An implementation method for tunnel lining energy dissipation and shock absorption structure suitable for high-intensity earthquake areas
Through the combined structure of anchor rods, shock absorbers and EPS concrete, the problem of tunnel lining is easily damaged in earthquake areas, effective shock absorption effect is achieved, and the tunnel's seismic resistance ability is improved under earthquakes.
Patent Information
- Application Number
- CN202111652151.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-12-31
AI Technical Summary
In the high-intensity areas of earthquakes, the tunnel lining structure is prone to damage and lacks buffering and shock-absorbing structures, resulting in damage to the tunnel structure and obstacles to use.
The combined structure of anchor rod installation, shock absorber and EPS concrete filling layer is adopted. The anchor rod and shock absorber are connected through elastically. The damper and steel spring absorb vibration. The EPS concrete disperses the load, forms a buffer layer, and reduces the load concentration.
Effectively improve the shock absorption performance of the tunnel under earthquakes, prevent structural damage, extend the service life of the tunnel, and reduce the damage to the lining structure by earthquakes.
Smart Images

Figure CN114542105B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel construction, and in particular relates to an implementation method of a tunnel lining energy dissipation and shock absorption structure suitable for high-intensity earthquake areas. Background Art
[0002] Due to the vast territory and complex terrain of my country, tunnels have become a necessary way to cross complex areas such as mountains during the construction of transportation facilities. According to incomplete statistics, the mileage of tunnels currently under construction and built in my country has exceeded 10,000 km. Due to the influence of design, construction, terrain and natural disasters such as earthquakes, it is easy to cause lining structure damage, tunnel leakage, roadbed damage and other phenomena in the tunnel, which in turn affects the normal use of the tunnel structure. Among them, the damage of the tunnel lining structure is one of the main causes of tunnel diseases. Under the action of earthquakes, there will be interaction between the lining structure of the tunnel and the surrounding rock, and the lack of buffer and shock-absorbing structure will cause structural damage to the tunnel lining. Summary of the invention
[0003] The present invention provides an implementation method for a tunnel lining energy dissipation and shock absorption structure suitable for high-seismic intensity areas, with the aim of improving the shock absorption performance of the tunnel and solving the problem that the tunnel lining structure is easily damaged due to natural disasters such as earthquakes in high-seismic intensity areas.
[0004] To this end, the present invention adopts the following technical solutions:
[0005] An implementation method for a tunnel lining energy dissipation and shock absorption structure suitable for a high-intensity earthquake zone specifically comprises the following steps:
[0006] 1) Tunnel excavation;
[0007] 2) Anchor bolt installation: select an anchor bolt installation area in the excavated tunnel, drill holes on the surrounding rock in the same cross section of the tunnel, the drilling direction is within the cross section, the drilling positions are spread over the top and sides of the surrounding rock, and the holes are distributed radially; continue drilling in the anchor bolt installation area at intervals according to the above method, so that the holes cover the entire anchor bolt installation area;
[0008] An anchor rod is installed and fixed in the drill hole, the head end of the anchor rod is exposed, a shock absorbing member is installed at the front end of the anchor rod, and the front end of the anchor rod is elastically and movably connected with the shock absorbing member;
[0009] 3) Construction of primary lining: spray the lower surface of the surrounding rock with primary lining, and wrap the anchor rods and shock absorbers in the primary lining to ensure that the anchor rods and shock absorbers do not leak out;
[0010] 4) Secondary lining construction: A secondary lining steel mesh is laid in the tunnel, a gap is formed between the secondary lining steel mesh and the lower surface of the primary lining, and then secondary lining concrete is sprayed to form the secondary lining. After the secondary lining is formed, a gap is left between the secondary lining and the primary lining;
[0011] 5) Installation of shock-absorbing and buffering components: The shock-absorbing and buffering components are installed between the primary lining layer and the secondary lining layer, and the shock-absorbing and buffering components are located in the section where each anchor rod is located; the shock-absorbing and buffering components include a damper and a steel spring, and the steel spring is sleeved on the piston rod of the damper, and the steel spring is driven to move when the piston rod is extended and retracted; the head end of the damper piston rod is fixed to the primary lining layer, and the damper base is fixed to the upper surface of the secondary lining layer;
[0012] 6) EPS concrete construction: Install the formwork in the gap between the primary lining and the secondary lining, pour EPS concrete in the formwork, the lower surface of the EPS concrete and the upper surface of the secondary lining solidify into one, a gap layer is formed between the upper surface of the EPS concrete and the lower surface of the primary lining, and the piston rod of the damper leaks out into the gap layer;
[0013] Furthermore, a rubber pad is fixedly connected to the damper base, a steel pad is also fixedly connected to the bottom of the rubber pad, the steel pad is fixed to the upper surface of the second lining layer by screws, and the rubber pad and the steel pad are cast and fixed in the EPS concrete.
