Distribution network power supply reliability assessment method and device

By obtaining and classifying the topological structure and fault data of the park distribution network, calculating the wiring type and power outage time of the power supply area, the problem of complexity of the power supply reliability assessment of the park distribution network is solved, and standardized evaluation and efficient power supply reliability are achieved. Evaluate.

CN114757496BActive Publication Date: 2024-11-08GUANGDONG POWER GRID CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202210294375.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-23
Publication Date
2024-11-08
Estimated Expiration
2042-03-23

AI Technical Summary

Technical Problem

The large scale of the park's distribution network, many grid structures and large number of equipment, leads to complex and cumbersome power supply reliability assessment, lack of standardized solution processes, and it is difficult to effectively evaluate power supply reliability.

Method used

By obtaining the distribution network topology and line failure data of each power supply area of ​​the park, classifying and determining the wiring type, calculating the average power outage time of the target user, and then determining the power supply reliability rate, establishing a standardized evaluation method, simplifying data collection and entry, and reducing evaluation Difficulty.

Benefits of technology

The quantitative assessment of the power supply reliability of the park distribution network has been achieved, and important measurement indicators are provided for power grid planning, reducing the evaluation complexity and data entry workload, and improving the evaluation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114757496B_ABST
    Figure CN114757496B_ABST
Patent Text Reader

Abstract

The present application discloses a method and device for evaluating the power supply reliability of a distribution network. The method obtains the distribution network topology structure and line fault data of each power supply area in a park to be evaluated, and classifies the wiring modes of each distribution line in each power supply area according to the overhead line structure and the cable line structure, determines the wiring type of each distribution line in each power supply area, and then calculates the average power outage time of target users in the park to be evaluated based on the wiring type and the line fault data, and determines the power supply reliability rate of the park to be evaluated according to the average power outage time of the target users. Therefore, only the topology information of the overhead lines and cable lines is required, which simplifies the original method that requires detailed topology information, thereby reducing the workload of data collection and entry, and reducing the difficulty of evaluation. At the same time, a standardized reliability evaluation method is established, which can perform power supply reliability evaluation on different distribution networks, and provide important measurement indicators for the power grid planning of the park distribution network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power distribution network safety technology, and in particular to a method and device for evaluating the power supply reliability of a power distribution network. Background Art

[0002] As economic development is moving towards a new path of transformation and upgrading, quality improvement and efficiency increase, industrial parks have higher and higher requirements for power supply reliability. Once a sudden power outage such as a power supply failure occurs, it will cause significant losses. Therefore, it is of great significance to establish a reliability assessment system for power grid construction plans to effectively ensure the reliability of power supply in the park.

[0003] At present, the main evaluation methods for the reliability of power supply of conventional distribution networks are failure mode and consequence analysis or minimum path analysis. By setting up a failure mode and consequence analysis table or minimum path analysis table for the detailed topological structure and equipment parameters of different distribution networks, reliability evaluation is performed based on the analysis table data. However, the scale of the park distribution network is large, with many types of grid structures, a large number of equipment, and large differences in grid scales, which makes the table building process very complicated and cumbersome, making the reliability evaluation of the park distribution network extremely difficult. Summary of the invention

[0004] The present application provides a method and device for evaluating the reliability of power supply of a distribution network, so as to solve the technical problem that the reliability evaluation of the current park distribution network is difficult.

[0005] In order to solve the above technical problems, in a first aspect, the present application provides a method for evaluating the reliability of power supply of a distribution network, comprising:

[0006] Obtain the distribution network topology and line fault data of each power supply area in the park to be evaluated. The distribution network topology includes the overhead line structure and the cable line structure.

[0007] Classify the wiring modes of each distribution line in each power supply area according to the overhead line structure and the cable line structure, and determine the wiring type of each distribution line in each power supply area;

[0008] Based on the wiring type and line fault data, calculate the average power outage time for target users in the park to be evaluated;

[0009] Determine the power supply reliability rate of the park to be evaluated based on the average power outage time of target users.

