a front wall (not shown), a rear wall 1, a horizontal girder 3, a vertical girder 4, a vertical frame 2 and a horizontal stiffener 6. A plurality of vertically arranged vertical frames 2 are arranged on the rear side of the front wall, and a plurality of vertically arranged vertical frames 2 are correspondingly arranged on the front side of the rear wall 1. The plurality of vertical girder 4 and the plurality of horizontal girder 3 are perpendicularly intersected to form a well-shaped support structure. The front wall and the rear wall 1 are connected together through the well-shaped support structure to form an octagonal transverse bulkhead. The vertical frames 2 on the front wall correspond to the vertical frames 2 on the rear wall 1. End brackets 5 are respectively arranged at the upper and lower end surfaces of the corresponding two vertical frames 2. The two ends of the end bracket 5 are respectively connected to the vertical frames 2 on the front wall and the vertical frames 2 on the rear wall 1. A manhole is opened on the vertical girder 4 near the upper part of each horizontal girder 2. The horizontal reinforcing ribs 6 are vertically fixed between a plurality of adjacent vertical girders 4, and the horizontal reinforcing ribs 6 are close to the manholes and parallel to the horizontal girders 2. The horizontal reinforcing ribs 6 are arranged to improve the stability of the passage formed by the entire manhole, so that the strength of the tic-tac-toe supporting structure around the manholes is guaranteed. The strength of a single manhole is also reinforced by adding reinforcing ribs around the edge of the manhole on each vertical girders 4.
[0026] The vertically arranged transverse bulkhead B is located between the two cargo holds of the LNG ship. The shape of the front and rear bulkhead plates is close to an octagon. The front and rear wall plates 1 are spaced a certain distance apart, which becomes the rib spacing of the transverse bulkhead. The front and rear end walls of the transverse bulkhead are connected to the vertical frame 2 by welding. At the same time, the front and rear end walls of the transverse bulkhead are connected to the vertical girder 4 by welding. The front and rear end walls of the transverse bulkhead are connected to the horizontal girder 3 by welding. A cutout is provided on the horizontal girder 3, and the vertical frame 2 provided can pass through the cutout. At the same time, the above-mentioned tic-tac-toe structure formed by the horizontal girder 3 and the vertical girder 4 is used to increase the structural rigidity.
[0027] A vertical girder 4 is arranged between the front and rear wall plates in the vertical direction, and a plurality of vertical girder 4 is arranged between the front and rear wall plates of the bulkhead structure. The distance between adjacent vertical girder 4 will be selected and arranged according to the double bottom structure at the bottom of the LNG ship and the related structure at the top so that its strength meets the design requirements of the ship.
[0028] A plurality of horizontal girders 3 are arranged in the horizontal direction between the front and rear wall plates, and a plurality of horizontal girders 3 are arranged between the front and rear wall plates of the bulkhead structure. The distance between adjacent horizontal girders 3 is arranged according to the relevant structure of the LNG ship side. A ladder manhole can be arranged on the horizontal girder 3, and the strength can be reinforced by adding reinforcing ribs around the ladder manhole. The ladder manhole can achieve the purpose of up and down passage in the transverse compartment. The horizontal girder 3 can also be provided with vertical electrical openings, and the horizontal girder 3 can also be provided with vertical life-saving passage openings. On the front end wall, horizontal reinforcing ribs 6 can be arranged between the vertical frame members 2 according to the finite element calculation results, and the horizontal reinforcing ribs 6 can prevent the front end wall from buckling. On the rear end wall, horizontal reinforcing ribs 6 can be arranged between the vertical frame members 2 according to the finite element calculation results, and the horizontal reinforcing ribs 6 can prevent the rear end wall from buckling.
