A construction technology of buried pipe with concrete lining at the bottom of circular hydraulic tunnel
By using the construction process of using embedded conveyor pipes and arc-shaped support formwork at the bottom of the circular hydraulic tunnel, the construction is solved by using the bottom-up extrusion injection of high-flow concrete, combining the structural joint water stop and end sealing formwork. The problems of water stop positioning and concrete quality defects have improved construction efficiency and quality.
Patent Information
- Application Number
- CN202210210947.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-04
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-03-04
AI Technical Summary
During the concrete lining construction at the bottom of the circular hydraulic tunnel, due to the narrow construction space and difficulty in water stop positioning, the special-shaped wooden assembly formwork has poor stability, resulting in concrete quality defects, such as expansion mold, eccentric displacement of water stop, honeycomb lint surface, etc. , increasing construction costs and construction period.
The construction process of concrete lining embedded pipe method at the bottom of the circular hydraulic tunnel is adopted. Through the embedded conveyor pipe and arc-shaped support formwork, the reinforcement formwork of copper water stop and rubber water stop are combined, and the high-flow concrete is used to bottom up. Extrusion injection, remove internal air, and reduce water stop seepage through structural joints and end sealing formwork.
It improves the density and apparent quality of concrete, reduces construction costs and construction period, reduces water stop failure and quality defects, and enhances construction stability and efficiency.
Smart Images

Figure CN114607412B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a construction process of a circular hydraulic tunnel bottom concrete lining buried pipe method, belonging to the technical field of engineering construction. Background Art
[0002] The water diversion structure is mainly composed of horseshoe-shaped and circular water diversion tunnels. For the concrete lining construction of circular or horseshoe-shaped circular tunnels, removable formwork (needle beam steel formwork trolley) or non-removable formwork (permanent steel lining) is often used for segmented casting. The lining structure joints of the pressure tunnel section adopt a double-layer water-stopping setting of 651 type rubber waterstop and water-stop copper sheet, and the flat pressure tunnel section adopts 651 type rubber waterstop.
[0003] A Chinese patent with publication number CN112096415A discloses a construction process of a circular tunnel bottom concrete lining buried pipe method, which adopts high-flow, self-compacting pumped concrete, and buries a steel pipe device at the bottom of the tunnel. The concrete is injected by concrete pumping and extrusion, and the high flowability of the concrete is used to squeeze and inject from bottom to top. The concrete rolls upward and gradually fills the bottom area of the tunnel. The concrete is extruded from the middle of the bottom of the casting area. The high flowability and self-compactness of the concrete can be used to fill the casting area. With the increase of the casting thickness, the fresh concrete injected at the bottom can effectively and continuously turn up from the bottom to disturb the poured upper concrete, remove the air inside the concrete, and rely on the self-gravity of the upper concrete to better exert the self-compactness of the concrete, which is used to effectively reduce the concrete quality defects that often occur at the bottom. The present invention reduces the construction cost of concrete defect treatment, saves construction period, and improves the reputation and competitiveness of the construction unit.
[0004] However, in the actual construction process, due to the narrow construction space, the special-shaped wooden assembly formwork used for water-stop positioning is difficult to reinforce and difficult to construct, resulting in poor overall stability of the positioning special-shaped wooden assembly formwork, and expansion of the formwork and eccentric displacement of the water-stop during the concrete pouring process, resulting in water seepage or failure of the water-stop; the anti-arc section of the lining concrete flow surface is difficult to vent during the concrete pouring process or the pouring construction method is improper, resulting in serious honeycombing and pockmarking on the flow surface of the concrete anti-arc section. The above-mentioned quality defects result in a large amount of work to deal with the quality defects of the lining concrete in the later stage of construction, which greatly increases the construction cost of the lining concrete. Summary of the invention
[0005] The purpose of the present invention is to provide a construction process of a circular hydraulic tunnel bottom concrete lining buried pipe method, which is used to solve the technical problems existing in the existing technical construction.