[0014] Furthermore, the steel plate is an arc-shaped steel plate, and the curvature is opposite to the curvature of the upper surface of the second lining layer. The length of the steel plate is not less than 40 cm, and the width is not less than 20 cm.
[0015] Furthermore, the shock absorber includes a metal sleeve with an opening on the top of the metal sleeve, and the head end of the anchor rod is inserted into the metal sleeve through the opening; a movable rod perpendicular to the anchor rod is inserted into the metal sleeve, and the middle part of the movable rod is fixedly connected to the anchor rod; two springs are sleeved on the movable rod, one end of the spring abuts against the end of the metal sleeve and the other end abuts against the anchor rod; when the anchor rod swings left and right, the movable rod moves left and right accordingly; a rubber sleeve for sealing is connected to the outside of the metal sleeve.
[0016] Furthermore, a screw hole is provided at the tail end of the anchor rod, an external thread is provided at the middle portion of the movable rod, and the middle portion of the movable rod is threadedly connected to the anchor rod.
[0017] Furthermore, the template in step 6) is arc-shaped, with a notch left on the template, and the notches on adjacent templates are spliced into a circular notch, and the circular notch is used to place the damper.
[0018] Furthermore, the single construction length of the second lining layer and EPS concrete is 2-4 meters.
[0019] The shock-absorbing structure of the present invention is based on the primary lining layer and the secondary lining layer, and a shock-absorbing component is arranged at the tail end of the anchor rod. An EPS concrete filling layer is poured between the primary lining layer and the secondary lining layer, and a shock-absorbing buffer component is connected; under the action of an earthquake, the shock-absorbing component can reduce the vibration of the anchor rod, and the shock-absorbing buffer component and the EPS concrete filling layer can reduce the impact of the primary lining layer on the secondary lining layer, effectively reducing and dispersing the load, and preventing load concentration, thereby achieving the effect of energy dissipation and shock reduction. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 is a schematic cross-sectional view of a tunnel of the present invention;
[0021] Figure 2 yes Figure 1 A partial enlarged view of the middle A part;
[0022] Figure 3 yes Figure 1 A partial enlarged view of part B in the middle;
[0023] Figure 4 It is a structural schematic diagram of the template of the present invention;
[0024] Figure 5 It is a schematic diagram of the use state of the template of the present invention;
[0025] In the figure: 1-primary lining, 2-secondary lining, 3-EPS concrete, 4-gap layer, 5-anchor rod, 6-shock absorber, 61-metal sleeve, 62-movable rod, 63-spring, 64-rubber sleeve, 7-shock absorber, 71-damper, 72-steel spring, 73-rubber pad, 74-steel pad, 75-support pad, 8-template, 81-circular notch. DETAILED DESCRIPTION
[0026] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments:
[0027] like Figure 1 As shown, a method for implementing a tunnel lining energy dissipation and shock absorption structure suitable for high-intensity earthquake areas specifically includes the following steps:
[0028] 1) Tunnel excavation: Tunnel excavation is carried out according to the line planning and actual site conditions. The excavation can be carried out by various methods such as a tunnel boring machine or drilling and blasting method. Support is carried out while the tunnel is excavated. According to the geological report, the shock-absorbing support structure of the present invention is used in high-intensity areas.
