A full-section deep hole grouting reinforcement method
By excavating the end wall at the tunnel entrance and setting up a pipe shed support structure, combined with the multi-circle grouting hole structure and specific grouting liquid ratio in the deep hole grouting area, the problem of poor reinforcement effect when the tunnel soil is loose is solved , achieving efficient tunnel reinforcement and stability improvement.
Patent Information
- Application Number
- CN202210049686.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-17
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN114483048B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of tunnel dark excavation reinforcement methods, and in particular to a full-section deep hole grouting reinforcement method. Background Art
[0002] With the rapid development of my country's economy, in order to adapt to the development and construction of modern cities, the scale of underground projects has expanded rapidly and connected into a network. In order to avoid affecting the ground environment and traffic, dark tunnel engineering has gradually become the main construction method for urban underground projects. When dark tunnel construction is carried out in the city, it is often necessary to pass through important buildings. Therefore, when dark tunneling, it is necessary to perform advance grouting of the tunnel to achieve reinforcement of the entire tunnel.
[0003] At present, a Chinese patent application with publication number CN111878083A discloses a method for pre-grouting construction of a dark-excavated tunnel, comprising: step one: dividing the tunnel section into a first upper guide tunnel, a second upper guide tunnel, a first lower guide tunnel and a second lower guide tunnel; step two: after pre-supporting with a pipe shed, pre-grouting the first upper guide tunnel along the tunnel excavation direction, excavating and supporting the first upper guide tunnel; step three: utilizing the excavated and supported space of the first upper guide tunnel, grouting and reinforcing the areas to be excavated of the first lower guide tunnel and the second upper guide tunnel from the first upper guide tunnel; step four: excavating and supporting the first lower guide tunnel; utilizing the excavated and supported space of the first lower guide tunnel, grouting and reinforcing the areas to be excavated of the second lower guide tunnel from the first lower guide tunnel; step five: excavating and supporting the second upper guide tunnel, and then excavating and supporting the second lower guide tunnel; step six: repeating steps two, three, four and five to complete the tunnel construction.
[0004] Regarding the above-mentioned related technologies, the inventor believes that full-section deep hole grouting is only carried out on the basis of pipe-roof advance support. When the soil of the tunnel to be excavated is relatively loose, the full-section deep hole grouting reinforcement method needs to be further optimized. Summary of the invention
[0005] In order to further improve the full-section deep hole grouting reinforcement effect of a dark-excavated tunnel, the present application provides a full-section deep hole grouting reinforcement method.
[0006] This application provides a full-section deep hole grouting reinforcement method, which adopts the following technical solution:
[0007] A full-section deep hole grouting reinforcement method comprises the following steps:
[0008] S1, construct and stake out the tunnel opening position, and excavate the end wall of the tunnel opening. The end wall is used to support the tunnel face and is located below the center of the tunnel face.
[0009] S2, draw the excavation outline of the tunnel portal on the end wall, and set up the pipe shed support structure at the tunnel portal outline;
[0010] S3, a first section deep hole grouting area is set below the pipe-roof support structure, a second section deep hole grouting area is set outside the pipe-roof support structure away from the first section deep hole grouting area, and deep hole grouting is performed in the first section deep hole grouting area and the second section deep hole grouting area, respectively, specifically comprising the following steps:
[0011] S31, positioning a central grouting hole at the center of the deep hole grouting area of the first section, then drilling the central grouting hole, and injecting grout into the central grouting hole;
[0012] S32, taking the central grouting hole of the first section deep hole grouting area in step S31 as the center, opening circumferential grouting holes in the second section deep hole grouting area, and injecting grout, one hole is opened and one hole is injected;
[0013] S33, removing the end wall to make the entire tunnel face flush, opening circumferential grouting holes in the deep hole grouting area of the first section and around the central grouting hole in step S31, and injecting grout, one hole is opened and one hole is injected.
