Installation and use method of prefabricated shear wall positioning device

By designing a precast shear wall positioning device, and utilizing the cooperation of the first and second positioning plates, along with transition bolts and adjusting bolts, the problems of position adjustment and diagonal bracing in the traditional installation of precast shear walls are solved, achieving rapid positioning and efficient construction.

CN114482575BActive Publication Date: 2024-11-22LANGFANG NORMAL UNIV +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202210150127.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2021-12-31
Filing Date
2022-02-18
Publication Date
2024-11-22
Estimated Expiration
2042-02-18

AI Technical Summary

Technical Problem

The installation of traditional precast shear wall structures requires manual adjustment of position and installation of diagonal bracing, which increases the workload on site, reduces construction efficiency, and the diagonal bracing occupies space.

Method used

The design includes a precast shear wall positioning device, comprising a first positioning plate and a second positioning plate. The positioning plates are pre-embedded at the bottom of the precast shear wall and on the floor slab, and the transition bolts and adjusting bolts are used to achieve rapid positioning, eliminating the need for diagonal bracing.

Benefits of technology

This enables rapid positioning and installation of precast shear walls, reducing construction difficulty and improving building construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114482575B_ABST
    Figure CN114482575B_ABST
Patent Text Reader

Abstract

The present application provides a method for installing and using a prefabricated shear wall positioning device. The prefabricated shear wall positioning device is designed, wherein the positioning device includes a first positioning plate and a second positioning plate, and the second positioning plate is provided with a transition bolt and an adjustment bolt. When in use, the first positioning plate is embedded in the bottom of the prefabricated shear wall, and the second positioning plate is embedded in the position of the floor slab connected to the bottom of the prefabricated shear wall corresponding to the first positioning plate. The prefabricated shear wall is quickly positioned on the floor slab through the mutual coordination and adjustment of the first positioning plate and the second positioning plate, thereby realizing the rapid positioning and installation of the prefabricated shear wall, eliminating the diagonal bracing process of the prefabricated shear wall during the construction process, reducing the difficulty of installation and construction of the prefabricated shear wall, and greatly improving the construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of prefabricated building engineering, and in particular to a method for installing and using a prefabricated shear wall positioning device. Background Art

[0002] Prefabricated buildings refer to buildings that are assembled and installed on site by transporting factory-processed building components and accessories, such as floor slabs, wall panels, stairs, balconies, etc., to the construction site through reliable connection methods. Prefabrication technology has the characteristics of reducing a large amount of on-site work, high degree of component standardization, and high production efficiency, which meets the construction requirements of green buildings and energy conservation and environmental protection.

[0003] The main construction process sequence of the traditional prefabricated shear wall structure system - floor wall panel installation is: floor level positioning and setting out → prefabricated shear wall bottom leveling gasket placement → prefabricated shear wall hoisting → prefabricated shear wall installation → diagonal brace installation → prefabricated shear wall elevation and verticality verification → floor and cast-in-place wall concrete pouring → prefabricated shear wall bottom plugging grouting → grouting operation. For example, CN112211319A discloses a same-layer grouting method for prefabricated shear wall installation in prefabricated buildings, in which the prefabricated shear wall is hoisted to the location to be installed and installed, and a number of diagonal braces are supported on the inner wall surface of the prefabricated shear wall. After the elevation and verticality of the prefabricated shear wall are verified, grouting material is injected into the closed cavity and the grouting sleeve through the grouting sleeve, and finally the diagonal braces are removed in sequence.

[0004] The above process method requires manual placement of leveling gaskets to accurately adjust the installation position of the prefabricated shear wall, and the installation of diagonal braces to adjust the verticality of the prefabricated shear wall. After the construction is completed, the diagonal braces need to be removed, which greatly increases the workload of on-site operations and reduces construction efficiency. In addition, the diagonal braces take up a lot of space. Summary of the invention

[0005] In view of the above-mentioned defects or deficiencies in the prior art, the present application aims to provide a method for installing and using a prefabricated shear wall positioning device, by designing a first positioning plate and a second positioning plate, and pre-embedding the first positioning plate at the bottom of the prefabricated shear wall, and pre-embedding the second positioning plate on the floor slab connected to the bottom of the prefabricated shear wall, and by the first positioning plate and the second positioning plate cooperating with each other, the prefabricated shear wall is quickly positioned on the floor slab, thereby realizing the rapid positioning and installation of the prefabricated shear wall, eliminating the diagonal bracing process of the prefabricated shear wall during the construction process, reducing the difficulty of installation and construction of the prefabricated shear wall, and greatly improving the construction efficiency.