[0010] The present application obtains the distribution network topology and line fault data of each power supply area in the park to be evaluated, and classifies the wiring modes of each distribution line in each power supply area according to the overhead line structure and cable line structure, and determines the wiring type of each distribution line in each power supply area. Therefore, only the topology information of the overhead lines and cable lines is required, which simplifies the original method that requires detailed topology information, thereby reducing the workload of data collection and entry, and reducing the difficulty of evaluation. At the same time, the present application establishes a standardized reliability evaluation method to be able to evaluate the power supply reliability of different distribution networks; then based on the wiring type and line fault data, the average power outage time of the target users in the park to be evaluated is calculated, and according to the average power outage time of the target users, the power supply reliability rate of the park to be evaluated is determined, so as to evaluate the power supply unreliability caused by power outages, thereby quantifying the power supply reliability of the park to be evaluated, and providing important measurement indicators for the power grid planning of the park distribution network.

[0011] Preferably, according to the overhead line structure and the cable line structure, the wiring modes of each distribution line in each power supply area are classified to determine the wiring type of each distribution line in each power supply area, including:

[0012] For each distribution line in each power supply area, determining the line connection state and switch selection state of the overhead line structure in the distribution line, and determining the overhead line connection type of the distribution line;

[0013] For each distribution line in each power supply area, the line connection state and switch selection state of the cable line structure in the distribution line are determined, and the cable line connection type of the distribution line is determined.

[0014] As a preferred method, based on the wiring type and line fault data, the average power outage time of the target users in the park to be evaluated is calculated, including:

[0015] According to the line fault data, the average power outage time for regional users in each power supply area is calculated using the preset average power outage time calculation formula corresponding to the wiring type;

[0016] Based on the average power outage time of regional users in each power supply area and the number of connected users corresponding to each connection type, the average power outage time of target users in the park to be evaluated is determined.

[0017] Preferably, according to the line fault data, the average power outage time of regional users in each power supply area is calculated using a preset average power outage time calculation formula corresponding to the wiring type, including:

[0018] For each distribution line in each power supply area, the average power outage time of line users of the distribution line is calculated using a preset average power outage time calculation formula corresponding to the wiring type of the distribution line;

[0019] For each power supply area, the average power outage time for regional users in the power supply area is calculated based on the average power outage time for line users corresponding to each distribution line in the power supply area.

[0020] Preferably, according to the average power outage time of regional users in each power supply area and the number of connected users corresponding to each connection type, the average power outage time of target users in the park to be evaluated is determined, including:

[0021] Using the preset system power outage time calculation formula, the average power outage time of regional users in each power supply area and the number of connected users corresponding to each connection type are calculated to obtain the average power outage time of target users in the park to be evaluated. The system power outage time calculation formula is:

[0022]

[0023] Among them, SAIDI 目标 is the average power outage time of target users, N 区域 is the number of power supply areas in the park to be evaluated, SAIDI j (i) is the average power outage time for line users of the jth type of connection distribution line in the i-th power supply area, N j (i) is the number of users with the jth connection type in the i-th power supply area.

[0024] As a preferred method, the power supply reliability rate of the park to be evaluated is determined based on the average power outage time of the target users, including:

[0025] The power supply reliability rate of the park to be evaluated is calculated using the preset power supply reliability rate calculation formula according to the average power outage time of the target users. The preset power supply reliability rate calculation formula is:

[0026]

[0027] Among them, SAIDI 目标 is the average power outage time of the target users, and RS_1 is the power supply reliability rate.

[0028] Preferably, before obtaining the distribution network topology and line fault data of each power supply area in the park to be evaluated, the method further includes:

[0029] According to the typical power supply area types, the park to be evaluated is divided into zones to obtain multiple power supply areas.

[0030] In a second aspect, the present application provides a device for evaluating the reliability of power supply of a distribution network, comprising:

[0031] An acquisition module is used to acquire the distribution network topology and line fault data of each power supply area in the park to be evaluated. The distribution network topology includes an overhead line structure and a cable line structure.

