Large-span top-decker open-hole web-beam-arch composite rigid frame bridge and its construction method

By combining NC-UHPC material and embedded steel pipe concrete strong skeleton in a large-span overhead open-hole web beam arch combination rigid frame, a stable triangular frame structure is formed, which solves the mechanical performance limitations and high cost of traditional bridge structures. The problem of this has achieved efficient and environmentally friendly bridge construction and use effects.

CN114457667BActive Publication Date: 2024-11-26林同棪国际工程咨询(中国)有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111276145.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-29
Publication Date
2024-11-26
Estimated Expiration
2041-10-29

AI Technical Summary

Technical Problem

Traditional upper-bearing reinforced concrete arch bridges and prestressed concrete continuous rigid structure bridges have limitations in mechanical properties, making it difficult to expand their leaping capabilities, and the application of ultra-high performance concrete in bridge structures is limited by the high cost and self-shrinkage characteristics.

Method used

A large-span overhead type open-hole web beam arch combined rigid structure bridge structure is adopted, and a stable triangular frame structure is formed by combining NC-UHPC materials, combining embedded steel pipe concrete strong skeleton and prefabricated UHPC variable cross-section straight web. , make full use of UHPC's high strength, durability and compressive strength to reduce the structure's own weight and construction period.

Benefits of technology

It improves the load-bearing efficiency of the bridge structure, overcomes the problems of cracking and deflection, and expands the leaping ability of the concrete rigid structure bridge, and has the advantages of excellent structural stress performance, high cost-effectiveness, light construction, environmental protection and energy-saving.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114457667B_ABST
    Figure CN114457667B_ABST
Patent Text Reader

Abstract

The invention discloses a large-span top-bearing open-web beam-arch composite rigid frame bridge, comprising an upper chord box girder (1), a lower chord box arch (2) and a hollow bridge pier (3), wherein the upper chord box girder (1) and the lower chord box arch (2) form a beam-arch triangular area directly above the hollow bridge pier (3), and the upper chord box girder (1) is provided with an arch upper column (5) on the lower chord box arch (2) and a V-shaped branch pier (5) on the hollow bridge pier (3) to form a stable triangular frame structure with the upper chord girder (1) in the beam-arch triangular area. 4) Support, the upper chord box girder comprises a NC prefabricated top plate (111), a prefabricated NC bottom plate (121) and a prefabricated UHPC variable cross-section straight web plate (131), wherein the prefabricated UHPC variable cross-section straight web plate (131) is configured such that the plate surface area at both ends of the web plate is larger than the plate surface area in the middle portion; the load-bearing efficiency of the bridge structure is improved from the aspects of the structural system and the force mechanism, the cracking and deflection problems commonly occurring in conventional concrete rigid frame bridges are overcome, and the spanning capacity of concrete rigid frame bridges is further expanded.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bridge engineering, and in particular to a large-span top-bearing open-hole web beam-arch combined rigid frame bridge and a construction method thereof. Background Art

[0002] The top-bearing reinforced concrete arch bridge is a thrust bridge structure system, which is widely used due to its advantages of economic cost, beautiful shape and large span capacity. The large-span top-bearing reinforced concrete arch bridge is mainly suitable for mountainous areas or mountainous urban construction environments. The huge thrust generated by it requires relatively hard and complete rocks with high compressive strength as the bearing layer of the arch foot foundation. When the geological conditions of the bridge site are poor, it is often impossible to use a large-span thrust arch bridge. The traditional prestressed concrete continuous rigid frame bridge is also a major bridge type suitable for mountainous areas or mountainous urban construction environments, but this bridge type is often suitable for situations where the main span does not exceed 200m. When the prestressed concrete continuous rigid frame bridge develops to a larger span, due to its excessive self-weight, the concrete strength will be basically consumed by its self-weight. It is very easy to have defects such as mid-span deflection and main beam cracking during service, thus limiting the development of the span capacity of this type of bridge.

[0003] Since traditional single structural systems such as top-bearing reinforced concrete arch bridges and prestressed concrete continuous rigid frame bridges have certain limitations in mechanical properties, the prospect of developing to a larger span is limited. Compared with the traditional single bridge structure system, the composite structure system can give full play to their respective advantages. At present, my country is vigorously promoting prefabricated and assembled bridges and composite structure bridges. Compared with cast-in-place concrete box girders, prefabricated and assembled box girders and composite structure box girders have the advantages of significantly improving construction quality and green construction benefits, effectively reducing construction risks and the adverse effects of construction on traffic and the environment, and improving production efficiency. The traditional assembled prefabricated segmental prestressed concrete box girder has high construction accuracy requirements, a relatively long prefabrication period, and high requirements for beam storage and transportation. Whether the whole hole segment assembly of the bridge erection machine or the cantilever segment assembly is used, the requirements for on-site construction equipment are very high. The traditional concrete box girder adopts the disadvantages of easy cracking of the web and heavy weight due to the low tensile and shear strength of ordinary concrete itself. To address this problem, the drawbacks of traditional concrete box girders can be solved by using corrugated steel web concrete box girders and steel truss web concrete composite beams. However, there are also problems such as large amount of maintenance work in the later stage, stress concentration at the steel-concrete connection nodes, and complex force. Ultra-High Performance Concrete (UHPC) is a high-density cement-based composite engineering material prepared according to the principle of maximum packing density (reducing porosity and macropores) and low water-cement ratio. It has outstanding advantages such as high strength, high elastic modulus, high durability, high toughness, high density, and low creep. Many engineering practices have shown that UHPC can significantly reduce the size of components, reduce the deadweight of the structure, and increase the spanning capacity while ensuring the same strength and durability.

[0004] In bridge engineering, although UHPC has been widely used in many aspects such as combined bridge deck pavement structures and reinforcement of old bridges, from the current usage situation, one of the main factors restricting the development of UHPC bridge structures is its high cost and high self-shrinkage characteristics. In the field of bridge structure engineering technology, it would be very uneconomical to use UHPC as the main structural material, and because the bridge structure needs to meet multiple performance targets such as strength, stiffness, and stability, its ultra-high mechanical properties cannot be fully utilized, so that the advantages of UHPC materials will be idle and wasted. Summary of the invention

[0005] In view of this, the purpose of the present invention is to provide a large-span top-bearing open-hole web beam-arch composite rigid frame bridge and its construction method, improve the load-bearing efficiency of the bridge structure from the aspects of the structural system and force mechanism, overcome the cracking and deflection problems that usually occur in rigid frame bridges, and further expand the spanning capacity of concrete rigid frame bridges. By combining NC-UHPC materials, the advantages of high compressive strength and low price of NC are fully utilized, and the outstanding advantages of UHPC such as high strength, high elastic modulus, high durability, high toughness, high density, and low creep are fully utilized. It has the advantages of excellent structural force performance, high cost performance, light construction hoisting weight, short construction period, convenient maintenance, energy saving and environmental protection.

[0006] The large-span top-bearing open-hole web beam-arch composite rigid frame bridge of the present invention comprises an upper chord box girder (1), a lower chord box arch (2) and a hollow bridge pier (3), wherein the upper chord box girder (1) and the lower chord box arch (2) form a beam-arch triangle area directly above the hollow bridge pier (3), wherein the upper chord box girder (1) is supported in the beam-arch triangle area by an arch upper column (5) arranged on the lower chord box arch (2) and a V-shaped branch pier (4) arranged on the hollow bridge pier (3) and forming a stable triangular frame structure with the upper chord girder (1), wherein the upper chord box girder comprises an NC prefabricated top plate (111), a prefabricated NC bottom plate (121) and a prefabricated UHPC variable-section straight web plate (131), wherein the prefabricated UHPC variable-section straight web plate (131) is configured such that the plate surface area at both ends of the web plate is larger than the plate surface area at the middle portion;

[0007] Furthermore, the lower chord box arch (2), the V-shaped branch pier (4), and the arch upper column (5) are symmetrically arranged along the center line of the hollow bridge pier (3), and the hollow bridge pier (3) is a variable cross-section structure with a small upper part and a large lower part;

[0008] Furthermore, the arch upper column (5) is an embedded steel strong frame and is inserted into the beam-arch joint section (13) and the pier-arch joint section (34); the lower chord box arch (2) is an embedded steel tube concrete strong frame and is inserted into the beam-arch joint section (13) and the pier-arch joint section (34); shear nails are arranged on the outer side of the steel tube of the strong frame;