[0006] The present application provides a method for installing and using a prefabricated shear wall positioning device, the prefabricated shear wall positioning device comprising:

[0007] A first positioning plate, wherein the first positioning plate comprises a first side plate and a second side plate connected to the first side plate, wherein the first side plate and the second side plate form a first angle; and a width of the first positioning plate is less than or equal to a thickness of the prefabricated shear wall;

[0008] A second positioning plate, the second positioning plate cooperating with the first positioning plate comprises a third side plate provided with a transition bolt hole and a fourth side plate connected to the third side plate, the third side plate and the fourth side plate forming a second angle; the bottom end of the third side plate is horizontally connected to a third flat plate provided with an adjustment bolt hole; the bottom end of the fourth side plate is horizontally connected to a fourth flat plate provided with an adjustment bolt hole;

[0009] The installation and use method of the prefabricated shear wall positioning device comprises the following steps:

[0010] Take a number of the first positioning plates and fix them to the bottom of the prefabricated shear wall reinforcement according to the design requirements;

[0011] Casting prefabricated shear wall reinforcement, and embedding the first positioning plate at the bottom of the prefabricated shear wall;

[0012] Using a positioning template to determine the embedded position of the second positioning plate when tying the floor slab reinforcement;

[0013] Take a number of second positioning plates and fix them to the pre-buried positions of the second positioning plates;

[0014] Casting floor slab reinforcement and pre-embedding the second positioning plate on the floor slab;

[0015] Install transition bolts;

[0016] Install the adjusting bolt;

[0017] Hoisting the prefabricated shear wall to a predetermined position;

[0018] Lowering the prefabricated shear wall until the first positioning plate contacts the transition bolt;

[0019] The adjusting bolts are adjusted to complete the positioning of the prefabricated shear wall.

[0020] Specifically, the first positioning plate is used to be embedded in the bottom of the prefabricated shear wall along the length direction of the prefabricated shear wall, and the second positioning plate is used to be embedded in the floor slab connected to the bottom of the prefabricated shear wall. After installing the transition bolts and adjustment bolts, the prefabricated shear wall can be quickly positioned on the floor slab by cooperating and adjusting the first positioning plate and the second positioning plate.

[0021] Specifically, during the descent of the prefabricated shear wall, the prefabricated connecting steel bars are inserted into the grouting sleeves pre-embedded in the prefabricated shear wall for preliminary positioning. When the first positioning plate contacts the transition bolts, the prefabricated shear wall automatically completes horizontal positioning through the transition bolts under the gravity of the prefabricated shear wall, and then the verticality and height of the prefabricated shear wall are adjusted by adjusting the adjustment bolts to complete the final positioning of the prefabricated shear wall. After the positioning of the prefabricated shear wall is completed, the grouting layer around the bottom of the prefabricated shear wall and the top of the floor is blocked to form a closed cavity, and then grouting is performed into the cavity along the grouting holes set on the grouting sleeves in a compartment-by-compartment pressure-maintaining manner until the slurry flows out of the grouting holes, completing the grouting of all grouting sleeves and grouting layers. After the solidification time or strength of the grouting layer reaches the requirements, the steel bar binding, floor angle steel pre-embedding and pouring of the next floor slab can be started.

[0022] Furthermore, the first positioning plate is pre-buried between grouting sleeves inside the prefabricated shear wall along the length direction of the prefabricated shear wall.

[0023] Specifically, the number of grouting sleeves embedded in the prefabricated shear wall is the same as the number of connecting steel bars embedded in the floor slab or the foundation, and the grouting sleeves are distributed at equal distances along the length direction of the wall panel.

[0024] Furthermore, three first positioning plates are embedded in the bottom of the prefabricated shear wall, and three second positioning plates are embedded in the floor slab accordingly, and the length directions of the first positioning plates and the corresponding second positioning plates in the middle are perpendicular to the length direction of the prefabricated shear wall, while the length directions of the other first positioning plates and the corresponding second positioning plates are parallel to the length direction of the prefabricated shear wall.

