A RTR pipeline forming and repair construction method
By adopting RTR pipeline molding and repairing construction methods in a high-temperature drying environment in Saudi Arabia, using silica powder putty, premixed resin coating and crude glass fiber mesh to repair RTR pipeline fittings, the corrosion resistance of pipelines in the existing technology in high-temperature drying environment is solved. and thermal expansion problems reduce construction costs and time and improve construction efficiency.
Patent Information
- Application Number
- CN202210390836.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-14
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-04-14
AI Technical Summary
In the high-temperature and dry climate of Saudi Arabia, existing carbon steel pipelines, concrete pipelines and cast iron pipelines cannot meet the corrosion resistance and thermal expansion requirements of the pipeline, resulting in overall cutting and scrapping when there is a problem with RTR pipe fittings or tee branch pipes, resulting in High construction costs and slow progress.
RTR pipeline molding and repair construction methods include cutting defective pipe fittings, applying silica powder putty for base bonding, grinding and curing, using premixed resin coating and crude fiberglass mesh for repair, forming a fixed layer, replacing the overall cutting waste deal with.
It effectively saves manual labor hours and materials for replacing new materials, reduces the replacement construction cycle between raw materials and new materials, speeds up pipeline construction progress, and improves repair quality and construction efficiency.
Smart Images

Figure CN114811261B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pipelines, and in particular to a RTR pipeline forming and repair construction method. Background Art
[0002] Saudi Arabia is located in a tropical desert climate, with high temperatures and little rainfall all year round, dry climate, long coastline and highly corrosive soil. The climate and geographical environment have high requirements for the corrosion resistance and thermal expansion of underground pipelines. Carbon steel pipelines, concrete pipelines and cast iron pipelines cannot meet the unique climate and environment of Saudi Arabia. In order to adapt to the requirements of Saudi Arabia's unique climate and geographical environment for pipelines, reinforced thermosetting resin (RTR) pipelines with light weight, high strength and corrosion resistance are produced.
[0003] Reinforced thermosetting resin (RTR) pipes are made of glass fiber and epoxy resin, and are divided into a thermosetting lining layer, an epoxy resin structural reinforcement layer and a wear-resistant outer layer.
[0004] Currently, when problems occur with RTR pipe fittings or three-way branches, they must be cut as a whole and scrapped, and then replaced with new RTR pipe fittings or three-way branches, which results in high construction costs and slow construction progress. Summary of the invention
[0005] In order to reduce construction costs and improve construction progress, the present application provides an RTR pipeline forming and repair construction method.
[0006] The present application provides a RTR pipeline forming and repair construction method, which adopts the following technical solution:
[0007] A RTR pipeline forming and repairing construction method, comprising:
[0008] Cutting the defective part of the original pipe fitting; wherein the original pipe fitting includes an RTR straight pipe or a three-way branch pipe;
[0009] Apply silica powder putty to the gap of the original pipe fitting to perform base bonding; wherein the gap is the cutting part of the original pipe fitting;
[0010] Sand the cured primer and clean the sanded primer surface with a brush or non-lint cloth;
[0011] Dipping the premixed resin coating with a wool roller, evenly applying a layer of the premixed resin coating on the surface of the base layer, and then winding a layer of coarse glass fiber mesh on the surface of the premixed resin coating; then applying a layer of the premixed resin coating on the surface of the coarse glass fiber mesh, and then winding a layer of coarse glass fiber mesh on the surface of the premixed resin coating, and repeating this process until the number of layers specified in the preset formula is reached to form a fixed layer;
[0012] A surface cushion layer is applied on the surface of the fixing layer, and the repair is completed after curing.
[0013] By adopting the above technical solution, the defective part of the RTR pipe fitting is cut, and silica powder putty is applied to the cut part to repair the original RTR pipe fitting, and then the coarse glass fiber mesh is coated with premixed resin coating, which helps to repair the original pipe fitting; this process replaces the situation where the original on-site pipe fittings must be cut and scrapped as a whole and then replaced with new pipe fittings when problems or defects occur, effectively saving labor hours for replacing new materials and materials for repurchasing pipe fittings; it not only reduces the construction cycle of replacing raw materials and new materials, but also effectively speeds up the construction progress of the pipeline.
[0014] Optionally, after the step of cutting the defective part of the original pipe fitting, the step further includes:
[0015] The original pipe fittings are cleaned.
[0016] Optionally, the step of cleaning the original pipe fittings specifically includes:
[0017] In the case where the original pipe fittings have been in contact with oil or grease, they are scrubbed with a clean cloth soaked in the pure acetone;
[0018] or,
[0019] If the original pipe is free of oil or grease, wipe it with a clean, dry, non-lint cloth.
[0020] Optionally, before applying silica powder putty to the gap of the original pipe fitting and performing the base bonding step, the method further comprises:
[0021] The wear-resistant outer layer and the epoxy resin structural reinforcement layer of the original pipe fitting are polished with a grinding disc to expose the thermosetting inner lining layer, and the surface of the thermosetting inner lining layer is cleaned.
[0022] Optionally, after the step of polishing the cured primer layer and cleaning the polished primer layer surface with a brush or a non-lint-lined woven cloth, the method further comprises:
[0023] Use rubber coated fixing brackets or belts to fix the original pipe fittings.
[0024] Optionally, before the fixing layer bonding step is performed, the following steps are further included:
[0025] The environmental conditions on the surface of the coarse glass fiber mesh are detected and trimmed.
