A customized production system and method based on wind power spare parts
By obtaining the production demand and spare parts data of wind power equipment, and conducting customized production planning and trial production verification, the problem of chaotic spare parts management of wind power equipment is solved, stable supply and resource optimization of wind power equipment is achieved, and inventory waste is avoided.
Patent Information
- Application Number
- CN202210542054.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-18
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-05-18
AI Technical Summary
The existing wind power spare parts management is chaotic and cannot be customized production and maintenance verification, resulting in a lack of stable supply of production and excessive inventory, which wastes resources.
By obtaining production demand data of wind power equipment and spare parts data, custom production planning, trial production verification, supply planning optimization, and reserve and supply management of spare parts to ensure production tracking, monitoring and process adjustment.
Customized production planning based on production needs and spare parts data has been realized, avoiding excessive stock of spare parts, ensuring the stable supply of wind power equipment, and reducing resource waste.
Smart Images

Figure CN114792170B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of wind power production, and in particular relates to a customized production system and method based on wind power spare parts. Background Art
[0002] Wind power equipment is equipment that uses wind energy to generate electricity or wind power. Wind power technology equipment is an important part of the wind power industry, and is also the foundation and guarantee for the development of the wind power industry. Wind power equipment is widely used in the wind power industry, which is a green and pollution-free industry. In recent years, with the rapid development of the wind power industry, wind power equipment has been more and more widely used, and the demand has also increased.
[0003] Wind power spare parts management is an important part of the production and maintenance of wind power equipment. The existing wind power spare parts management is usually chaotic. It is not possible to customize wind power equipment production based on wind power spare parts, nor can it perform maintenance verification and supply reserve planning based on wind power spare parts. This can easily lead to a lack of stable supply of wind power spare parts for the production of wind power equipment. Some wind power spare parts may have too much inventory, wasting unnecessary inventory and management resources. Summary of the invention
[0004] The purpose of the embodiments of the present invention is to provide a customized production system and method based on wind power spare parts, aiming to solve the problems raised in the background technology.
[0005] To achieve the above objectives, the embodiments of the present invention provide the following technical solutions:
[0006] A customized production method based on wind power spare parts, the method specifically comprises the following steps:
[0007] Acquire production demand data and spare parts data of wind power equipment, perform customized production planning according to the production demand data and the spare parts data, and generate customized production planning information;
[0008] Conduct trial production and verification of wind power equipment according to the customized production planning information, conduct reserve planning of spare parts according to the trial production and verification results, and generate reserve planning data;
[0009] Performing spare parts supply planning according to the customized production planning information and the reserve planning data to generate supply planning data;
[0010] Perform maintenance verification of spare parts and generate maintenance verification information, optimize and adjust the supply planning data according to the maintenance verification information, and generate supply planning adjustment data;
[0011] Equipment production tracking and monitoring is performed according to the customized production planning information, production tracking and monitoring information is generated, and production process adjustments are performed according to the production tracking and monitoring information.
[0012] As a further limitation of the technical solution of the embodiment of the present invention, the obtaining of production demand data and spare parts data of wind power equipment, performing customized production planning according to the production demand data and the spare parts data, and generating customized production planning information specifically include the following steps:
[0013] Obtain production demand data and spare parts data for wind power equipment;
[0014] Determining spare parts demand information according to the production demand data and the spare parts data;
[0015] Customized production planning is performed according to the production demand data and the spare parts demand information to generate customized production planning information.
[0016] As a further limitation of the technical solution of the embodiment of the present invention, the wind power equipment trial production verification is performed according to the customized production planning information, and the spare parts reserve planning is performed according to the trial production verification results, and the reserve planning data is generated, which specifically includes the following steps:
[0017] Conducting trial production of wind power equipment according to the customized production planning information to obtain wind power trial production equipment;
[0018] Conduct operational verification on wind power trial equipment and determine whether the verification has passed;
[0019] Verify spare parts for wind power trial equipment that has passed verification and generate spare parts verification data;
[0020] Spare parts reserve planning is performed according to the spare parts verification data to generate reserve planning data.