[0025] Specifically, since the length directions of the first positioning plate and the corresponding second positioning plate located in the middle are perpendicular to the length direction of the prefabricated shear wall, when the prefabricated shear wall falls, the gravity of the prefabricated shear wall can realize automatic positioning of the prefabricated shear wall in the length direction; and the length directions of the other first positioning plates and the corresponding second positioning plates are parallel to the length direction of the prefabricated shear wall. When the prefabricated shear wall falls, the gravity of the prefabricated shear wall can realize automatic positioning of the prefabricated shear wall in the thickness direction, which greatly reduces the difficulty of adjusting the position of the prefabricated shear wall during installation.

[0026] Furthermore, the positioning template is provided with a through hole for passing the connecting steel bars when positioning the embedded position of the second positioning plate, so as to avoid interference and failure to position the embedded position of the second positioning plate.

[0027] Furthermore, the length of the positioning template is equal to the length of the prefabricated shear wall, which can more conveniently locate the embedded position of the second positioning plate.

[0028] Furthermore, a pair of transition bolt holes for connecting transition bolts are symmetrically arranged on the third side plate and the fourth side plate. Specifically, the positions of the transition bolt holes are determined so that there is no interference with the adjustment bolts after the transition bolts are screwed in.

[0029] Furthermore, the transition bolt includes a hemispherical nut. Specifically, the nut is hemispherical, so that the prefabricated shear wall can automatically slide down and position when it falls; the thickness of the hemispherical nut, that is, the vertical distance from the bottom surface of the nut to the top, is less than or equal to the designed thickness of the grouting layer.

[0030] Furthermore, the first side plate is horizontally connected to the bottom end with a first flat plate, and the second side plate is horizontally connected to the bottom end with a second flat plate. Specifically, the first flat plate and the second flat plate can protect the prefabricated shear wall and can also make it easier to level and position when adjusting the adjustment bolts.

[0031] Furthermore, two pairs of adjustment bolt holes for connecting adjustment bolts are symmetrically arranged on the third plate and the fourth plate. Specifically, the third plate and the fourth plate have the same thickness.

[0032] Furthermore, the first side panel is equal to the second side panel in length; the third side panel is equal to the fourth side panel in length; the length of the first side panel is greater than that of the third side panel, which is convenient for docking installation and adjustment, and also convenient for later grouting of the gap between the first positioning plate and the second positioning plate.

[0033] In summary, the present application discloses a method for installing and using a prefabricated shear wall positioning device. The beneficial effect produced based on the above scheme is that, by designing a prefabricated shear wall positioning device, the positioning device includes a first positioning plate and a second positioning plate, and the second positioning plate is provided with a transition bolt and an adjustment bolt. When in use, the first positioning plate is embedded in the bottom of the prefabricated shear wall, and the second positioning plate is embedded in the position of the first positioning plate corresponding to the floor slab connected to the bottom of the prefabricated shear wall. Through the mutual coordination and adjustment of the first positioning plate and the second positioning plate, the prefabricated shear wall is quickly positioned on the floor slab, thereby realizing the rapid positioning and installation of the prefabricated shear wall, eliminating the diagonal bracing process of the prefabricated shear wall during the construction process, reducing the difficulty of installation and construction of the prefabricated shear wall, and greatly improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Other features, objects and advantages of the present application will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings.

[0035] Figure 1 This is a schematic diagram of the installation position of the prefabricated shear wall positioning device for this application.

[0036] Figure 2 This is a schematic diagram of the connection of the prefabricated shear wall positioning device in Example 2 of the present application.

[0037] Figure 3 This is an oblique view of the first positioning plate and the second positioning plate of Example 1 of the present application.

[0038] Figure 4 This is a top view of the second positioning plate of Example 1 of the present application.

[0039] Figure 5 This is a schematic diagram of the positioning mold in Example 2 of the present application.

[0040] Figure 6 This is a flow chart for the installation and use of the prefabricated shear wall positioning device for this application.

