A method for assembling and positioning a side piece of a catheter frame

By setting support parts on both sides of the tire frame and using cross braces to fix the side sheet body, the problems of difficulty and low efficiency in the assembly and positioning process of the side sheet body of the conduit frame are solved, and a more efficient assembly process is achieved, reducing the crane's Takes time.

CN114541354BActive Publication Date: 2024-11-05CSSC HUANGPU WENCHONG SHIPBUILDING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210303006.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-24
Publication Date
2024-11-05
Estimated Expiration
2042-03-24

AI Technical Summary

Technical Problem

During the assembly and positioning process of the side panel of the conduit frame, due to the cross-operation of the car crane and the altitude vehicle, the assembly is difficult and inefficient, and the gantry crane is occupied for a long time.

Method used

Supports are provided on both sides of the tire frame, and after lifting the side sheet body and welding it with the tire frame, the side sheet body is welded and fixed with the support to reduce the time of the crane.

Benefits of technology

The assembly and positioning efficiency of the side panel body is improved, the assembly difficulty is reduced, and the use of the crane is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114541354B_ABST
    Figure CN114541354B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for assembling and positioning the side panel of a conductor frame, comprising the following steps: arranging a plurality of support members on the ground on both sides of a frame; hoisting the side panel body onto the frame so that the side panel body is close to the support members, and welding the side panel body to the frame; providing a cross brace so that one end of the cross brace is welded to the support member, and the other end of the cross brace is welded to the side panel body; and after the side panel body is fixed, the crane releases the hook. The method for assembling and positioning the side panel of the conductor frame of the present invention arranges support members on both sides of the frame before the side panel body is hoisted, and after the side panel body is welded to the frame, the cross brace can be used to quickly fix the side panel body. Since the side panel body is close to the support member, the size and weight of the cross brace are small, and the difficulty of installation is low, thereby greatly improving the efficiency of assembling and positioning the side panel body and reducing the time occupied by the crane.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of catheter racks, and in particular to an assembly and positioning method for a side piece body of a catheter rack. Background Art

[0002] In recent years, offshore wind power has developed rapidly. As the supporting structure of large wind turbines, the conductor frame is the basis for the safe operation of the entire wind turbine. The four-pile conductor frame consists of a lower piece, two side pieces and an upper piece. A gantry crane is required for assembly. The lower piece is first placed on the tire frame, followed by the two side pieces, and finally the upper piece. The key step is the positioning of the side pieces. At present, the conductors on the side pieces need to be welded to the tire frame first, and then the support parts are arranged on the ground to support the diagonal bracing tubes of the side pieces. The support parts need to be hoisted by a car crane, and the welding of the support parts and the diagonal bracing tubes requires construction workers to use aerial vehicles for operation. Due to the influence of the cross-operation of the car crane and the aerial vehicle during the process, the assembly and positioning construction of the side pieces is difficult and inefficient, resulting in the occupancy of the gantry crane for a long time. Summary of the invention

[0003] The object of the present invention is to provide a method for assembling and positioning a side piece of a conductor pipe frame, so as to improve the efficiency of assembling and positioning the side piece, reduce the difficulty of assembling and positioning, and reduce the time occupied by the crane.

[0004] To achieve this object, the present invention adopts the following technical solutions:

[0005] Provided is a method for assembling and positioning a side piece of a catheter frame, comprising the following steps:

[0006] S10. Several supports are provided on the ground on both sides of the tire frame;

[0007] S20. Hoisting the side panel onto the tire frame, so that the side panel is close to the support member, and the side panel is welded to the tire frame;

[0008] S30. Providing a cross brace, so that one end of the cross brace is welded to the support member, and the other end of the cross brace is welded to the side sheet body;

[0009] S40. After the side piece body is fixed, the crane releases the hook.

[0010] As a preferred solution of the present invention, the side panel body comprises a conduit and a plurality of diagonal braces arranged on the conduit, the diagonal braces are in an X shape, the conduit is welded to the tire frame, and the transverse braces are welded to the diagonal braces.

[0011] As a preferred solution of the present invention, the centers of the plurality of diagonal braces are located at the same height, and the transverse brace is connected to the centers of the diagonal braces.