[0006] The technical solution of the present invention is a construction process of a circular hydraulic tunnel bottom concrete lining buried pipe method, comprising the following steps:
[0007] S1: Install the delivery pipe in the buried pipe assembly at the middle position of the bottom of the tunnel, and the length of the pre-buried delivery pipe is the same as the length of the tunnel lining segment;
[0008] S2: Install the arc-shaped support template inside the tunnel, install the end plugging template between two adjacent support templates, and simultaneously make the copper waterstop and rubber waterstop at the end plugging template;
[0009] S3: Process the reinforcement template on the end plugging template into an "L" shape according to the height and width of the copper waterstop nose, and fix the copper waterstop by embedding the reinforcement template at the raised part of the copper waterstop nose;
[0010] S4: The inner wooden templates on both sides of the convex ridge of the rubber water stop are processed in advance and then used for on-site template assembly. During the processing of the inner wooden template, the inner wooden template is cut into a 45° to 60° groove at the contact point between the middle convex ridge of the rubber water stop and the inner wooden template;
[0011] S5: An inner formwork reinforcement block is used on the inner side of the inner wooden formwork to form an internal top force, and the outer side of the inner wooden formwork is fixed to the edge steel pipe by vertical and horizontal reinforcement and welding. The space between the edge steel pipe and the end blocking formwork is filled with wooden boards and reinforced with wooden wedges.
[0012] In the aforementioned circular hydraulic tunnel bottom concrete lining buried pipe construction process, the buried pipe assembly includes a delivery pipe, the inlet end of the delivery pipe is connected to the delivery pump, a group of discharge holes are opened on the delivery pipe along its axial direction, and the inside of the delivery pipe at the discharge hole is connected to the fan blade through a rotating rod.
[0013] In the aforementioned circular hydraulic tunnel bottom concrete lining buried pipe construction process, a telescopic rod is installed inside the conveying pipe at the discharge hole, and the free end of the telescopic rod is connected to the end of the rotating rod.
[0014] In the aforementioned circular hydraulic tunnel bottom concrete lining buried pipe construction process, the outer sleeve of the conveying pipe is provided with an arc-shaped support plate, and a discharge trough matching with it is opened at the position of the support plate corresponding to the discharge hole, and the discharge hole and the discharge trough are connected through a transition sleeve.
[0015] In the aforementioned circular hydraulic tunnel bottom concrete lining buried pipe construction process, the end of the delivery pipe away from the delivery pump is connected to a control valve, and a sealing component is provided on the inner wall of the delivery pipe at the discharge hole.
[0016] In the aforementioned circular hydraulic tunnel bottom concrete lining buried pipe construction process, the sealing assembly includes a sliding cavity arranged on the inner wall of the conveying pipe, and the end of the sliding cavity close to the discharge hole is slidably connected with a baffle, and the side wall of the baffle is in contact with the inner wall of the sliding cavity. A pressure chamber is arranged on the inner wall of the conveying pipe at the telescopic rod, and a piston slidably connected to the pressure chamber is connected between the end of the telescopic rod and the rotating rod, and the side wall of the pressure chamber at the bottom of the piston is connected to the end of the sliding cavity away from the baffle through an air pipe.
[0017] In the aforementioned circular hydraulic tunnel bottom concrete lining buried pipe construction process, the sliding cavity is arranged on the side of the discharge hole away from the control valve, a sliding groove is provided at the bottom of the end of the baffle plate close to the discharge hole, a sliding block is slidably connected inside the sliding groove, an elastic part is connected between the sliding block and the inner end of the sliding groove, a chamfer is provided on the side of the free end of the sliding block away from the control valve, and a connecting part connecting the inner end of the sliding groove and the sliding cavity is provided inside the baffle plate.
[0018] In the aforementioned circular hydraulic tunnel bottom concrete lining buried pipe construction process, a receiving cavity is provided on the side of the baffle close to the inner wall of the conveying pipe, the inner end of the receiving cavity is fixedly connected to an elastomer, and the outer end of the receiving cavity is provided with a sealing plate that movably fits with the end of the elastomer, a through groove is provided inside the sealing plate along its length direction, a connecting groove connected to the through groove is provided in the middle of the sealing plate, the middle of the through groove is filled with an expansion block, the expansion block is made of water-swelling waterstop material, and slide plates are respectively provided in the through grooves 24 at both ends of the expansion block, and slots matching the slide plates are symmetrically provided on the side walls of the discharge trough.