[0041] In the figure, 1. grouting sleeve; 2. prefabricated shear wall; 3. first positioning plate; 4. second positioning plate; 5. floor slab; 6. grouting hole; 7. grouting hole; 8. transition bolt; 9. grouting layer; 10. adjustment bolt; 11. foundation; 12. connecting steel bar; 13. first positioning hole; 14. second positioning hole; 15. third positioning hole; 16. through hole; 17. positioning template; 301. first side plate; 302. second side plate; 303. first flat plate; 304. second flat plate; 401. third side plate; 402. fourth side plate; 403. third flat plate; 404. fourth flat plate; 405. transition bolt hole; 406. adjustment bolt hole. DETAILED DESCRIPTION

[0042] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant inventions, rather than to limit the inventions. It is also necessary to explain that, for ease of description, only the parts related to the invention are shown in the accompanying drawings. The present application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

[0043] Example 1

[0044] like Figure 3 , 4 A prefabricated shear wall positioning device is shown, comprising a first positioning plate 3 and a second positioning plate 4, wherein the first positioning plate 3 and the second positioning plate 4 are made of steel plates.

[0045] The first positioning plate 3 includes a first side plate 301 and a second side plate 302 connected to the first side plate 301. The first side plate 301 and the second side plate 302 are of equal length, and the first side plate 301 and the second side plate 302 form an angle of 90°; the first side plate 301 is horizontally connected to a first flat plate 303 at the bottom end; the second side plate 302 is horizontally connected to a second flat plate 304 at the bottom end; the first positioning plate 3 is 15 cm long, 20 cm wide, and 8 cm high;

[0046] The second positioning plate 4 includes a third side plate 401 and a fourth side plate 402 connected to the third side plate 401, the third side plate 401 and the fourth side plate 402 are equal in length, and the third side plate 401 and the fourth side plate 402 form an opening angle of 90°; the third side plate 401 and the fourth side plate 402 are equal in length; the bottom end of the third side plate 401 is horizontally connected to the third flat plate 403; the bottom end of the fourth side plate 402 is horizontally connected to the fourth flat plate 404; the length of the second positioning plate 4 is 14 cm, the width is 20 cm, and the height is 8 cm.

[0047] A pair of transition bolt holes 405 are symmetrically provided on the third side plate 401 and the fourth side plate 402 for connecting transition bolts 8 .

[0048] The transition bolt 8 includes a hemispherical nut and a screw connected to the bottom of the nut. The thickness of the hemispherical nut is 2 cm, that is, the vertical distance from the bottom surface of the nut to the top.

[0049] The third plate 403 and the fourth plate 404 have the same thickness, both of which are 2 cm, and two pairs of adjustment bolt holes 406 are symmetrically provided on the third plate 403 and the fourth plate 404 for connecting the adjustment bolts 10, and the screw length of the adjustment bolts 10 is 4 cm.

[0050] Example 2

[0051] like Figure 1 The prefabricated shear wall 2 shown has a thickness of 20 cm, a length of 3 m and a height of 3 m, and includes 6 grouting sleeves 1 and 6 connecting steel bars 12 pre-buried at equal distances, one end of the connecting steel bar 12 protruding out of the prefabricated shear wall 2 and the other end inserted into the interior of the grouting sleeve 1.

[0052] The prefabricated shear wall positioning device described in Example 1 is used as follows Figure 1 The prefabricated shear wall 2 shown is installed on the floor 5, and the installation flow chart is as follows Figure 6 As shown, the following steps are included:

[0053] When tying the prefabricated shear wall reinforcement, three first positioning plates 3 are taken and fixed to the bottom of the prefabricated shear wall reinforcement along the length direction of the prefabricated shear wall 2 according to the design requirements. The three first positioning plates 3 are distributed between the grouting sleeves 1, and the length direction of the first positioning plate 3 and the corresponding second positioning plate 4 in the middle is perpendicular to the length direction of the prefabricated shear wall 2, while the length directions of the other first positioning plates 3 and the corresponding second positioning plates 4 are parallel to the length direction of the prefabricated shear wall 2;

[0054] Cast the prefabricated shear wall reinforcement and embed the first positioning plate 3 at the bottom of the prefabricated shear wall 2;