[0021] As a further limitation of the technical solution of the embodiment of the present invention, performing spare parts supply planning according to the customized production planning information and the reserve planning data and generating supply planning data specifically include the following steps:
[0022] Performing spare parts supply quantity planning according to the customized production planning information and the reserve planning data to generate supply quantity planning data;
[0023] Obtain spare parts supply information;
[0024] Supply planning is performed according to the spare parts supply information and the supply quantity planning data to generate supply planning data.
[0025] As a further limitation of the technical solution of the embodiment of the present invention, the performing of spare parts maintenance verification, generating maintenance verification information, optimizing and adjusting the supply planning data according to the maintenance verification information, and generating supply planning adjustment data specifically include the following steps:
[0026] Perform maintenance verification of spare parts and generate maintenance verification information;
[0027] Determine the repair parts and success rate according to the repair verification information;
[0028] The supply planning data is optimized and adjusted according to the maintenance parts and the success rate to generate supply planning adjustment data.
[0029] As a further limitation of the technical solution of the embodiment of the present invention, the step of tracking and monitoring equipment production according to the customized production planning information, generating production tracking and monitoring information, and adjusting the production process according to the production tracking and monitoring information specifically includes the following steps:
[0030] Perform equipment production tracking and monitoring according to the customized production planning information to generate production tracking and monitoring information;
[0031] Performing production monitoring and analysis on the production tracking and monitoring information to generate production monitoring and analysis data;
[0032] Adjust the production process according to the production monitoring and analysis data.
[0033] A customized production system based on wind power spare parts, the system includes a production planning unit, a reserve planning unit, a supply planning unit, an optimization and adjustment unit and a tracking and monitoring unit, wherein:
[0034] A production planning unit, used to obtain production demand data and spare parts data of wind power equipment, perform customized production planning according to the production demand data and the spare parts data, and generate customized production planning information;
[0035] A reserve planning unit, configured to perform trial production and verification of wind power equipment according to the customized production planning information, perform reserve planning of spare parts according to the trial production and verification results, and generate reserve planning data;
[0036] A supply planning unit, configured to perform supply planning of spare parts according to the customized production planning information and the reserve planning data, and generate supply planning data;
[0037] An optimization and adjustment unit, used to perform maintenance verification of spare parts, generate maintenance verification information, optimize and adjust the supply planning data according to the maintenance verification information, and generate supply planning adjustment data;
[0038] The tracking and monitoring unit is used to perform equipment production tracking and monitoring according to the customized production planning information, generate production tracking and monitoring information, and adjust the production process according to the production tracking and monitoring information.
[0039] As a further limitation of the technical solution of the embodiment of the present invention, the production planning unit specifically includes:
[0040] A data acquisition module is used to acquire production demand data and spare parts data of wind power equipment;
[0041] A demand analysis module, used to determine spare parts demand information according to the production demand data and the spare parts data;
[0042] The production planning module is used to perform customized production planning according to the production demand data and the spare parts demand information, and generate customized production planning information.
[0043] As a further limitation of the technical solution of the embodiment of the present invention, the reserve planning unit specifically includes:
[0044] A trial production module, used to carry out trial production of wind power equipment according to the customized production planning information to obtain wind power trial production equipment;
[0045] The first verification module is used to perform operation verification on the wind power trial equipment and determine whether the verification is passed;
[0046] The second verification module is used to verify the spare parts of the wind power trial equipment that has passed the verification and generate spare parts verification data;
[0047] The reserve planning module is used to carry out reserve planning of spare parts according to the spare parts verification data and generate reserve planning data.
[0048] As a further limitation of the technical solution of the embodiment of the present invention, the supply planning unit specifically includes:
[0049] A supply quantity planning module, used to plan the supply quantity of spare parts according to the customized production planning information and the reserve planning data, and generate supply quantity planning data;
[0050] Supply information acquisition module, used to obtain spare parts supply information;
[0051] The supply planning module is used to perform supply planning based on the spare parts supply information and the supply quantity planning data to generate supply planning data.
[0052] Compared with the prior art, the present invention has the following beneficial effects:
[0053] The embodiment of the present invention acquires production demand data and spare parts data, performs customized production planning, generates customized production planning information; performs trial production verification of wind power equipment according to the customized production planning information; performs spare parts supply planning, generates supply planning data; optimizes and adjusts the supply planning data, and generates supply planning adjustment data. It is possible to perform customized production planning, spare parts supply planning and optimization adjustment according to production demand data and spare parts data, generate customized production planning information and supply planning adjustment data, perform trial production verification of wind power equipment, and generate reserve planning data, thereby ensuring the supply of wind power spare parts for the production of wind power equipment, while avoiding excessive inventory of wind power spare parts, which causes unnecessary waste of inventory and management resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention.