[0019] In the aforementioned circular hydraulic tunnel bottom concrete lining buried pipe construction process, a sealing plate is sleeved on the outer wall of one end of the delivery pipe close to the control valve, and the outer side surface of the sealing plate is in contact with the inner wall of the support plate.
[0020] Beneficial effects of the invention: Compared with the prior art, the invention has the following advantages:
[0021] 1. The present invention reduces the difficulty in reinforcing and constructing the special-shaped wooden assembly formwork for water-stop positioning, which results in poor overall stability of the special-shaped wooden assembly formwork, by setting up the construction process of structural joint water-stopping, end plugging formwork and concrete pouring. At the same time, it reduces the problem of formwork expansion and eccentric displacement of water-stopping that causes water seepage or failure of water-stopping during concrete pouring.
[0022] 2. The present invention pre-buries the delivery pipe in the buried pipe assembly at the bottom of the supporting formwork, pumps concrete into the bottom of the supporting formwork through the delivery pump and the delivery pipe, utilizes the high fluidity of the concrete, and squeezes and injects it from the bottom of the supporting formwork from bottom to top, so that the concrete rolls upward and gradually fills the bottom area of the tunnel, and effectively discharges the air inside it, effectively reducing the use of valves reserved on both sides of the formwork in the current construction process, which leads to quality defects such as honeycombs, pores and voids in the concrete at the bottom of the casting area and the arc sections on both sides, thereby improving the density and apparent quality of the lining concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a process step diagram of the present invention;
[0024] Figure 2 It is a schematic diagram of the structure of the present invention;
[0025] Figure 3 It is a partial cross-sectional view of the template for the end of the lining structure seam and the water stop laying of the pressure tunnel section;
[0026] Figure 4 It is a schematic diagram of the seam end template and water stop laying of the lining structure of the pressure tunnel section;
[0027] Figure 5 yes Figure 2 The enlarged view of point A in the middle;
[0028] Figure 6 yes Figure 5 The enlarged view of point B in the middle;
[0029] Figure 7 It is a schematic diagram of the structure of the baffle in the present invention when it is working.
[0030] Figure markings: 1-support template, 2-end plugging template, 3-conveying pipe, 4-discharge hole, 5-fan blade, 6-telescopic rod, 7-support plate, 8-discharge trough, 9-transition sleeve, 10-control valve, 11-sliding cavity, 12-baffle, 13-pressure cavity, 14-piston, 15-air pipe, 16-slider, 17-elastic part, 18-chamfer, 19-air duct, 20-sealing plate, 21-storage cavity, 22-elastic body, 23-plugging plate, 24-through groove, 25-connecting groove, 26-expansion block, 27-slide plate, 28-slot. DETAILED DESCRIPTION
[0031] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0032] Embodiment of the present invention: A circular hydraulic tunnel bottom concrete lining buried pipe construction process, such as Figure 1-Figure 4 As shown, the process steps are as follows:
[0033] S1: Install the delivery pipe 3 in the buried pipe assembly at the middle position of the bottom of the tunnel, and the length of the pre-buried delivery pipe 3 is the same as the length of the tunnel lining segment;
[0034] S2: Install the arc-shaped support template 1 inside the tunnel, install the end plugging template 2 between two adjacent support templates 1, and simultaneously manufacture the copper waterstop and rubber waterstop at the end plugging template 2;
[0035] S3: Process the reinforcement template on the end plugging template 2 into an "L" shape according to the height and width of the copper waterstop nose, and fix the copper waterstop by embedding the reinforcement template at the raised part of the copper waterstop nose;
[0036] S4: The inner wooden templates on both sides of the rubber waterstop ridge need to be processed in advance, and then used for on-site template assembly to strengthen the embedding and positioning of the copper waterstop groove, the middle ridge of the rubber waterstop and the middle block template. During the processing of the inner wooden template, the inner template is cut into a 45°~60° groove at the contact point between the middle ridge of the rubber waterstop and the inner wooden template to further increase the fixing effect of the inner template;
[0037] S5: An inner formwork reinforcement block is set on the inner side of the inner wooden formwork to form an internal top force. The outer side of the inner wooden formwork is fixed to the edge steel pipe by vertical and horizontal anchor bars and welding. The space between the edge steel pipe and the end blocking formwork is filled with wooden boards and reinforced with wooden wedges to ensure the flatness of the end of the structural joint.
