A building pipeline support device with earthquake-resistant function

By using support devices of boom groups, rotary connecting seats and sliding connecting seats on building pipelines, the problem of insufficient seismic resistance in the prior art is solved, and multi-directional seismic resistance and safety improvement are achieved.

CN114593277BActive Publication Date: 2024-11-22唐强 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210370946.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-11
Publication Date
2024-11-22
Estimated Expiration
2042-04-11

AI Technical Summary

Technical Problem

The existing building pipeline fixtures have insufficient seismic resistance during earthquakes and cannot take into account seismic resistance in multiple directions, which poses safety hazards.

Method used

The building pipeline support device is adopted including a boom group, a rotary connecting seat and a sliding connecting seat. The boom group includes a buffer boom, a horizontal cross arm, a support vertical arm and an elastic support assembly. The vibrating energy is reduced through sliding and rotary connections and offset the transverse wave. Influence.

Benefits of technology

It improves the seismic resistance of building pipelines, takes into account multi-dimensional seismic resistance, reduces the kinetic energy transmission of transverse waves to the pipeline, and solves the problems of weak seismic performance and safety hazards of existing devices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114593277B_ABST
    Figure CN114593277B_ABST
Patent Text Reader

Abstract

The present invention discloses a building pipe support device with earthquake-resistant function, comprising an arm group, a rotating connection seat and a sliding connection seat, the arm group comprises two buffer arms symmetrically arranged along the setting direction of the building pipe, the buffer arms comprise a horizontal cross arm, a supporting vertical arm and an elastic support component, the far end of the horizontal cross arm is freely slidably connected to the building pipe through the sliding connection seat, and the sliding connection seat is rotatably connected to the horizontal cross arm; the invention has a unique structure, which can not only buffer the building pipe that slides up and down under the influence of longitudinal waves, but also offset the influence of transverse waves on the building pipe, thereby effectively solving the problem that the existing spring support hanger cannot take into account the earthquake resistance in multiple directions, has weak earthquake resistance and cannot meet the actual earthquake resistance requirements, but also can effectively solve the problem that the existing spring support hanger can only buffer the shaking of the building pipe and still has great safety hazards.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building pipeline fixing and installation, and in particular relates to a building pipeline supporting device with earthquake-resistant function. Background Art

[0002] Generally, building pipes are used to meet people's daily needs, such as water pipes, domestic wastewater pipes, sewage pipes, natural gas pipes, and heating pipes. These building pipes are generally installed in underground passages in a rigid manner. During an earthquake, the rigid connection can easily cause the pipes to be pulled strongly under the strong external force of the earthquake, resulting in pipe damage. Once the pipe is damaged, it will directly affect the use of tap water, natural gas, sewage, heating, etc., and affect people's daily lives.

[0003] At present, in order to enhance the earthquake resistance of building pipelines, spring support hangers are generally used to hang and fix the building pipelines on the top wall of the underground passage to reduce the contact space between the building pipelines and the underground passage. Although the existing spring support hangers have a certain earthquake resistance, they can only use the springs on the spring support hangers to buffer the shaking of the building pipelines, cannot take into account earthquake resistance in multiple directions, cannot cope with the damage of earthquake transverse waves to the building pipelines, have weak earthquake resistance, and cannot meet the actual earthquake resistance requirements; and when performing earthquake resistance, the existing spring support hangers only use the springs on the spring support hangers to buffer the building pipelines that are shaken by the earthquake elastic waves and reduce the amplitude of the shaking, and there are still great safety hazards. Summary of the invention

[0004] In view of the defects and problems existing in the existing building pipeline fixation, the present invention provides a building pipeline support device with earthquake-resistant function. The device has a unique structure and can not only buffer the building pipeline that slides up and down under the influence of longitudinal waves, but also offset the influence of transverse waves on the building pipeline. It not only effectively solves the problems that the existing spring support hanger cannot take into account the earthquake resistance in multiple directions, has weak earthquake resistance and cannot meet the actual earthquake resistance requirements, but also can effectively solve the problem that the existing spring support hanger can only buffer the shaking of the building pipeline and still has great safety hazards.