[0009] Furthermore, the embedded steel tube concrete strong frame of the lower chord box arch (2) is a truss structure, including a pre-embedded rigid frame upper chord steel pipe (201), a pre-embedded rigid frame lower chord steel pipe (202), a pre-embedded rigid frame vertical web member (203), and a pre-embedded rigid frame diagonal web member (204). The pre-embedded rigid frame upper chord steel pipe (201) and the pre-embedded rigid frame lower chord steel pipe (202) are arranged in parallel on both sides along the longitudinal bridge direction. The pre-embedded rigid frame upper chord steel pipe (201) and the pre-embedded rigid frame lower chord steel pipe (202) are arranged in parallel on both sides along the longitudinal bridge direction. 02) are fixedly connected with a pre-embedded rigid frame vertical web member (203) and a pre-embedded rigid frame diagonal web member (204), the pre-embedded rigid frame upper chord steel pipes (201) along the transverse bridge direction are fixedly connected to form a pre-embedded rigid frame upper flat joint (205), and the pre-embedded rigid frame lower chord steel pipes (202) along the transverse bridge direction are fixedly connected to form a pre-embedded rigid frame lower flat joint (206), and a pre-embedded rigid frame transverse joint (208) is connected between the pre-embedded rigid frame upper flat joint (205) and the pre-embedded rigid frame lower flat joint (206);

[0010] Furthermore, the prefabricated UHPC variable-section straight web (131) has vertical end plate surfaces that gradually decrease toward the middle to form an hourglass-shaped structure;

[0011] Furthermore, the prefabricated UHPC variable-section straight web (131) is pre-embedded with web vertical prestressed steel bars (135) and is provided with oblique prestressed steel bars (136) along the main tensile stress direction, the NC prefabricated top plate (111) is pre-embedded with top plate joint steel bars (118), the prefabricated NC bottom plate (121) is pre-embedded with bottom plate joint steel bars (127), both ends of the web vertical prestressed steel bars (135) are provided with web connection joints (107), the top plate joint steel bars (118) and the bottom plate joint steel bars (127) are respectively vertically overlapped with the web vertical prestressed steel bars (135) and are laterally fixedly connected through the web connection joints (107);

[0012] Furthermore, a web plate pre-embedded perforated steel plate (133) is provided at the center of the top edge and the bottom edge of the prefabricated UHPC variable-section straight web plate (131), the openings on the web plate pre-embedded perforated steel plate (133) are traversed by a web plate shear key pre-embedded steel pipe (134) and are welded firmly, and shear key steel bars (108, 109) are provided through the openings of the web plate pre-embedded perforated steel plate (133) and the steel pipes of the web plate shear key pre-embedded steel pipe (134);

[0013] Furthermore, web reinforcement vertical ribs (132) are arranged at the center of the longitudinal bridge direction on opposite sides of the prefabricated UHPC variable-section straight web plate (131), top plate reinforcement transverse ribs (112) are arranged at the center of the longitudinal bridge direction on the bottom edge of the NC prefabricated top plate (111), bottom plate reinforcement transverse ribs (122) are arranged at the center of the longitudinal bridge direction on the top edge of the prefabricated NC bottom plate (121), and the top plate reinforcement transverse ribs (112), the bottom plate reinforcement transverse ribs (122), and the web reinforcement vertical ribs (132) are arranged correspondingly;

[0014] Furthermore, after being assembled between the NC prefabricated top plates (111) and the prefabricated NC bottom plates (121), cast-in-place UHPC respectively forms a top plate connection belt (106) and a bottom plate connection belt (105); both ends of the web pre-embedded perforated steel plate (133) along the longitudinal bridge direction are provided with splicing plates (137); the splicing plates (137) are connected into a whole by high-strength bolts (138) and are embedded between the bottom plate connection belt (105) and the top plate connection belt (106); longitudinal prestressed steel beam corrugated pipes are provided in the NC prefabricated top plates (111) and the prefabricated NC bottom plates (121); the prestressed steel beams penetrate the longitudinal prestressed steel beam corrugated pipes and are tensioned and anchored by steel beam anchors (114).

[0015] The present invention also discloses a construction method of a large-span top-bearing open-hole web beam-arch combined rigid frame bridge, comprising the following steps:

[0016] Step a, constructing a pile foundation (7) and a cap (6);

[0017] Step b, constructing the hollow bridge pier (3) by climbing formwork, the pier-arch joint section (34) is constructed by a lower arch-pier-arch joint section cast-in-place bracket (801) and a lower arch-pier-arch joint section cast-in-place bracket arc section formwork support system (802);

[0018] Step c, using a bracket to assist the V-shaped branch pier (4) in on-site pouring construction, installing the strong skeleton segment of the lower chord box arch (2), and using the lower chord arch inverted triangle hanging basket (804) to symmetrically and synchronously cantilever on-site pouring the segment concrete of the lower chord box arch (2). After the concrete of the first hanging segment of the lower chord box arch (2) reaches the strength, move the lower chord arch inverted triangle hanging basket (804) forward to the next hanging segment;

[0019] Step d, installing the upper chord beam segment of the pier top section on the top of the V-shaped branch pier (4), and after the concrete of the third suspended cast segment of the lower chord box arch (2) reaches the required strength, tensioning the first pair of temporary buckle cables (805) of the lower chord arch;

[0020] Step e, after the upper chord beam segment of the pier top section above the pier top of the V-shaped branch pier (4) is installed, the upper chord beam standard segment is installed symmetrically and synchronously until the upper chord beams between the V-shaped branch piers (4) are connected;

[0021] Step f, continue to symmetrically and synchronously construct the upper chord beam standard segment and the lower chord box arch (2) suspended cast segment, and the lower chord arch temporary buckle (805) lags behind the lower chord box arch (2) suspended cast segment by one segment to perform cable hanging and tensioning;

[0022] Step g, when the suspended cast section of the lower chord box arch (2) and the standard section of the upper chord beam are constructed to the upper column (5), the upper column (5) is installed, and the UHPC cast-in-place joint of the beam-column joint section (15) and the lower chord arch and the upper column joint section (25) is cast;

[0023] Step h, repeating steps f to g to construct the upper chord box beam (1), the lower chord box arch (2) and the upper column (5) segment by segment until the upper chord box beam (1) and the lower chord box arch (2) are joined. Install the locking wedge block, tightly combine the upper chord box beam (1) with the lower chord box arch (2) and the locking wedge block, and form a stable triangular force-bearing structure in advance;

[0024] Step i, completing the construction of the beam-arch joint section (13), and symmetrically and synchronously constructing the conventional beam sections (12) on both sides;

[0025] Step j, using the side span bracket to first close the side span, then using the lower chord arch inverted triangle hanging basket (804) to close the middle span, and tensioning the conventional beam section bottom plate longitudinal prestressed steel strand (303) and the conventional beam section web plate longitudinal prestressed steel strand (304);

[0026] Step k, dismantling the lower arch inverted triangle hanging basket (804), symmetrically dismantling the lower arch temporary buckle (805) and the lower arch pier-arch joint section cast-in-place bracket (801) and the lower arch pier-arch joint section cast-in-place bracket arc section formwork support system (802), and completing the construction of the main structure of the bridge;

[0027] Furthermore, the construction method of the upper chord box girder (1) comprises the following steps:

[0028] Step ①, installing the NC prefabricated bottom plate unit (102) of the pier top section on the pier top of the V-shaped branch pier (4);

[0029] Step ②, installing the UHPC prefabricated solid web plate unit (104) of the pier top section, installing the NC prefabricated bottom plate and the UHPC prefabricated solid web shear key penetration steel bars of the pier top section, and pouring the UHPC cast-in-place connection joint;

[0030] Step ③, installing the NC prefabricated top plate unit (101) of the pier top section, installing the shear key through-steel bars of the NC prefabricated top plate and the UHPC prefabricated solid web plate of the pier top section, and pouring the UHPC cast-in-place connection joint;

[0031] Step ④: Use a temporary hanger to install the conventional beam section NC prefabricated floor plate unit (102) and temporarily fix it;