[0038] The present invention pre-buries the delivery pipe 3 in the buried pipe assembly at the bottom of the support formwork 1, pumps concrete from the bottom of the support formwork 1 through the delivery pump and the delivery pipe 3, utilizes the high fluidity of concrete, squeezes and injects from the bottom of the support formwork 1 from the bottom to the top, so that the concrete rolls upward and gradually fills the bottom area of the tunnel, and effectively discharges the air inside it, effectively reducing the valves reserved on both sides of the formwork used in the current construction process, and injects concrete by pumping, and relies on gravity to freely fall and fill the pouring area, resulting in the concrete at the bottom of the pouring area and the arc sections on both sides. Quality defects such as honeycombs, pores and cavities appear, the density and apparent quality of the lining concrete are improved, the construction cost of concrete defect treatment is reduced, and the construction period is saved. At the same time, by setting the construction process of structural seam water-stopping, end plugging formwork 2 and concrete pouring, the difficulty of reinforcing the special-shaped wooden assembly formwork for water-stopping positioning and the difficulty of construction are reduced, resulting in the problem of poor overall stability of the positioning special-shaped wooden assembly formwork, and at the same time, the problem of bulging mold and eccentric displacement of water-stopping causing water-stopping seepage or failure during concrete pouring is reduced.
[0039] The rubber waterstop is installed with an L-shaped reinforcement formwork. After the concrete is poured, the steel end plate is removed and the inner formwork reinforcement block made of φ8 steel bars is used to reinforce the leaking waterstop, further reducing the deformation and failure of the waterstop caused by the pouring of the next ring of lining concrete.
[0040] like Figure 5-Figure 6 As shown, the buried pipe assembly includes a delivery pipe 3, one end of which is connected to a delivery pump capable of delivering concrete, and a group of discharge holes 4 are opened on the outer surface of the delivery pipe 3 along its axial direction, and the inside of the delivery pipe 3 at the discharge hole 4 is rotatably connected to a fan blade 5 through a rotating rod. When the concrete in the delivery pipe 3 is pumped out from the discharge hole 4, it can drive the fan blade 5 to rotate. When the high-fluidity concrete in the delivery pipe 3 is squeezed out from the discharge hole 4, the concrete exerts a force on the fan blade 5, so that the fan blade 5 rotates continuously and stirs and disturbs the extruded concrete, effectively removing the air retained in the concrete, and further reducing the quality defects at the bottom and the arc sections on both sides of the casting area.
[0041] A telescopic rod 6 is installed inside the delivery pipe 3 at the discharge hole 4, and the free end of the telescopic rod 6 is connected to the end of the rotating rod. When the cavity between the support formwork 1 and the tunnel is poured, the fan blades 5 are driven by the telescopic rod 6 to be stored inside the delivery pipe 3, so that the delivery pipe 3 can be more easily drawn out from the inner end of the support formwork 1 and reused, reducing the situation where the fan blades 5 extend outside the delivery pipe 3, resulting in greater resistance when the delivery pipe 3 is drawn out of the concrete inside the support formwork 1.
[0042] The outer part of the delivery pipe 3 is sleeved with an arc-shaped support plate 7, and a discharge trough 8 matching with the discharge hole 4 is provided at the position of the support plate 7 corresponding to the discharge hole 4. A transition sleeve 9 connected to the discharge trough 8 is connected to the delivery pipe 3 at the outer end of the discharge hole 4. When the delivery pipe 3 is pre-buried, the support plate 7 is sleeved on the outside of the delivery pipe 3 at the same time, and the transition sleeve 9 on the delivery pipe 3 is aligned with the discharge trough 8. At this time, the concrete in the delivery pipe 3 can be squeezed out through the discharge trough 8, and the support plate 7 can isolate the extruded concrete from the delivery pipe 3, so that when the subsequent pouring is completed, the delivery pipe 3 can be more easily pulled out from the inside of the support formwork 1 by sliding inside the support plate 7, further improving the convenience during construction.