[0014] By adopting the above technical solution, the end wall is first excavated at the tunnel entrance. In the process of setting up the pipe-roof support structure in the later stage, the end wall can support the entire tunnel face. When the grouting holes are opened in the tunnel face, the internal structure at the tunnel entrance is not easy to loosen due to the support of the section, which helps to improve the firmness of the entire tunnel. Then, a grouting hole is opened at the center of the deep hole grouting area of the first section to reinforce the tunnel at the entire tunnel entrance, so that when the end wall is removed in the later stage, the structure at the tunnel entrance is not easy to displace, which helps to improve the firmness and stability of the entire tunnel.
[0015] In addition, drilling and grouting holes in the deep hole grouting area of the second section first, and then drilling and grouting holes in the deep hole grouting area of the first section, can help improve the stability of the overall structure of the tunnel. This is because the grouting structure in the deep hole grouting area of the second section works together with the pipe-roof support structure and the grouting structure at the center of the deep hole grouting area of the first section to support and stabilize the entire tunnel, making it less likely for subsequent operations to have a significant impact on the firmness of the tunnel.
[0016] The method of drilling one hole and grouting one hole helps to prevent the nearby soil from loosening when drilling adjacent grouting holes, which in turn helps to improve the firmness of the tunnel.
[0017] Optionally, in step S32, the circumferential grouting holes opened in the deep hole grouting area of the second section are multiple circles of coaxial holes; in step S33, the circumferential grouting holes opened in the deep hole grouting area of the first section are multiple circles of coaxial holes; the circumferential grouting holes opened in the same area and the grouting process are cyclically performed between adjacent circles of circumferential grouting holes.
[0018] By adopting the above technical scheme, the grouting structure of multiple circles of grouting holes can further improve the reinforcement effect of the tunnel, and the grouting is done in adjacent circles of circumferential grouting holes. When a grouting hole is drilled, the surrounding soil is not easy to loosen and deform, which helps to improve the firmness and safety of the entire tunnel.
[0019] Optionally, the drilling and grouting method in step S3 adopts geological drilling rig drilling. When the depth of the central grouting hole and the circumferential grouting hole reaches 0.8-1m, grouting is carried out using a drill rod. In the early stage of grouting, the hole is sealed with sealing slurry. After the sealing slurry solidifies, grouting liquid is injected. After the pressure reaches 0.6MPa for 5 minutes or no more slurry is absorbed, the drill rod is withdrawn to carry out the next grouting operation, and this cycle is repeated until the grouting hole is completed.
[0020] Optionally, in step S3, the retreat length of the drill rod during the grouting process is 0.2-0.3 m.
[0021] By adopting the above technical solution, the method of drilling grouting holes and grouting is simple and convenient, and the step-by-step grouting method can effectively improve the grouting effect and achieve the purpose of efficiently reinforcing the tunnel.
[0022] Optionally, the circumferential grouting holes in step S3 are all inclined holes, and the inclination directions of two adjacent circles of circumferential grouting holes are opposite, and one circle of circumferential grouting holes is inclined along the tunnel excavation direction toward a direction away from the central grouting hole in the deep hole grouting area of the first section.
[0023] Optionally, two adjacent circles of circumferential grouting holes are staggered.
[0024] Optionally, the hole spacing between adjacent circumferential grouting holes in step S3 is 500 to 800 mm.
[0025] By adopting the above technical solution, the grouting hole distribution with appropriate spacing and the grouting structure with appropriate inclination angle can support the entire tunnel more evenly, which not only makes the grouting structure less likely to be damaged, but also helps to make the entire tunnel firm and safe during the construction process.
[0026] Optionally, the sealing slurry is a water glass-phosphoric acid-water-soluble polyurethane composite liquid, and the volume ratio of water glass, phosphoric acid and water-soluble polyurethane is 1.2:(1.1-1.3):1.
[0027] By adopting the above technical scheme, a combination of water glass, phosphoric acid and water-soluble polyurethane in a suitable ratio is used as a sealing slurry for sealing. The sealing slurry has a fast curing speed and a high water content, which helps to achieve the purpose of faster sealing.
[0028] Optionally, the grouting liquid is a cement-water glass-acrylate combination liquid, and the volume ratio of cement, glass and acrylate is 1: (1-1.2): 1
[0029] By adopting the above technical scheme, a cement-water glass-acrylate combination liquid with a suitable ratio is used as the grouting liquid for grouting. The grouting liquid has a small surface tension, moderate viscosity and a short solidification time, which is conducive to efficient construction. In addition, the grouting liquid has a greater hardness after solidification, which helps to improve the firmness of the tunnel.