[0032] Step ⑤, install the standard section UHPC hourglass-shaped prefabricated web plate unit (103), install the high-strength bolt connection joint splicing plate (137) connected to the completed segment, tighten the high-strength bolts (138), install the conventional beam section NC prefabricated bottom plate and the UHPC hourglass-shaped prefabricated web shear key through-steel bars (109), pour the UHPC cast-in-place connection joint, and cast the UHPC cast-in-place prefabricated web reinforcement vertical rib connection joint (107);

[0033] Step ⑥, using a temporary hanger to install the conventional beam section NC prefabricated top plate unit (101) and temporarily fix it; installing the conventional beam section NC prefabricated top plate and the UHPC hourglass-shaped prefabricated web shear key through the steel bar (108), pouring the UHPC cast-in-place connection joint, and pouring the UHPC cast-in-place prefabricated web reinforcement vertical rib connection joint (107);

[0034] Step 7, casting the UHPC cast-in-place bottom plate connection belt (105) and the UHPC cast-in-place top plate connection belt (106) between the completed installation segments; after the UHPC cast-in-place belt reaches the design strength through curing, installing the longitudinal prestressed steel strand anchor (114) and tensioning the top plate longitudinal prestressed steel strand (113), then performing prestressed grouting and anchor sealing, and moving the hanger forward;

[0035] Step ⑧: Repeat steps ④ to ⑦ by using the symmetrical cantilever assembly method to install conventional prefabricated segments segment by segment until the entire bridge is closed and the prestressed closing steel strands of the top and bottom plates are tensioned.

[0036] The beneficial effects of the present invention are as follows: the large-span top-bearing open-hole web beam-arch composite rigid frame bridge and its construction method disclosed by the present invention improve the load-bearing efficiency of the bridge structure from the aspects of the structural system and the force mechanism, overcome the cracking and deflection problems that usually occur in the rigid frame bridge, and further expand the spanning capacity of the concrete rigid frame bridge. By combining NC-UHPC materials, the advantages of high compressive strength and low price of NC are fully utilized, and the outstanding advantages of UHPC such as high strength, high elastic modulus, high durability, high toughness, high density, and low creep are fully utilized, and the advantages of excellent structural force performance, high cost performance, light construction hoisting weight, short construction period, convenient maintenance, energy saving and environmental protection are achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0038] Figure 1 It is a elevational layout diagram of a deck-type open-web beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0039] Figure 2 It is a cross-sectional layout diagram of a deck-type open-hole web-beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0040] Figure 3 A three-dimensional axial perspective view of a deck-type open-hole web beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0041] Figure 4 A schematic diagram of the structural system of a deck-type beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0042] Figure 5 A schematic diagram of the force mechanism of the structural system of the deck-type beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0043] Figure 6 It is a schematic diagram of the force mechanism of the main beam with a hole web according to an embodiment of the present invention;

[0044] Figure 7 A three-dimensional axial perspective view of a top beam section of a deck-type open-hole web beam-arch composite rigid frame bridge pier according to an embodiment of the present invention;

[0045] Figure 8 A typical cross-sectional view of an upper chord beam of a deck-type open-web beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0046] Fig. 9 for Figure 8 A partial enlarged view of the middle A;

[0047] Fig.10 for Figure 8 A partial enlarged view of point B in the middle;

[0048] Fig.11 A schematic diagram of a three-dimensional decomposed structure of a typical segment of a chord beam on a perforated web according to an embodiment of the present invention;

[0049] Fig.12 It is a schematic diagram of the three-dimensional structure of a typical segment prefabricated top plate of a chord beam with a perforated web according to an embodiment of the present invention;

[0050] Fig.13 It is a schematic diagram of the three-dimensional structure of a typical segment prefabricated bottom plate of a chord beam with a perforated web according to an embodiment of the present invention;

[0051] Fig.14 The elevation and cross-sectional layout diagram of a typical segment prefabricated web of a perforated web upper chord beam according to an embodiment of the present invention;

[0052] Fig.15 A schematic diagram of a three-dimensional decomposed structure of a typical segment prefabricated web of a chord beam with a perforated web according to an embodiment of the present invention;

[0053] Fig.16 It is a elevational layout diagram of the lower chord arch of a deck-type open-web beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0054] Fig.17It is a cross-sectional arrangement diagram of the lower chord arch of the top-decker open-web beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0055] Fig.18 A typical cross-sectional arrangement diagram of a conventional beam section of a deck-type open-hole web-beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0056] Fig.19 It is a schematic diagram of the three-dimensional structure of the beam-arch combination section of the deck type open-hole web beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0057] Fig. 20 It is a schematic diagram of the steps of the construction method of the top-decker open-hole web beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0058] Fig.21 It is a schematic diagram of a triangular area construction method of a deck type open-hole web beam-arch composite rigid frame bridge according to an embodiment of the present invention;

[0059] Fig. 22 It is a schematic diagram of the steps of the construction method of the pier top upper chord beam segment and typical segments of the top-bearing open-web beam-arch composite rigid frame bridge according to an embodiment of the present invention.

[0060] The above drawings include the following reference numerals: 1—upper chord box girder, 2—lower chord box arch, 3—bridge pier, 4—V-shaped branch pier, 5—arch column, 6—cap, 7—pile foundation, 12—conventional beam section, 13—beam-arch combination section, 14—pier-beam combination section, 15—beam-column combination section, 25—lower chord arch and arch column combination section, 34—pier-arch combination section, 101—NC prefabricated top plate unit, 102—NC prefabricated bottom plate unit, 103—UHPC hourglass-shaped prefabricated web plate unit, 104—UHPC prefabricated solid web plate unit of pier top section, 105—UHPC cast-in-place bottom plate connecting strip, 106—UHPC cast-in-place top plate connecting strip, 107—UHPC cast-in-place prefabricated web reinforced vertical rib connection joint, 108—NC prefabricated bottom plate unit, 109—NC prefabricated bottom plate unit, 110—NC prefabricated bottom plate unit, 111—NC prefabricated bottom plate unit, 112—NC prefabricated bottom plate unit, 113—NC prefabricated bottom plate unit, 114—NC prefabricated bottom plate unit, 115—NC prefabricated bottom plate unit, 116—NC prefabricated bottom plate unit, 117—NC prefabricated top plate unit, 118—NC prefabricated bottom plate unit, 119—NC prefabricated bottom plate unit, 120—NC prefabricated bottom plate unit, 121—NC prefabricated bottom plate unit, 122—NC prefabricated bottom plate unit, 123—NC pre 8—NC precast top plate and UHPC hourglass-shaped precast web shear key through steel bars, 109—NC precast bottom plate and UHPC hourglass-shaped precast web shear key through steel bars, 111—NC precast top plate, 112—NC precast top plate reinforced transverse ribs, 113—longitudinal prestressed steel strands, 114—longitudinal prestressed steel strand anchors, 115—NC precast top plate shear key embedded perforated steel plate, 116—NC precast top plate shear key embedded steel pipe, 117—NC precast top plate shear key embedded through steel bars, 118—NC precast top plate and reinforced vertical rib connection joint embedded steel bar joint, 119—NC precast top plate longitudinal steel bars, 121—NC precast bottom plate, 122—NC precast bottom plate reinforced transverse ribs, 123—bottom plate longitudinal prestressed steel strands, 124—NC precast base plate shear key embedded perforated steel plate, 125—NC precast base plate shear key embedded steel pipe, 126—NC precast base plate shear key embedded through steel bar, 127—NC precast base plate and reinforced vertical rib connection joint embedded steel bar joint, 128—NC precast base plate longitudinal steel bar, 131—UHPC hourglass shaped precast web, 132—UHPC hourglass shaped precast web reinforced vertical rib, 133—precast web embedded perforated steel plate, 134—web plate shear key embedded steel pipe, 135—UHPC hourglass shaped precast web reinforced vertical rib vertical prestressed steel bar, 136—UHPC hourglass shaped precast web inclined prestressed steel bar along the main tensile stress direction, 137—high-strength bolt connection joint splicing plate, 138—high-strength bolt, 201—pre-embedded rigid skeleton upper chord steel pipe, 202—pre-embedded rigid skeleton lower chord steel pipe, 203—pre-embedded rigid skeleton vertical web member, 204—pre-embedded rigid skeleton diagonal web member, 205—pre-embedded rigid skeleton upper flat joint, 206—pre-embedded rigid skeleton lower flat joint, 207—pre-embedded rigid skeleton node plate, 208—pre-embedded rigid skeleton cross-joint, 209—pre-embedded rigid skeleton cross-joint node plate, 210—pre-embedded rigid skeleton cross-joint node plate, 211—pre-embedded rigid skeleton steel pipe poured with concrete, 212—rigid skeleton wrapped with concrete, 301—conventional beam segment bottom plate, 302—conventional beam segment web plate, 303—conventional beam segment bottom plate longitudinal prestressed steel strand, 304—conventional beam segment web plate longitudinal prestressed steel strand, 305—conventional beam segment web plate cross-joint,306—UHPC cast-in-place connection joint for the web cross-connection of the conventional beam segment, 801—cast-in-place bracket for the lower chord arch-pier joint segment, 802—cast-in-place bracket arc-shaped segment formwork support system for the lower chord arch-pier joint segment, 803—NC precast slab construction hanger for the upper chord beam, 804—inverted triangle hanging basket for the lower chord arch, 805—temporary buckle cable for the lower chord arch, 806—temporary buckle cable saddle for the lower chord arch. DETAILED DESCRIPTION

