An open-bench blasting method capable of controlling a forward
stroke of a blasting
muck pile comprises the steps of conducting
deep hole arrangement, conducting drilling construction, arranging
initiation bombs and detonators in deep holes, mounting explosives in the deep holes, conducting
detonator delayed
initiation design on an
earth surface network in the same blasting area, connecting the detonators in the blast holes with detonators of the
earth surface network, and initiating the detonators. The method is characterized in that the
detonator delayed
initiation design of the
earth surface network in the same blasting area is that the blasting area is divided into an earlier initiation
control area and a later initiation
control area which are initiated in sequence, and blasting occurs in the two initiation areas at one time. According to the method, as the blasting area is divided into the two initiation areas, the earlier initiation
control area is initiated to provide the later initiation control area with a moving space for containing goods supply and create a free
face space condition for the blasting of the later initiation control area. The forward
stroke of the blasting
muck pile can be controlled precisely and effectively. The safety of the mining operation is ensured, the assistant
workload of an electric
shovel is reduced, the production efficiency is improved, and the damage and loss caused by the blasting can be reduced.