[0012] As a preferred solution of the present invention, the support member includes a column and a support column, the column is vertically arranged on the ground, the support column is inclined on the ground, the support column is located on the side of the column away from the tire frame, and the end of the support column away from the ground is connected to the column.

[0013] As a preferred solution of the present invention, one end of the support column away from the column is welded to the ground anchor.

[0014] As a preferred solution of the present invention, the cross brace includes a connecting plate and a connecting pipe, one end of the connecting pipe is connected to the column, the other end of the connecting pipe is connected to the connecting plate, and the connecting plate is connected to the diagonal brace.

[0015] As a preferred solution of the present invention, the top of the column is higher than the center of the diagonal brace, and the connecting plate is connected to the center of the diagonal brace.

[0016] As a preferred solution of the present invention, the connecting plate is rectangular, one side of the connecting plate is welded to the surface of the diagonal brace, and the connecting pipe is welded to the surface of the connecting plate.

[0017] As a preferred solution of the present invention, the connecting pipe is arranged horizontally.

[0018] As a preferred solution of the present invention, one end of the support column connected to the column and the connecting pipe are at the same height.

[0019] Beneficial effects of the present invention:

[0020] The assembly and positioning method of the catheter frame side panel body of the present invention sets support members on both sides of the tire frame before the side panel body is hoisted. After the side panel body and the tire frame are welded, the side panel body can be quickly fixed by using cross braces. Since the side panel body is close to the support members, the size and weight of the cross braces are small, and the installation difficulty is low, thereby greatly improving the assembly and positioning efficiency of the side panel body and reducing the time occupied by the crane. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A top view of a side panel according to an embodiment of the present invention;

[0022] Figure 2 Figure 1 A side view of the side panel body after being placed on the tire frame;

[0023] Figure 3 It is a front view of the side panel and the lower panel of one embodiment of the present invention after being placed on the tire frame;

[0024] Figure 4 for Figure 3 Enlarged view of point A in the middle.

[0025] In the figure:

[0026] 1. Side piece; 11. Conduit; 12. Diagonal brace; 2. Support member; 21. Vertical column; 22. Support column; 3. Horizontal brace; 31. Connecting pipe; 32. Connecting plate; 4. Lower piece; 100. Tire frame; 200. Ground. DETAILED DESCRIPTION

[0027] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0028] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0029] like Figures 1 to 3 As shown, the side piece body 1 of one embodiment includes a conduit 11 and three diagonal braces 12, the diagonal braces 12 are connected to the same side of the conduit 11, and the three diagonal braces 12 are all X-shaped but of different sizes. The assembly and positioning method of the conduit frame side piece body of this embodiment includes the following steps:

[0030] S10. A plurality of support members 2 are provided on the ground 200 on both sides of the tire frame 100;

[0031] S20. Hoisting the side panel body 1 onto the tire frame 100, so that the side panel body 1 is close to the support member 2, and the side panel body 1 is welded to the tire frame 100;

[0032] S30 provides a cross brace 3, so that one end of the cross brace 3 is welded to the support member 2, and the other end of the cross brace 3 is welded to the side sheet body 1;

[0033] S40. After the side piece body 1 is fixed, the crane releases the hook.

[0034] The assembly and positioning method of the side panel of the catheter frame of this embodiment sets support members 2 on both sides of the tire frame 100 before the side panel body 1 is hoisted. After the side panel body 1 and the tire frame 100 are welded, the side panel body 1 can be quickly fixed by the cross brace 3. Since the side panel body 1 is close to the support member 2, the size and weight of the cross brace 3 are small, and the installation difficulty is low, thereby greatly improving the assembly and positioning efficiency of the side panel body 1 and reducing the time occupied by the crane. The distance between the support member 2 and the tire frame 100 is about 1 meter. If the distance is too close, it will cause certain obstacles to the hoisting and positioning of the side panel body 1. If it is too far, it will be inconvenient to install the cross brace 3.

