An automatic optimization assembly algorithm
Through the automatic optimization of BIM technology, the problems of low wall brick layout efficiency and difficult material statistics in traditional masonry projects are solved, automatic brick layout and refined management are realized, and construction efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202111671044.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-12-31
AI Technical Summary
In traditional masonry projects, the layout and extraction of wall bricks and the quantity of project are required to take a lot of manual time, and the lack of dimensional information, resulting in low brick layout efficiency and inconvenient material statistics, especially the statistical problems of corner brick materials.
The automatic optimization building algorithm based on BIM technology is adopted to generate production and processing drawings, guide on-site construction, and realize automatic brick arrangement and material statistics by defining parameterized axis grids, elevation, main structure modeling, parameterized design and iterative optimization.
The refined management of masonry projects has been realized, the workload of manual operation is reduced, and the efficiency and accuracy of brick layout is improved. The generated construction floor plan can be used for accurate statistics, reducing the manual workload of users and improving the user experience.
Smart Images

Figure CN114444174B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of masonry bricklaying of wall components, and in particular relates to an automatic optimization assembly algorithm. Background Art
[0002] Building information modeling is based on the relevant information data of construction projects, and the building model is established. The real information of the building is simulated through digital information simulation. BIM technology is a digital tool used in engineering design and construction management. It integrates the relevant information of various projects through parameter models, and shares and transmits them in the whole life cycle of project planning, operation and maintenance, so that engineering and technical personnel can correctly understand and efficiently respond to various building information, provide a basis for collaborative work for the design team and all construction entities including building operators, and play an important role in improving production efficiency, saving costs and shortening construction period. For BIM, the arrangement of wall bricks and the extraction of engineering quantities are mainly based on part segmentation or placing one by one using the families of conventional models. This method requires a lot of manpower and time to arrange, and the extracted engineering quantities lack size information, which is not convenient for the integration and statistics of engineering quantity information, especially the statistics of corner brick materials. At present, the country vigorously promotes the application of BIM technology in the construction industry to achieve refined project management and promote the integration of engineering information. Traditional masonry projects have always used CAD for manual brick laying. When data such as wall length and height change, the brick laying diagram needs to be manually readjusted and redrawn, resulting in low brick laying efficiency. Moreover, once the masonry wall changes, manual adjustments are required, which greatly reduces construction efficiency and is time-consuming and labor-intensive. Summary of the invention
[0003] The problem to be solved by the present invention is to provide an automatic optimization masonry assembly algorithm, which is widely used in the masonry assembly construction process in masonry engineering.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: an automatic optimization assembly algorithm, the steps are:
[0005] Use BIM software to build a secondary structure model based on the preliminary construction plan;
[0006] Production and processing drawings are directly generated through the secondary structure model to guide on-site construction.
[0007] Furthermore, the steps of establishing a secondary structure model using BIM software according to the preliminary construction plan are:
[0008] Define parametric grids and elevations;
[0009] Main structure modeling;
[0010] Parametric design of secondary structures;
[0011] The secondary structure model is iteratively optimized and solved.
[0012] Furthermore, the steps of parametrically defining the axis grid and elevation are:
[0013] Define the axis grid according to the construction plan, input the axis grid dimensions in the longitudinal and transverse directions, and define each axis grid number;
[0014] Define components that are not located in the grid by auxiliary lines, and define names for the auxiliary lines according to the offset distance from the grid;
[0015] According to the floor elevations in the drawings, enter the elevations of each structural layer and define the floor names.
[0016] Furthermore, according to the above-defined axis grid, the beams, plates and columns in the main structure are modeled;
[0017] Attributes are assigned to the beam, slab and column components, including: component name, concrete grade, component volume, axis grid position, estimated start time, estimated end time, actual start time, actual end time, planned start time and planned end time.
[0018] Furthermore, the parameters included in the secondary structure include: small bricks, large bricks, inclined bricks and mortar joints.