[0055] Figure 1 A flow chart of a method provided by an embodiment of the present invention is shown.
[0056] Figure 2 A flow chart of customized production planning in the method provided in an embodiment of the present invention is shown.
[0057] Figure 3 A flow chart of spare parts reserve planning in the method provided in an embodiment of the present invention is shown.
[0058] Figure 4 A flow chart of spare parts supply planning in the method provided in an embodiment of the present invention is shown.
[0059] Figure 5 A flow chart of generating supply planning adjustment data in the method provided in an embodiment of the present invention is shown.
[0060] Figure 6 A flow chart of equipment production tracking and monitoring in the method provided by an embodiment of the present invention is shown.
[0061] Figure 7 The application architecture diagram of the system provided by the embodiment of the present invention is shown.
[0062] Figure 8 A structural block diagram of a production planning unit in a system provided by an embodiment of the present invention is shown.
[0063] Fig. 9 A structural block diagram of a reserve planning unit in a system provided by an embodiment of the present invention is shown.
[0064] Fig.10 A structural block diagram of a supply planning unit in a system provided by an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0065] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0066] It is understandable that in the prior art, the management of wind power spare parts is usually chaotic. It is not possible to customize the production of wind power equipment based on wind power spare parts, nor is it possible to perform maintenance verification and supply reserve planning based on wind power spare parts. This can easily lead to a lack of stable supply of wind power spare parts for the production of wind power equipment. Some wind power spare parts may have excessive inventory, wasting unnecessary inventory and management resources.
[0067] To solve the above problems, the embodiments of the present invention obtain production demand data and spare parts data, perform customized production planning, and generate customized production planning information; perform trial production and verification of wind power equipment according to the customized production planning information; perform spare parts supply planning, and generate supply planning data; optimize and adjust the supply planning data, and generate supply planning adjustment data. Customized production planning, spare parts supply planning, and optimization and adjustment can be performed according to production demand data and spare parts data, customized production planning information and supply planning adjustment data can be generated, and trial production and verification of wind power equipment can be performed to generate reserve planning data, thereby ensuring that wind power equipment production provides wind power spare parts, while avoiding excessive inventory of wind power spare parts, which causes unnecessary waste of inventory and management resources.
[0068] Figure 1 A flow chart of a method provided by an embodiment of the present invention is shown.
[0069] Specifically, a customized production method based on wind power spare parts includes the following steps:
[0070] Step S101 : acquiring production demand data and spare parts data of wind power equipment, performing customized production planning according to the production demand data and the spare parts data, and generating customized production planning information.
[0071] In an embodiment of the present invention, production demand data and spare parts data of wind power equipment are obtained, and then the production demand data and spare parts data of wind power equipment are integrated to determine the spare parts demand information required for wind power equipment production, and customized production planning of wind power equipment is performed through the production demand data and spare parts demand information to generate customized production planning information. Specifically, the production demand data of wind power equipment includes size data and performance data of wind power equipment, and the size data and performance data of wind power equipment are integrated and arranged according to the demand level to generate the production demand data.
[0072] It can be understood that the spare parts demand information is the spare parts models and quantities required in the production process of wind power equipment. Information is loaded according to a preset demand information framework to generate the spare parts demand information required for the production of wind power equipment.
[0073] Specifically, Figure 2 A flow chart of customized production planning in the method provided in an embodiment of the present invention is shown.
[0074] Among them, in the preferred embodiment provided by the present invention, the obtaining of production demand data and spare parts data of wind power equipment, performing customized production planning according to the production demand data and the spare parts data, and generating customized production planning information specifically include the following steps:
[0075] Step S1011, obtaining production demand data and spare parts data of wind power equipment.
[0076] Step S1012: Determine spare parts demand information according to the production demand data and the spare parts data.
[0077] Step S1013: Perform customized production planning according to the production demand data and the spare parts demand information to generate customized production planning information.