[0032] A classification module, used to classify the wiring modes of each distribution line in each power supply area according to the overhead line structure and the cable line structure, and determine the wiring type of each distribution line in each power supply area;

[0033] A calculation module, used for calculating the average power outage time of target users in the park to be evaluated based on the wiring type and line fault data;

[0034] The determination module is used to determine the power supply reliability rate of the park to be evaluated based on the average power outage time of the target users.

[0035] In a third aspect, the present application provides a computer device, including a processor and a memory, the memory being used to store a computer program, and when the computer program is executed by the processor, the method for evaluating the power supply reliability of a distribution network as in the first aspect is implemented.

[0036] In a fourth aspect, the present application provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the method for evaluating the power supply reliability of a distribution network as in the first aspect.

[0037] It should be noted that the beneficial effects of the second to fourth aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 A schematic diagram of a flow chart of a method for evaluating the reliability of power supply of a distribution network shown in an embodiment of the present application;

[0039] Figure 2 A schematic diagram of an industry standard example network shown in an embodiment of the present application;

[0040] Figure 3 A schematic diagram of the structure of a device for evaluating the reliability of power supply of a distribution network shown in an embodiment of the present application;

[0041] Figure 4 A schematic diagram of the structure of a computer device shown in an embodiment of the present application. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0043] As documented in relevant technologies, the main methods for evaluating the reliability of power supply in conventional distribution networks are failure mode and consequence analysis or minimum path analysis. By using the detailed topological structures and equipment parameters of different distribution networks, a failure mode and consequence analysis table or minimum path analysis table is established, and reliability evaluation is performed based on the analysis table data. However, the scale of the campus distribution network is large, with many types of grid structures, a large number of equipment, and large differences in grid scale. Therefore, when conducting power supply reliability evaluation based on the detailed topological information of the distribution network, the following difficulties are usually faced:

[0044] (1) There is a lack of standardized solution process for power supply reliability assessment. For different distribution network topologies, it is necessary to re-establish the failure mode and consequence analysis table or minimum path analysis table.

[0045] (2) The scale of the FME analysis table or the minimum path analysis table changes with the distribution network system to be evaluated. When the scale of the distribution network system to be evaluated is large, the establishment of the FME analysis table or the minimum path analysis table will be very complicated;

[0046] (3) Carrying out power supply reliability assessment requires collecting detailed topological structure and equipment parameters of the distribution network, which brings great difficulty to the collection work. At the same time, data entry work is very cumbersome and the maintenance workload is huge.

[0047] To this end, an embodiment of the present application provides a method for evaluating the power supply reliability of a distribution network, by obtaining the distribution network topology structure and line fault data of each power supply area in the park to be evaluated, and classifying the wiring modes of each distribution line in each power supply area according to the overhead line structure and the cable line structure, and determining the wiring type of each distribution line in each power supply area, so that only the topology information of the overhead lines and cable lines is required, which simplifies the original method that requires detailed topology information, thereby reducing the workload of data collection and entry, and reducing the difficulty of evaluation. At the same time, the present application establishes a standardized reliability evaluation method so that power supply reliability evaluation can be performed for different distribution networks; then based on the wiring type and line fault data, the average power outage time of the target users in the park to be evaluated is calculated, and based on the average power outage time of the target users, the power supply reliability rate of the park to be evaluated is determined, so as to evaluate the power supply unreliability caused by power outages, thereby quantifying the power supply reliability of the park to be evaluated, and providing important measurement indicators for the power grid planning of the park distribution network.

[0048] Please refer to Figure 1 , Figure 1A flow chart of a method for evaluating the reliability of power supply of a distribution network provided in an embodiment of the present application. The method for evaluating the reliability of power supply of a distribution network in an embodiment of the present application can be applied to computer devices, including but not limited to smart phones, laptops, tablet computers, desktop computers, physical servers, cloud servers and other devices. It should be noted that the present application can evaluate the reliability of power supply of a medium voltage distribution network, and can also evaluate the reliability of power supply of other distribution networks.