[0019] Furthermore, the steps of performing parameterized design on the secondary structure are:
[0020] According to the wall constraints and wall length, the single-layer masonry method of small bricks is calculated, and the mathematical model of the single-layer small brick arrangement scheme is established according to the requirement that the size of non-whole bricks is ≥ 1 / 3 of the brick length:
[0021] L=a1+la×n+(n+1)×hf+b1
[0022] la / 3≤a1≤la
[0023] la / 3≤b1≤la
[0024] 8≤hf≤10
[0025] In the formula: L is the known wall length; a1 is the non-whole brick size at the beginning to be determined; b1 is the non-whole brick size at the end to be determined; hf is the width of the mortar joint of the small brick; la is the known standard small brick length; n is the number of small bricks to be determined.
[0026] Furthermore, the step of performing parameterized design on the secondary structure also includes:
[0027] According to the wall constraints and wall length, the large brick assembly method is calculated. According to the requirement that the spacing between the upper and lower layers of mortar joints is ≥ 1 / 3 of the brick length, the mathematical model of the two-layer large brick arrangement scheme is:
[0028] L=La×N1+C1+C2+(N1+1)×HF
[0029] La×N2+C3+C4+(N2-1)×HF=QC-Z my -Y my
[0030] La / 3≤C1≤La
[0031] La / 3≤C2≤La
[0032] La / 3≤C3≤La
[0033] La / 3≤C4≤La
[0034] 10≤HF≤15
[0035] Where: L is the known wall length; C1 is the size of the non-whole brick at the beginning of the first layer to be determined; C2 is the size of the non-whole brick at the end of the first layer to be determined; C3 is the size of the non-whole brick at the beginning of the second layer to be determined; C4 is the size of the non-whole brick at the end of the second layer to be determined; HF is the width of the mortar joint of the large brick; La is the known standard large brick length; N1 is the number of whole bricks in the first layer; N2 is the number of whole bricks in the second layer; Z my Y is the left gap distance of the second layer; my is the right gap distance of the second layer.
[0036] Furthermore, the step of performing parameterized design on the secondary structure also includes:
[0037] According to the wall height, calculate the mathematical model of the whole wall height arrangement plan:
[0038] QH=ha×N n +Ha×N N +H1×(N N +1)+C
[0039] 140≤C≤180
[0040] 3≤N1≤6
[0041] 12≤HF≤15
[0042] Where: QH is the known wall height; ha is the standard small brick height; Ha is the standard large brick height; HF is the mortar joint size; N n is the number of small brick layers, N N is the number of large brick layers; C is the height of inclined bricks.
[0043] Furthermore, in the step of iteratively optimizing and solving the secondary structure model, it is also necessary to calculate the objective function of the minimum value of the cutting part:
[0044] MIN=CCX×NNX+CCD×NND
[0045] NNX=N n ×(Xa1+Xb1)
[0046] N N =N 奇数行数 +N 偶数行数
[0047] NND=N 奇数行数 *(XC1+XC2)+N 偶数行数 *(XC3+XC4)
[0048] Where: CCX is the price of each standard small brick for the wall to be requested; CCD is the price of each standard large brick for the wall to be requested; NNX is the number of small non-whole bricks; NND is the number of large non-whole bricks; a1 is the size of the non-whole brick at the beginning to be requested; b1 is the size of the non-whole brick at the end to be requested; C1 is the size of the non-whole brick at the beginning of the first layer to be requested; C2 is the size of the non-whole brick at the end of the first layer to be requested; C3 is the size of the non-whole brick at the beginning of the second layer to be requested; C4 is the size of the non-whole brick at the end of the second layer to be requested;
[0049] The steps for iterative optimization and solution of the secondary structure model are:
[0050] By iteratively solving the mathematical model of the single-layer small brick arrangement scheme, the mathematical model of the two-layer large brick arrangement scheme, the mathematical model of the whole wall height arrangement scheme and the objective function, the optimal solution and the optimal secondary structure assembly scheme of the component are solved.
[0051] Furthermore, the production and processing drawings are directly generated through the secondary structure model to guide the on-site construction steps: based on BIM software, the lower left corner, wall length and wall height of the brick wall are determined by three points to generate the optimal secondary structure assembly plan and generate a construction plan to guide on-site construction.