[0035] Before hoisting the side piece 1, a pre-hoisting inspection is required. It is necessary to check whether the wire rope shackle used to hoist the side piece 1 is normal and undamaged, and whether it matches the tonnage of the hoisted side piece 1; check whether there is any obstruction on the lifting hook; check whether there are scaffolding, equipment pipelines and other obstacles that affect the hoisting in the construction area; check whether there is any high-altitude work or edge work on the site, and contact in advance to set up temporary guardrails; check whether the debris generated by other construction has been cleared. After confirming that there are no problems above, you can start hoisting.

[0036] Furthermore, the conduit 11 is welded to the tire frame 100, and the cross brace 3 is welded to the diagonal brace 12. The conduit 11 is cylindrical, so the conduit 11 is in contact with the tire frame 100, and the tire frame 100 can carry the side panel 1 more stably. When the conduit 11 is welded to the tire frame 100, the bottom of the side panel 1 is fixed, but the side panel 1 may still fall over. Therefore, the cross brace 3 is connected to the diagonal brace 12 to pull the side panel 1 at a higher position, so that the side panel 1 is completely fixed and will not move. There are several contact positions between the conduit 11 and the tire frame 100, and there are no less than three welding points at each contact position. The length of each weld is not less than 150 mm, and the height of the weld foot is not less than 15 mm.

[0037] Furthermore, when the side panel body 1 is placed on the tire frame 100, the centers of the plurality of diagonal braces 12 are located at the same height, and the cross brace 3 is connected to the center of the diagonal brace 12. Therefore, each cross brace 3 is also at the same height, and since the cross brace 3 is connected to the support member 2, each support member 2 can be manufactured with the same size, which is beneficial to reducing the manufacturing cost and improving the assembly positioning efficiency.

[0038] like Figure 3 As shown, the support member 2 includes a column 21 and a support column 22, the column 21 is vertically arranged on the ground 200, the support column 22 is inclinedly arranged on the ground 200, the support column 22 is located on the side of the column 21 away from the tire frame 100, and the end of the support column 22 away from the ground 200 is connected to the column 21. The side panel body 1 has a large weight. When the side panel body 1 is fixed, the column 21 will receive a force in the horizontal direction. The support member 2 uses the support column 22 to support the column 21, which can prevent the column 21 from bending and realize effective support for the side panel body 1.

[0039] Furthermore, one end of the support column 22 away from the column 21 is welded to a ground anchor (not shown in the figure), so that the support column 22 has higher stability, and thus the support member 2 also has higher stability.

[0040] like Figure 3 and Figure 4As shown, the cross brace 3 includes a connecting pipe 31 and a connecting plate 32, one end of the connecting pipe 31 is connected to the column 21, the other end of the connecting pipe 31 is connected to the connecting plate 32, and the connecting plate 32 is connected to the diagonal brace 12. The diagonal brace 12 and the connecting pipe 31 are both made of round pipes, so the surface of the diagonal brace 12 is a curved surface, and it is difficult to directly weld the connecting pipe 31 to the diagonal brace 12 firmly, while the connecting plate 32 can use one side edge to weld to the surface of the diagonal brace 12, and also provides a larger and flat surface for the connecting pipe 31 for welding, so that the cross brace 3 can more firmly connect the diagonal brace 12 and the support member 2, reducing the difficulty of the welding operation.

[0041] Specifically, the connecting plate 32 is rectangular, one side of the connecting plate 32 is welded to the surface of the diagonal brace 12, and the connecting pipe 31 is welded to the surface of the connecting plate 32. When installing the cross brace 3, the connecting plate 32 is first connected to the diagonal brace 12, and then the connecting pipe 31 is positioned so that the two ends of the connecting pipe 31 are welded to the connecting plate 32 and the column 21 respectively.

[0042] like Figure 3 and Figure 4 As shown, the top of the column 21 is higher than the center of the diagonal brace 12, and the connecting plate 32 is connected to the center of the diagonal brace 12. Since the top of the column 21 is higher than the center of the diagonal brace 12, a certain error is allowed in the connection position between the cross brace 3 and the column 21, especially when the cross brace 3 needs to be positioned by a car crane, the positioning difficulty of the cross brace 3 can be reduced.