[0049] like Figure 1 As shown, the method for evaluating the reliability of power supply of the distribution network of this embodiment includes steps S101 to S104, which are described in detail as follows:

[0050] Step S101, obtaining the distribution network topology structure and line fault data of each power supply area in the park to be evaluated, wherein the distribution network topology structure includes an overhead line structure and a cable line structure.

[0051] In this step, the topological structure includes the topological connection relationship between the component models such as overhead lines, cable lines, distribution transformers, circuit breakers, load switches, disconnectors and fuses, which is mainly reflected by the network model. It can be understood that this application only requires the topological structure of overhead lines and cable lines.

[0052] Optionally, basic parameters of distribution lines: line type, length, model, resistance per unit length, reactance, susceptance, and current carrying capacity. Among them, line types are divided into overhead insulated lines, overhead bare wires, and cables. According to the line model, the line resistance per unit length, reactance, and current carrying capacity can be obtained by query. Since the influence of susceptance is extremely small, it can generally be ignored.

[0053] Optionally, the line fault data stop includes:

[0054] Distribution lines: failure downtime rate, mean fault repair time;

[0055] Distribution transformers: failure outage rate, mean fault repair time;

[0056] Disconnector (knife switch): fault outage rate, mean fault repair time, mean fault location and isolation time;

[0057] Circuit breakers and fuses: failure downtime rate, mean fault repair time, mean power supply restoration time upstream of the fault point;

[0058] Load switch: failure outage rate, mean fault repair time;

[0059] Contact switch: average switching time of contact switch during power outage.

[0060] Optionally, before obtaining the distribution network topology and line fault data of each power supply area in the park to be evaluated, it also includes: partitioning the park to be evaluated according to typical power supply area types to obtain multiple power supply areas, namely the power supply areas described in step S101.

[0061] Step S102: Classify the wiring modes of each distribution line in each power supply area according to the overhead line structure and the cable line structure, and determine the wiring type of each distribution line in each power supply area.

[0062] In this step, the wiring type includes overhead line wiring type and cable line wiring type. For each typical power supply area, the medium voltage distribution network line is further divided into multiple typical wiring types, such as whether the line is interconnected or not, and whether the switch is selective or not.

[0063] Step S103: Calculate the average power outage time of target users in the park to be evaluated based on the wiring type and the line fault data.

[0064] In this step, for each typical connection type in each typical power supply area, the reliability index of the average power outage time of each user is calculated by comprehensively considering various major influencing factors. And according to the number of users connected to each typical connection type in each typical power supply area, the proportion between it and the total number of users in the area to be evaluated is used as a weighted average to obtain the average power outage time SAIDI of system users in the area to be evaluated, that is, the average power outage time of target users.

[0065] Step S104: determining the power supply reliability rate of the park to be evaluated according to the average power outage time of the target users.

[0066] In this step, optionally, a preset power supply reliability calculation formula is used to calculate the power supply reliability of the park to be evaluated according to the average power outage time of the target users. The preset power supply reliability calculation formula is:

[0067]

[0068] Among them, SAIDI 目标 is the average power outage time of the target user, and Rs_1 is the power supply reliability rate.

[0069] In one embodiment, Figure 1 Based on the embodiment shown, the above step S102 includes:

[0070] For each of the distribution lines in each of the power supply areas, determining the line connection state and switch selection state of the overhead line structure in the distribution line, and determining the overhead line connection type of the distribution line;

[0071] For each of the distribution lines in each of the power supply areas, the line connection state and the switch selection state of the cable line structure in the distribution line are determined, and the cable line connection type of the distribution line is determined.

[0072] In this embodiment, according to the line connection state and switch selection state of the overhead line structure, the overhead line connection type includes overhead line with connection and switch selectivity, overhead line with connection and switch non-selectivity, overhead line single radiation and switch selectivity, and overhead line single radiation and switch non-selectivity. According to the line connection state and switch selection state of the cable line structure, the cable line connection type includes cable line with connection and switch selectivity, cable line with connection and switch non-selectivity, cable line single radiation and switch selectivity, and cable line single radiation and switch non-selectivity. Among them, single radiation means that the line is not connected.