[0029] 2) Anchor bolt installation: The high-intensity area is designated as the anchor bolt 5 installation area, and drilling equipment is used to drill holes in the surrounding rock within the same cross section of the tunnel, ensuring that the drilling direction is within the cross section, the drilling positions are spread over the top and sides of the surrounding rock, and the holes are distributed radially. Continue drilling in the anchor bolt 5 installation area at intervals according to the above method, so that the holes cover the entire anchor bolt 5 installation area.
[0030] The distance between adjacent boreholes in the same section is 20-50cm, and the distance between adjacent boreholes in cross-section is 50-200cm. The specific distance can be comprehensively analyzed based on multiple factors such as tunnel size, geological activity level, bedrock firmness, etc. In areas with higher safety risk levels, the spacing between anchor rods 5 should be reduced to increase support strength. Since stress is concentrated at the transition between the top and side surfaces of the surrounding rock, cracks are prone to occur in the surrounding rock, so the density of anchor rods 5 is high in this area to improve tunnel strength.
[0031] Anchor rods 5 are installed in the drilled holes, and concrete is poured to fix the anchor rods 5; the head ends of the anchor rods 5 are exposed, and the exposed distances of the head ends of the anchor rods 5 are roughly equal, which is convenient for subsequent construction operations. The anchor rods 5 are made of BFRP composite material anchor rods 5, which have high strength and good corrosion resistance, and help to increase the life of the anchor rods 5. Then, the shock absorber 6 is connected to the front end of the anchor rod 5. The structure of the shock absorber 6 is as follows:
[0032] like Figure 3 As shown, the shock absorber 6 includes a square metal sleeve 61, and an opening is provided at the top of the metal sleeve 61. The tail end of the anchor rod 5 is inserted into the metal sleeve 61 through the opening. The left and right ends of the metal sleeve 61 are provided with openings, and a movable rod 62 perpendicular to the anchor rod 5 is inserted into the metal sleeve 61 through the openings. A screw hole is provided at the tail end of the anchor rod 5, and an external thread is provided in the middle of the movable rod 62. The middle of the movable rod 62 is threadedly connected with the anchor rod 5. Springs 63 are respectively sleeved at the left and right ends of the movable rod 62, and one end of the spring 63 abuts against the side wall of the inner cavity of the metal sleeve 61, and the other end abuts against the anchor rod 5. When the anchor rod 5 swings left and right, the movable rod 62 moves left and right accordingly, and drives the movable rod 62 to squeeze the spring 63. A rubber sleeve 64 for sealing is connected to the outer surface of the metal sleeve 61, and the rubber sleeve 64 blocks the holes on the metal sleeve 61 to prevent concrete from entering the metal sleeve 61.
[0033] 3) Construction of primary lining: The lower surface of the surrounding rock is sprayed with primary lining according to existing technology and equipment. The primary lining concrete evenly covers the bedrock. The primary lining 1 wraps the head of the anchor rod 5 and the shock-absorbing component 6 to ensure that the anchor rod 5 and the shock-absorbing component 6 do not leak out.
[0034] 4) Secondary lining construction: A secondary lining steel mesh is laid in the tunnel, leaving a gap between the secondary lining steel mesh and the lower surface of the primary lining 1. Secondary lining concrete is then sprayed to form the secondary lining 2. After the secondary lining 2 is formed, a gap is left between it and the primary lining 1 to facilitate subsequent construction.
[0035] 5) Installation of shock-absorbing and buffering components: The shock-absorbing and buffering components 7 are installed between the primary lining layer 1 and the secondary lining layer 2, and the shock-absorbing and buffering components 7 are located in the section where each anchor rod 5 is located. For the convenience of construction, the cross section where the anchor rod 5 is located should be marked during the construction of the anchor rod 5, so that the shock-absorbing and buffering components 7 can be installed in the plane of the anchor rod 5 for easy construction. The shock-absorbing and buffering components 7 include a damper 71 and a steel spring 72. The steel spring 72 is sleeved on the piston rod of the damper 71, and the steel spring 72 is driven to move when the piston rod is extended and retracted; the piston rod head of the damper 71 is fixed to the surrounding rock through a perforated support plate 75 and a screw, and the base of the damper 71 is fixed to the upper surface of the secondary lining layer 2.