[0005] The solution adopted by the present invention to solve the technical problem is: a building pipe support device with earthquake resistance function, including a boom group, a rotating connection seat and a sliding connection seat, the boom group includes two buffer booms symmetrically arranged along the setting direction of the building pipe, the buffer boom includes a horizontal cross arm, a supporting vertical arm and an elastic support component, the far end of the horizontal cross arm is freely slidably connected to the building pipe through the sliding connection seat, and the sliding connection seat is rotatably connected to the horizontal cross arm; the supporting vertical arm includes a vertical rod and a load-bearing rod, and the top of the vertical rod is vertically rotated through the rotating connection seat It is fixed on the top wall above the building pipe between the two rotating connecting seats, the bottom end of the vertical rod is connected to the load-bearing rod, the other end of the load-bearing rod is inclined toward the building pipe, the middle part of the load-bearing rod is cross-arranged with the horizontal cross arm, and are hinged together, the elastic support component is arranged in any of the four angle areas between the load-bearing rod and the horizontal cross arm, and the head and tail ends of the elastic support are respectively hinged to the load-bearing rod and the horizontal cross arm on the adjacent side, which is used to constrain the size of the angle between the load-bearing rod and the horizontal cross arm, so that the horizontal cross arm maintains a horizontal state under natural load-bearing state.

[0006] The sliding connection seat includes a guide sleeve and a connecting sleeve. The guide sleeve is matched and sleeved on the building pipe. The connecting sleeve is slidably sleeved on the guide sleeve, and the top end of the connecting sleeve is vertically provided with a connecting shaft, which is vertically connected to the far end of the horizontal cross arm for rotation.

[0007] A mounting platform is provided at the top of the connecting sleeve, and a connecting shaft is vertically fixed in the middle of the mounting platform; a connecting shaft hole is vertically provided at the far end of the horizontal cross arm, and the connecting shaft is rotatably sleeved in the connecting shaft hole through a bearing, and a horizontal cross arm is extended upward and connected to an anti-slip plate, and the bottom surface of the anti-slip plate and the upper end surface of the mounting platform are respectively in sliding contact with the upper and lower end surfaces of the horizontal cross arm, and the diameter of the anti-slip plate is larger than the diameter of the connecting shaft hole.

[0008] The edges of both the front and rear ends of the guide sleeve are provided with limit stops protruding in the radial direction, and the connecting sleeve is matched and sleeved on the guide sleeve between the two limit stops.

[0009] A limit stop is provided on the guide sleeve on the inner side of the limit stop, and the connecting sleeve is located between the two limit stops; a limit top spring is provided on the guide sleeve between the limit stop and the adjacent side limit stop, and the two ends of the limit top spring are respectively fixedly connected to the adjacent side limit stop and the limit stop.

[0010] The rotating connecting seat comprises a connecting seat body, which is fixedly connected to the top wall. A rotating hanging shaft is installed in the connecting seat body along the vertical rotation. The bottom end of the rotating hanging shaft extends downward from the connecting seat body and is fixedly connected to the top of the vertical pole.

[0011] The upper end surface of the connecting seat body is provided with an anti-slip groove in the vertical direction, and the bottom of the anti-slip groove is provided with a rotating shaft hole that penetrates the connecting seat body in the vertical direction. The rotating hanging shaft is rotatably mounted in the rotating shaft hole, and the top end of the rotating hanging shaft extends upward into the anti-slip groove and is vertically connected with an anti-slip plate. The bottom surface of the anti-slip plate is in sliding contact with the bottom of the anti-slip groove, and the anti-slip plate can rotate in the anti-slip groove following the fixed shaft.

[0012] The elastic support component is arranged in the angle area below the horizontal cross arm and away from the building pipeline side. The elastic support component includes a telescopic sleeve rod, and a support top spring is arranged in the telescopic sleeve rod. The support top spring will drive the telescopic sleeve rod to maintain the shortest retracted state in a natural state. Both ends of the telescopic sleeve rod are respectively hinged to the bottom end of the load-bearing rod and the proximal end of the horizontal cross arm through pins, and when the far end of the horizontal cross arm is loaded, the telescopic sleeve rod will be driven to extend outward and compress the support top spring.

[0013] The telescopic sleeve rod includes a sleeve shaft, a piston shaft, a fixed ring platform and a connecting bolt. The tail end of the sleeve is provided with a sliding cavity along the axial direction, and a fixed boss is fixedly mounted on the outer ring surface of the tail end of the sleeve. A plurality of guide strip holes connected with the internal sliding cavity are evenly opened along the circumference on the outer ring surface of the sleeve on the front side of the fixed boss; the piston shaft is slidably mounted in the sliding cavity of the sleeve, and the tail end of the piston shaft extends outward from the sleeve and is hinged to the tail end of the load-bearing rod; the fixed ring platform is matched and mounted on the sleeve shaft, and the fixed ring platform is connected to the piston shaft inside the sleeve shaft through the guide strip hole by the connecting bolt, and the fixed ring platform will drive the fixed ring platform to slide synchronously through the connecting bolt when the piston shaft slides; the supporting top spring is matched and mounted on the sleeve shaft between the fixed ring platform and the fixed boss, and the supporting top spring will push the fixed ring platform away from the fixed boss in a natural state.