[0073] In one embodiment, Figure 1 Based on the embodiment shown, the above step S103 includes:

[0074] According to the line fault data, using a preset average power outage time calculation formula corresponding to the wiring type, calculate the average power outage time for regional users in each of the power supply areas;

[0075] The average power outage time of target users in the park to be evaluated is determined according to the average power outage time of regional users in each of the power supply areas and the number of connected users corresponding to each connection type.

[0076] In this embodiment, the average power outage time of regional users in each power supply area is determined based on each distribution line in each power supply area, and then the average power outage time of users in each area is used to determine the average power outage time of system users in the entire park to be evaluated. The average power outage time is determined by the overhead line structure and the cable line structure, so that the power supply stability problem caused by the power outage can be considered to achieve quantitative power supply reliability, and then the power supply reliability can be evaluated.

[0077] Optionally, the calculation process of the average power outage time of regional users includes:

[0078] For each distribution line in each power supply area, using a preset average power outage time calculation formula corresponding to the wiring type of the distribution line, calculate the average power outage time of line users of the distribution line;

[0079] For each of the power supply areas, the average power outage time of the regional users in the power supply area is calculated according to the average power outage time of the line users corresponding to each of the distribution lines in the power supply area.

[0080] In this optional embodiment, illustratively, for the cable line connection type:

[0081] ① Average power outage time for users on lines with interconnection and selective switches:

[0082]

[0083] Among them, L 线 is the total length of the line; K 主 The total length of the main line is L 线 The proportion of 段 is the number of feeder disconnections; 故 is the line failure rate; 计 is the planned outage rate of the line; t 故切 The time for fault location, isolation and switching operation; t 计切 The planned outage isolation and / or switching operation time; t 故修 is the mean repair time of line fault (excluding t 故切 );t 计停 is the average outage time of the planned outage of the line (excluding t 计切 ); 开 is the switch failure rate; t 开修 is the mean repair time of the section switch failure (excluding t 故切 );M 开 It is the number of switches in the cable ring network cabinet.

[0084] ② Average power outage time for users on lines with connections and non-selective switches:

[0085]

[0086] ③ Average power outage time for users on lines with single radiation and selective switches:

[0087]

[0088] ④ Average power outage time for users on lines with single radiation and non-selective switches:

[0089]

[0090] For cable line wiring type:

[0091] ① Average power outage time for users on lines with interconnection and selective switches:

[0092]

[0093] ② Average power outage time for users on lines with connections and non-selective switches:

[0094]

[0095] ③ Average power outage time for users on lines with single radiation and selective switches:

[0096]

[0097] ④ Average power outage time for users on lines with single radiation and non-selective switches:

[0098]

[0099] Optionally, the calculation process of the average power outage time of the target user includes:

[0100] The preset system power outage time calculation formula is used to calculate the average power outage time of regional users in each power supply area and the number of connected users corresponding to each connection type to obtain the average power outage time of the target users in the park to be evaluated. The system power outage time calculation formula is:

[0101]

[0102] Among them, SAIDI 目标 is the average power outage time of the target user, N 区域 is the number of power supply areas in the park to be evaluated, SAIDI j (i) is the average power outage time for line users of the jth type of connection distribution line in the i-th power supply area, N j (i) is the number of users with the jth connection type in the i-th power supply area.

[0103] By way of example and not limitation, Figure 2 The following is a network diagram of the industry standard DL / T 1563. Figure 2 Taking the Internet as an example, the evaluation method of this application is compared with the industry standard.

[0104] Network parameters of the industry standard example:

[0105]

[0106] Industry standard example network diagram network reliability parameters:

[0107]

[0108]

[0109] Industry standard example network diagram network reliability parameters:

[0110] Parameter name Parameter Value Average fault location and isolation time h 1 Average fault power outage contact switch switching time h 0.05 Average power supply restoration time at upstream fault point h 0.3

[0111] According to the above parameters, the industry standard calculation example is based on a detailed topological structure, and the failure mode consequence analysis and calculation of each component are used to form a failure mode consequence analysis table. When the switch failure is ignored, the reliability evaluation results of the final industry standard calculation example network are shown in the following table.