[0078] Furthermore, the customized production method based on wind power spare parts also includes the following steps:
[0079] Step S102: Perform trial production and verification of wind power equipment according to the customized production planning information, perform reserve planning of spare parts according to the trial production and verification results, and generate reserve planning data.
[0080] In an embodiment of the present invention, the wind power equipment to be produced is determined according to the customized production planning information, and then trial production of the wind power equipment is carried out to obtain the wind power trial equipment. Operation verification of the wind power trial equipment is carried out according to the performance data to generate an operation verification result, and whether the verification has passed is determined according to the operation verification. When the verification has passed, durability verification is carried out on multiple spare parts in the wind power trial equipment to generate spare parts verification data, and then according to the spare parts verification data, the models and corresponding quantities of spare parts for standby replacement of the wind power equipment are planned to generate reserve planning data.
[0081] Specifically, Figure 3 A flow chart of spare parts reserve planning in the method provided in an embodiment of the present invention is shown.
[0082] Among them, in the preferred embodiment provided by the present invention, the wind power equipment trial production verification is carried out according to the customized production planning information, and the spare parts reserve planning is carried out according to the trial production verification results, and the generation of reserve planning data specifically includes the following steps:
[0083] Step S1021, conducting trial production of wind power equipment according to the customized production planning information to obtain wind power trial production equipment.
[0084] Step S1022, performing operation verification on the wind power trial production equipment and determining whether the verification is passed.
[0085] Step S1023, verifying spare parts of the wind power trial production equipment that has passed the verification, and generating spare parts verification data.
[0086] Step S1024, performing spare parts reserve planning according to the spare parts verification data to generate reserve planning data.
[0087] Furthermore, the customized production method based on wind power spare parts also includes the following steps:
[0088] Step S103, performing spare parts supply planning according to the customized production planning information and the reserve planning data, and generating supply planning data.
[0089] In an embodiment of the present invention, spare parts supply quantity planning is performed according to customized production planning information and reserve planning data, the supply quantity of each spare part is determined, supply quantity planning data is generated, spare parts supply information of multiple suppliers for spare parts supply is obtained, supply reserve planning is performed for each supplier according to the spare parts supply information and supply quantity planning data, and supply planning data is generated.
[0090] Specifically, Figure 4 A flow chart of spare parts supply planning in the method provided in an embodiment of the present invention is shown.
[0091] Among them, in the preferred embodiment provided by the present invention, the supply planning of spare parts is performed according to the customized production planning information and the reserve planning data, and the generation of supply planning data specifically includes the following steps:
[0092] Step S1031, performing supply quantity planning of spare parts according to the customized production planning information and the reserve planning data, and generating supply quantity planning data.
[0093] Step S1032, obtaining spare parts supply information.
[0094] Step S1033, performing supply planning according to the spare parts supply information and the supply quantity planning data, and generating supply planning data.
[0095] Furthermore, the customized production method based on wind power spare parts also includes the following steps:
[0096] Step S104, performing maintenance verification of spare parts, generating maintenance verification information, optimizing and adjusting the supply planning data according to the maintenance verification information, and generating supply planning adjustment data.
[0097] In an embodiment of the present invention, repair verification is performed on spare parts damaged during the durability verification process to generate repair verification information. According to the repair verification information, statistics are collected on the success rates of each repaired spare part. According to the repaired spare parts and the corresponding success rates, spare parts supply reserves are optimized and adjusted to generate supply planning adjustment data.
[0098] Specifically, Figure 5 A flow chart of generating supply planning adjustment data in the method provided in an embodiment of the present invention is shown.
[0099] Among them, in the preferred embodiment provided by the present invention, the performing of spare parts maintenance verification, generating maintenance verification information, optimizing and adjusting the supply planning data according to the maintenance verification information, and generating supply planning adjustment data specifically include the following steps:
[0100] Step S1041, perform maintenance verification of spare parts and generate maintenance verification information.
[0101] Step S1042: determine the maintenance parts and success rate according to the maintenance verification information.
[0102] Step S1043, optimizing and adjusting the supply planning data according to the maintenance parts and the success rate, and generating supply planning adjustment data.
[0103] Furthermore, the customized production method based on wind power spare parts also includes the following steps:
[0104] Step S105 , performing equipment production tracking and monitoring according to the customized production planning information, generating production tracking and monitoring information, and adjusting the production process according to the production tracking and monitoring information.