[0052] The above technical solution has the following beneficial effects:
[0053] The present invention is based on BIM technology, realizes automatic brick arrangement and material statistics, and can achieve the purpose of refined management of masonry engineering. Compared with the existing technology, it has strong operability, reduces the workload of manual operation of brick arrangement, generates brick arrangement diagrams to directly guide on-site construction, and can directly assign work to individuals in the future to achieve refined management. Through the generated construction plan, a specific brick body list can be obtained to achieve accurate statistics.
[0054] By automatically optimizing the assembly algorithm, the optimal secondary structure assembly plan is generated, and a more reasonable and material-saving arrangement plan is automatically and quickly calculated according to the arrangement of wall components and block arrangement parameters. For brick arrangement, there is no need to spend a lot of manpower and time to arrange bricks. One-click brick arrangement can be achieved, which improves the efficiency of brick arrangement and the accuracy of brick arrangement. It is highly operable and greatly reduces the manual workload of users, thereby improving the user experience. It can be widely used in the construction industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 It is a schematic diagram of the arrangement of large bricks according to an embodiment of the present invention. DETAILED DESCRIPTION
[0056] The present invention will be further described below in conjunction with embodiments and drawings:
[0057] This automatic optimization masonry algorithm is based on BIM software. Through the overall secondary structure model of the component, it can realize one-click brick arrangement, improve the efficiency of brick arrangement, and at the same time improve the accuracy of brick arrangement. It can directly generate processing drawings and brick body lists, which can be directly used to guide on-site processing.
[0058] In one embodiment of the present invention, Figure 1 As shown, an automatic optimization assembly algorithm, the steps are:
[0059] S1: Use BIM software to establish a secondary structure model according to the preliminary construction plan. Specifically, the steps of using BIM software to establish a secondary structure model according to the preliminary construction plan are as follows:
[0060] S11: Define parametric grid and elevation:
[0061] Define the axis grid according to the construction plan, input the axis grid dimensions in the longitudinal and transverse directions, and define each axis grid number; in this embodiment, the longitudinal axis grid uses digital axis numbers, and the transverse axis grid uses alphabetic axis numbers;
[0062] Define components that are not located in the grid by auxiliary lines, and define names for the auxiliary lines according to the offset distance from the grid;
[0063] According to the floor elevation of the drawing, input the elevation of each structural layer and define the floor name. That is, after the plane axis grid is defined, define the axis grid in the direction of the vertical plane axis grid; specifically, in this embodiment, each structural layer includes the beam, plate, and column structure in the main structure, and the secondary structure needs to be built between the main structures. By determining the specific position and height of the beam, plate, and column structure in the axis grid, the parametric design of the secondary structure is carried out.
[0064] S12: Main structure modeling. Specifically, according to the axis grid defined above, the beam, plate and column components in the main structure are modeled. In the process of modeling the beam, plate and column components, the basic modules of beams, plates and columns need to be defined; by typing the input parameter values in the software, the created basic modules of beams, plates and columns are directly called, and then the beams, plates and columns with determined parameter values are directly generated. And the beams, plates and columns are assigned attributes, and the assigned attributes include: component name, concrete grade, component volume, axis grid position, expected start time, expected end time, actual start time, actual end time, planned start time, and planned end time. These six time attributes are directly recorded by creating corresponding fields in the program. Parametric design of secondary structures needs to be based on main structure modeling. Since beams, plates and columns have been modeled by BIM technology in the prior art, no further details will be given here.