[0112] Evaluation results of the industry standard example network:

[0113] Reliability Index Industry Standard Assessment Results Number of households during power outage (pre-arranged) 8.8980 hours Number of households during power outage (fault) 0.3232 hours Number of households during power outage 9.2212 hours SAIDI-S 1.7796h SAIDI-F 0.0646h SAIDI 1.8442h ASAI 99.8947%

[0114] As can be seen from the table above, the industry standard calculation example network is calculated by the industry standard analysis method. The number of households during power outage (pre-arranged) is 8.8980 hours, the number of households during power outage (fault) is 0.3232 hours, the number of households during power outage is 9.2212 hours, SAIDI-S is 1.7796h, SAIDI-F is 0.0646h, SAIDI is 1.8442h, and ASAI is 99.8947%. Among them, the average pre-arranged power outage hours of power supply system users in a unit year is recorded as SAIDI-S; the average fault power outage hours of power supply system users in a unit year is recorded as SAIDI-F; the average power outage hours of power supply system users in a unit year is recorded as SAIDI; in a unit year, the ratio of the expected value of the total effective power supply hours to the total hours of the unit year is recorded as ASAI.

[0115] According to the full-line approximate evaluation parameters in the above table, using this patented method, the full-line parameters are processed according to evenly segmented line length and evenly distributed users. After evaluation, the full-line approximate evaluation results shown in the following table can be obtained.

[0116] Reliability Index Approximate evaluation results of the entire line Number of households during power outage (pre-arranged) 8.9458 hours Number of households during power outage (fault) 0.3562 hours Number of households during power outage 9.3112 hours SAIDI-S 1.8996h SAIDI-F 0.0746h SAIDI 1.9042h ASAI 99.8962%

[0117] In order to implement the distribution network power supply reliability evaluation method corresponding to the above method embodiment, so as to achieve the corresponding functions and technical effects. Figure 3 , Figure 3 The structural block diagram of a distribution network power supply reliability evaluation device provided in an embodiment of the present application is shown. For the convenience of explanation, only the parts related to the present embodiment are shown. The distribution network power supply reliability evaluation device provided in an embodiment of the present application includes:

[0118] An acquisition module 301 is used to acquire the distribution network topology and line fault data of each power supply area in the park to be evaluated, wherein the distribution network topology includes an overhead line structure and a cable line structure;

[0119] A classification module 302, for classifying the wiring modes of each distribution line in each power supply area according to the overhead line structure and the cable line structure, and determining the wiring type of each distribution line in each power supply area;

[0120] A calculation module 303, configured to calculate an average power outage time of target users in the park to be evaluated based on the wiring type and the line fault data;

[0121] The determination module 304 is used to determine the power supply reliability rate of the park to be evaluated according to the average power outage time of the target users.

[0122] In one embodiment, the classification module 302 includes:

[0123] A first determining unit is used to determine, for each of the distribution lines in each of the power supply areas, a line connection state and a switch selection state of an overhead line structure in the distribution line, and determine an overhead line connection type of the distribution line;

[0124] The second determining unit is used to determine, for each of the distribution lines in each of the power supply areas, a line connection state and a switch selection state of a cable line structure in the distribution line, and determine a cable line connection type of the distribution line.

[0125] In one embodiment, the calculation module 303 includes:

[0126] A first calculation unit, configured to calculate an average power outage time for regional users in each of the power supply areas according to the line fault data and using a preset average power outage time calculation formula corresponding to the wiring type;

[0127] The third determining unit is used to determine the average power outage time of the target users in the park to be evaluated according to the average power outage time of the regional users in each of the power supply areas and the number of connected users corresponding to each connection type.