[0043] The end of the delivery pipe 3 away from the delivery pump is connected with a control valve 10, and a blocking assembly is provided on the inner wall of the delivery pipe 3 at the discharge hole 4. When the delivery pipe 3 needs to be drawn out from the inside of the support plate 7, the control valve 10 and the delivery pump work simultaneously, and the blocking assembly seals the discharge hole 4, so that the concrete in the delivery pipe 3 is squeezed out from the end of the delivery pipe 3 to the end of the support plate 7. As the delivery pipe 3 gradually slides out from the inner end of the support plate 7, the concrete squeezed out from the end of the delivery pipe 3 can gradually fill the entire support plate 7 and squeeze out the residual gas inside it, thereby realizing the concrete pouring work inside the support plate 7 and improving the overall strength of the concrete at the support plate 7.
[0044] The blocking assembly includes a sliding cavity 11 arranged on the inner wall of the conveying pipe 3, and a baffle 12 is slidably connected to one end of the sliding cavity 11 near the discharge hole 4, and the side wall of the baffle 12 fits with the inner wall of the sliding cavity 11. A pressure cavity 13 is connected to the inner wall of the conveying pipe 3 at the telescopic rod 6, and a piston 14 slidably connected to the pressure cavity 13 is connected between the end of the telescopic rod 6 and the rotating rod, and the side wall of the pressure cavity 13 at the bottom of the piston 14 is connected to the end of the sliding cavity 11 away from the baffle 12 through an air pipe 15. When the chamber outside the support plate 7 is cast, the telescopic rod 6 drives the fan blades 5 to retract into the conveying pipe 3, and the piston 14 presses the gas at the bottom of the pressure cavity 13 into the inner end of the sliding cavity 11 through the air pipe 15, so that the baffle 12 in the sliding cavity 11 moves toward the discharge hole 4 and blocks the discharge hole 4, so that the opening and closing of the discharge hole 4 can be automatically operated by the operation of the telescopic rod 6.
[0045] The slide cavity 11 is arranged on the side of the discharge hole 4 away from the control valve 10, a slide groove is provided at the bottom of the end of the baffle plate 12 close to the discharge hole 4, a slider 16 is slidably connected inside the slide groove, an elastic member 17 is connected between the slider 16 and the inner end of the slide groove, a chamfer 18 is provided on the side of the free end of the slider 16 away from the control valve 10, and an air passage 19 connecting the inner end of the slide groove with the inside of the slide cavity 11 is provided inside the baffle plate 12. By setting the position of the slide cavity 11, the situation that the end of the baffle plate 12 is directly facing the feed end of the conveying pipe 3, resulting in the flow of concrete hindering the movement of the baffle plate 12 is reduced. At the same time, when the interior of the slide cavity 11 is inflated and drives the slide groove on the baffle 12 to slide out of the slide cavity 11, the gas in the slide cavity 11 is pressed into the slide groove through the air channel 19 and drives the slider 16 to slide toward the outer end of the slide groove. At this time, the flowing concrete can promote the movement of the baffle 12 toward the side of the discharge hole 4 by squeezing the slider 16. When the baffle 12 retracts to the inner end of the slide cavity 11 for reset, the end of the slide cavity 11 can press the slider 16 into the slide groove by squeezing the chamfer 18 on the slider 16, so that the slider 16 can be effectively reset and work reciprocatingly.
[0046] A sealing plate 20 is connected to the outer wall of one end of the delivery pipe 3 near the control valve 10, and the outer side of the sealing plate 20 is in contact with the inner wall of the support plate 7. When concrete flows out from the opened control valve 10 to the end of the support plate 7, the sealing plate 20 can limit the outflowing concrete, so that the concrete that continuously flows out can exert pressure on the end of the delivery pipe 3, so that the delivery pipe 3 can be more easily drawn out from the inside of the support plate 7.