[0105] In the embodiment of the present invention, when the wind power equipment is produced according to the customized production planning information, the production process is tracked and monitored to generate production tracking and monitoring information, and the problems in the production process are determined by monitoring and analyzing the production tracking and monitoring information, and the production monitoring and analysis data are generated, and then the production process or production process is adjusted accordingly according to the production monitoring and analysis data. For example, the design of tooling and auxiliary tools is adjusted, and the verification method is adjusted.
[0106] Specifically, Figure 6 A flow chart of equipment production tracking and monitoring in the method provided by an embodiment of the present invention is shown.
[0107] Among them, in the preferred implementation mode provided by the present invention, the equipment production tracking and monitoring is performed according to the customized production planning information, the production tracking and monitoring information is generated, and the production process adjustment is performed according to the production tracking and monitoring information, which specifically includes the following steps:
[0108] Step S1051, performing equipment production tracking and monitoring according to the customized production planning information to generate production tracking and monitoring information.
[0109] Step S1052: Perform production monitoring and analysis on the production tracking and monitoring information to generate production monitoring and analysis data.
[0110] Step S1053: adjusting the production process according to the production monitoring and analysis data.
[0111] Furthermore, Figure 7 The application architecture diagram of the system provided by the embodiment of the present invention is shown.
[0112] Among them, in another preferred embodiment provided by the present invention, a customized production system based on wind power spare parts includes:
[0113] The production planning unit 101 is used to obtain production demand data and spare parts data of wind power equipment, perform customized production planning according to the production demand data and the spare parts data, and generate customized production planning information.
[0114] In the embodiment of the present invention, the production planning unit 101 obtains the production demand data and spare parts data of the wind power equipment, and then integrates the production demand data and spare parts data of the wind power equipment to determine the spare parts demand information required for the production of the wind power equipment, and performs customized production planning of the wind power equipment through the production demand data and spare parts demand information to generate customized production planning information. Specifically, the production demand data of the wind power equipment includes the size data and performance data of the wind power equipment, and the size data and performance data of the wind power equipment are integrated and arranged according to the demand level to generate the production demand data.
[0115] Specifically, Figure 8 It shows a structural block diagram of the production planning unit 101 in the system provided by the embodiment of the present invention.
[0116] Among them, in the preferred embodiment provided by the present invention, the production planning unit 101 specifically includes:
[0117] The data acquisition module 1011 is used to acquire production demand data and spare parts data of wind power equipment.
[0118] The demand analysis module 1012 is used to determine spare parts demand information according to the production demand data and the spare parts data.
[0119] The production planning module 1013 is used to perform customized production planning according to the production demand data and the spare parts demand information, and generate customized production planning information.
[0120] Furthermore, the customized production system based on wind power spare parts also includes:
[0121] The reserve planning unit 102 is used to perform trial production and verification of wind power equipment according to the customized production planning information, perform reserve planning of spare parts according to the trial production and verification results, and generate reserve planning data.
[0122] In an embodiment of the present invention, the reserve planning unit 102 determines the wind power equipment to be produced according to the customized production planning information, and then conducts trial production of the wind power equipment to obtain the wind power trial equipment, performs operation verification of the wind power trial equipment according to the performance data, generates an operation verification result, and determines whether the verification is passed according to the operation verification. When the verification is passed, durability verification is performed on multiple spare parts in the wind power trial equipment to generate spare parts verification data, and then according to the spare parts verification data, the models and corresponding quantities of spare parts for backup replacement of wind power equipment are planned to generate reserve planning data.
[0123] Specifically, Fig. 9 It shows a structural block diagram of the reserve planning unit 102 in the system provided by an embodiment of the present invention.
[0124] Among them, in the preferred implementation mode provided by the present invention, the reserve planning unit 102 specifically includes:
[0125] The trial production module 1021 is used to carry out trial production of wind power equipment according to the customized production planning information to obtain wind power trial production equipment.
[0126] The first verification module 1022 is used to perform operation verification on the wind power trial production equipment and determine whether the verification is passed.
[0127] The second verification module 1023 is used to verify the spare parts of the wind power trial production equipment that has passed the verification and generate spare parts verification data.
[0128] The reserve planning module 1024 is used to perform reserve planning of spare parts according to the spare parts verification data and generate reserve planning data.