[0030] In summary, this application includes the following beneficial technical effects:
[0031] 1. By excavating the end wall, the end wall can support the entire tunnel face. When the grouting holes are opened on the tunnel face, the internal structure at the entrance is not easy to loosen, which helps to improve the firmness of the entire tunnel;
[0032] 2. By first drilling and grouting the deep hole grouting area of the second section, and then drilling and grouting the deep hole grouting area of the first section, it helps to improve the stability of the overall structure of the tunnel;
[0033] 3. By making the inclination directions of two adjacent circumferential grouting holes opposite, the entire grouting structure supports the tunnel evenly, which not only makes the grouting structure less likely to be damaged, but also helps to make the entire tunnel firm and safe during the construction process;
[0034] 4. The use of a water glass-phosphoric acid-water soluble polyurethane combination liquid as the sealing slurry helps to seal the holes quickly. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a schematic diagram of the three-dimensional structure of the end wall highlighted during the full-section deep hole grouting reinforcement construction process of the embodiment of the present application;
[0036] Figure 2 It is a front view highlighting the first section deep hole grouting area and the second section deep hole grouting area during the full section deep hole grouting reinforcement construction process of the embodiment of the present application;
[0037] Figure 3 It is a schematic diagram highlighting the inclination angle of the grouting hole during the full-section deep hole grouting reinforcement construction process of the embodiment of the present application.
[0038] Explanation of the accompanying reference numerals: 1. end wall; 2. pipe-roof support structure; 3. heading face; 4. first section deep hole grouting area; 5. second section deep hole grouting area; 6. center grouting hole; 7. circumferential grouting hole. DETAILED DESCRIPTION
[0039] The following is combined with Figure 1-3 This application is described in further detail.
[0040] The present application embodiment discloses a full-section deep hole grouting reinforcement method. Figure 1 A full-section deep hole grouting reinforcement method comprises the following steps:
[0041] S1, refer to Figure 1 and Figure 2 , the position of the opening is laid out for construction, and the end wall 1 of the tunnel blind opening is excavated. The end wall 1 can be a flat plate or any other shape that can support the face 3 (the face 3 refers to the working face that continuously advances the excavation of the tunnel). The end wall 1 in this embodiment is a right-angled triangular prism, and one right-angled face of the end wall 1 is in contact with the face 3. The area of the right-angled face is less than half of the area of the face 3, and the other right-angled side is adjacent to the ground soil. The end wall 1 is located below the center of the face 3. The end wall 1 can support the entire face 3, so that the structure at the opening is not easy to loosen, and the upper surface of the end wall 1 is convenient for operators to perform padding construction operations up and down.
[0042] S2, reference Figure 1 and Figure 2 After the end wall 1 is excavated in place, the excavation outline of the tunnel portal is drawn on the end wall 1, and a pipe-roof support structure 2 is set at the tunnel portal outline (which belongs to the prior art and will not be described here).
[0043] S31, positioning a central grouting hole 6 at the center of the deep hole grouting area 4 of the first section, then drilling the central grouting hole 6, and injecting grout into the central grouting hole 6;
[0044] S32, taking the central grouting hole 6 of the first section deep hole grouting area 4 in step S31 as the center, opening a circumferential grouting hole 7 (located on the periphery of the pipe-roof support structure 2) in the second section deep hole grouting area 5, the circumferential grouting hole 7 opened in the second section deep hole grouting area 5 is a plurality of circles of coaxial holes, grouting, opening one hole, grouting one hole, opening the grouting hole 6 and the grouting process are cyclically performed between adjacent circles of the circumferential grouting holes 6;
[0045] S33, remove the end wall 1 to make the entire face 3 flush, open circumferential grouting holes 6 around the central grouting hole 6 in the first section deep hole grouting area 4 in step S31, the circumferential grouting holes 7 opened in the first section deep hole grouting area 4 are multiple circles of coaxial holes, grouting, open one hole, grout one hole, open the central grouting hole 6 and the grouting process is cyclically carried out between adjacent circles of circumferential grouting holes 7.