[0047] like Figure 7 As shown, a receiving chamber 21 is provided on one side of the baffle plate 12 close to the inner wall of the conveying pipe 3, an inner end of the receiving chamber 21 is fixedly connected with an elastomer 22, an outer end of the receiving chamber 21 is provided with a sealing plate 23 which is movably fitted with the end of the elastomer 22, a through groove 24 is provided inside the sealing plate 23 along its length direction, a connecting groove 25 connected with the through groove 24 is provided in the middle of the upper end of the sealing plate 23, the middle part of the through groove 24 is filled with an expansion block 26, the expansion block 26 is made of a water-swelling waterstop material, slide plates 27 are respectively provided in the through grooves 24 at both ends of the expansion block 26, and slots 28 matching the slide plates 27 are symmetrically provided on the side walls of the discharge trough 8. When the baffle 12 blocks the discharge hole 4, the baffle 12 can drive the blocking plate 23 to move to the discharge hole 4, and eject the blocking plate 23 into the discharge trough 8 through the elastic body 22, and then the water in the concrete flowing into the outer end of the discharge trough 8 contacts the expansion block 26 through the connecting groove 25, so that the expansion block 26 drives the slide plates 27 at both ends to insert into the card groove 28 after expansion, so that the slide plates 27 can be locked inside the discharge trough 8, reducing the concrete outside the support plate 7 from flowing back from the discharge trough 8 and causing the internal collapse. At the same time, the expansion block 26 can also absorb the water in the concrete at the discharge trough 8, improve the solidification efficiency of the concrete there, and further reduce the concrete there flowing into the support plate 7 through the discharge trough 8.
[0048] Working principle: by pre-burying the delivery pipe 3 in the buried pipe assembly at the bottom of the support formwork 1, the concrete is pumped in from the bottom of the support formwork 1 through the delivery pump and the delivery pipe 3, and the high fluidity of the concrete is used to squeeze and inject from the bottom of the support formwork 1 from the bottom to the top, so that the concrete rolls upward and gradually fills the bottom area of the tunnel, and effectively discharges the air inside it, effectively reducing the valves reserved on both sides of the formwork used in the current construction process, and injecting concrete by pumping, relying on gravity to freely fall and fill the pouring area, resulting in the concrete at the bottom of the pouring area and the arc sections on both sides. Quality defects such as honeycombs, pores and voids appear, improving the density and apparent quality of the lining concrete, reducing the construction cost of concrete defect treatment, and saving construction time. At the same time, by setting the construction process of structural joint water stop, end plugging formwork 2 and concrete pouring, the difficulty of reinforcing the special-shaped wooden assembly formwork for water stop positioning and the difficulty of construction are reduced, resulting in the problem of poor overall stability of the positioning special-shaped wooden assembly formwork, and at the same time reducing the problem of expansion of the formwork and eccentric displacement of water stop during concrete pouring, resulting in water seepage or failure of water stop. When the high-fluidity concrete in the delivery pipe 3 is squeezed out from the discharge hole 4, the concrete exerts a force on the blades 5, causing the blades 5 to rotate continuously and stirring the extruded concrete, effectively removing the air retained in the concrete, and further reducing the quality defects at the bottom and the arc sections on both sides of the casting area. When the cavity between the support formwork 1 and the tunnel is cast, the blades 5 are driven by the telescopic rod 6 to be stored in the delivery pipe 3, so that the delivery pipe 3 can be more easily pulled out from the inner end of the support formwork 1 and reused, reducing the situation where the blades 5 extend outside the delivery pipe 3, resulting in greater resistance when the delivery pipe 3 is pulled out of the concrete inside the support formwork 1. When the delivery pipe 3 is pre-buried, the support plate 7 is simultaneously sleeved on the outside of the delivery pipe 3, and the transition sleeve 9 on the delivery pipe 3 is aligned with the discharge trough 8. At this time, the concrete in the delivery pipe 3 can be squeezed out through the discharge trough 8, and the support plate 7 can isolate the extruded concrete from the delivery pipe 3, which is convenient for the subsequent pouring. When the delivery pipe 3 is completed, it can be more easily pulled out from the inside of the support formwork 1 by sliding inside the support plate 7, further improving the convenience during construction. When the delivery pipe 3 needs to be pulled out from the inside of the support plate 