[0129] Furthermore, the customized production system based on wind power spare parts also includes:
[0130] The supply planning unit 103 is used to perform spare parts supply planning according to the customized production planning information and the reserve planning data, and generate supply planning data.
[0131] In an embodiment of the present invention, the supply planning unit 103 plans the supply quantity of spare parts according to the customized production planning information and reserve planning data, determines the supply quantity of each spare part, generates supply quantity planning data, obtains spare parts supply information of multiple suppliers for supplying spare parts, and plans supply reserves for each supplier according to the spare parts supply information and supply quantity planning data, and generates supply planning data.
[0132] Specifically, Fig.10 It shows a structural block diagram of the supply planning unit 103 in the system provided by the embodiment of the present invention.
[0133] Among them, in the preferred implementation mode provided by the present invention, the supply planning unit 103 specifically includes:
[0134] The supply quantity planning module 1031 is used to plan the supply quantity of spare parts according to the customized production planning information and the reserve planning data, and generate supply quantity planning data.
[0135] The supply information acquisition module 1032 is used to acquire spare parts supply information.
[0136] The supply planning module 1033 is used to perform supply planning according to the spare parts supply information and the supply quantity planning data, and generate supply planning data.
[0137] Furthermore, the customized production system based on wind power spare parts also includes:
[0138] The optimization and adjustment unit 104 is used to perform maintenance verification of spare parts and generate maintenance verification information, and optimize and adjust the supply planning data according to the maintenance verification information to generate supply planning adjustment data.
[0139] In an embodiment of the present invention, the optimization and adjustment unit 104 performs repair verification on the spare parts damaged during the durability verification process, generates repair verification information, and counts the success rates of the spare parts repaired according to the repair verification information. According to the repaired spare parts and the corresponding success rates, the spare parts supply reserve is optimized and adjusted to generate supply planning adjustment data.
[0140] The tracking and monitoring unit 105 is used to perform equipment production tracking and monitoring according to the customized production planning information, generate production tracking and monitoring information, and adjust the production process according to the production tracking and monitoring information.
[0141] In the embodiment of the present invention, when the wind power equipment is produced according to the customized production planning information, the tracking and monitoring unit 105 tracks and monitors the production process, generates production tracking and monitoring information, determines the problems in the production process by monitoring and analyzing the production tracking and monitoring information, generates production monitoring and analysis data, and then makes corresponding adjustments to the production process or production process according to the production monitoring and analysis data. For example, the design of tooling and auxiliary tools is adjusted, the verification method is adjusted, etc.
[0142] To sum up, the embodiments of the present invention can perform customized production planning, spare parts supply planning and optimization adjustment according to production demand data and spare parts data, generate customized production planning information and supply planning adjustment data, and conduct trial production verification of wind power equipment, and generate reserve planning data, so as to ensure the supply of wind power spare parts for the production of wind power equipment, and at the same time avoid excessive inventory of wind power spare parts, which would cause unnecessary waste of inventory and management resources.
[0143] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be performed in other orders. Moreover, at least a portion of the steps in each embodiment may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.
[0144] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0145] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0146] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
[0147] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A customized production method based on wind power spare parts, characterized in that: The method specifically comprises the following steps: Acquire production demand data and spare parts data of wind power equipment, perform customized production planning according to the production demand data and the spare parts data, and generate customized production planning information; Conduct trial production and verification of wind power equipment according to the customized production planning information, conduct reserve planning of spare parts according to the trial production and verification results, and generate reserve planning data; Performing spare parts supply planning according to the customized production planning information and the reserve planning data to generate supply planning data; Perform maintenance verification of spare parts and generate maintenance verification information, optimize and adjust the supply planning data according to the maintenance verification information, and generate supply planning adjustment data; Perform equipment production tracking and monitoring according to the customized production planning information, generate production tracking and monitoring information, and adjust the production process according to the production tracking and monitoring information; The step of conducting trial production and verification of wind power equipment according to the customized production planning information, conducting spare parts reserve planning according to the trial production and verification results, and generating reserve planning data specifically includes the following steps: Conducting trial production of wind power equipment according to the customized production planning information to obtain wind power trial production equipment; Conduct operational verification on wind power trial equipment and determine whether the verification has passed; Verify spare parts for wind power trial equipment that has passed verification and generate spare parts verification data; Perform spare parts reserve planning according to the spare parts verification data to generate reserve planning data; The performing of spare parts maintenance verification, generating maintenance verification information, optimizing and adjusting the supply planning data according to the maintenance verification information, and generating supply planning adjustment data specifically include the following steps: Perform maintenance verification of spare parts and generate maintenance verification information; Determine the repair parts and success rate according to the repair verification information; The supply planning data is optimized and adjusted according to the maintenance parts and the success rate to generate supply planning adjustment data.