[0061] The large-span top-supported open-hole web beam-arch composite rigid frame bridge of this embodiment comprises an upper chord box girder 1, a lower chord box arch 2 and a hollow pier 3, wherein the upper chord box girder 1 and the lower chord box arch 2 form a beam-arch triangle area directly above the hollow pier 3, wherein the upper chord box girder 1 is supported in the beam-arch triangle area by an arch upper column 5 arranged on the lower chord box arch 2 and a V-shaped branch pier 4 arranged on the hollow pier 3 and forming a stable triangular frame structure with the upper chord box girder 1, wherein the upper chord box girder comprises an NC prefabricated top plate 111, a prefabricated NC bottom plate 121 and a prefabricated UHPC variable-section straight web 131, wherein the prefabricated UHPC variable-section straight web 131 is provided with a plate surface area at both ends of the web being larger than the plate surface area at the middle portion; the upper chord box girder 1 and the lower chord box arch 2 The beam-arch combination section 13 is formed by the intersection. The beam-arch combination section 13 located between the side span and the end of the upper chord beam and the beam-arch combination section 13 located between the middle span is a conventional beam section 12. A pier-beam combination section 14 is set between the upper chord box beam 1 and the V-shaped branch pier 4, a beam-column combination section 15 is set between the upper chord box beam 1 and the arch upper column 5, and a lower chord arch and arch upper column combination section 25 is set between the lower chord box arch 2 and the arch upper column 5. The intersection of the top of the hollow pier 3 and the bottom of the V-shaped branch pier 4 intersects with the arch foot of the lower chord arch of the side span and the middle span to form a pier-arch combination section 34. The upper chord box beam 1, the lower chord box arch 2, the hollow pier 3, the V-shaped branch pier 4, and the arch upper column 5 are consolidated in pairs to form a beam-arch combination continuous rigid frame system. A longitudinal movable support is set at the bottom edge of the side span beam end. The lower chord box arch 2, hollow bridge piers 3, V-shaped branch piers 4, and arch columns 5 bear pressure, and the horizontal thrust generated by the lower chord box arch 2 is resisted and balanced by the longitudinal prestressed steel strands 113 arranged in the top and bottom plates of the upper chord box girder 1, forming a "thrust-free-self-balancing" force system. The conventional beam sections 12 located between the beam-arch joint section 13 of the side span and the end of the upper chord beam and between the beam-arch joint section 13 of the middle span are mainly subjected to bending, forming a beam-arch combined force system.

[0062] The upper chord box girder 1 is composed of a pier top segment and a conventional segment, wherein the pier top segment is composed of a NC prefabricated top plate unit 101, a prefabricated NC bottom plate unit 102, and a prefabricated UHPC solid variable cross-section straight web plate unit 104 of the pier top segment; the conventional segment is composed of a NC prefabricated top plate unit 101, a prefabricated NC bottom plate unit 102, and a prefabricated UHPC variable cross-section straight web plate unit 103. The NC prefabricated top plate unit 101 is composed of a NC prefabricated top plate 111, the prefabricated NC bottom plate unit 102 is composed of a prefabricated NC bottom plate 121, and the UHPC solid variable cross-section straight web plate unit 104 is composed of a prefabricated UHPC variable cross-section straight web 131, except that the prefabricated UHPC variable cross-section straight web 131 of the pier top segment is thicker than that of the conventional segment. The prefabricated UHPC variable cross-section straight web plate unit 103 is composed of a prefabricated UHPC variable cross-section straight web 131. Longitudinal prestressed steel beam corrugated pipes are arranged in the NC prefabricated top plate unit 101 and the NC prefabricated bottom plate unit 102, which are connected by longitudinal prestressed steel beams, and longitudinal prestressed steel beam anchors 114 are arranged at the end of the segment for tension anchoring and providing pre-compression stress to offset the horizontal thrust generated by the lower chord box arch 2, as well as the tensile stress generated on the beam section by the deadweight of the structure and vehicle load. The box beam adopts a straight web single-box single-chamber or single-box multi-chamber structure, with equal beam height and constant web height. A transverse diaphragm is arranged in the pier top segment, and the bottom of the pier top segment beam is connected to the pier by consolidation or support. The NC prefabricated top plate unit 101, the prefabricated NC bottom plate unit 102, the UHPC prefabricated variable-section straight web plate unit 103, and the pier top segment prefabricated UHPC solid variable-section straight web plate unit 104 are all prefabricated in a factory in a standardized manner. The top and bottom edges of the prefabricated UHPC variable-section straight web 131 are the same length along the bridge as the NC prefabricated top plate 111 and the prefabricated NC bottom plate 121. They are narrowest at the center of the web and can be regarded as a variable-section component that gradually changes along the height direction of the web. The force mechanism of the box girder is similar to that of a double Warren truss structure. Since the web is made of UHPC, its high-strength mechanical properties are fully utilized to reduce the plate thickness. At the same time, by opening and hollowing the web, the deadweight of the structure is significantly reduced, and the cross-sectional area of ​​the lower structure piers and the number of foundation projects are effectively reduced. The traditional prefabricated box girder segments are large in size and heavy in weight. The present invention breaks down the prefabricated box girder segments into small pieces, disassembles them into NC top plates, NC bottom plates and UHPC web plates, and prefabricates them separately, eliminating the inner mold and support system of the prefabricated segment box girder, achieving lightweight and miniaturization of prefabricated components, avoiding over-limit transportation, and effectively reducing the weight of on-site hoisting. The main beam adopts UHPC prefabricated open web, which is a high-quality component made in the factory. High-strength steel fiber is used in UHPC, which makes it have high tensile strength and ductility. No steel bars are required, so there is no corrosion of steel bars caused by salt damage and concrete carbonization. It has high durability, which further improves the maintenance-free performance of the structure.Due to the special structure of the prefabricated UHPC variable-section straight web 131, the hollow openings formed between the webs can provide good lighting, making the internal space of the main beam bright and convenient for inspection and maintenance. The hollow openings formed between the webs can ensure good ventilation inside and outside the box beam, effectively reducing the adverse effects of the temperature gradient secondary stress caused by the temperature difference between the inside and outside of the box beam on the box beam structure. Among them, the beam joint section 14, the beam-column joint section 15, and the lower chord arch and the upper column joint section 25 all use UHPC as the cast-in-place joint material for the connection nodes.