7, the control valve 10 and the delivery pump work at the same time, and the blocking component closes the discharge hole 4, so that the concrete in the delivery pipe 3 is squeezed out from the end of the delivery pipe 3 to the end of the support plate 7. As the delivery pipe 3 gradually slides out from the inner end of the support plate 7, the concrete squeezed out from the end of the delivery pipe 3 can gradually fill the entire support plate 7 and squeeze out the residual gas inside it, thereby realizing the concrete pouring work inside the support plate 7 and improving the overall strength of the concrete at the support plate 7.When the casting of the chamber outside the support plate 7 is completed, the telescopic rod 6 drives the fan blades 5 to retract into the conveying pipe 3, and the gas at the bottom of the pressure chamber 13 is pressed into the inner end of the sliding chamber 11 through the air pipe 15 by the piston 14, so that the baffle 12 in the sliding chamber 11 moves toward the side of the discharge hole 4 and blocks the discharge hole 4, so that the opening and closing of the discharge hole 4 can be automatically operated by the operation of the telescopic rod 6. By setting the position of the slide cavity 11, the end of the baffle 12 is reduced to be opposite to the feed end of the conveying pipe 3, resulting in the flow of concrete hindering the movement of the baffle 12. At the same time, when the slide cavity 11 is inflated and drives the slide groove on the baffle 12 to slide out of the slide cavity 11, the gas in the slide cavity 11 is pressed into the slide groove through the air channel 19, and drives the slider 16 to slide toward the outer end of the slide groove. At this time, the flowing concrete can promote the movement of the baffle 12 to the side of the discharge hole 4 by squeezing the slider 16. When the baffle 12 retracts to the inner end of the slide cavity 11 for reset, the end of the slide cavity 11 can press the slider 16 into the slide groove by squeezing the chamfer 18 on the slider 16, so that the slider 16 can be effectively reset and reciprocate. When the concrete flows out from the opened control valve 10 to the end of the support plate 7, the sealing plate 20 can limit the outflowing concrete, so that the concrete that continuously flows out can exert pressure on the end of the conveying pipe 3, so that the conveying pipe 3 can be more easily drawn out from the inside of the support plate 7. When the baffle 12 blocks the discharge hole 4, the baffle 12 can drive the blocking plate 23 to move to the discharge hole 4, and pop the blocking plate 23 into the discharge trough 8 through the elastic body 22. Then, the moisture in the concrete flowing into the outer end of the discharge trough 8 contacts the expansion block 26 through the connecting groove 25, so that the expansion block 26 drives the slide plates 27 at both ends to insert into the card groove 28 after expansion, so that the slide plate 27 can be locked in the discharge trough 8, reducing the concrete outside the support plate 7 from flowing back from the discharge trough 8 and causing the internal collapse thereof. At the same time, the expansion block 26 can also absorb the moisture in the concrete at the discharge trough 8, thereby improving the solidification efficiency of the concrete there, and further reducing the concrete there from flowing into the support plate 7 through the discharge trough 8.
Claims
1. A construction process for the concrete lining of a circular hydraulic tunnel bottom. Features: The following steps are included: S1: installing the delivery pipe (3) in the buried pipe assembly at the middle position of the bottom of the tunnel, and the length of the pre-buried delivery pipe (3) is the same as the length of the tunnel lining segment; S2: installing the arc-shaped support template (1) inside the tunnel, installing the end plugging template (2) between two adjacent support templates (1), and simultaneously manufacturing the copper waterstop and rubber waterstop at the end plugging template (2); S3: Process the reinforcement template on the end plugging template (2) into an "L" shape according to the height and width of the copper waterstop nose, and fix the copper waterstop by embedding the reinforcement template at the raised part of the copper waterstop nose; S4: The inner wooden templates on both sides of the convex ridge of the rubber water stop are processed in advance and then used for on-site template assembly. During the processing of the inner wooden template, the inner wooden template is cut into a 45° to 60° groove at the contact point between the middle convex ridge of the rubber water stop and the inner wooden template; S5: An inner formwork reinforcement block is used on the inner side of the inner wooden formwork to form an inner top force, and the outer side of the inner wooden formwork is fixed to the edge steel pipe by vertical and horizontal reinforcement and welding. The space between the edge steel pipe and the end blocking formwork (2) is filled with wooden boards and reinforced with wooden wedges.