[0014] When the two buffer suspension arms are in a natural use state, the angle between the two buffer suspension arms is less than 180 degrees.

[0015] The beneficial effects of the present invention are as follows: the building pipe support device with earthquake-resistant function provided by the present invention has a unique structure, including an arm group, a rotating connection seat, a sliding connection seat and an elastic support component. The arm group includes two buffer arms symmetrically arranged along the setting direction of the building pipe, one end of the buffer arm is slidably connected to the building pipe through the sliding connection seat, and the buffer arm is rotatably connected to the sliding connection seat, and the other end of the buffer arm is vertically rotated and fixed on the top wall above the building pipe between the two sliding connection seats through the rotating connection seat. When in use, the buffer arm can rotate around the building top wall connecting column and slide and rotate along the building pipe to reduce and reduce the kinetic energy of the front and back, left and right shaking transmitted by the low-profile transverse wave to the building pipe, thereby improving the earthquake-resistant effect of the building pipe, so that it can not only take into account the earthquake resistance in multiple directions, but also offset the kinetic energy transmitted by the earthquake transverse wave to the building pipe, effectively solving the problems that the existing spring support hanger cannot take into account the earthquake resistance in multiple directions, has weak earthquake resistance and cannot meet the actual earthquake resistance requirements, and can also effectively solve the problem that the existing spring support hanger can buffer the shaking of the building pipe but still has great safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.

[0017] Figure 2 It is a side structural schematic diagram of the present invention.

[0018] Figure 3 yes Figure 2 Enlarged structural diagram at A in the middle.

[0019] Figure 4 It is a schematic diagram of the three-dimensional structure of the buffer boom of the present invention.

[0020] Figure 5 It is a schematic diagram of the top structure of the present invention.

[0021] Figure 6 It is a schematic diagram of the three-dimensional structure of the sliding connection seat of the present invention.

[0022] Figure 7 It is a schematic diagram of the cross-sectional structure of the sliding connection seat of the present invention.

[0023] Figure 8 It is a schematic diagram of the installation position of the elastic support assembly of the present invention.

[0024] Fig. 9 It is one of the schematic diagrams of the telescopic sleeve structure of the present invention.

[0025] Fig.10 It is a schematic diagram of the forward and backward shaking movement process of the buffer suspension rod of the present invention.

[0026] Fig.11 It is a schematic diagram of the left-right shaking movement process of the buffer suspension rod of the present invention.

[0027] Fig.12 It is a structural schematic diagram of the limit buffer assembly of the present invention.

[0028] Fig.13 This is the second schematic diagram of the telescopic sleeve structure of the present invention.

[0029] Fig.14 It is a schematic diagram of the structure of the telescopic sleeve rod valve plate of the present invention.

[0030] Fig.15 It is a schematic diagram of the setting position of the guide track of the present invention.

[0031] Fig.16 It is a schematic diagram of the guide track structure of the present invention.

[0032] Fig.17 It is a schematic diagram of the setting position of the second elastic support component of the present invention.

[0033] Numbers in the figure: 1 is a boom assembly, 11 is a buffer boom, 12 is a horizontal cross arm, 121 is a notch groove, 13 is a supporting vertical arm, 131 is a vertical rod, 132 is a load-bearing rod, 14 is an elastic support assembly, 15 is a pin, 16 is a telescopic sleeve rod, 161 is a sleeve shaft, 1611 is a sliding cavity, 1612 is a guide bar hole, 162 is a piston shaft, 163 is a fixed ring platform, 164 is a connecting bolt, 165 is a fixed boss, 166 is a telescopic shaft, 167 is a connecting shaft, 1671 is a telescopic hole, 168 is a guide valve plate, 1681 is a connecting hole, 169 is an anti-slip ring, 17 is a support top Spring, 2 is a rotating connecting seat, 21 is a connecting seat body, 211 is an anti-slip groove, 212 is a hanging shaft hole, 22 is a rotating hanging shaft, 23 is an anti-slip plate b, 24 is an anti-slip plate c, 3 is a sliding connecting seat, 31 is a guide sleeve, 32 is a connecting sleeve, 33 is a connecting shaft, 34 is an installation platform, 35 is a connecting plate, 36 is an anti-slip plate, 37 is a limit stopper, 5 is a building pipeline, 6 is a building top wall, 7 is an extreme buffer assembly, 71 is an extreme stopper, 72 is an extreme top spring, 8 is a guide rail, 81 is a rail groove, 82 is an anti-slip slider, 9 is a second elastic support assembly, and 91 is a hinged rod. DETAILED DESCRIPTION

[0034] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0035] Example 1

[0036] The existing spring support hanger can only hang and fix the building pipes on the top wall of the underground passage, and use the springs on the spring support hanger to cushion the shaking of the building pipes. It cannot take into account the earthquake resistance in multiple directions, cannot cope with the damage of the earthquake transverse waves to the building pipes, has weak earthquake resistance, and cannot meet the actual earthquake resistance requirements; and when performing earthquake resistance, the existing spring support hanger only uses the springs on the spring support hanger to cushion the building pipes that are shaken by the earthquake elastic waves and reduce the amplitude of the shaking, which still poses a great safety hazard.