[0063] In this embodiment, the lower chord box arch 2, V-shaped branch pier 4, and arch upper column 5 are arranged symmetrically along the center line of the hollow pier 3. The hollow pier 3 is a variable cross-section structure with a small upper part and a large lower part. The transition areas of the beam-arch combination section 13, the pier-beam combination section 14, the beam-column combination section 15, the lower chord arch and arch upper column combination section 25, and the pier-arch combination section 34 are all provided with arc chamfers. The arch upper column 5 is arranged parallel to the V-shaped branch pier 4 on the facade. The bottom edge linear shape of the conventional beam section 12 and the beam-arch combination section is consistent with the bottom edge linear shape of the lower chord box arch 2, and the facade is arched. The main pier below the arch-pier combination section is a variable cross-section hollow pier with a large bending stiffness to resist the unbalanced thrust of the side span and the lower chord arch of the middle span under the action of variable loads. The part above the arch-pier joint section is a double-leg V-shaped pier, which forms a stable triangular frame structure with the upper chord beam. It not only effectively reduces the negative bending moment and shear force of the upper chord beam, but also has a smaller longitudinal displacement stiffness of the pier top in the bridge direction than the single-leg pier. It can better adapt to the displacement of the superstructure on the pier top caused by the longitudinal prestressing effect in the upper chord beam, temperature changes, concrete shrinkage creep, etc., and reduce the bending moment on the bottom of the pier caused by the displacement of the pier top, thereby improving the stress of the pier foundation and reducing the foundation scale.

[0064] In this embodiment, the arch column 5 is an embedded steel strong frame and is inserted into the beam-arch joint section 13 and the pier-arch joint section 34. The lower chord box arch 2 is an embedded steel tube concrete strong frame and is inserted into the beam-arch joint section 13 and the pier-arch joint section 34. Shear nails are arranged on the outside of the strong frame steel pipe; the steel strong frame and the outer reinforced concrete together form an SRC structure, and the arch column 5 is prefabricated in the factory. During on-site construction, high-performance concrete is poured into the steel pipe of the strong frame, and a template is set up on the outside of the strong frame to cast the outer concrete in sections and layers. After it solidifies and bears force, the concrete poured into the steel pipe in the strong frame and the outer reinforced concrete and the steel pipe together form an SRC structure.

[0065] In this embodiment, the embedded steel tube concrete strong frame of the lower chord box arch 2 is a truss structure, including a pre-embedded rigid frame upper chord steel pipe 201, a pre-embedded rigid frame lower chord steel pipe 202, a pre-embedded rigid frame vertical web member 203, and a pre-embedded rigid frame diagonal web member 204. The pre-embedded rigid frame upper chord steel pipe 201 and the pre-embedded rigid frame lower chord steel pipe 202 are arranged in parallel on both sides of the longitudinal bridge, and the pre-embedded rigid frame vertical web member 203 is fixedly connected between the pre-embedded rigid frame upper chord steel pipe 201 and the pre-embedded rigid frame lower chord steel pipe 202 that are parallel to the longitudinal bridge. The embedded rigid frame diagonal web rod 204 and the embedded rigid frame upper chord steel pipe 201 along the transverse direction of the bridge are fixedly connected to form the embedded rigid frame upper horizontal joint 205, and the embedded rigid frame lower chord steel pipe 202 along the transverse direction of the bridge are fixedly connected to form the embedded rigid frame lower horizontal joint 206, and the embedded rigid frame upper horizontal joint 205 and the embedded rigid frame lower horizontal joint 206 are connected with the embedded rigid frame transverse joint 208; the lower chord arch adopts an embedded steel tube concrete strong frame, which can play the role of a bracket and a template, and has the advantages of light installation weight and strong self-erection ability. By pouring high-performance concrete into the steel pipe and setting up formwork on the outside of the strong frame to pour the outer concrete in sections and layers, after it solidifies and bears the force, the concrete poured into the steel pipe in the strong frame and the outer reinforced concrete together with the steel pipe form the SRC structure, which jointly exerts the structural bearing capacity. After the concrete solidifies and forms the lower chord arch, the rigid frame is filled and wrapped with concrete, which enhances the compression stability of the rigid frame and significantly improves the stiffness, strength and seismic ductility of the arch bridge. Compared with the simple reinforced concrete box arch structure, the lower chord arch adopts a steel pipe strong frame + outer reinforced concrete composite structure, which effectively reduces the wall thickness and cross-sectional area, and reduces the amount of concrete materials and the deadweight of the structure.

[0066] In this embodiment, the prefabricated UHPC variable-section straight web 131 is an hourglass-shaped structure with vertical end panels gradually decreasing toward the middle; the hollow openings formed between the webs can provide good lighting, making the internal space of the main beam bright and convenient for inspection and maintenance. The hollow openings formed between the webs can ensure good ventilation inside and outside the box beam, and effectively reduce the adverse effects of the temperature gradient secondary stress caused by the temperature difference between the inside and outside of the box beam on the box beam structure. The prefabricated UHPC variable-section straight web 31 of the conventional beam section uses high-strength fiber-reinforced concrete with a compressive strength of not less than 80MPa, and there is no need to configure ordinary steel bars in the web. The box girder top plate composed of the NC prefabricated top plate 111 and the top plate connecting belt 106 serves as the bearing structure of the bridge deck load, and bears the tensile and compressive loads generated by the main beam together with the prefabricated NC bottom plate 121 and the bottom plate connecting belt 105. The prefabricated UHPC variable-section straight web 131 can be regarded as a variable-section component that gradually changes along the web height direction. The force mechanism of the box girder is similar to that of a double Warren truss structure.

[0067] In this embodiment, the prefabricated UHPC variable-section straight web 131 is pre-embedded with web vertical prestressed steel bars 135 and oblique prestressed steel bars 136 are arranged along the direction of the main tensile stress, the NC prefabricated top plate 111 is pre-embedded with top plate joint steel bars 118, the prefabricated NC bottom plate 121 is pre-embedded with bottom plate joint steel bars 127, both ends of the web vertical prestressed steel bars 135 are provided with web connection joints 107, the top plate joint steel bars 118 and the bottom plate joint steel bars 127 are respectively vertically overlapped with the web vertical prestressed steel bars 135 and are laterally fixedly connected through the web connection joints 107; they are connected to form a whole through the web reinforcement vertical rib connection joints 107 to ensure the lateral stiffness of the NC prefabricated top plate 111, the prefabricated NC bottom plate 121 and the prefabricated UHPC variable-section straight web 131 and the torsional stiffness of the box girder.

[0068] In this embodiment, the top and bottom edges of the prefabricated UHPC variable-section straight web 131 are provided with web pre-embedded perforated steel plates 133, the openings on the web pre-embedded perforated steel plates 133 are traversed by web shear key pre-embedded steel pipes and welded firmly, and the openings of the web pre-embedded perforated steel plates 133 and the steel pipes of the web shear key pre-embedded steel pipes 134 are penetrated by shear key steel bars (108, 109); the tensioned prestressed steel bars are temporarily anchored on the pedestal, and then the UHPC is poured. When the UHPC is cured to a strength value not less than 90% of the design strength value and the prestressed steel bars are sufficiently bonded to the UHPC, the prestressed steel bars are relaxed, and prestress is applied to the hourglass-shaped UHPC prefabricated web by means of the bonding and anchoring of the UHPC and the prestressed steel bars. The number of the above-mentioned prestressed steel bars is based on the fact that no tensile stress is generated under the action of the constant load and no cracks are generated under the action of the most unfavorable design load combination. A prefabricated web plate pre-embedded perforated steel plate 133 is arranged at the top and bottom edges of the prefabricated UHPC variable-section straight web plate 131 of the conventional beam section. The perforated holes embedded in the hourglass-shaped UHPC prefabricated web plate 131 are traversed by a web plate shear key pre-embedded steel pipe 134 and welded firmly. A NC prefabricated top plate and UHPC hourglass-shaped prefabricated web plate shear key through-steel bar 108 or a NC prefabricated bottom plate and UHPC hourglass-shaped prefabricated web plate shear key through-steel bar 109 is arranged at the center of each circular hole of the prefabricated web plate pre-embedded perforated steel plate 133 and at the center of each steel pipe of the web plate shear key pre-embedded steel pipe 134.

[0069] In this embodiment, web reinforcement vertical ribs 132 are arranged in the center of the longitudinal bridge direction on the opposite sides of the prefabricated UHPC variable-section straight web plate 131, top plate reinforcement transverse ribs 112 are arranged in the center of the longitudinal bridge direction at the bottom edge of the NC prefabricated top plate 111, and bottom plate reinforcement transverse ribs 122 are arranged in the center of the longitudinal bridge direction at the top edge of the prefabricated NC bottom plate 121. The top plate reinforcement transverse ribs 112, the bottom plate reinforcement transverse ribs 122, and the web reinforcement vertical ribs 132 are arranged correspondingly; the positions of the top plate reinforcement transverse ribs 112, the bottom plate reinforcement transverse ribs 122 and the web reinforcement vertical ribs 132 are aligned with each other and have equal thickness.