2. The construction process of the circular hydraulic tunnel bottom concrete lining buried pipe method according to claim 1, Features: The buried pipe assembly comprises a conveying pipe (3), the inlet end of the conveying pipe (3) is connected to a conveying pump, a group of discharge holes (4) are opened on the conveying pipe (3) along its axial direction, and the inside of the conveying pipe (3) at the discharge hole (4) is rotatably connected to a fan blade (5) via a rotating rod.
3. The construction process of the circular hydraulic tunnel bottom concrete lining buried pipe method according to claim 2, Features: A telescopic rod (6) is installed inside the conveying pipe (3) at the discharge hole (4), and the free end of the telescopic rod (6) is connected to the end of the rotating rod.
4. The construction process of the circular hydraulic tunnel bottom concrete lining buried pipe method according to claim 3, Features: The conveying pipe (3) is externally sleeved with an arc-shaped support plate (7), and a discharge trough (8) matching with the discharge hole (4) is provided at a position of the support plate (7) corresponding to the discharge hole (4), and the discharge hole (4) and the discharge trough (8) are connected via a transition sleeve (9).
5. The construction process of the circular hydraulic tunnel bottom concrete lining buried pipe method according to claim 4, Features: The end of the delivery pipe (3) away from the delivery pump is connected to a control valve (10), and a blocking component is provided on the inner wall of the delivery pipe (3) at the discharge hole (4).
6. The construction process of the circular hydraulic tunnel bottom concrete lining buried pipe method according to claim 5, Features: The blocking assembly comprises a sliding cavity (11) arranged on the inner wall of the conveying pipe (3); an end of the sliding cavity (11) close to the discharge hole (4) is slidably connected to a baffle (12); the side wall of the baffle (12) is in contact with the inner wall of the sliding cavity (11); a pressure cavity (13) is arranged on the inner wall of the conveying pipe (3) at the telescopic rod (6); a piston (14) slidably connected to the pressure cavity (13) is connected between the end of the telescopic rod (6) and the rotating rod; the side wall of the pressure cavity (13) at the bottom end of the piston (14) is connected to the end of the sliding cavity (11) away from the baffle (12) through an air pipe (15).
7. The construction process of the circular hydraulic tunnel bottom concrete lining buried pipe method according to claim 6, Features: The slide cavity (11) is arranged on a side of the discharge hole (4) away from the control valve (10); a slide groove is provided at the bottom of one end of the baffle plate (12) close to the discharge hole (4); a slider (16) is slidably connected inside the slide groove; an elastic member (17) is connected between the slider (16) and the inner end of the slide groove; a chamfer (18) is provided on the side of the free end of the slider (16) away from the control valve (10); and an air passage (19) is provided inside the baffle plate (12) to connect the inner end of the slide groove with the inside of the slide cavity (11).
8. The construction process of the circular hydraulic tunnel bottom concrete lining buried pipe method according to claim 6, Features: A receiving chamber (21) is provided on one side of the baffle plate (12) close to the inner wall of the conveying pipe (3); an elastic body (22) is fixedly connected to the inner end of the receiving chamber (21); a blocking plate (23) movably fitted with the end of the elastic body (22) is provided at the outer end of the receiving chamber (21); a through groove (24) is provided inside the blocking plate (23) along its length direction; a connecting groove (25) connected to the through groove (24) is provided in the middle of the blocking plate (23); an expansion block (26) is filled in the middle of the through groove (24); the expansion block (26) is made of a water-swelling water stop strip material; slide plates (27) are respectively provided in the through grooves (24) at both ends of the expansion block (26); and clamping grooves (28) matched with the slide plates (27) are symmetrically provided on the side wall of the discharge trough (8).
9. The construction process of the circular hydraulic tunnel bottom concrete lining buried pipe method according to claim 4, Features: A sealing plate (20) is sleeved on the outer wall of one end of the delivery pipe (3) close to the control valve (10), and the outer side surface of the sealing plate (20) is in contact with the inner wall of the support plate (7).