[0128] Preferably, the first computing unit comprises:

[0129] A first calculation subunit is used to calculate, for each distribution line in each power supply area, an average power outage time of line users of the distribution line by using a preset average power outage time calculation formula corresponding to the wiring type of the distribution line;

[0130] The second calculation subunit is used to calculate, for each of the power supply areas, an average power outage time of the regional users in the power supply area according to the average power outage time of the line users corresponding to each of the distribution lines in the power supply area.

[0131] Preferably, the third determining unit comprises:

[0132] The operation subunit is used to calculate the average power outage time of regional users in each power supply area and the number of connected users corresponding to each connection type by using a preset system power outage time calculation formula to obtain the average power outage time of target users in the park to be evaluated. The system power outage time calculation formula is:

[0133]

[0134] Among them, SAIDI 目标 is the average power outage time of the target user, N 区域 is the number of power supply areas in the park to be evaluated, SAIDI j (i) is the average power outage time for line users of the jth type of connection distribution line in the i-th power supply area, N j (i) is the number of users with the jth connection type in the i-th power supply area.

[0135] Preferably, the determining module 304 includes:

[0136] The second calculation unit is used to calculate the power supply reliability of the park to be evaluated according to the average power outage time of the target user by using a preset power supply reliability calculation formula, and the preset power supply reliability calculation formula is:

[0137]

[0138] Among them, SAIDI 目标 is the average power outage time of the target user, and RS_1 is the power supply reliability rate.

[0139] Preferably, the evaluation device further comprises:

[0140] A partitioning module is used to partition the park to be evaluated according to typical power supply area types to obtain multiple power supply areas.

[0141] The above-mentioned distribution network power supply reliability assessment device can implement the distribution network power supply reliability assessment method of the above-mentioned method embodiment. The options in the above-mentioned method embodiment are also applicable to this embodiment and will not be described in detail here. The rest of the contents of the embodiment of this application can refer to the contents of the above-mentioned method embodiment, and will not be repeated in this embodiment.

[0142] Figure 4 This is a schematic diagram of the structure of a computer device provided in one embodiment of the present application. Figure 4 As shown, the computer device 4 of this embodiment includes: at least one processor 40 ( Figure 4Only one is shown in the figure) a processor, a memory 41, and a computer program 42 stored in the memory 41 and executable on the at least one processor 40, wherein the processor 40 implements the steps in any of the above method embodiments when executing the computer program 42.

[0143] The computer device 4 may be a computing device such as a smart phone, a tablet computer, a desktop computer, a cloud server, etc. The computer device may include but is not limited to a processor 40 and a memory 41. Those skilled in the art will appreciate that Figure 4 It is only an example of the computer device 4 and does not constitute a limitation on the computer device 4. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.

[0144] The processor 40 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0145] In some embodiments, the memory 41 may be an internal storage unit of the computer device 4, such as a hard disk or memory of the computer device 4. In other embodiments, the memory 41 may also be an external storage device of the computer device 4, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the computer device 4. Further, the memory 41 may also include both an internal storage unit and an external storage device of the computer device 4. The memory 41 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program, etc. The memory 41 may also be used to temporarily store data that has been output or is to be output.

[0146] In addition, an embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0147] An embodiment of the present application provides a computer program product. When the computer program product is run on a computer device, the computer device implements the steps in the above-mentioned method embodiments when executing the computer device.

[0148] In several embodiments provided in the present application, it is understood that each box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from that marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved.

[0149] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device to execute all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage media include: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0150] The specific embodiments described above further describe the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only a specific embodiment of the present application and is not intended to limit the scope of protection of the present application. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of protection of the present application.

Claims

1. A method for evaluating the reliability of power supply of a distribution network, characterized in that: include: Obtaining the distribution network topology and line fault data of each power supply area in the park to be evaluated, wherein the distribution network topology includes an overhead line structure and a cable line structure; For each of the distribution lines in each of the power supply areas, determining the line connection state and switch selection state of the overhead line structure in the distribution line, and determining the overhead line connection type of the distribution line; For each of the power distribution lines in each of the power supply areas, determining the line connection state and switch selection state of the cable line structure in the power distribution line, and determining the cable line connection type of the power distribution line; For each distribution line in each power supply area, using a preset average power outage time calculation formula corresponding to the wiring type of the distribution line, calculate the average power outage time of line users of the distribution line; For each of the power supply areas, the average power outage time of the regional users in the power supply area is calculated according to the average power outage time of the line users corresponding to each of the distribution lines in the power supply area; Determine the average power outage time of target users in the park to be evaluated according to the average power outage time of regional users in each power supply area and the number of connected users corresponding to each connection type; The power supply reliability rate of the park to be evaluated is determined according to the average power outage time of the target users.