[0055] Use the positioning template 17 to determine the embedded position of the second positioning plate 4 when tying the floor slab reinforcement, then take three of the second positioning plates 4 and fix them to the embedded position of the second positioning plates 4. After the second positioning plates 4 are tied and fixed, remove the positioning template 17. Figure 5 As shown, it is 3m long and 20cm wide, and is provided with 6 through holes 16, a first positioning hole 13, a second positioning hole 14, and a third positioning hole 15. The first positioning hole 13 and the third positioning hole 15 are used to position the second positioning plate 4 whose length direction is parallel to the length direction of the prefabricated shear wall 2, and the second positioning hole 14 is used to position the second positioning plate 4 whose length direction is perpendicular to the length direction of the prefabricated shear wall 2;

[0056] Cast the floor slab reinforcement and embed the second positioning plate 4 on the floor slab 5;

[0057] Install transition bolts 8 on the third side plate 401 and the fourth side plate 402;

[0058] Install the adjusting bolts 10 on the third plate 403 and the fourth plate 404;

[0059] The prefabricated shear wall 2 is hoisted to a predetermined position, and is initially positioned by inserting the connecting steel bars 12 embedded in the foundation 11 into the grouting sleeves 1 embedded in the prefabricated shear wall 2; the foundation 11 may also be the installed lower prefabricated shear wall 2.

[0060] Continue to lower the prefabricated shear wall 2 until the first positioning plate 3 contacts the transition bolt 8, thereby completing the positioning of the prefabricated shear wall 2 in the thickness and length directions;

[0061] Adjust the adjusting bolts 10 to complete the verticality and height adjustment of the prefabricated shear wall 2 and complete the final positioning. Figure 1 and Figure 2 shown.

[0062] After the positioning of the prefabricated shear wall 2 is completed, the bottom of the prefabricated shear wall 2 and the top of the floor 5 are sealed around the grouting layer 9 to form a closed cavity, and the thickness of the grouting layer 9 is 2 cm. Then, grouting is performed into the cavity along the grouting holes 7 set on the grouting sleeve 1 in a compartment-by-compartment pressure-maintaining manner until the grouting flows out from the grouting holes 6, and the grouting of all grouting sleeves 1 and the grouting layer 9 is completed. After the solidification time or strength of the grouting layer reaches the requirements, the subsequent reinforcement binding of the floor 5, the pre-embedding and pouring of the second positioning plate 4, and the subsequent positioning and installation of the prefabricated shear wall 2 can be started according to the above installation and use method.

[0063] During the descent of the prefabricated shear wall 2, after the first positioning plate 3 contacts the transition bolt 8, since the length directions of the first positioning plate 3 and the corresponding second positioning plate 4 located in the middle are perpendicular to the length direction of the prefabricated shear wall 2, when the prefabricated shear wall 2 descends, under the action of the gravity of the prefabricated shear wall 2, the prefabricated shear wall 2 is automatically positioned in the length direction, and since the length directions of the other first positioning plates 3 and the corresponding second positioning plates 4 are parallel to the length direction of the prefabricated shear wall 2, when the prefabricated shear wall 2 descends, under the action of the gravity of the prefabricated shear wall 2, the prefabricated shear wall 2 is automatically positioned in the thickness direction, and then the verticality and height of the prefabricated shear wall 2 are adjusted by adjusting the adjustment bolts 10 to complete the final positioning of the prefabricated shear wall 2, which greatly reduces the difficulty of position adjustment of the prefabricated shear wall 2 during installation.

[0064] It can be seen from the above embodiments that the present application provides a prefabricated shear wall positioning device and an installation and use method thereof. By designing a prefabricated shear wall positioning device, the positioning device includes a first positioning plate 3 and a second positioning plate 4, and the second positioning plate 4 is provided with a transition bolt 8 and an adjustment bolt 10. When in use, the first positioning plate 3 is embedded in the bottom of the prefabricated shear wall 2, and the second positioning plate 4 is embedded in the position of the floor 5 connected to the bottom of the prefabricated shear wall 2 corresponding to the first positioning plate 3. Through the mutual coordination and adjustment of the first positioning plate 3 and the second positioning plate 4, the prefabricated shear wall 2 is quickly positioned on the floor, so that the prefabricated shear wall 2 is quickly positioned and installed, which eliminates the diagonal bracing process of the prefabricated shear wall 2 during the construction process, reduces the difficulty of installation and construction of the prefabricated shear wall 2, and greatly improves the construction efficiency.