[0070] In this embodiment, the NC prefabricated top plate 111 and the prefabricated NC bottom plate 121 are assembled and then cast into place UHPC to form a top plate connection belt 106 and a bottom plate connection belt 105, respectively. The web prefabricated perforated steel plate 133 is provided with a splicing plate 137 at both ends along the longitudinal bridge direction. The splicing plate 137 is connected into a whole by a high-strength bolt 138 and is embedded between the bottom plate connection belt 105 and the top plate connection belt 106. The NC prefabricated top plate 111 and the prefabricated NC bottom plate 121 are both A longitudinal prestressed steel beam corrugated pipe is provided, and the prestressed steel beam runs through the longitudinal prestressed steel beam corrugated pipe and is tensioned and anchored by the steel beam anchor 114; the splicing plate 137 is connected into a whole by high-strength bolts 138 and buried between the bottom plate connection belt 105 and the top plate connection belt 106; the NC prefabricated top plate plate unit 1 between each segment is connected by the UHPC cast-in-place top plate connection belt 106; the NC prefabricated bottom plate plate unit 102 is connected by the UHPC cast-in-place bottom plate connection belt 105. The top plate connection belt 106 and the bottom plate connection belt 105 are both formed by cast-in-place UHPC at the joints after the prefabricated NC bottom plate 121 and the NC prefabricated top plate 111 are assembled. The NC prefabricated top plate unit 101 and the prefabricated NC bottom plate unit 102 in the above-mentioned NC-UHPC combined assembled prestressed concrete box girder are both provided with longitudinal prestressed steel beam corrugated pipes, which are connected by longitudinal prestressed steel beams, and longitudinal prestressed steel beam anchors 114 are provided at the ends of the segments for tensioning and anchoring and providing precompression stress to offset the tensile stress on the beam cross section caused by self-weight and vehicle loads.

[0071] This embodiment also discloses a construction method of a large-span top-bearing open-hole web beam-arch composite rigid frame bridge, comprising the following steps:

[0072] Step a, constructing pile foundation 7 and cap 6;

[0073] Step b, the hollow pier 3 is constructed by climbing formwork, and the pier-arch joint section 34 is constructed by the lower chord-arch-pier-arch joint section cast-in-place bracket 801 and the lower chord-arch-pier-arch joint section cast-in-place bracket arc section formwork support system 802;

[0074] Step c, using the bracket to assist the on-site pouring construction of the V-shaped branch pier 4, installing the strong skeleton segment of the lower chord box arch 2, and using the lower chord arch inverted triangle hanging basket 804 to symmetrically and synchronously cantilever on-site pouring the concrete of the lower chord box arch 2 segment. After the concrete of the first hanging segment of the lower chord box arch 2 reaches the strength, move the lower chord arch inverted triangle hanging basket 804 forward to the next hanging segment;

[0075] Step d, installing the upper chord beam segment of the pier top section on the top of the V-shaped branch pier 4, and after the concrete of the third suspended cast segment of the lower chord box arch 2 reaches the strength, tensioning the first pair of temporary buckle cables 805 of the lower chord arch;

[0076] Step e, after the upper chord beam segment of the pier top section above the pier top of the V-shaped branch pier 4 is installed, the upper chord beam standard segment is installed symmetrically and synchronously until the upper chord beams between the V-shaped branch piers 4 are connected;

[0077] Step f, continue to symmetrically and synchronously construct the upper chord standard segment and the lower chord box arch 2 suspended segment, and the lower chord arch temporary buckle 805 lags behind the lower chord box arch 2 suspended segment by one segment for cable hanging and tensioning;

[0078] Step g, when the suspended cast section of the lower chord box arch 2 and the standard section of the upper chord beam are constructed to the upper column 5 of the arch, the upper column 5 is installed, and the UHPC cast-in-place joint of the beam-column joint section 15 and the lower chord arch and the upper column joint section 25 is cast;

[0079] Step h, repeat steps f to g to construct the upper chord box girder 1, the lower chord box arch 2 and the upper column 5 segment by segment until the upper chord box girder 1 and the lower chord box arch 2 are joined. Install the locking wedge block, tightly combine the upper chord box girder 1 with the lower chord box arch 2 and the locking wedge block, and form a stable triangular force-bearing structure in advance;

[0080] Step i, completing the construction of the beam-arch joint section 13, and symmetrically and synchronously constructing the conventional beam section 12 on both sides;

[0081] Step j, using the side span bracket to close the side span first, and then using the lower chord arch inverted triangle hanging basket 804 to close the middle span, and tensioning the conventional beam section bottom plate longitudinal prestressed steel strands 303 and the conventional beam section web plate longitudinal prestressed steel strands 304;

[0082] Step k, remove the lower chord arch inverted triangle hanging basket 804, symmetrically remove the lower chord arch temporary buckle 805 and the lower chord arch pier-arch joint section cast-in-place bracket 801 and the lower chord arch pier-arch joint section cast-in-place bracket arc section formwork support system 802, and complete the construction of the main structure of the bridge. In this embodiment, the hollow pier 3, the pier-arch joint section (34), and the V-shaped branch pier 4 are constructed by on-site casting. The lower chord box arch 2 uses the V-shaped branch pier 4 to support the lower chord arch temporary buckle 805 to assist the cantilever force in the construction stage, and adopts symmetrical and synchronous installation of a strong skeleton and on-site casting construction. The upper chord box girder 1 is constructed by symmetrical and synchronous cantilever assembly. The arch upper columns 5 are symmetrically and synchronously installed.

[0083] In this embodiment, the construction method of the upper chord box girder 1 includes the following steps:

[0084] Step ①, installing the NC prefabricated bottom plate unit 102 of the pier top section on the top of the V-shaped branch pier 4;

[0085] Step ②, installing the UHPC prefabricated solid web plate unit 104 of the pier top section, installing the NC prefabricated bottom plate and the UHPC prefabricated solid web shear key penetration steel bars of the pier top section, and pouring the UHPC cast-in-place connection joint;

[0086] Step ③, install the NC prefabricated top plate unit 101 of the pier top section, install the NC prefabricated top plate and the UHPC prefabricated solid web shear key through the steel bars of the pier top section, and pour the UHPC cast-in-place connection joint;

[0087] Step ④: Use a temporary hanger to install the conventional beam section NC prefabricated bottom plate unit 102 and temporarily fix it;

[0088] Step ⑤, install the standard section UHPC hourglass-shaped prefabricated web plate unit 103, install the high-strength bolt connection joint splicing plate 137 connected to the completed segment, tighten the high-strength bolts 138, install the conventional beam section NC prefabricated bottom plate and the UHPC hourglass-shaped prefabricated web shear key through-steel bars 109, pour the UHPC cast-in-place connection joint, and cast the UHPC cast-in-place prefabricated web reinforcement vertical rib connection joint 107;

[0089] Step ⑥, use a temporary hanger to install the conventional beam section NC prefabricated top plate unit 101 and temporarily fix it; install the conventional beam section NC prefabricated top plate and the UHPC hourglass-shaped prefabricated web shear key through the steel bar 108, pour the UHPC cast-in-place connection joint, and cast the UHPC cast-in-place prefabricated web reinforcement vertical rib connection joint 107;

[0090] Step 7, pouring the UHPC cast-in-place bottom plate connecting strip 105 and the UHPC cast-in-place top plate connecting strip 106 between the installed segments; after the UHPC cast-in-place strip reaches the design strength after curing, installing the longitudinal prestressed steel strand anchor 114 and tensioning the top plate longitudinal prestressed steel strand 113, and then performing prestressed grouting and anchor sealing, and moving the hanger forward;

[0091] Step ⑧, repeat steps ④ to ⑦ by symmetrical cantilever assembly method to install conventional prefabricated segments segment by segment, close the whole bridge, and tension the top plate and bottom plate prestressed closing steel bundles. In this embodiment, the pre-embedded steel pipe 116 of the NC prefabricated top plate shear key, the pre-embedded steel pipe 125 of the NC prefabricated bottom plate shear key, and the pre-embedded steel pipe 134 of the web plate shear key serve as the shear pin of the shear key and the inner template of the circular opening of the shear key. The cast-in-place UHPC for filling and pouring the gaps between the NC prefabricated top plate unit 101, the NC prefabricated top plate unit 102 and the UHPC hourglass-shaped prefabricated web plate unit 103 or the pier top section UHPC prefabricated solid web plate unit 104 uses short steel fibers with a length of no more than 15 mm to ensure its fluidity, and is pressurized into these gaps through the pre-embedded steel pipes 116 and 125 pre-embedded in the NC prefabricated top plate shear key, ensuring that the gaps are fully filled with UHPC.