[0037] In view of the above problems, this embodiment provides a building pipeline support device with earthquake resistance function, such as Figure 1-11 As shown, it includes a boom group 1, a rotating connection seat 2 and a sliding connection seat 3. The boom group 1 includes two buffer booms 11 symmetrically arranged on one side of the building pipeline along the setting direction of the building pipeline 5. The angle between the two buffer booms 11 in the natural use state is less than 180 degrees; the buffer boom includes a horizontal cross arm 12, a supporting vertical arm 13 and an elastic support assembly 14. The distal end of the horizontal cross arm 12 is freely slidably connected to the building pipeline 4 through the sliding connection seat 3, and the sliding connection seat 3 is rotatably connected to the horizontal cross arm 12. Specifically:

[0038] like Figure 3-6 As shown, the sliding connection seat 3 includes a guide sleeve 31 and a connecting sleeve 32. The guide sleeve 31 is matched and sleeved on the building pipe 5. The connecting sleeve 32 is slidably sleeved on the guide sleeve, and the connecting sleeve can slide freely along the axial direction on the guide sleeve. The top of the connecting sleeve 32 is vertically provided with a connecting shaft 33, and the connecting shaft 33 is vertically connected to the far end of the horizontal cross arm. There are many ways to connect the connecting shaft 33 to the horizontal cross arm. For example, a mounting platform 34 is provided at the top of the connecting sleeve, and a connecting plate 35 is vertically welded to the bottom of the connecting shaft 33. The connecting plate is fixed to the center of the mounting platform by countersunk bolts. A connecting shaft hole is vertically provided at the distal end of the horizontal cross arm 12, and the connecting shaft is rotatably mounted in the connecting shaft hole through a bearing, and the horizontal cross arm is extended upward and connected with an anti-slip plate 36, and the bottom surface of the anti-slip plate 36 and the upper end surface of the connecting plate 35 are respectively in sliding contact with the upper and lower end surfaces of the horizontal cross arm, and the diameter of the anti-slip plate is larger than the diameter of the connecting shaft hole. The mounting platform and the anti-slip plate can not only strengthen the connection strength between the connecting shaft and the horizontal cross arm, but also because the bottom surface of the anti-slip plate and the upper end surface of the mounting platform are respectively in sliding contact with the upper and lower end surfaces of the horizontal cross arm, the rotation stability of the connecting shaft can be further enhanced.

[0039] Furthermore, radially protruding limit stops 37 are provided at the front and rear end edges of the guide sleeve 31, and the connecting sleeve is matched and mounted on the guide sleeve between the two limit stops. The limit stops at the front and rear ends of the guide sleeve can limit the sliding range of the connecting sleeve along the guide slideway to prevent the connecting sleeve from falling off the guide sleeve.

[0040] The supporting vertical arm 13 includes a vertical rod 131 and a load-bearing rod 132. The top of the vertical rod 131 is vertically rotated and fixed on the building top wall 6 above the building pipeline 5 between the two sliding connection seats 3 through a rotating connection seat 2. Specifically: Figure 2-5 As shown, the rotating connection seat 2 includes a connection seat body 21, the connection seat body 21 is fixedly connected to the top wall, a rotating suspension shaft 22 is vertically rotatably installed in the connection seat body, the bottom end of the rotating suspension shaft 22 extends downward from the connection seat body 21, and is fixedly connected to the top of the vertical rod 131; there are many ways to install the rotating suspension shaft, for example: the upper end surface of the connection seat body 21 is vertically opened with an anti-slip groove 211, the bottom of the anti-slip groove is vertically opened with a suspension shaft hole 212 that penetrates the connection seat body, and the rotating suspension shaft 2 2 is rotatably mounted in the hanging shaft hole 212, and the top end of the rotating hanging shaft extends upward into the anti-dropping groove and is vertically connected with an anti-dropping plate b23, the bottom surface of the anti-dropping plate b23 is in sliding contact with the bottom of the anti-dropping groove, and an anti-dropping plate c24 is fixedly mounted on the rotating hanging shaft 22 below the connecting seat body 21, the upper end surface of the anti-dropping plate c24 is in sliding contact with the connecting seat body 21, and the anti-dropping plate b23 and the anti-dropping plate c24 will rotate with the rotating hanging shaft to prevent the rotating hanging shaft from falling off from the connecting seat body in the vertical direction.