[0029] like Figure 3 As shown, the structure of the horizontally arranged transverse bulkhead A includes a front end wall (not shown), a rear end wall 7, a horizontal girder 9, a vertical girder 10, a horizontal frame 8 and a horizontal frame end bracket 11. A plurality of horizontal frames 8 are arranged horizontally on the rear side of the front end wall, and a plurality of horizontal frames 8 are arranged horizontally on the front side of the rear end wall 7. The plurality of vertical girder 10 and the plurality of horizontal girder 9 are perpendicularly intersected to form a well-shaped support structure. The front end wall and the rear end wall 7 are connected together through the well-shaped support structure to form an octagonal transverse bulkhead. The horizontal frames 8 on the front end wall correspond to the horizontal frames 8 on the rear end wall 7. The horizontal frame end brackets 11 are respectively arranged at the end faces of the corresponding two horizontal frames 8. The two ends of the horizontal frame end brackets 11 are respectively connected to the horizontal frames 8 on the front end wall and the horizontal frames 8 on the rear end wall. A manhole is opened on the vertical girder 10 near the upper part of each horizontal girder 9.
[0030] The horizontally arranged transverse bulkhead A is located between the two cargo holds of the LNG ship. The shape of the front and rear bulkhead plates is close to an octagon. There is a certain distance between the front and rear bulkhead plates 7, which becomes the rib spacing of the transverse bulkhead. The front and rear end walls of the transverse bulkhead are connected to the horizontal frame 8 by welding.
[0031] The front and rear wall plates of the horizontally arranged transverse bulkhead A are rigidly connected by welding with a "well"-shaped frame composed of horizontal girders 9 and vertical girders 10. Multiple vertical girders 10 are arranged in the vertical direction between the front and rear wall plates, and the distance between the vertical girders 10 is arranged according to the double bottom structure of the bottom of the LNG ship and the top related structure. Each vertical girder 10 is arranged according to its own design requirements to facilitate the passage of personnel in the transverse bulkhead. A manhole is arranged above the intersection line of each vertical girder 10 with the horizontal girder 9, and the strength is reinforced by adding reinforcing ribs around the manhole. Multiple horizontal girders 9 are arranged in the horizontal direction between the front and rear wall plates, and multiple horizontal girders 9 are arranged between the front and rear wall plates of the bulkhead structure. The distance between the horizontal girders 9 is arranged according to the side related structure of the LNG ship. A ladder hole can be arranged on the horizontal girder 9, which can achieve the purpose of up and down passage in the transverse bulkhead. Electrical openings can be arranged on the horizontal girder 9, and vertical life-saving channel openings are also arranged on the horizontal girder 9.
[0032] In order to ensure the strength of the front wall plate itself, multiple horizontal ribs 8 are arranged between multiple horizontal girders 9 on the front wall plate of the transverse bulkhead structure. The spacing between the horizontal ribs 8 is determined according to the relevant structure on the side of the LNG ship and the pressure of the cargo tank of the LNG ship. According to the different pressures of the liquid tank of the LNG ship, brackets can be set at the roots of the horizontal ribs 8 to reduce the span between the two horizontal ribs 9. Similarly, in order to ensure the strength of the rear wall plate itself, multiple horizontal ribs 8 can be arranged between multiple horizontal girders 9 on the rear wall of the transverse bulkhead structure. The setting position of the horizontal ribs 8 can be determined according to the results of finite element calculation to reduce the buckling of the rear wall plate. Through the design of the horizontal ribs 8, other special horizontal reinforcement measures can be reduced, thereby reducing the overall weight of the horizontally arranged transverse bulkhead A.
[0033] The above embodiments are only further explanations of the present invention and are not limitations of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the embodiments as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.
