A method, device and storage medium for reconfiguring a power distribution network
The distribution network contact line model is built through the equipment ordered tree model to optimize the distribution network supply path, solve the problem of load transfer complexity in multi-segment and multi-contact topology, and achieve load balancing and efficient fault recovery.
Patent Information
- Application Number
- CN202210128855.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-11
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-02-11
AI Technical Summary
It is difficult for existing distribution network power transfer methods to achieve evaluation and optimization down to the branch line level in a multi-segment, multi-connection topology, resulting in complex load transfer and affecting the rapid recovery of fault areas and overall power supply quality.
The equipment ordered tree model is used to construct a distribution network contact line model. By judging single or multiple contact lines, combined with the contact switch load and topology, the transferable supply interval is determined, and linear programming is performed to solve the optimal operation with load balancing as the goal. method to optimize the transfer path.
It improves the feasibility and efficiency of the distribution network transfer scheme, reduces equipment operation risks, improves load balance and equipment utilization, and simplifies the dispatching and fault handling process.
Smart Images

Figure CN114530846B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power distribution network transfer reconstruction, and in particular to a power distribution network transfer network reconstruction method, device and storage medium. Background Art
[0002] The distribution network is an important link between the power grid and users. If it fails, it will directly affect the power supply effect of users. The most direct one is power outage, which not only affects normal production and life, but also brings huge economic losses.
[0003] At present, my country's distribution network generally adopts multi-segment, multi-connection structure, closed-loop wiring, and open-loop operation to achieve segment-by-segment adjustment and self-healing. There are many types of switches installed in the distribution network system, which is relatively complex. On the one hand, due to the increasing complexity of the network structure, the operation and maintenance planning personnel are prone to cause deficiencies or redundancies when planning multi-connection lines, resulting in excessive line load or low equipment utilization. Especially for many early-constructed distribution network systems, the grid structure is unreasonable, the power supply quality is poor, and the possibility of operation failure is also relatively high. On the other hand, when a distribution network fails, in addition to isolating the faulty area and repairing it as soon as possible, it is also necessary to minimize the impact of the fault on the overall distribution network through load transfer. When handling faults, due to real-time changes in load and complex and diverse transfer paths, distribution network control personnel need to spend a lot of time analyzing and selecting the optimal transfer path, resulting in difficulty in timely restoration of power supply in non-faulty areas.
[0004] Therefore, when a distribution network failure occurs, an algorithm is needed to optimize and select the distribution network transfer plan, determine the optimal plan with the strongest execution feasibility, and ensure that the load transfer plan can form the smallest power outage range.
[0005] Among the currently disclosed related technologies: Chinese patent [202010112113.6] proposes a distribution network N-1 transfer method and system. Through the distribution network topology and historical load data, a contact table is constructed, and each branch is traversed to generate N-1 transfer plans for branches, busbars, main transformers and substations. When there is a need for transfer in the distribution network, the transfer is carried out according to the previously obtained transfer plan and the real-time load of the distribution network. This method is based on the normal grid topology and is built on the basis of known user load data characteristics. It limits the transferred load to meet the N-1 condition. If the spare margin of the connecting line does not meet the N-1 condition, it cannot assist the control personnel in analyzing the real-time load transfer situation of the distribution network.
[0006] Chinese patent [201910008649.0] proposes a distribution network load transfer auxiliary decision analysis method. By retrieving the historical load curve of the line to be transferred out three days ago, and adding the load curve of the line to be transferred out and the load curve of the line to be transferred in one by one, the abnormal load during the conventional adjustment of the transfer-in and transfer-out lines is eliminated, and the distribution network load transfer safety verification, distribution network load transfer reliability verification and distribution network load transfer correction verification are performed to achieve the selection of the optimal distribution network load transfer plan. This method generates a transfer plan based on the historical negative mean value in the time period, and eliminates some loads, making it difficult to fully reflect the real-time operating status and special methods of the transfer line.