[0036] When installing the shock-absorbing buffer 7, a cut is made on the lower surface of the primary lining 1 to remove part of the concrete to reserve an installation position, and the installation position is used to place the support pad 75. The cut position is offset from the installation position of the anchor rod 5, and the upper end of the damper 71 is fixed by the support pad 75.
[0037] like Figure 2 As shown, in order to prevent the load concentration from damaging the structure of the second lining 2, a rubber pad 73 is fixed to the base of the damper 71, and a steel pad 74 is also fixed to the bottom of the rubber pad 73. The steel pad 74 is fixed to the upper surface of the second lining 2 by screws. The steel pad 74 is an arc-shaped steel plate, and the curvature corresponds to the curvature of the upper surface of the second lining 2, so that the steel pad 74 is in close contact with the second lining 2. The length of the steel pad 74 is not less than 40 cm and the width is not less than 20 cm. The steel pad 74 increases the force-bearing area and reduces the pressure, thereby reducing the risk of load concentration.
[0038] 6) Construction of EPS concrete 3: Install formwork 8 in the gap between the primary lining layer 1 and the secondary lining layer 2, pour EPS concrete 3 in the formwork 8, the bottom of EPS concrete 3 and the upper surface of the secondary lining layer 2 solidify into one, and a gap layer 4 is formed between the upper surface of EPS concrete 3 and the lower surface of the primary lining layer 1. The piston rod of the damper 71 leaks out into the gap layer 4 to ensure that the damper 71 can retract and retract normally.
[0039] like Figure 4 and 5 As shown, the template 8 is in the shape of an arc plate and can be customized according to the tunnel structure and size. The template 8 is supported on the left and right sides of the tunnel, and the template 8 does not need to be supported near the top of the tunnel. A notch is left on the template 8, and the notches on adjacent templates 8 are spliced into a circular notch 81. The diameter of the circular notch 81 is equal to the outer diameter of the damper 71. The circular notch 81 is used to place the damper 71. The template 8 is removed after the EPS concrete 3 is cured and formed.
[0040] Function of the shock-absorbing component 6: When a natural disaster such as an earthquake occurs, the vibration of the surrounding rock drives the anchor rod 5 to vibrate. Since the shock-absorbing component 6 is connected to the tail end of the anchor rod 5, when the tail end of the anchor rod 5 swings, it drives the movable rod 62 to swing left and right in the metal sleeve 61 to release part of the energy; prevent the load from being concentrated on the tail end of the anchor rod 5, resulting in destructive fracture at the connection between the anchor rod 5 and the primary lining 1, causing damage to the tunnel structure.
[0041] Function of shock-absorbing buffer 7: The load generated by earthquake acts on damper 71 through primary lining 1. Damper 71 is compressed to absorb part of the energy. The load is transmitted to rubber pad 73 and steel pad 74 through damper 71. Since steel pad 74 is arc-shaped and has a large area, it helps to quickly disperse the load to secondary lining 2, avoiding stress concentration on the secondary lining 2, thereby improving the seismic resistance of the tunnel during earthquake.
[0042] EPS concrete filling layer 3: A gap layer of about 10-30 cm is formed between the EPS concrete filling layer 3 and the primary lining layer 1. The load generated by the earthquake acts on the buffer layer, which can consume a large amount of seismic wave energy, thereby reducing the impact of the earthquake on the secondary lining layer 2.