[0065] S13: Parametric design of the secondary structure; the parameters included in the secondary structure include: small bricks, large bricks, inclined bricks and mortar joints. Considering that there are different forms of constraints at the connection between the wall itself and other structures, it is necessary to select the constraint form at both ends of the wall according to the actual construction situation. Therefore, in this embodiment, the constraints between the secondary structure and the connected wall are omitted, and the mortar joints at the connected wall are not considered. At the same time, the wall that meets the waterproof requirements requires a concrete anti-slope wall at the bottom of the wall, and the wall without waterproof requirements needs to be laid with 3-6 batches of small bricks; mortar is selected for bricklaying, and the mortar joints are required to be 8mm-15mm, or adhesive, and the mortar joints are required to be 4mm-5mm. The size of small bricks and large bricks and the oblique laying angle are selected, and the inclination angle of the oblique bricks is controlled at 45-60 degrees; according to the above constraints, the initial material arrangement is performed, and the number of layers of large and small bricks, the oblique laying height, and the mortar joint width are input to establish the initial model of the parameter wall.
[0066] Specifically, the steps for parametric design of the secondary structure are:
[0067] In this embodiment, taking a wall without waterproofing requirements as an example, the single-layer masonry method of small bricks is calculated according to the wall constraints and wall length, and the mathematical model of the single-layer small brick arrangement scheme is established according to the requirement that the size of non-whole bricks is ≥ 1 / 3 of the brick length:
[0068] L=a1+la×n+(n+1)×hf+b1
[0069] la / 3≤a1≤la
[0070] la / 3≤b1≤la
[0071] 8≤hf≤10
[0072] In the formula: L is the known wall length; a1 is the non-whole brick size at the beginning to be determined; b1 is the non-whole brick size at the end to be determined; hf is the width of the mortar joint of the small brick, in mm; la is the known standard small brick length; n is the number of whole bricks and small bricks to be determined.
[0073] According to the wall constraints and wall length, the large brick assembly method is calculated. According to the requirement that the spacing between the upper and lower layers of mortar joints is ≥ 1 / 3 of the brick length, the mathematical model of the two-layer large brick arrangement scheme is:
[0074] L=La×N1+C1+C2+(N1+1)×HF
[0075] La×N2+C3+C4+(N2+1)×HF=LZ my -Y my
[0076] La / 3≤C1≤La
[0077] La / 3≤C2≤La
[0078] La / 3≤C3≤La
[0079] La / 3≤C4≤La
[0080] 10≤HF≤15
[0081] Where: L is the known wall length; C1 is the size of the non-whole brick at the beginning of the first layer to be determined; C2 is the size of the non-whole brick at the end of the first layer to be determined; C3 is the size of the non-whole brick at the beginning of the second layer to be determined; C4 is the size of the non-whole brick at the end of the second layer to be determined; HF is the width of the mortar joint of the large brick, in mm; La is the known standard large brick size; N1 is the number of whole bricks in the first layer; N2 is the number of whole bricks in the second layer; Z my Y is the left gap distance of the second layer; my is the right gap distance of the second layer, as shown in Figure 1 shown.
[0082] After the small bricks are set in the first layer, the second layer can be set in the center relative to the first layer according to the rules. The number of layers of small bricks is small and small bricks are not needed in the waterproof wall, which has little impact on the cost. Therefore, it is simplified into a mathematical model of a single-layer small brick arrangement scheme.
[0083] It can be imagined that, as an alternative solution, a mathematical model of the two-layer small brick arrangement scheme can be established to make the results more accurate.
[0084] According to the wall height, calculate the mathematical model of the whole wall height arrangement plan:
[0085] QH=ha×N n +Ha×N N +H F ×(N N+1)+C
[0086] 140≤C≤180
[0087] 3≤N n ≤6
[0088] 12≤HF≤15
[0089] Where: QH is the known wall height; ha is the standard small brick height; Ha is the standard large brick height; H F is the height of the mortar joint; N n is the number of small brick layers, N N is the number of large brick layers, where N n and N N All are integers; C is the height of the inclined brick, in mm. During the construction process, the inclined bricks are set up at an angle with one layer.
[0090] S14: Iteratively optimize and solve the secondary structure model.