[0041] Furthermore, the anti-slip groove 211 is filled with a lubricating medium, and there are various types of lubricating media, for example, the lubricating medium is lubricating oil, which is used to reduce the friction between the anti-slip plate and the bottom of the anti-slip groove.

[0042] The bottom end of the vertical rod 131 is connected to the load-bearing rod 132, and the bottom end of the load-bearing rod 132 is inclined toward the building pipeline. The middle part of the load-bearing rod 132 is cross-set with the horizontal cross arm and hinged together. There are many ways to hinge the load-bearing rod with it, for example: Figure 4 As shown, a notch groove 121 is vertically opened in the middle of the horizontal cross arm 12 and penetrates the horizontal cross arm to the rear side. The width of the notch groove matches the width of the load-bearing rod. The notch groove and the middle of the load-bearing rod are longitudinally opened with penetrating pin holes. The load-bearing rod is matched and cross-inserted into the notch groove, and the pin hole in the middle of the load-bearing rod overlaps with the pin holes on the left and right groove walls in the middle of the notch groove, and they are hinged and fixed together by the pin shaft 15.

[0043] The elastic support assembly 14 is arranged in any of the four angle zones between the load-bearing rod 132 and the horizontal cross arm 12, and the head and tail ends of the elastic support are respectively hinged to the load-bearing rod and the horizontal cross arm on the adjacent side, and is used to constrain the size of the angle between the load-bearing rod and the horizontal cross arm, so that the horizontal cross arm maintains a horizontal state under a natural load-bearing state, specifically:

[0044] like Figure 8 and Fig. 9As shown, the elastic support assembly 14 is arranged in the angle area below the horizontal cross arm and away from the building pipeline side. The elastic support assembly 14 includes a telescopic sleeve 16. A support top spring 17 is arranged in the telescopic sleeve 16. The support top spring 17 will drive the telescopic sleeve to maintain the shortest retracted state in a natural state. Both ends of the telescopic sleeve are hinged to the bottom end of the load-bearing rod and the proximal end of the horizontal cross arm through pins respectively, and when the distal end of the horizontal cross arm is connected to the building pipeline through a sliding connecting seat and naturally bears weight, the telescopic sleeve will be driven to extend outward and compress the support top spring.

[0045] The telescopic sleeve rod 16 includes a sleeve shaft 161, a piston shaft 162, a fixed ring platform 163 and a connecting bolt 164. The tail end of the sleeve shaft 161 is provided with a sliding cavity 1611 along the axial direction, and a fixed boss 165 is fixedly sleeved on the outer ring surface of the tail end of the sleeve shaft 161. A plurality of guide strip holes 1612 connected with the internal sliding cavity are evenly opened along the circumference on the outer ring surface of the sleeve on the front side of the fixed boss; the piston shaft is slidably sleeved in the sliding cavity of the sleeve, and the tail end of the piston shaft extends outward from the sleeve and is hinged to the tail end of the load-bearing rod; the fixed ring platform is matched and sleeved on the sleeve shaft, and the fixed ring platform is connected to the piston shaft inside the sleeve shaft through the guide strip hole by the connecting bolt, and the fixed ring platform will drive the fixed ring platform to slide synchronously through the connecting bolt when the piston shaft slides; the supporting top spring is matched and sleeved on the sleeve shaft between the fixed ring platform and the fixed boss, and the supporting top spring will push the fixed ring platform away from the fixed boss in a natural state.

[0046] When the building pipe support device provided in the present embodiment is in use, when the building top wall 6 shakes up and down following the building encountering the longitudinal wave of the earthquake, the building top wall 6 will drive the building pipe to shake up and down through the building pipe support device. When the building pipe 5 shakes up and down, the horizontal cross arm will swing up and down around the hinge with the load-bearing rod following the shaking of the building pipe. While the horizontal cross arm swings up and down around the hinge with the load-bearing rod, it will simultaneously stretch and squeeze the telescopic sleeve rod of the elastic support component. In this process, when the telescopic sleeve rod is stretched, the supporting top spring will be squeezed, thereby applying a reverse force to the horizontal balance rod, buffering and reducing the shaking amplitude of the horizontal cross bar and the building pipe; when the building is shaken back and forth and left and right by the transverse wave of the earthquake, the two buffering booms will offset the transverse wave through the sliding connection seat. Specifically:

[0047] like Fig.10 As shown, when the building top wall 6 is driven by the transverse wave to shake back and forth, the building top wall 6 will drive the connecting sleeve of the corresponding sliding connection seat to slide synchronously back and forth along the outer ring wall of the guide sleeve through the two buffer arms, thereby offsetting the kinetic energy of the shaking transmitted back and forth by the transverse wave through the building top wall 6 and the buffer arms to the building pipeline; Fig.11As shown, when the building top wall 6 is driven by the transverse wave to shake left and right, and the kinetic energy driving the shaking left and right is transmitted to the building pipeline through the two buffer arms, since the connection mode between the two buffer arm columns and the connecting sleeve and the building is rotational connection, when the two buffer arm columns follow the building to shake left and right to push up and pull the building pipeline, the two buffer arms will rotate synchronously around the rotating suspension shaft in the direction of or opposite to each other, thereby pushing the connecting sleeve connected to the rotation of the two buffer arms to slide along the guide sleeve in the direction of or opposite to each other, thereby offsetting the kinetic energy of the shaking left and right transmitted to the building pipeline by the transverse wave through the building top wall 6 and the buffer arms. When the buffer arm columns follow the building top wall 6 to shake left and right to push up and pull the building pipeline, the two buffer arms will rotate synchronously around the rotating suspension shaft in the direction of or opposite to each other, thereby pushing the connecting sleeve connected to the rotation of the two buffer arms to slide along the guide sleeve in the direction of or opposite to each other, thereby offsetting the kinetic energy of the shaking left and right transmitted to the building pipeline by the transverse wave through the building and the buffer arms.

[0048] Compared with the existing building pipe fixing method, the building pipe support device provided in this embodiment utilizes the characteristics of the buffer boom being able to rotate around the building top wall connecting column and slide and rotate along the building pipe, thereby reducing and suppressing the kinetic energy of the front and back, left and right shaking transmitted by the low-profile transverse wave to the building pipe, thereby improving the seismic effect of the building pipe, so that it can not only take into account multi-directional seismic resistance, but also offset the kinetic energy transmitted by the earthquake transverse wave to the building pipe, effectively solving the problem that the existing spring support hanger cannot take into account multi-directional seismic resistance, has weak seismic resistance performance, and cannot meet the actual seismic resistance requirements, and can also effectively solve the problem that the existing spring support hanger can buffer the shaking of the building pipe but still has great safety hazards.

[0049] Example 2

[0050] The difference between Example 2 and Example 1 is that the structure of the telescopic sleeve rod is different.

[0051] like Fig.13As shown, the telescopic sleeve includes a telescopic shaft 166 and a connecting shaft 167. The tail end of the connecting shaft 167 is hinged to the proximal end of the horizontal cross arm 12 through a pin shaft. A telescopic hole 1671 is axially opened at the front end of the connecting shaft 167. A guide valve plate 168 is slidably installed in the telescopic hole 1671. An anti-disengagement ring 169 is coaxially installed at the front end opening of the telescopic hole 1671. A sliding hole connected to the telescopic hole is opened in the middle of the anti-disengagement ring 169. The diameter of the sliding hole is smaller than the diameter of the telescopic hole. The telescopic shaft 166 is slidably sealed in the sliding hole of the anti-disengagement ring, and the tail end of the telescopic shaft extends into the anti-disengagement ring. The telescopic hole is vertically connected to the valve plate 168, and the valve plate on the outside of the telescopic shaft is provided with a plurality of connecting holes 1681 which penetrate the valve plate axially, and the front end of the telescopic shaft is hinged to the bottom end of the load-bearing rod through a pin shaft; the support top spring is matched and sleeved on the telescopic shaft between the anti-detachment ring and the valve plate, and the support top spring will push the valve plate away from the anti-detachment ring in a natural state. Compared with the telescopic sleeve provided in Example 1, the telescopic sleeve of the building pipeline support device provided in this embodiment is provided with a telescopic hole, and the support top spring is installed in the telescopic hole, so that it will not be directly exposed to the air, thereby increasing the service life.

[0052] Furthermore, lubricating oil is filled in the telescopic hole of the connecting shaft. When the telescopic sleeve is lengthened or shortened, the lubricating oil in the telescopic hole will flow into the telescopic hole through the connecting hole on the valve plate. The lubricating oil can not only lubricate the telescopic shaft to reduce the friction between it and the connecting shaft, but also maintain the supporting top spring.

[0053] Example 3

[0054] The difference between Example 3 and Example 4 is that limit buffer components 7 are symmetrically provided at the front and rear ends of the guide sleeve.