[0046] After the hole is opened and grouting is performed at the center of the first section deep hole grouting area 4, the grouting structure in the second section deep hole grouting area 5 works together with the pipe-roof support structure 2 and the grouting structure at the center of the first section deep hole grouting area 4 to support and stabilize the entire tunnel, which helps to reinforce the tunnel at the entire entrance. On this basis, grouting holes are drilled and grouting is performed in the first section deep hole grouting area 4. During the grouting process, a method of drilling one hole and grouting one hole is adopted, and the grouting holes are opened and the grouting process is cyclically performed between adjacent circles of circumferential grouting holes 7 in the same area. This helps to prevent the nearby soil from loosening during the process of drilling adjacent grouting holes, thereby helping to improve the firmness of the tunnel and the stability of the overall structure of the tunnel. The multi-circle grouting structure can also have a reinforcement effect on the tunnel.
[0047] Combination Figure 2 and Figure 3 As shown, the grouting holes in the first section deep hole grouting area 4 and the second section deep hole grouting area 5 extend in the direction of tunnel excavation, and the circumferential grouting holes 7 are all oblique holes, and the inclination directions of the two adjacent circles of circumferential grouting holes 7 are opposite, and one circle of circumferential grouting holes 7 is inclined in the direction away from the central grouting hole 6 of the first section deep hole grouting area 4 along the tunnel excavation direction. The two adjacent circles of circumferential grouting holes 7 are staggered, and the hole spacing between adjacent circumferential grouting holes 7 of the same circle of circumferential grouting holes 7 is 500 to 800 mm, and 600 mm in this embodiment. The distribution of circumferential grouting holes 7 with appropriate spacing and the grouting structure with appropriate inclination angles are helpful to support the entire tunnel more evenly, which not only makes the grouting structure not easy to be damaged, but also helps to make the entire tunnel firm and safe during construction.
[0048] In addition, in the above steps, the grouting method of drilling the grouting hole adopts a geological drilling rig to drill holes. When the depth of the grouting hole reaches 0.8m, 0.9m or 1m (1m in this embodiment), the hole is first sealed by the sealing slurry. The sealing slurry is a water glass-phosphoric acid-water-soluble polyurethane combination liquid. The volume ratio of water glass, phosphoric acid and water-soluble polyurethane can be 1.2:1.1:1, or 1.2:1.3:1. In this embodiment, the volume ratio of water glass, phosphoric acid and water-soluble polyurethane is 1.2:1.2:1. After the sealing slurry solidifies, the grouting liquid is injected into the grouting hole by using a drill rod. When the pressure reaches 0.6Mpa and lasts for 5 minutes, the drill rod is withdrawn 0.3m to carry out the grouting operation of the next section, and the cycle is repeated until the grouting hole is completed. In another embodiment, after the sealing slurry solidifies, the grouting liquid is injected into the grouting hole by using a drill rod. When the drill rod no longer absorbs slurry, the drill rod is withdrawn 0.2m to carry out the grouting operation of the next section. The grouting liquid is a cement-water glass-acrylate combination liquid. The volume ratio of cement, glass and acrylate can be 1:1.1:1, or 1:1.2:1. In this embodiment, the volume ratio of cement, glass and acrylate is 1:1.1:1, and the water glass concentration is 35°Be. The method of drilling grouting holes and grouting is simple and convenient, and the step-by-step grouting method can effectively improve the grouting effect and achieve the purpose of efficiently reinforcing the tunnel. The use of suitable sealing slurry and grouting liquid helps to complete the construction quickly and efficiently, and helps to improve the firmness of the tunnel.
[0049] The implementation principle of a full-section deep hole grouting reinforcement method in the embodiment of the present application is as follows: first, the opening position is constructed and laid out, and the end wall 1 is opened; then, a pipe shed support structure 2 is set at the outline of the opening; then, grouting holes are positioned at the center of the first section deep hole grouting area 4, the second section deep hole grouting area 5, and the first section deep hole grouting area 4 in sequence, and then grouting holes are drilled, and grouting is injected into the grouting holes, one hole is opened, one hole is injected, and a central grouting hole 6 is opened in the same area, and the grouting process is cyclically performed between adjacent circumferential grouting holes 7. Through the above-mentioned specific construction method, the entire full-section deep hole grouting process can be made fast and efficient, and more importantly, it helps to greatly improve the firmness of the tunnel.