Claims
1. A transverse bulkhead structure for a large LNG ship, wherein the large LNG ship is provided with a liquefied natural gas containment system, wherein the containment system is provided with a plurality of liquid cargo tanks, It is characterized in that The transverse bulkhead structure includes two types: a vertically arranged transverse bulkhead and a horizontally arranged transverse bulkhead. A vertically arranged transverse bulkhead is provided between the bow area and the liquid cargo tank, a horizontally arranged transverse bulkhead is provided between adjacent liquid cargo tanks in the midship area, and a vertically arranged transverse bulkhead is provided between the stern area and the liquid cargo tank. The main beam arrangement direction of the vertically arranged transverse bulkhead is vertical, and vertical passages and ventilation ducts are arranged inside the vertically arranged transverse bulkhead. The main beam arrangement direction of the horizontally arranged transverse bulkhead is horizontal to optimize the structural weight. The structure of the vertically arranged transverse bulkhead includes a front end wall, a rear end wall, a horizontal girder, a vertical girder, a vertical frame and a horizontal stiffener. A plurality of vertically arranged vertical frames are arranged on the rear side surface of the front end wall, and a plurality of vertically arranged vertical frames are correspondingly arranged on the front side surface of the rear end wall. The plurality of vertical girders and the plurality of horizontal girders are vertically intersected with each other to form a tic-tac-toe support structure. The front end wall and the rear end wall are connected together through the tic-tac-toe support structure to form an octagonal transverse bulkhead. The vertical frames on the front end wall correspond to the vertical frames on the rear end wall. In the corresponding two vertical ribs, the vertical frames are arranged on the rear end wall. End brackets are respectively provided at the upper and lower end surfaces of the frame, and the two ends of the end brackets are respectively connected to the vertical frame on the front end wall and the vertical frame on the rear end wall. A manhole is provided on the vertical girder near the upper part of each horizontal girder, and the horizontal stiffener is vertically fixed between a plurality of adjacent vertical girder, and the horizontal stiffener is close to the manhole and parallel to the horizontal girder; a plurality of cutouts are provided on the edge of the horizontal girder on the vertically arranged transverse bulkhead, and each cutout corresponds to the vertical frame on the front end wall and the rear end wall so that the crisscross support structure is tightly fixed to the front end wall and the rear end wall; The structure of the horizontally arranged transverse bulkhead comprises a front end wall, a rear end wall, a horizontal girder, a vertical girder, a horizontal frame and a bracket at the end of the horizontal frame. A plurality of horizontally arranged horizontal frames are arranged on the rear side surface of the front end wall, and a plurality of horizontally arranged horizontal frames are correspondingly arranged on the front side surface of the rear end wall. The plurality of vertical girder and the plurality of horizontal girder are perpendicularly intersected with each other to form a tic-tac-toe support structure. The front end wall and the rear end wall are connected together through the tic-tac-toe support structure to form an octagonal transverse bulkhead. The horizontal frames on the front end wall correspond to the horizontal frames on the rear end wall. Vertical stiffeners are respectively arranged at the end surfaces of the corresponding two horizontal frames. The two ends of the vertical stiffeners are respectively connected to the horizontal frames on the front end wall and the horizontal frames on the rear end wall. A manhole is opened on the vertical girder near the upper part of each horizontal girder. A plurality of cutouts are arranged on the edge of the vertical girder on the horizontally arranged transverse bulkhead, and each cutout corresponds to the horizontal frames on the front end wall and the rear end wall so that the tic-tac-toe support structure is tightly fixed to the front end wall and the rear end wall.
2. A transverse bulkhead structure for a large LNG ship according to claim 1, It is characterized in that Reinforcing ribs for strengthening the strength are arranged around each of the manholes.
3. A transverse bulkhead structure for a large LNG ship according to claim 1, It is characterized in that The horizontal girder is provided with a ladder hole for realizing the up and down passage of the transverse bulkhead.
4. A transverse bulkhead structure for a large LNG ship according to claim 1, It is characterized in that An electrical opening and a vertical life-saving passage hole are arranged on the horizontal beam.
5. A large LNG ship, It is characterized in that The LNG ship is provided with a transverse bulkhead structure as described in any one of claims 1 to 4.