[0043] Furthermore, the connecting pipe 31 is arranged horizontally, so that the tension or pressure generated by the connecting pipe 31 on the column 21 is perpendicular to the length direction of the column 21, and no vertical force component is generated on the column 21, thereby preventing the column 21 from deforming in the vertical direction. The column 21 can be made of I-beams, which have high structural strength and are relatively common, so that the column 21 can be quickly manufactured.

[0044] Furthermore, the end of the support column 22 connected to the column 21 is at the same height as the connecting pipe 31. For the support member 2, the structural strength of the connection between the support column 22 and the column 21 is the highest. The connecting pipe 31 is arranged here, and the force generated by the connecting pipe 31 on the column 21 can be shared by the support column 22 to the greatest extent, which can prevent the column 21 from being deformed, thereby ensuring the stability of the side panel body 1 on the tire frame 100.

[0045] like Figure 3As shown, the catheter frame of this embodiment also includes a lower sheet body 4, which is also assembled from a number of structures similar to the diagonal braces 12. The catheters 11 of the two side sheet bodies 1 are respectively connected to the two sides of the lower sheet body 4, and the lower sheet body 4 is first mounted on the tire frame 100 before the side sheet body 1. After the welding of the side sheet body 1 and the lower sheet body 4 is completed, the upper sheet body (not shown in the figure) is hoisted to the top of the side sheet body 1 for assembly. Compared with the lower sheet body 4, the upper sheet body has an additional catheter 11, which is a symmetrical structure. The two catheters 11 of the upper sheet body are respectively welded to the diagonal brace 12 of a side sheet body 1.

[0046] As a preferred embodiment of the present invention, in the description of this specification, the reference term "further" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0047] The above embodiments are only used to illustrate the detailed scheme of the present invention, and the present invention is not limited to the above detailed scheme, that is, it does not mean that the present invention must rely on the above detailed scheme to be implemented. Those skilled in the art should understand that any improvement of the present invention, equivalent replacement of various raw materials of the product of the present invention, addition of auxiliary components, selection of specific methods, etc., all fall within the protection scope and disclosure scope of the present invention.

Claims

1. A method for assembling and positioning a side panel of a catheter frame, characterized in that: The steps include: S10. Several supports are provided on the ground on both sides of the tire frame; S20. Hoisting the side panel onto the tire frame, so that the side panel is close to the support member, and the side panel is welded to the tire frame; S30. Providing a cross brace, so that one end of the cross brace is welded to the support member, and the other end of the cross brace is welded to the side sheet body; S40. After the side piece is fixed, the crane is unhooked; The side piece body comprises a conduit and a plurality of diagonal braces arranged on the conduit, the diagonal braces are in an X shape, the conduit is welded to the tire frame, and the transverse brace is welded to the diagonal brace; The centers of the plurality of diagonal braces are located at the same height, and the transverse brace is connected to the centers of the diagonal braces.

2. The method for assembling and positioning the side piece of a catheter frame according to claim 1, characterized in that: The support member includes a column and a support column, wherein the column is vertically arranged on the ground, the support column is inclinedly arranged on the ground, the support column is located on a side of the column away from the tire frame, and one end of the support column away from the ground is connected to the column.

3. The method for assembling and positioning the side piece of the catheter frame according to claim 2, characterized in that: One end of the support column away from the column is welded to the ground anchor.

4. The method for assembling and positioning the side piece of a catheter frame according to claim 2, characterized in that: The transverse brace includes a connecting plate and a connecting pipe, one end of the connecting pipe is connected to the column, the other end of the connecting pipe is connected to the connecting plate, and the connecting plate is connected to the diagonal brace.

5. The method for assembling and positioning the side piece of a catheter frame according to claim 4, characterized in that: The top of the column is higher than the center of the diagonal brace, and the connecting plate is connected to the center of the diagonal brace.

6. The method for assembling and positioning the side piece of a catheter frame according to claim 5, characterized in that: The connecting plate is rectangular, one side of the connecting plate is welded to the surface of the diagonal support, and the connecting pipe is welded to the surface of the connecting plate.

7. The method for assembling and positioning the side piece of a catheter frame according to claim 6, characterized in that: The connecting pipe is arranged horizontally.

8. The method for assembling and positioning the side piece of a catheter frame according to claim 7, characterized in that: One end of the support column connected to the column is at the same height as the connecting pipe.