[0055] like Fig.11 The limit buffer components 7 are symmetrically provided at the front and rear ends of the guide sleeve 31, and the limit buffer components 7 include a limit stop 71 and a limit top spring 72. The limit stop is on the guide sleeve inside the limit stop of the sliding sleeve, and the connecting sleeve is located between the two limit stops; the limit top spring is matched and mounted on the guide sleeve between the limit stop and the adjacent side limit stop, and the front and rear sections of the limit top spring are respectively connected to the limit stop and the limit stop. When in use, when the earthquake intensity exceeds the bearing range of the building pipeline support device, the connecting sleeve sliding along the guide sleeve will touch the limit stops on the adjacent sides respectively during the sliding process, and squeeze the limit top spring for buffering, so as to prevent the connecting sleeve from sliding larger due to the excessive earthquake intensity and colliding with the limit stop to cause damage to the device.

[0056] Example 4

[0057] The difference between Example 4 and Example 3 is that Fig.15 and Fig.16As shown, a guide track 8 is provided on the building top wall 6 on one side of the building pipeline along the pre-laying direction of the building pipeline, and the vertical section shape of the track groove 81 of the guide track 8 is an inverted convex shape. There are many ways to set the guide track, for example: the guide track is a steel track, which is fixed to the building top wall by expansion bolts; two independent anti-slip sliders 82 are matched and installed in the track groove of the guide track 8, and the bottom of the anti-slip slider extends downward through the notch of the track groove to extend the guide track for fixing the rotating connecting seat. Compared with Example 3, when the building pipeline support device provided by this embodiment is in use, when the dust on the guide sleeve is not cleaned in time, the friction between it and the connecting sleeve is increased, affecting the normal sliding of the connecting sleeve, causing the connecting sleeve to be unable to effectively offset the kinetic energy transmitted by the seismic shear wave, the buffer boom can drive the corresponding anti-slip slide to slide in the guide track by rotating the connecting seat, thereby assisting the sliding connecting seat to offset the kinetic energy transmitted by the seismic shear wave.

[0058] Example 5

[0059] The difference between Example 5 and Example 4 is that the tail end of the vertical pole is hinged to the top end of the load-bearing rod through a pin shaft, and a second elastic support component 9 is provided on the front side of the supporting vertical arm above the horizontal cross arm. The second elastic support component has the same structure as the elastic support component, and the two ends of the telescopic sleeve rod in the second elastic support component 9 are respectively hinged to the vertical pole and the load-bearing rod.

[0060] like Fig.17 As shown, the tail end of the vertical pole is hinged to the top end of the load-bearing rod through a pin shaft, and a second elastic support component 9 is provided on the front side of the supporting vertical arm above the horizontal cross arm. The second elastic support component 9 has the same structure as the elastic support component, and both include a telescopic sleeve rod provided with a supporting top spring, and the two ends of the telescopic sleeve rod are respectively hinged to the vertical pole and the load-bearing rod. Specifically: the vertical pole and the front side of the load-bearing rod above the horizontal cross arm are fixed with a hinge rod 91, and the two ends of the telescopic sleeve rod are respectively hinged to the ends of the hinge rod on the front side of the vertical pole and the load-bearing rod through a pin shaft; therefore, when the longitudinal wave of an earthquake transmits the kinetic energy of the up and down shaking to the building pipeline through the building and the buffer boom during use, the second elastic support component will initially buffer the transmitted energy, and then the elastic support component located in the angle area below the horizontal cross arm away from the building pipeline side will secondary buffer the transmitted energy, thereby reducing the influence of the buffer boom on the building pipeline caused by the longitudinal wave of the earthquake, and improving the earthquake-resistant effect.

[0061] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.