[0091] Calculate the objective function of the minimum price of the cut part:
[0092] MIN=CCX×NNX+CCD×NND
[0093] NNX=N n ×(Xa1+Xb1)
[0094] N N =N 奇数行数 +N 偶数行数
[0095] NND=N 奇数行数 *(XC1+XC2)+N 偶数行数 *(XC3+XC4)
[0096] In Xa1: when a1>0, X takes 1; when a1=0, X takes 0;
[0097] In Xb1: when b1>0, X takes 1; b1=0X takes 0;
[0098] In XC1: when C1>0, X takes 1; C1=0X takes 0;
[0099] In XC2: when C2>0, X takes 1; when C2=0, X takes 0;
[0100] In XC3: when C3>0, X takes 1; when C3=0, X takes 0;
[0101] In XC4: when C4>0, X takes 1; when C4=0, X takes 0;
[0102] Where: CCX is the price of each standard small brick for the wall to be required; CCD is the price of each standard large brick for the wall to be required; NNX is the number of small bricks that are not whole bricks; NND is the number of large bricks that are not whole bricks; N n is the number of small brick layers, N N is the number of large brick layers; a1 is the non-whole brick size at the beginning to be sought; b1 is the non-whole brick size at the end to be sought; C1 is the non-whole brick size at the beginning of the first layer to be sought; C2 is the non-whole brick size at the end of the first layer to be sought; C3 is the non-whole brick size at the beginning of the second layer to be sought; C4 is the non-whole brick size at the end of the second layer to be sought.
[0103] Among them, in the group layout plan, there are at least two non-whole bricks in a row, a1=0, b1=0, C1=0, C2=0, C3=0 and C4=0 represent whole bricks, when a1>0, b1>0, C1>0, C2>0, C3>0 and C4>0 represent non-whole bricks, Xa1, Xb1, XC1, XC2, XC3 and XC4 are decision variables, that is, the number of non-whole bricks in a single layer and on one side. The purpose of establishing the objective function is to minimize the cost and the cost of the cut part of the bricks, to minimize the number of non-whole bricks, and to minimize the number of whole bricks that do not need to be cut. The higher the value, the less waste material, the higher the utilization rate, and the less labor cost consumed.
[0104] The steps for iterative optimization and solution of the secondary structure model are:
[0105] The optimal solution is obtained by iteratively solving the mathematical model of the single-layer small brick arrangement scheme, the mathematical model of the two-layer large brick arrangement scheme, and the mathematical model of the optimized secondary structure model and the objective function;
[0106] S2: Directly generate production and processing drawings through the secondary structure model to guide on-site construction.
[0107] Specifically, by utilizing software secondary development, the optimized parameters: number of small brick layers, number of large brick layers, oblique masonry height, and the optimal wall assembly method that meets the specifications for each layer are selected based on BIM software by selecting three points: the lower left corner of the brick wall, the wall length, and the wall height. Based on the assembly algorithm of the above-mentioned parametric design of the secondary structure, the selection of three points can realize automatic generation of the optimal secondary structure assembly plan, draw a three-dimensional diagram of the brick wall, and then directly generate a construction plan based on the three-dimensional diagram of the secondary structure, thereby obtaining a specific brick body list and the required order processing drawings, achieving accurate statistics, and directly using them to guide on-site construction.