[0007] Chinese patent [201810772493.9] proposes a method for automatically generating a power supply plan for a substation under-voltage distribution network. By establishing a data interface with major related systems, relevant data information is obtained. After data processing and analysis, the system data is combined to generate a power supply plan for the transferable network line, a 10kV busbar series supply plan for the distribution network line that cannot be transferred, an analysis of the load conditions of the main transformer and main network line of the distribution network line on the opposite side of the transfer power supply, and an analysis of important users affected by the substation under-voltage and plan support. This method takes into account the real-time load under fault conditions, but is still limited to the original grid structure. It does not perform grid reconstruction optimization for the load rate of each component, and does not consider the multi-segment and multi-connection topology of the distribution network, and cannot achieve evaluation and optimization down to the branch line level. Summary of the invention
[0008] In order to solve the above technical problem or at least partially solve the above technical problem, the present invention provides a distribution network transfer network reconstruction method, device and storage medium.
[0009] In a first aspect, the present invention provides a method for reconfiguring a distribution network transfer network, comprising:
[0010] Collect the grid structure information of the distribution network where the line to be transferred is located;
[0011] According to the grid structure information of the distribution network where the supply-required transfer line is located, a corresponding distribution network interconnection line model based on the equipment ordered tree model is constructed;
[0012] Determine whether the line to be transferred is a single interconnection line in the distribution network interconnection line model;
[0013] If yes, the transferable section of the line to be transferred is determined according to the load margin of the interconnection line corresponding to the line to be transferred and the section load of the line to be transferred;
[0014] Otherwise, the transferable range supported by each tie switch is determined by combining the tie switch load on each tie line, the supply belt of each switch device on the line to be transferred and the topological structure of the distribution network tie line model;
[0015] With the goal of load balancing of each interconnection line, linear programming is used to solve the optimal operation mode while satisfying the optimization constraints.
[0016] Furthermore, the device ordered tree model includes: a root representing a power source, a node representing a switching device, and a line segment representing a line.
[0017] Furthermore, the step of determining the transferable section of the line requiring transfer according to the load margin of the interconnection line corresponding to the line requiring transfer and the section load of the line requiring transfer comprises:
[0018] Determine the contact line corresponding to the line to be transferred;
[0019] The load margin of the interconnection line is calculated by subtracting the real-time load of the interconnection line from the rated load of the interconnection line;
[0020] Calculate the section load between each section switch and the tie switch on the main path of the line to be transferred;
[0021] The section of the line requiring transfer whose section load is less than the load margin is taken as the transferable section of the line requiring transfer.
[0022] Furthermore, the method of determining the transferable supply range supported by each tie switch in combination with the tie switch load on each tie line, the supply belt lower minimum segment load of each switch device on the line to be transferred, and the topological structure of the distribution network tie line model includes:
[0023] Traverse the contact switches SL1, SL2, ..., SLn between the power supply line to be transferred and each contact line, and determine n main paths from each contact switch to the power supply line to be transferred;
[0024] Traverse the switchgear along each main path starting from the tie switch, and calculate the remaining load margin of each tie switch load after passing through the minimum segmented load of the next level of each switchgear;
[0025] The interconnecting switches for transferring power to each equipment switch are selected based on the maximum value of the residual load margin of each branch switch supported by the load of each interconnecting switch to determine the transferable range supported by each interconnecting switch.
[0026] Furthermore, the calculation of the minimum load of the supply belt of each switchgear includes:
[0027] Get the real-time load of each switchgear;
[0028] If the switchgear is a sectionalized switch, the minimum sectional load of the switchgear at the lower level is calculated according to the real-time load of each switchgear and the topological position of the switchgear in the distribution network interconnection line model: L′ SSk =LSSk -L SS(k-1) ;
[0029] Among them, L' ssk Indicates the minimum load of the supply belt of the switchgear ssk, L SSk represents the real-time load of the switchgear SSk, L SS(k-1) represents the real-time load of switchgear SS(k-1);
[0030] If the switchgear is a terminal switch, the minimum load of the lower level of the switchgear supply is: L' SSk =L SSk .