Claims

1. A building pipeline support device with earthquake resistance, characterized in that: The slingshot assembly comprises two buffer arms symmetrically arranged along the direction in which the building pipe is set, the buffer arms comprise a horizontal cross arm and a supporting vertical arm, the distal end of the horizontal cross arm is freely slidably connected to the building pipe through a sliding connection seat, and the sliding connection seat is rotatably connected to the horizontal cross arm; the supporting vertical arm comprises a vertical rod and a load-bearing rod, the top of the vertical rod is vertically rotated and fixed on the top wall above the building pipe between the two sliding connection seats through a rotating connection seat, the bottom end of the vertical rod is connected to the load-bearing rod, the bottom end of the load-bearing rod is inclined toward the building pipe, the middle part of the load-bearing rod is cross-arranged and hinged together, the elastic supporting assembly is arranged in any of the four angle areas between the load-bearing rod and the horizontal cross arm, and the head and tail ends of the elastic supporting assembly are respectively hinged to the load-bearing rod and the horizontal cross arm on the adjacent side, for constraining the size of the angle between the load-bearing rod and the horizontal cross arm, so that the horizontal cross arm maintains a horizontal state under a natural load-bearing state; The sliding connection seat comprises a guide sleeve and a connecting sleeve, the guide sleeve is matched and sleeved on the building pipe, the connecting sleeve is slidably sleeved on the guide sleeve, and a connecting shaft is vertically provided at the top of the connecting sleeve, and the connecting shaft is vertically rotatably connected to the far end of the horizontal cross arm; The top of the connecting sleeve is provided with an installation platform, and the connecting shaft is vertically fixed in the middle of the installation platform; the distal end of the horizontal cross arm is provided with a connecting shaft hole vertically, the connecting shaft is rotatably sleeved in the connecting shaft hole through a bearing, and the horizontal cross arm is extended upward and connected with an anti-slip plate, the bottom surface of the anti-slip plate and the upper end surface of the mounting platform are respectively in sliding contact with the upper and lower end surfaces of the horizontal cross arm, and the diameter of the anti-slip plate is larger than the diameter of the connecting shaft hole; the elastic support component is arranged in the angle area away from the building pipeline side below the horizontal cross arm, and the elastic support component includes a telescopic sleeve rod, and a support top spring is arranged in the telescopic sleeve rod, which will drive the telescopic sleeve rod to maintain the shortest retracted state in the natural state, and the two ends of the telescopic sleeve rod are respectively hinged to the bottom end of the load-bearing rod and the proximal end of the horizontal cross arm through pin shafts, and when the distal end of the horizontal cross arm is loaded, the telescopic sleeve rod will be driven to extend outward and compress the support top spring.

2. The building pipeline support device with earthquake resistance according to claim 1 is characterized in that: The edges of both the front and rear ends of the guide sleeve are provided with limit stops protruding in the radial direction, and the connecting sleeve is matched and sleeved on the guide sleeve between the two limit stops.

3. The building pipeline support device with earthquake resistance according to claim 2 is characterized in that: The front and rear ends of the guide sleeve are symmetrically provided with limit buffer components, and the limit buffer components include a limit stopper and a limit top spring. The limit stopper is slidably mounted on the guide sleeve on the inner side of the limit stopper, and the connecting sleeve is located between the two limit stops; the limit top spring is matchingly mounted on the guide sleeve between the limit stopper and the adjacent side limit stopper, and the front and rear sections of the limit top spring are respectively connected to the limit stopper and the limit stopper.

4. The building pipeline support device with earthquake resistance according to claim 1 is characterized in that: The rotating connecting seat comprises a connecting seat body, which is fixedly connected to the top wall. A rotating hanging shaft is installed in the connecting seat body along the vertical rotation. The bottom end of the rotating hanging shaft extends downward from the connecting seat body and is fixedly connected to the top of the vertical pole.

5. The building pipeline support device with earthquake resistance according to claim 4 is characterized in that: The upper end surface of the connecting seat body is provided with an anti-slip groove in the vertical direction, and the bottom of the anti-slip groove is provided with a rotating shaft hole that penetrates the connecting seat body in the vertical direction. The rotating hanging shaft is rotatably mounted in the rotating shaft hole, and the top end of the rotating hanging shaft extends upward into the anti-slip groove and is vertically connected with an anti-slip plate. The bottom surface of the anti-slip plate is in sliding contact with the bottom of the anti-slip groove, and the anti-slip plate can rotate in the anti-slip groove following the fixed shaft.

6. The building pipeline support device with earthquake resistance according to claim 1 is characterized in that: The telescopic sleeve rod includes a sleeve shaft, a piston shaft, a fixed ring platform and a connecting bolt. The tail end of the sleeve is provided with a sliding cavity along the axial direction, and a fixed boss is fixedly mounted on the outer ring surface of the tail end of the sleeve. A plurality of guide strip holes connected with the internal sliding cavity are evenly opened along the circumference on the outer ring surface of the sleeve on the front side of the fixed boss; the piston shaft is slidably mounted in the sliding cavity of the sleeve, and the tail end of the piston shaft extends outward from the sleeve and is hinged to the tail end of the load-bearing rod; the fixed ring platform is matched and mounted on the sleeve shaft, and the fixed ring platform is connected to the piston shaft inside the sleeve shaft through the guide strip hole by the connecting bolt, and the fixed ring platform will drive the fixed ring platform to slide synchronously through the connecting bolt when the piston shaft slides; the supporting top spring is matched and mounted on the sleeve shaft between the fixed ring platform and the fixed boss, and the supporting top spring will push the fixed ring platform away from the fixed boss in a natural state.

7. The building pipeline support device with earthquake resistance according to claim 1 is characterized in that: When the two buffer suspension arms are in a natural use state, the angle between the two buffer suspension arms is less than 180 degrees.