2. The evaluation method according to claim 1, characterized in that: Determining the average power outage time of target users in the park to be evaluated according to the average power outage time of regional users in each power supply area and the number of connected users corresponding to each connection type includes: The preset system power outage time calculation formula is used to calculate the average power outage time of regional users in each power supply area and the number of connected users corresponding to each connection type to obtain the average power outage time of the target users in the park to be evaluated. The system power outage time calculation formula is: Among them, SAIDI 目标 is the average power outage time of the target user, N 区域 is the number of power supply areas in the park to be evaluated, SAIDI j (i) is the average power outage time for line users of the jth type of connection distribution line in the i-th power supply area, N j (i) is the number of users with the jth connection type in the i-th power supply area.

3. The evaluation method according to claim 1, characterized in that: Determining the power supply reliability rate of the park to be evaluated according to the average power outage time of the target user includes: The power supply reliability rate of the park to be evaluated is calculated using a preset power supply reliability rate calculation formula according to the average power outage time of the target users. The preset power supply reliability rate calculation formula is: Among them, SAIDI 目标 is the average power outage time of the target user, and RS_1 is the power supply reliability rate.

4. The evaluation method according to claim 1, characterized in that: Before obtaining the distribution network topology and line fault data of each power supply area in the park to be evaluated, the method further includes: The park to be evaluated is divided into zones according to typical power supply area types to obtain a plurality of power supply areas.

5. A device for evaluating the reliability of power supply of a distribution network, characterized in that: include: An acquisition module is used to acquire the distribution network topology and line fault data of each power supply area in the park to be evaluated, wherein the distribution network topology includes an overhead line structure and a cable line structure; A classification module, for determining, for each of the distribution lines in each of the power supply areas, a line connection state and a switch selection state of an overhead line structure in the distribution line, and determining an overhead line connection type of the distribution line; For each of the power distribution lines in each of the power supply areas, determining the line connection state and switch selection state of the cable line structure in the power distribution line, and determining the cable line connection type of the power distribution line; A calculation module, configured to calculate, for each distribution line in each power supply area, an average power outage time of line users of the distribution line by using a preset average power outage time calculation formula corresponding to the wiring type of the distribution line; For each of the power supply areas, the average power outage time of the regional users in the power supply area is calculated according to the average power outage time of the line users corresponding to each of the distribution lines in the power supply area; the average power outage time of the target users in the park to be evaluated is determined according to the average power outage time of the regional users in each of the power supply areas and the number of connection users corresponding to each connection type; The determination module is used to determine the power supply reliability rate of the park to be evaluated according to the average power outage time of the target users.

6. A computer device, characterized in that: It comprises a processor and a memory, the memory is used to store a computer program, and when the computer program is executed by the processor, the method for evaluating the power supply reliability of the distribution network as claimed in any one of claims 1 to 4 is implemented.

7. A computer-readable storage medium, characterized in that: It stores a computer program, which, when executed by a processor, implements the method for evaluating the power supply reliability of a distribution network as claimed in any one of claims 1 to 4.

Citation Information

Patent Citations

  • Method and system for evaluating reliability of power distribution network

    CN105160500A

  • Approximate estimation method for reliability of medium-voltage distribution network

    CN110705878A

  • Power distribution network planning annual power supply reliability evaluation method and device

    CN112330117A

  • Simulation prediction method and system for power supply reliability of power distribution network, and storage medium

    CN114065537A

  • Method and system for evaluating reliability of medium-voltage power distribution network

    CN114219240A