[0050] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A full-section deep hole grouting reinforcement method, characterized in that: The following steps are involved: S1, constructing and staking out the position of the tunnel opening, and excavating the end wall (1) of the tunnel opening, wherein the end wall (1) is used to support the tunnel face (3), and the end wall (1) is located below the center of the tunnel face (3); S2, drawing the excavation outline of the tunnel portal on the end wall (1), and setting up a pipe-roof support structure (2) at the tunnel portal outline; S3, a first section deep hole grouting area (4) is arranged below the pipe-roof support structure (2), a second section deep hole grouting area (5) is arranged outside the pipe-roof support structure (2), and deep hole grouting is performed in the first section deep hole grouting area (4) and the second section deep hole grouting area (5), respectively, specifically comprising the following steps: S31, positioning a central grouting hole (6) at the center of the deep hole grouting area (4) of the first section, then drilling the central grouting hole (6), and injecting grout into the central grouting hole (6); S32, taking the central grouting hole (6) of the first section deep hole grouting area (4) in step S31 as the center, opening a circumferential grouting hole (7) in the second section deep hole grouting area (5), and injecting grout, one hole is opened and one hole is injected; S33, removing the end wall (1) to make the entire tunnel face (3) flush, opening circumferential grouting holes (7) in the first section deep hole grouting area (4) and around the central grouting hole (6) in step S31, and injecting grout, one hole opened and one hole injected.
2. A full-section deep hole grouting reinforcement method according to claim 1, characterized in that: In the step S32, the circumferential grouting holes (7) opened in the second section deep hole grouting area (5) are multiple circles of coaxial holes; in the step S33, the circumferential grouting holes (7) opened in the first section deep hole grouting area (4) are multiple circles of coaxial holes; the circumferential grouting holes (7) opened in the same area and the grouting process are cyclically performed between adjacent circles of circumferential grouting holes (7).
3. A full-section deep hole grouting reinforcement method according to any one of claims 1-2, characterized in that: The drilling and grouting method in step S3 adopts a geological drilling rig to drill holes. When the depth of the central grouting hole (6) and the circumferential grouting hole (7) reaches 0.8-1m, grouting is carried out using a drill rod. In the early stage of grouting, the holes are sealed with sealing slurry. After the sealing slurry solidifies, grouting liquid is injected. When the pressure reaches 0.6MPa for 5 minutes or no more slurry is absorbed, the drill rod is withdrawn to carry out the next section of grouting operation, and the cycle is repeated until the grouting hole is completed.
4. A full-section deep hole grouting reinforcement method according to claim 3, characterized in that: In step S3, the retreat length of the drill rod during the grouting process is 0.2-0.3 m.
5. A full-section deep hole grouting reinforcement method according to claim 2, characterized in that: The circumferential grouting holes (7) in step S3 are all inclined holes, and the inclination directions of two adjacent circles of circumferential grouting holes (7) are opposite, wherein one circle of circumferential grouting holes (7) is inclined in a direction away from the central grouting hole (6) of the first section deep hole grouting area (4) along the tunnel excavation direction.
6. A full-section deep hole grouting reinforcement method according to claim 2, characterized in that: Two adjacent circles of circumferential grouting holes (7) are staggeredly distributed.
7. A full-section deep hole grouting reinforcement method according to claim 2, characterized in that: In the step S3, the hole spacing between adjacent circumferential grouting holes (7) in the same circle of circumferential grouting holes (7) is 500 to 800 mm.
8. A full-section deep hole grouting reinforcement method according to claim 3, characterized in that: The sealing slurry is a water glass-phosphoric acid-water soluble polyurethane composite liquid, and the volume ratio of water glass, phosphoric acid and water soluble polyurethane is 1.2: (1.1-1.3):
1.
9. A full-section deep hole grouting reinforcement method according to claim 3, characterized in that: The grouting liquid is a cement-water glass-acrylate composite liquid, and the volume ratio of cement, glass and acrylate is 1:(1-1.2):1.