[0065] The above embodiments of the present application are merely examples for clearly illustrating the present application, and are not limitations on the implementation methods of the present application. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is impossible to list all the implementation methods here. All obvious changes or modifications derived from the technical solution of the present application are still within the scope of protection of the present application.

Claims

1. A method for installing and using a prefabricated shear wall positioning device, characterized in that: The prefabricated shear wall positioning device comprises: A first positioning plate, wherein the first positioning plate comprises a first side plate and a second side plate connected to the first side plate, wherein the first side plate and the second side plate form a first angle; and a width of the first positioning plate is less than or equal to a thickness of the prefabricated shear wall; A second positioning plate, the second positioning plate cooperating with the first positioning plate comprises a third side plate provided with a transition bolt hole and a fourth side plate connected to the third side plate, the third side plate and the fourth side plate forming a second angle; the bottom end of the third side plate is horizontally connected to a third flat plate provided with an adjustment bolt hole; the bottom end of the fourth side plate is horizontally connected to a fourth flat plate provided with an adjustment bolt hole; The installation and use method of the prefabricated shear wall positioning device comprises the following steps: Take a number of the first positioning plates and fix them to the bottom of the prefabricated shear wall reinforcement according to the design requirements; Casting prefabricated shear wall reinforcement, and embedding the first positioning plate at the bottom of the prefabricated shear wall; Using a positioning template to determine the embedded position of the second positioning plate when tying the floor slab reinforcement; Take a number of second positioning plates and fix them to the pre-buried positions of the second positioning plates; Casting floor slab reinforcement and pre-embedding the second positioning plate on the floor slab; Install transition bolts; Install the adjusting bolt; Hoisting the prefabricated shear wall to a predetermined position; Lowering the prefabricated shear wall until the first positioning plate contacts the transition bolt; The adjusting bolts are adjusted to complete the positioning of the prefabricated shear wall.

2. The method for installing and using a prefabricated shear wall positioning device according to claim 1, characterized in that: The first positioning plate is pre-buried between the grouting sleeves inside the prefabricated shear wall along the length direction of the prefabricated shear wall.

3. The method for installing and using a prefabricated shear wall positioning device according to claim 2, characterized in that: Three first positioning plates are embedded at the bottom of the prefabricated shear wall, and three second positioning plates are embedded on the floor slab accordingly. The length directions of the first positioning plates and the corresponding second positioning plates in the middle are perpendicular to the length direction of the prefabricated shear wall, while the length directions of the other first positioning plates and the corresponding second positioning plates are parallel to the length direction of the prefabricated shear wall.

4. The method for installing and using a prefabricated shear wall positioning device according to claim 1, characterized in that: The positioning template is provided with a through hole, and the length of the through hole is equal to the length of the prefabricated shear wall.

5. The method for installing and using a prefabricated shear wall positioning device according to claim 1, characterized in that: The third side plate and the fourth side plate are symmetrically provided with a pair of transition bolt holes for connecting transition bolts.

6. The method for installing and using a prefabricated shear wall positioning device according to claim 1, characterized in that: The transition bolt includes a hemispherical nut.

7. The method for installing and using a prefabricated shear wall positioning device according to claim 1, characterized in that: The bottom end of the first side plate is horizontally connected to a first flat plate; the bottom end of the second side plate is horizontally connected to a second flat plate.

8. The method for installing and using a prefabricated shear wall positioning device according to claim 1, characterized in that: Two pairs of adjustment bolt holes for connecting adjustment bolts are symmetrically arranged on the third flat plate and the fourth flat plate.

9. The method for installing and using a prefabricated shear wall positioning device according to claim 7, characterized in that: The first side panel is equal to the second side panel in length; the third side panel is equal to the fourth side panel in length; and the first side panel is longer than the third side panel.

Citation Information

Patent Citations

  • Same-floor grouting method for installing prefabricated shear wall of fabricated type building

    CN112211319A

  • Method for connecting double-steel plate shear wall with floor slab

    CN108035443A

  • Bolting plug-in vertical prefabricated shear wall and superimposed sheet joint structure and construction method thereof

    CN110056092A

  • Prefabricated floor slab-prefabricated shear wall connecting joint and construction method thereof

    CN113668750A

  • Style of calligraphy connecting piece precast shear wall joining of plates structure is done in area

    CN206070731U