[0092] Compared with the prior art, the present invention has the following beneficial effects:

[0093] (1) The combination of the upper arch and rigid frame bridge structure system fully utilizes the mechanical characteristics of the arch and beam structure, gives full play to the advantages of the combined structural system, and improves the structural stiffness and spanning capacity of the concrete continuous rigid frame. It is especially suitable for bridge construction in mountainous areas or mountainous cities, especially in poor geological conditions, where it is impossible to use a large-span thrust arch bridge, but the short-tower cable-stayed bridge, beam-arch combined rigid frame bridge, and continuous rigid frame cannot meet the span requirements.

[0094] (2) The main pier below the arch-pier joint section is a hollow pier with a variable cross-section, which has a large bending stiffness to resist the unbalanced thrust of the side span and the lower chord arch of the middle span under the action of variable loads. The part above the arch-pier joint section is a double-leg V-shaped pier, which forms a stable triangular frame structure with the upper chord beam, which not only effectively reduces the negative bending moment and shear force of the upper chord beam, but also has a smaller longitudinal displacement stiffness of the pier top compared to the single-leg bridge pier, which can better adapt to the displacement of the upper structure caused by the longitudinal prestress effect in the upper chord beam, temperature changes, and concrete shrinkage creep on the pier top, and reduce the bending moment caused by the displacement of the pier top on the pier bottom, thereby improving the stress of the pier foundation and reducing the foundation scale.

[0095] (3) The lower arch uses an embedded steel tube concrete strong frame, which can serve as a support and formwork, and has the advantages of light installation weight and strong self-erection ability. By pouring high-performance concrete into the steel tube, and setting up a formwork outside the strong frame to pour the outer concrete in sections and layers, after it solidifies and bears stress, the concrete poured into the steel tube in the strong frame and the outer reinforced concrete together with the steel tube form an SRC structure, which jointly exerts the structural bearing capacity. After the concrete solidifies and forms the lower arch, the rigid frame is filled and wrapped with concrete, which enhances the compression and buckling stability of the rigid frame and significantly improves the stiffness, strength and seismic ductility of the arch bridge. Compared with the simple reinforced concrete box arch structure, the lower arch adopts a steel tube concrete strong frame + outer reinforced concrete composite structure, which effectively reduces the wall thickness and cross-sectional area, and reduces the amount of concrete materials and the deadweight of the structure.

[0096] (4) The NC prefabricated top plate, NC prefabricated bottom plate, and UHPC prefabricated web in the upper chord and conventional beam sections are all prefabricated in the factory and installed on site. The UHPC cast-in-place wet joint has a short solidification time, which greatly shortens the erection period of the box girder.

[0097] (5) The NC precast top slab, NC precast bottom slab, and UHPC precast web slab in the upper chord and conventional beam sections can all be prefabricated in a standardized manner using standardized formwork. The vertical curves and pre-arches of the bridge can be adjusted and adapted using the UHPC cast-in-place wet joints between the sections.

[0098] (6) Reducing the amount of engineering work for the substructure and foundation. Since the webs in the upper chord and conventional beam sections are made of UHPC, their high-strength mechanical properties are fully utilized to reduce the thickness of the plates. At the same time, by opening holes and hollowing out the webs, the deadweight of the structure is significantly reduced, effectively reducing the cross-sectional area of ​​the substructure piers and the amount of foundation engineering.

[0099] (7) Traditional prefabricated box girder segments are large in size and heavy in weight. The present invention breaks down the prefabricated box girder segments into parts, disassembling them into NC top plates, NC bottom plates and UHPC web plates, which are prefabricated separately. This eliminates the need for the inner mold and support system of the prefabricated segment box girder, achieves lightweight and miniaturized prefabricated components, avoids over-limit transportation, and effectively reduces the weight of on-site hoisting.

[0100] (8) The use of UHPC materials for cast-in-place joints connecting node components reduces material consumption, simplifies the structure, shortens the construction period, and enhances the strength of the connection section, overcoming the weakness of the connection nodes of prefabricated components. This ensures that wet joint connections are no longer the weak link of prefabricated assembly structures.

[0101] (9) Energy saving, emission reduction, low carbon and environmental protection. Due to the significant reduction in the amount of materials used in the upper and lower structures, CO2 emissions during construction are reduced compared to NC box girder bridges of the same size.

[0102] (10) Improve maintenance-free performance. The UHPC prefabricated perforated webs in the upper chord and conventional beam sections are high-quality components prefabricated in the factory. High-strength steel fibers are used in UHPC, which gives it high tensile strength and ductility. No steel bars are required, so there is no risk of corrosion of steel bars caused by salt damage and concrete carbonization. It has high durability, further improving the maintenance-free performance of the structure.

[0103] (11) The hollow openings on the web of the upper chord and conventional beam sections provide good lighting, making the interior space of the main beam bright and convenient for inspection and maintenance.

[0104] (12) The hollow openings on the web of the upper chord and the conventional beam section can ensure good ventilation inside and outside the box girder, effectively reducing the adverse effects of the temperature gradient secondary stress caused by the temperature difference between the inside and outside of the box girder on the box girder structure.

[0105] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A large-span top-bearing open-web beam-arch composite rigid frame bridge, characterized in that: The invention comprises an upper chord box girder (1), a lower chord box arch (2) and a hollow bridge pier (3); the upper chord box girder (1) and the lower chord box arch (2) form a beam-arch triangular area directly above the hollow bridge pier (3); the upper chord box girder (1) is supported in the beam-arch triangular area by an arch upper column (5) arranged on the lower chord box arch (2) and a V-shaped branch pier (4) arranged on the hollow bridge pier (3) and forming a stable triangular frame structure with the upper chord girder (1); the upper chord box girder comprises an NC prefabricated top plate (111), a prefabricated NC bottom plate (121) and a prefabricated UHPC variable-section straight web plate (131); the prefabricated UHPC variable-section straight web plate (131) is configured such that the plate surface area at both ends of the web plate is larger than the plate surface area at the middle portion.

2. The large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 1, characterized in that: The lower chord box arch (2), the V-shaped branch pier (4), and the arch upper column (5) are symmetrically arranged along the center line of the hollow bridge pier (3), and the hollow bridge pier (3) is a variable cross-section structure with a small upper part and a large lower part.

3. The large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 2 is characterized in that: The arch upper column (5) is an embedded steel strong frame and is inserted into the beam-arch joint section (13) and the pier-arch joint section (34); the lower chord box arch (2) is an embedded steel tube concrete strong frame and is inserted into the beam-arch joint section (13) and the pier-arch joint section (34); shear nails are arranged on the outer side of the steel tube of the strong frame.

4. The large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 2, characterized in that: The embedded steel tube concrete strong frame of the lower chord box arch (2) is a truss structure, comprising a pre-embedded rigid frame upper chord steel pipe (201), a pre-embedded rigid frame lower chord steel pipe (202), a pre-embedded rigid frame vertical web member (203), and a pre-embedded rigid frame diagonal web member (204). The pre-embedded rigid frame upper chord steel pipe (201) and the pre-embedded rigid frame lower chord steel pipe (202) are arranged in parallel on both sides along the longitudinal bridge direction. The pre-embedded rigid frame upper chord steel pipe (201) and the pre-embedded rigid frame lower chord steel pipe (202) are arranged in parallel along the longitudinal bridge direction. ) are fixedly connected with a pre-embedded rigid frame vertical web member (203) and a pre-embedded rigid frame diagonal web member (204), the pre-embedded rigid frame upper chord steel pipes (201) along the transverse direction of the bridge are fixedly connected to form a pre-embedded rigid frame upper flat joint (205), and the pre-embedded rigid frame lower chord steel pipes (202) along the transverse direction of the bridge are fixedly connected to form a pre-embedded rigid frame lower flat joint (206), and a pre-embedded rigid frame transverse joint (208) is connected between the pre-embedded rigid frame upper flat joint (205) and the pre-embedded rigid frame lower flat joint (206).