Claims
1. An implementation method for tunnel lining energy dissipation and shock absorption structure in high-intensity earthquake areas, characterized in that: The specific steps include: 1) Tunnel excavation; 2) Anchor rod (5) installation: An anchor rod (5) installation area is selected in the excavated tunnel, and holes are drilled on the surrounding rock in the same cross section of the tunnel. The drilling direction is located in the cross section, and the drilling positions are distributed on the top and side of the surrounding rock, and the holes are distributed radially; drilling construction is continued in the anchor rod (5) installation area at intervals, so that the holes cover the entire anchor rod (5) installation area; An anchor rod (5) is installed and fixed in the drilled hole, the head end of the anchor rod (5) is exposed, a shock absorbing member (6) is installed at the front end of the anchor rod (5), and the front end of the anchor rod (5) is elastically and movably connected to the shock absorbing member (6); 3) Construction of primary lining: spraying the lower surface of the surrounding rock with primary lining, and wrapping the head end of the anchor rod (5) and the shock absorbing member (6) in the primary lining (1) to ensure that the anchor rod (5) and the shock absorbing member (6) are not exposed; 4) Construction of the secondary lining: a secondary lining steel mesh is laid in the tunnel, a gap is formed between the secondary lining steel mesh and the lower surface of the primary lining (1), and then secondary lining concrete is sprayed to form a secondary lining (2). After the secondary lining (2) is formed, a gap is left between the secondary lining (2) and the primary lining (1); 5) Installation of shock-absorbing and buffering components: The shock-absorbing and buffering components (7) are installed between the primary lining layer (1) and the secondary lining layer (2), and the shock-absorbing and buffering components (7) are located in the cross section where each anchor rod (5) is located, and the shock-absorbing and buffering components (7) and the anchor rod (5) are arranged in a staggered manner; the shock-absorbing and buffering components (7) include a damper (71) and a steel spring (72), and the steel spring (72) is sleeved on the piston rod of the damper (71), and the steel spring (72) is driven to move when the piston rod is extended or retracted; the piston rod head end of the damper (71) is fixedly connected to the primary lining layer (1), and the base of the damper (71) is fixedly connected to the secondary lining layer (2); 6) EPS concrete (3) construction: a formwork (8) is installed in the gap between the primary lining layer (1) and the secondary lining layer (2), and EPS concrete (3) is poured in the formwork (8). The bottom layer of the EPS concrete (3) and the upper surface of the secondary lining layer (2) are solidified to form a whole, and a gap layer (4) is formed between the upper surface of the EPS concrete (3) and the lower surface of the primary lining layer (1), and the piston rod of the damper (71) is exposed in the gap layer (4); A rubber pad (73) is fixedly connected to the base of the damper (71), a steel pad (74) is also fixedly connected to the bottom of the rubber pad (73), the steel pad (74) is fixed to the upper surface of the second lining layer (2) by screws, and the rubber pad (73) and the steel pad (74) are cast and fixed in the EPS concrete (3); The shock absorbing member (6) comprises a metal sleeve (61), the top of the metal sleeve (61) is provided with an opening, and the head end of the anchor rod (5) is inserted into the metal sleeve (61) through the opening; a movable rod (62) perpendicular to the anchor rod (5) is inserted into the metal sleeve (61), and the middle part of the movable rod (62) is fixedly connected to the anchor rod (5); two springs (63) are sleeved on the movable rod (62), one end of the spring (63) abuts against the end of the metal sleeve (61) and the other end abuts against the anchor rod (5); when the anchor rod (5) swings left and right, the movable rod (62) moves left and right accordingly; a rubber sleeve (64) for sealing is connected to the outer surface of the metal sleeve (61); The rear end of the anchor rod (5) is provided with a screw hole, the middle portion of the movable rod (62) is provided with an external thread, and the middle portion of the movable rod (62) is threadedly connected to the anchor rod (5).
2. The implementation method of the tunnel lining energy dissipation and shock absorption structure applicable to high-intensity earthquake areas according to claim 1 is characterized in that: The steel backing plate (74) is an arc-shaped steel plate, and the curvature thereof is opposite to the curvature of the upper surface of the second lining layer (2). The length of the steel backing plate (74) is not less than 40 cm, and the width is not less than 20 cm.
3. The implementation method of the tunnel lining energy dissipation and shock absorption structure applicable to high-intensity earthquake areas according to claim 1 is characterized in that: The template (8) in step 6) is arc-shaped, with a notch left on the template (8), and the notches on adjacent templates (8) are spliced into a circular notch (81), and the circular notch (81) is used to place the damper (71).
4. The implementation method of the tunnel lining energy dissipation and shock absorption structure applicable to high-intensity earthquake areas according to claim 1 is characterized in that: The single construction length of the secondary lining (2) and EPS concrete (3) is 2-4 meters.