[0031] Furthermore, according to the following formula: M [SL,SSk] =M-(L′ SS1 +L′ SS2 +…+L′ SSk ) Calculate the remaining load margin of each interconnecting switch load after each switch device supplies the next minimum segmented load, where M represents the load provided by the interconnecting switch.
[0032] Furthermore, with the load balancing of each interconnection line as the goal, the optimal operation mode solved by linear programming under the condition of satisfying the optimization constraints includes:
[0033] Calculate the load balance of each reconstructed contact line:
[0034] Where n is the number of contact lines involved in the optimization, R Fi is the load rate of interconnection line i (the ratio of the line's real-time load to its rated load);
[0035] Determine the optimization constraints of the contact line:
[0036]
[0037] Where, L i The real-time load of the line, Rated load of line i, T min and T max They represent the maximum and minimum load limits of the main transformer in the distribution network, respectively. i is the impedance of the ith line; l (i) 、x (i) are the length of each section of the longest path of the ith line through the tie switch and the impedance value per unit length of the corresponding conductor, respectively. i +∑x (i) l (i) That is, the impedance value at the end of the i-th line after reconstruction; is the maximum impedance value calculated under the minimum operation mode of the system according to the setting value of the time-limited current quick-break protection of line i;
[0038] Based on the optimization constraints and the smaller the load balance, linear programming is performed to solve the optimal supply and the minimum segmented load of each switchgear.
[0039] In a second aspect, the present invention provides a device for realizing distribution network transfer network reconstruction, comprising: a processing unit, a storage unit, a bus unit, an input unit, and a display unit, wherein the bus unit connects the processing unit, the storage unit, the input unit, and the display unit, the storage unit stores at least one instruction, and the processing unit reads and executes the instruction to realize the distribution network transfer network reconstruction method.
[0040] In a third aspect, the present invention provides a storage medium for realizing the reconstruction of a distribution network transfer network, wherein the storage medium for realizing the reconstruction of a distribution network transfer network stores at least one instruction, reads and executes the instruction, and realizes the distribution network transfer network reconstruction method.
[0041] The above technical solution provided by the embodiment of the present invention has the following advantages compared with the prior art:
[0042] 1. Define the ordered tree model of the equipment, and build the distribution network interconnection line model based on the ordered tree model of the equipment according to the distribution network network architecture information, so as to more conveniently carry out the analysis of the distribution network in terms of power transfer, load distribution and optimization reconstruction through line connection.
[0043] 2. For multi-connection lines that need to be transferred, the distribution network connection line model is used to perform topological search for equipment switches step by step along the main paths of multiple connection switches, and the connection switch that provides the maximum residual load margin for the branch switch is selected for transfer, and finally the transferable range of each connection switch is determined. This provides a reliable reference for the dispatching operation and fault handling of the distribution network dispatching personnel.
[0044] 3. For grid structures with overloaded lines or low equipment utilization, with the goal of balancing the load of interconnecting lines, linear programming is used to solve the optimal operation mode while satisfying the optimization constraints to ensure load balancing of interconnecting lines, reduce equipment operation risks, and effectively improve equipment utilization. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0047] Figure 1 A flow chart of a method for reconfiguring a power distribution network provided by an embodiment of the present invention;
[0048] Figure 2 A schematic diagram of a switch device and a node of an ordered tree model representing the switch device provided by an embodiment of the present invention;
[0049] Figure 3 A schematic diagram of a distribution network interconnection line model of multiple interconnection lines provided in an embodiment of the present invention;
[0050] Figure 4 A schematic diagram of a distribution network interconnection line model of a single interconnection line provided in an embodiment of the present invention;
[0051] Figure 5 A flow chart for determining the transferable section of a supply-required transfer line according to the load margin of the interconnection line corresponding to the supply-required transfer line and the section load of the supply-required transfer line provided in an embodiment of the present invention;
[0052] Figure 6 A flow chart for determining the transferable range supported by each tie switch in accordance with the embodiment of the present invention by combining the tie switch load on each tie line, the supply belt lower minimum segment load of each switch device on the line to be transferred, and the topological structure of the distribution network tie line model;
[0053] Figure 7 A schematic diagram of a device for realizing power distribution network transfer network reconstruction provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0055] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0056] See also Figure 1 As shown, an embodiment of the present invention provides a method for reconfiguring a power distribution network, including:
[0057] S100, collecting grid structure information of the distribution network where the line to be transferred is located;
[0058] S200, constructing a corresponding distribution network interconnection line model based on the equipment ordered tree model according to the grid structure information of the distribution network where the supply transfer line is located; in the specific implementation process, referring to Figure 2 , Figure 3 and Figure 4 As shown, the equipment ordered tree model includes: a root representing a power source, a node representing a switch device, and a line segment representing a line. According to the grid structure information of the distribution network, the corresponding transformer equipment is abstracted as a power source, the switch device is abstracted as a node, and the line is abstracted as a line segment to establish a distribution network interconnection line model. For the distribution network interconnection line model, the power flow direction of the nodes on the main path between the power sources is not fixed and is a bidirectional node, and the power flow direction of the nodes on the branch path is fixed and is a unidirectional node. In the distribution network interconnection line model, the segment between the nodes is the smallest unit for the distribution network transfer and optimization reconstruction.