[0108] The embodiments of the present invention are described in detail above, but the contents described are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. An automatic optimization assembly algorithm, characterized in that: The steps are: Use BIM software to build a secondary structure model based on the preliminary construction plan; Directly generate production and processing drawings through the secondary structure model to guide on-site construction; The steps of establishing the secondary structure model using BIM software according to the preliminary construction plan are as follows: Define parametric grids and elevations; Main structure modeling; Parametric design of secondary structures; Iteratively optimize and solve the secondary structure model; Wherein, the steps of performing parameterized design on the secondary structure are: According to the wall constraints and wall length, the single-layer masonry method of small bricks is calculated. According to the requirement that the size of non-whole bricks is ≥ 1 / 3 of the brick length, the mathematical model of the single-layer small brick arrangement scheme is established: L=a1+la×n+(n+1)×hf+b1 la / 3≤a1≤la la / 3≤b1≤la 8≤hf≤10 Where: L is the known wall length; a1 is the non-whole brick size at the beginning to be determined; b1 is the non-whole brick size at the end to be determined; hf is the width of the mortar joint of the small brick; la is the known standard small brick length; n is the number of small bricks to be determined; According to the wall constraints and wall length, the large brick assembly method is calculated. According to the requirement that the spacing between the upper and lower layers of mortar joints is ≥ 1 / 3 of the brick length, the mathematical model of the two-layer large brick arrangement scheme is: L=La×N1+C1+C2+(N1+1)×HF La×N2+C3+C4+(N2-1)×HF=QC-Zmy-Ymy La / 3≤C1≤La La / 3≤C2≤La La / 3≤C3≤La La / 3≤C4≤La 10≤HF≤15 Where: L is the known wall length; C1 is the non-whole brick size at the beginning of the first layer to be determined; C2 is the non-whole brick size at the end of the first layer to be determined; C3 is the non-whole brick size at the beginning of the second layer to be determined; C4 is the non-whole brick size at the end of the second layer to be determined; HF is the mortar joint width of the large brick; La is the known standard large brick length; N1 is the number of whole bricks in the first layer; N2 is the number of whole bricks in the second layer; Zmy is the left gap distance of the second layer; Ymy is the right gap distance of the second layer; According to the wall height, calculate the mathematical model of the whole wall height arrangement plan: QH=ha×Nn+Ha×NN+HF×(NN+1)+C 140≤C≤180 3≤N1≤6 12≤HF≤15 Where: QH is the known wall height; ha is the standard small brick height; Ha is the standard large brick height; HF is the mortar joint size; Nn is the number of small brick layers, NN is the number of large brick layers; C is the height of the inclined brick; In the step of iteratively optimizing and solving the secondary structure model, it is also necessary to calculate the objective function of the minimum value of the cutting part: MIN=CCX×NNX+CCD×NND NNX=Nn×(Xa1+Xb1) NN = N odd number of rows + N even number of rows NND = N odd number of rows * (XC1 + XC2) + N even number of rows * (XC3 + XC4) Where: CCX is the price of each standard small brick for the wall to be requested; CCD is the price of each standard large brick for the wall to be requested; NNX is the number of small non-whole bricks; NND is the number of large non-whole bricks; a1 is the size of the non-whole brick at the beginning to be requested; b1 is the size of the non-whole brick at the end to be requested; C1 is the size of the non-whole brick at the beginning of the first layer to be requested; C2 is the size of the non-whole brick at the end of the first layer to be requested; C3 is the size of the non-whole brick at the beginning of the second layer to be requested; C4 is the size of the non-whole brick at the end of the second layer to be requested; The steps for iterative optimization and solution of the secondary structure model are: By iteratively solving the mathematical model of the single-layer small brick arrangement scheme, the mathematical model of the two-layer large brick arrangement scheme, the mathematical model of the whole wall height arrangement scheme and the objective function, the optimal solution and the optimal secondary structure assembly scheme of the component are solved.
2. The automatic optimization assembly algorithm according to claim 1, characterized in that: The steps for defining parameterized grids and elevations are: Define the axis grid according to the construction plan, input the axis grid dimensions in the longitudinal and transverse directions, and define each axis grid number; Define components that are not located in the grid by auxiliary lines, and define names for the auxiliary lines according to the offset distance from the grid; According to the floor elevations in the drawings, enter the elevations of each structural layer and define the floor names.
3. The automatic optimization assembly algorithm according to claim 2, characterized in that: According to the above-defined axis grid, model the beams, plates and columns in the main structure; Attributes are assigned to the beam, slab and column components, including: component name, concrete grade, component volume, axis grid position, estimated start time, estimated end time, actual start time, actual end time, planned start time and planned end time.
4. The automatic optimization assembly algorithm according to claim 1, characterized in that: The parameters included in the secondary structure include: small bricks, large bricks, inclined bricks and mortar joints.
5. The automatic optimization assembly algorithm according to claim 1, characterized in that: The production and processing drawings are directly generated through the secondary structure model to guide the on-site construction steps: based on BIM software, the lower left corner, wall length and wall height of the brick wall are determined by three points to generate the optimal secondary structure assembly plan and generate a construction plan to guide on-site construction.