2. The customized production method based on wind power spare parts according to claim 1 is characterized in that: The step of obtaining production demand data and spare parts data of wind power equipment, performing customized production planning according to the production demand data and the spare parts data, and generating customized production planning information specifically includes the following steps: Obtain production demand data and spare parts data for wind power equipment; Determining spare parts demand information according to the production demand data and the spare parts data; Customized production planning is performed according to the production demand data and the spare parts demand information to generate customized production planning information.
3. The customized production method based on wind power spare parts according to claim 1 is characterized in that: The step of performing spare parts supply planning according to the customized production planning information and the reserve planning data and generating supply planning data specifically comprises the following steps: Performing spare parts supply quantity planning according to the customized production planning information and the reserve planning data to generate supply quantity planning data; Obtain spare parts supply information; Supply planning is performed according to the spare parts supply information and the supply quantity planning data to generate supply planning data.
4. The customized production method based on wind power spare parts according to claim 1 is characterized in that: The step of tracking and monitoring equipment production according to the customized production planning information, generating production tracking and monitoring information, and adjusting the production process according to the production tracking and monitoring information specifically includes the following steps: Perform equipment production tracking and monitoring according to the customized production planning information to generate production tracking and monitoring information; Performing production monitoring and analysis on the production tracking and monitoring information to generate production monitoring and analysis data; Adjust the production process according to the production monitoring and analysis data.
5. A customized production system based on wind power spare parts, used to implement any of the methods described in claims 1-4, characterized in that: The system includes a production planning unit, a reserve planning unit, a supply planning unit, an optimization and adjustment unit, and a tracking and monitoring unit, wherein: A production planning unit, used to obtain production demand data and spare parts data of wind power equipment, perform customized production planning according to the production demand data and the spare parts data, and generate customized production planning information; A reserve planning unit, configured to perform trial production and verification of wind power equipment according to the customized production planning information, perform reserve planning of spare parts according to the trial production and verification results, and generate reserve planning data; A supply planning unit, configured to perform supply planning of spare parts according to the customized production planning information and the reserve planning data, and generate supply planning data; An optimization and adjustment unit, used to perform maintenance verification of spare parts, generate maintenance verification information, optimize and adjust the supply planning data according to the maintenance verification information, and generate supply planning adjustment data; The tracking and monitoring unit is used to perform equipment production tracking and monitoring according to the customized production planning information, generate production tracking and monitoring information, and adjust the production process according to the production tracking and monitoring information.
6. The customized production system based on wind power spare parts according to claim 5 is characterized in that: The production planning unit specifically includes: A data acquisition module is used to acquire production demand data and spare parts data of wind power equipment; A demand analysis module, used to determine spare parts demand information according to the production demand data and the spare parts data; The production planning module is used to perform customized production planning according to the production demand data and the spare parts demand information, and generate customized production planning information.
7. The customized production system based on wind power spare parts according to claim 5 is characterized in that: The reserve planning unit specifically includes: A trial production module, used to carry out trial production of wind power equipment according to the customized production planning information to obtain wind power trial production equipment; The first verification module is used to perform operation verification on the wind power trial equipment and determine whether the verification is passed; The second verification module is used to verify the spare parts of the wind power trial equipment that has passed the verification and generate spare parts verification data; The reserve planning module is used to carry out reserve planning of spare parts according to the spare parts verification data and generate reserve planning data.
8. The customized production system based on wind power spare parts according to claim 5 is characterized in that: The supply planning unit specifically includes: A supply quantity planning module, used to plan the supply quantity of spare parts according to the customized production planning information and the reserve planning data, and generate supply quantity planning data; Supply information acquisition module, used to obtain spare parts supply information; The supply planning module is used to perform supply planning based on the spare parts supply information and the supply quantity planning data to generate supply planning data.