[0059] S300, determining whether the line to be transferred is a single interconnection line in the distribution network interconnection line model; if so, executing S400, otherwise executing S500.
[0060] S400, determining a transferable section of the line requiring transfer according to the load margin of the interconnection line corresponding to the line requiring transfer and the section load of the line requiring transfer.
[0061] During the specific implementation process, see Figure 5 As shown, the method of determining the transferable section of the line requiring transfer according to the load margin of the interconnection line corresponding to the line requiring transfer and the section load of the line requiring transfer includes:
[0062] S401, determine the contact line corresponding to the line to be transferred; set the contact line of the line j to be transferred of the single contact line as the contact line i.
[0063] S402, calculate the load margin of the tie line by subtracting the real-time load of the tie line from the rated load of the tie line; in the specific implementation process, the real-time load L of the tie line i i , the rated load of interconnection line i is Then the load margin of interconnection line i is
[0064] S403, calculating the section load between each section switch and the tie switch on the main path of the line to be transferred; Figure 6 As shown in the figure, the tie switch between the tie line i and the demand-transfer line j is set as SL, and the section load L between each section switch and the tie switch on the main path of the demand-transfer line is calculated. jSSk .
[0065] S404, select the section of the line requiring transfer whose section load is less than the load margin as the transferable section of the line requiring transfer, L jSSk <M i .
[0066] S500, determining the transferable range supported by each tie switch in combination with the tie switch load on each tie line, the supply belt lower minimum section load of each switch device on the line to be transferred, and the topological structure of the distribution network tie line model.
[0067] During the specific implementation process, see Figure 6 As shown, the method of combining the load of the tie switch on each tie line, the supply belt of each switch device on the line to be transferred and the topological structure of the distribution network tie line model to determine the transferable range supported by each tie switch includes:
[0068] S501, traverse the connecting switches SL1, SL2, ..., SLn between the power supply line to be transferred and each connecting line, and determine n main paths from each connecting switch to the power supply line to be transferred.
[0069] S502, define a counting variable k=1;
[0070] S503, searching for the kth switch device along each main path starting from the tie switch SLi, and calculating the remaining load margin of the tie switch SLi load after the kth switch device supplies the minimum segmented cumulative load of the lower level.
[0071] In the specific implementation process, the calculation of the residual load margin of the tie switch SLi load after the kth switchgear supplies the minimum segmented cumulative load of the lower level includes:
[0072] Get the real-time load of each switchgear;
[0073] If the switchgear is a sectionalized switch, the minimum sectional load of the switchgear at the lower level is calculated according to the real-time load of each switchgear and the topological position of the switchgear in the distribution network interconnection line model: L′ SSk =L SSk -L SS(k-1) ;
[0074] Among them, L' SSk Indicates the minimum load of the supply section of the switchgear SSk, L SSk represents the real-time load of the switchgear SSk, L SS(k-1) represents the real-time load of switchgear SS(k-1);
[0075] If the switchgear is a terminal switch, the minimum load of the supply belt of the switchgear is equal to the real-time load of the switchgear: L' SSk =L SSk .