5. The large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 1, characterized in that: The prefabricated UHPC variable-section straight web (131) has a vertical plate surface at both ends that gradually decreases toward the middle to form an hourglass-shaped structure.

6. The large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 5, characterized in that: The prefabricated UHPC variable-section straight web (131) is pre-embedded with web vertical prestressed steel bars (135) and is provided with oblique prestressed steel bars (136) along the main tensile stress direction; the NC prefabricated top plate (111) is pre-embedded with top plate joint steel bars (118); the prefabricated NC bottom plate (121) is pre-embedded with bottom plate joint steel bars (127); both ends of the web vertical prestressed steel bars (135) are provided with web connection joints (107); the top plate joint steel bars (118) and the bottom plate joint steel bars (127) are respectively vertically overlapped with the web vertical prestressed steel bars (135) and are laterally fixedly connected through the web connection joints (107).

7. The large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 6, characterized in that: The top and bottom edges of the prefabricated UHPC variable-section straight web (131) are centrally provided with web pre-embedded perforated steel plates (133); the openings on the web pre-embedded perforated steel plates (133) are traversed by web shear key pre-embedded steel pipes (134) and are welded firmly; and shear key steel bars (108, 109) are penetrated through the openings of the web pre-embedded perforated steel plates (133) and the steel pipes of the web shear key pre-embedded steel pipes (134).

8. The large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 7, characterized in that: Web reinforcement vertical ribs (132) are arranged at the center of the longitudinal bridge direction on opposite sides of the prefabricated UHPC variable-section straight web plate (131); top plate reinforcement transverse ribs (112) are arranged at the center of the longitudinal bridge direction on the bottom edge of the NC prefabricated top plate (111); bottom plate reinforcement transverse ribs (122) are arranged at the center of the longitudinal bridge direction on the top edge of the prefabricated NC bottom plate (121); and the top plate reinforcement transverse ribs (112), the bottom plate reinforcement transverse ribs (122), and the web reinforcement vertical ribs (132) are arranged correspondingly.

9. The large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 8, characterized in that: After being assembled between the NC prefabricated top plates (111) and the prefabricated NC bottom plates (121), cast-in-place UHPC respectively forms a top plate connection belt (106) and a bottom plate connection belt (105); both ends of the web pre-embedded perforated steel plate (133) along the longitudinal bridge direction are provided with splicing plates (137); the splicing plates (137) are connected into a whole by high-strength bolts (138) and are embedded between the bottom plate connection belt (105) and the top plate connection belt (106); longitudinal prestressed steel beam corrugated pipes are provided in the NC prefabricated top plates (111) and the prefabricated NC bottom plates (121); the prestressed steel beams penetrate the longitudinal prestressed steel beam corrugated pipes and are tensioned and anchored by steel beam anchors (114).

10. The construction method of the large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 1, characterized in that: The following steps are involved: Step a, constructing a pile foundation (7) and a cap (6); Step b, constructing the hollow bridge pier (3) by climbing formwork, the pier-arch joint section (34) is constructed by a lower arch-pier-arch joint section cast-in-place bracket (801) and a lower arch-pier-arch joint section cast-in-place bracket arc section formwork support system (802); Step c, using a bracket to assist the on-site pouring construction of the V-shaped branch pier (4), installing the strong skeleton segment of the lower chord box arch (2), and using the lower chord arch inverted triangle hanging basket (804) to symmetrically and synchronously cantilever on-site pouring the segment concrete of the lower chord box arch (2); after the concrete of the first hanging segment of the lower chord box arch (2) reaches the required strength, the lower chord arch inverted triangle hanging basket (804) is moved forward to the next hanging segment; Step d, installing the upper chord beam segment of the pier top section on the top of the V-shaped branch pier (4), and after the concrete of the third suspended cast segment of the lower chord box arch (2) reaches the required strength, tensioning the first pair of temporary buckle cables (805) of the lower chord arch; Step e, after the upper chord beam segment of the pier top section above the pier top of the V-shaped branch pier (4) is installed, the upper chord beam standard segment is installed symmetrically and synchronously until the upper chord beams between the V-shaped branch piers (4) are connected; Step f, continue to symmetrically and synchronously construct the upper chord beam standard segment and the lower chord box arch (2) suspended cast segment, and the lower chord arch temporary buckle (805) lags behind the lower chord box arch (2) suspended cast segment by one segment to perform cable hanging and tensioning; Step g, when the suspended cast section of the lower chord box arch (2) and the standard section of the upper chord beam are constructed to the upper column (5), the upper column (5) is installed, and the UHPC cast-in-place joint of the beam-column joint section (15) and the lower chord arch and the upper column joint section (25) is cast; Step h, repeating steps f to g to construct the upper chord box beam (1), the lower chord box arch (2) and the upper column (5) segment by segment until the upper chord box beam (1) and the lower chord box arch (2) are joined; installing a locking wedge block, tightly combining the upper chord box beam (1) with the lower chord box arch (2) and the locking wedge block, and forming a stable triangular force-bearing structure in advance; Step i, completing the construction of the beam-arch joint section (13), and symmetrically and synchronously constructing the conventional beam sections (12) on both sides; Step j, using the side span bracket to first close the side span, then using the lower chord arch inverted triangle hanging basket (804) to close the middle span, and tensioning the conventional beam section bottom plate longitudinal prestressed steel strand (303) and the conventional beam section web plate longitudinal prestressed steel strand (304); Step k, dismantle the lower arch inverted triangle hanging basket (804), symmetrically dismantle the lower arch temporary buckle (805), the lower arch pier-arch joint section cast-in-place bracket (801), and the lower arch pier-arch joint section cast-in-place bracket arc section formwork support system (802), and complete the construction of the main structure of the bridge.

11. The construction method of the large-span deck-type perforated web beam-arch composite rigid frame bridge according to claim 10, characterized in that: The construction method of the upper chord box girder (1) comprises the following steps: Step ①, installing the NC prefabricated bottom plate unit (102) of the pier top section on the pier top of the V-shaped branch pier (4); Step ②, installing the UHPC prefabricated solid web plate unit (104) of the pier top section, installing the NC prefabricated bottom plate and the UHPC prefabricated solid web shear key penetration steel bars of the pier top section, and pouring the UHPC cast-in-place connection joint; Step ③, installing the NC prefabricated top plate unit (101) of the pier top section, installing the shear key through-steel bars of the NC prefabricated top plate and the UHPC prefabricated solid web plate of the pier top section, and pouring the UHPC cast-in-place connection joint; Step ④: Use a temporary hanger to install the conventional beam section NC prefabricated floor plate unit (102) and temporarily fix it; Step ⑤, install the standard section UHPC hourglass-shaped prefabricated web plate unit (103), install the high-strength bolt connection joint splicing plate (137) connected to the completed segment, tighten the high-strength bolts (138), install the conventional beam section NC prefabricated bottom plate and the UHPC hourglass-shaped prefabricated web shear key through-steel bars (109), pour the UHPC cast-in-place connection joint, and cast the UHPC cast-in-place prefabricated web reinforcement vertical rib connection joint (107); Step ⑥, using a temporary hanger to install the conventional beam section NC prefabricated top plate unit (101) and temporarily fix it; installing the conventional beam section NC prefabricated top plate and the UHPC hourglass-shaped prefabricated web shear key through the steel bar (108), pouring the UHPC cast-in-place connection joint, and pouring the UHPC cast-in-place prefabricated web reinforcement vertical rib connection joint (107); Step 7, casting the UHPC cast-in-place bottom plate connection belt (105) and the UHPC cast-in-place top plate connection belt (106) between the completed installation segments; after the UHPC cast-in-place belt reaches the design strength through curing, installing the longitudinal prestressed steel strand anchor (114) and tensioning the top plate longitudinal prestressed steel strand (113), then performing prestressed grouting and anchor sealing, and moving the hanger forward; Step ⑧: Repeat steps ④ to ⑦ by using the symmetrical cantilever assembly method to install conventional prefabricated segments segment by segment until the entire bridge is closed and the prestressed closing steel strands of the top and bottom plates are tensioned.