[0076] According to the following formula: M [SLi,SSk] =M i -(L' SS1 +L' SS1 ……+L' SSk ) Calculate the residual load margin of the tie switch SLi after the load passes through the kth switchgear's supply and the next minimum segmented cumulative load, where M i Indicates the load provided by the tie switch SLi.
[0077] S504, determine the remaining load margin Is it greater than zero? If yes, execute S505; otherwise, execute S508.
[0078] S505, determine whether the kth device switch SSk is a branch switch, if yes, execute S506, otherwise execute S507.
[0079] S506: Whether the remaining domain load margin of the current branch switch SSk supported by the tie switch SLi is the maximum value of the remaining load margins of the current branch switches supported by the tie switch loads, if yes, execute S507; otherwise, execute S508.
[0080] S507, k is incremented by one, and the process jumps to S503.
[0081] S508, the tie switch SLi transfers the supply to the next smallest segment of the supply belt of the switchgear SS(k-1).
[0082] S600 aims to balance the load of each interconnection line and solves the optimal operation mode through linear programming while satisfying the optimization constraints.
[0083] In the specific implementation process, the load balance of each interconnection line is taken as the goal, and the optimal operation mode solved by linear programming under the condition of meeting the optimization constraints includes:
[0084] Calculate the load balance of each reconstructed contact line:
[0085] Where n is the number of contact lines involved in the optimization, R Fi is the load rate of interconnection line i (the ratio of the line's real-time load to its rated load);
[0086] Determine the optimization constraints of the contact line:
[0087]
[0088] Where, L i The real-time load of the line, Rated load of line i, T min and T max They represent the maximum and minimum load limits of the main transformer in the distribution network, respectively. i is the impedance of the ith line; l (i) 、x (i) are the length of each section of the longest path of the ith line through the tie switch and the impedance value per unit length of the corresponding conductor, respectively. i +∑x (i) l (i) That is, the impedance value at the end of the i-th line after reconstruction; is the maximum impedance value calculated under the minimum operation mode of the system according to the setting value of the time-limited current quick-break protection of line i;
[0089] Based on the optimization constraints and the smaller the load balance, linear programming is performed to solve the optimal supply and the minimum segmented load of each switchgear.
[0090] Example 2
[0091] See also Figure 7 As shown, an embodiment of the present invention provides a device for realizing distribution network transfer network reconstruction, including: a processing unit, a storage unit, a bus unit, an input unit, and a display unit, wherein the bus unit connects the processing unit, the storage unit, the input unit, and the display unit, the storage unit stores at least one instruction, and the processing unit reads and executes the instruction to realize the distribution network transfer network reconstruction method.
[0092] Example 3
[0093] An embodiment of the present invention provides a storage medium for realizing distribution network transfer network reconstruction, wherein the storage medium for realizing distribution network transfer network reconstruction stores at least one instruction, reads and executes the instruction, and realizes the distribution network transfer network reconstruction method.
[0094] In the embodiments provided by the present invention, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0095] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0096] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0097] The foregoing is merely a specific embodiment of the present invention, which enables those skilled in the art to understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features claimed herein.
Claims
1. A method for reconfiguring a distribution network transfer network. It is characterized in that include: Collect the grid structure information of the distribution network where the line to be transferred is located; According to the grid structure information of the distribution network where the supply-required transfer line is located, a corresponding distribution network interconnection line model based on the equipment ordered tree model is constructed; Determine whether the line to be transferred is a single interconnection line in the distribution network interconnection line model; If yes, the transferable section of the demand-transfer line is determined according to the load margin of the interconnection line corresponding to the demand-transfer line and the section load of the demand-transfer line, including: determining the interconnection line corresponding to the demand-transfer line, calculating the load margin of the interconnection line by subtracting the real-time load of the interconnection line from the rated load of the interconnection line, calculating the section load between each section switch and the interconnection switch on the main path of the demand-transfer line, and taking the section of the demand-transfer line with a section load less than the load margin as the transferable section of the demand-transfer line; Otherwise, the transferable supply interval supported by each connecting switch is determined by combining the connecting switch load on each connecting line, the supply belt of each switch device on the line to be transferred and the topological structure of the distribution network connecting line model, including: traversing the connecting switches SL1, SL2, ..., SLn between the line to be transferred and each connecting line, and determining n main paths from each connecting switch to the power supply of the line to be transferred; traversing the switch devices along each main path starting from the connecting switch, and calculating the residual load margin of each connecting switch load after passing through the supply belt of each switch device The minimum segmented load; selecting the connecting switch for transfer of each device switch according to the maximum value of the residual load margin of each branch switch supported by the load of each connecting switch, so as to determine the transferable supply interval supported by each connecting switch; With the load balance of each interconnection line as the goal, linear programming is used to solve the optimal operation mode under the condition of satisfying the optimization constraints, including: calculating the load balance degree of each reconstructed interconnection line: , where n is the number of contact lines involved in the optimization, is the load rate of interconnection line i, which is the ratio of the line’s real-time load to its rated load; Determine the optimization constraints of the contact line: ; In the formula, The real-time load of the line, line i Rated load, T min and T max They represent the maximum and minimum load limits of the main transformer in the distribution network. X i For the i The impedance of the line; l (i) , x (i) Respectively i The length of each section of the line and the impedance value per unit length of the corresponding conductor in the longest path of the line through the tie switch supply, X i +∑ x (i) l (i) After reconstruction i The impedance value at the end of the line; According to the line i The setting value of the time-limited current quick-break protection is the maximum impedance value calculated under the minimum operation mode of the system; Based on the optimization constraints and the smaller the load balance, linear programming is performed to solve the optimal supply and the minimum segmented load of each switchgear.
2. According to the method for reconfiguring the power distribution network transfer network of claim 1, It is characterized in that The device ordered tree model includes: a root representing a power source, nodes representing switching devices, and line segments representing lines.
3. According to the method for reconfiguring the power distribution network transfer network of claim 1, It is characterized in that Calculation of the minimum load of the supply belt of each switchgear includes: Get the real-time load of each switchgear; If the switchgear is a section switch, the minimum section load of the switchgear supply belt is calculated according to the real-time load of each switchgear and the topological position of the switchgear in the distribution network interconnection line model: ; in, Indicates the minimum load of the supply lower level of the switchgear SSk, represents the real-time load of the switchgear SSk, represents the real-time load of switchgear SS(k-1); If the switchgear is a terminal switch, the minimum load of the lower level of the switchgear supply is: .
4. According to the method for reconfiguring the power distribution network transfer network of claim 3, It is characterized in that According to the following formula: Calculate the remaining load margin of each tie switch load after each switch device supplies the next minimum segmented load, where M represents the load provided by the tie switch.
5. A device for realizing power distribution network transfer network reconstruction, It is characterized in that include: A processing unit, a storage unit, a bus unit, an input unit, and a display unit, wherein the bus unit connects the processing unit, the storage unit, the input unit, and the display unit, the storage unit stores at least one instruction, and the processing unit reads and executes the instruction to implement the distribution network transfer network reconstruction method as described in any one of claims 1-4.
6. A storage medium for realizing the reconstruction of a distribution network transfer network, It is characterized in that The storage medium for implementing the distribution network transfer network reconstruction stores at least one instruction, reads and executes the instruction, and implements the distribution network transfer network reconstruction method as described in any one of claims 1-4.
Citation Information
Patent Citations
Automatic generation method for power supply transferring scheme in distribution network with substation voltage loss
CN108808675A
Method for assisted decision-making and analysis of distribution network load transfer
CN109510205A
Power distribution network N-1 transfer method and system
CN111313402A
Power distribution network interconnection switch configuration optimizing method in consideration of load characteristic
CN107276067A
Load transfer method and device for improving reliability of distribution network
CN110212539A