[0026] Optionally, the step of detecting and trimming the environmental conditions on the surface of the coarse glass fiber mesh specifically includes:
[0027] When the surface of the coarse glass fiber mesh is wet, it is wiped with a clean, dry and non-linty woven cloth, and then the surface of the coarse glass fiber mesh is heated.
[0028] Optionally, before the step of cutting the defective part of the original pipe fitting, the method further includes:
[0029] Monitoring the construction environment, wherein the construction environment includes ambient temperature, relative humidity and dew point;
[0030] When the relative humidity is greater than 95%, the wet surface of the original pipe is dried with a clean, dry and non-linty cloth, and then the construction site of the original pipe is preheated.
[0031] In summary, the present application includes at least one of the following beneficial technical effects:
[0032] 1. Cut the defective part of the RTR pipe fittings, apply silica powder putty on the cut part to repair the original RTR pipe fittings, and then apply the coarse glass fiber mesh with pre-mixed resin coating to help repair the original pipe fittings; this process replaces the original on-site pipe fittings that must be cut and scrapped as a whole when there are problems or defects, and then replaced with new pipe fittings, effectively saving labor hours for replacing new materials and repurchasing materials for pipe fittings; it not only reduces the replacement construction cycle of raw materials and new materials, but also effectively speeds up the construction progress of the pipeline;
[0033] 2. Inspection and repair of construction materials (pipe fittings and coarse fiberglass mesh) and construction environment will help improve the repair quality of pipe fittings and construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a flow chart of an RTR pipeline forming and repair construction method shown in one embodiment of the present application. DETAILED DESCRIPTION
[0035] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below through the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0036] The embodiment of the present application discloses a RTR pipeline forming and repair construction method.
[0037] As an implementation method of RTR pipeline forming repair construction method, Figure 1 As shown, the following steps are included:
[0038] 100, construction preparation.
[0039] Wherein, step 100 specifically includes:
[0040] 101. Prepare the materials and equipment required for construction, including disc grinder, digital thermometer, dew point meter, infrared thermometer, hot blower, coarse fiberglass mesh, wool roller, sanding disc, sandpaper and grinding wheel.
[0041] 102. All piping components used in the piping system shall be subjected to non-destructive testing, and unqualified materials shall be separated and isolated from undamaged materials to avoid accidental use.
[0042] 103. Coarse fiberglass mesh should be inspected before use. Do not use winding components or material containers that show signs of damage or leakage.
[0043] 104. Resins and curing agents that are suitable for coarse glass fiber mesh and reinforced coarse glass fiber mesh within their validity period should be used and clearly marked in storage containers to ensure that the storage of winding materials meets storage requirements.
[0044] 105. Ensure that all necessary tools and materials are available and pay attention to the safety precautions in the design documents and operating manuals.
[0045] It should be noted that step 102, step 103, step 104 and step 105 are not in any particular order and can be executed in parallel.
[0046] 200, cutting the defective part of the original pipe fitting; wherein the original pipe fitting includes an RTR straight pipe or a three-way branch pipe.
[0047] Specifically, the defective part of the original pipe is cut by a disc grinder for subsequent repair.
[0048] 300, use a grinding disc to grind the wear-resistant outer layer and epoxy resin structural reinforcement layer of the original pipe fittings to expose the thermosetting lining layer and clean the surface of the thermosetting lining layer.
[0049] Specifically, since the reinforced thermosetting resin (RTR) pipe is divided into a thermosetting inner lining layer, an epoxy resin structural reinforcement layer and a wear-resistant outer layer, the surface paint of the tee branch pipe is ground off with an abrasive disc to expose the thermosetting inner lining layer to ensure effective bonding between the winding material and the pipe structure wall.
[0050] At the same time, clean the surface of the thermosetting lining to ensure that there is no dirt, grease or other impurities on the surface, so as to improve the repair quality of the pipe fittings.
[0051] 400, clean the original pipe fittings.
[0052] Specifically, in order to improve the repair quality of the original pipe fittings, the outer surface of the original pipe fittings should be kept clean and dry, so the original pipe fittings need to be cleaned or wiped.
[0053] Wherein, step 400 specifically includes:
[0054] 401. If the original pipe fittings have been in contact with grease, wipe them with a clean cloth soaked in pure acetone.
[0055] 402. If the original pipe fittings are free of grease, wipe them with a clean, dry, non-lint cloth.
[0056] It should be noted that step 401 and step 402 are partially sequential and can be executed in parallel.
[0057] 500, apply silica powder putty to the gaps of the original pipe fittings for base bonding; the gaps are the cutting points of the original pipe fittings.
[0058] Specifically, apply silica powder putty to the gaps of the original pipes, that is, the cut parts of the original pipes, and dry them at room temperature. Based on the temperature in the desert area, the drying time should be no less than 24 hours to ensure that the silica powder is completely dry and the construction quality is guaranteed.
[0059] It should be noted that silica powder is made by crushing silica. The chemical properties of silica are very stable. It is insoluble in water and does not react with water. It has a high hardness. Silica is widely used as a raw material for building materials and is also an important raw material for the inorganic salt industry. Silica powder can be used for processing glass, ceramics and refractory materials, metallurgy, concrete, etc.
[0060] 600, sand the cured primer and clean the sanded primer surface with a brush or non-lint cloth.
[0061] 700, use rubber coated fixing brackets or belts to fix the original pipe fittings.
[0062] Specifically, the rubber-coated fixing bracket is used to ensure that the original pipe fittings will not move during the construction process. The original pipe fittings can also be fixed with belts to facilitate the subsequent construction of the pipe fittings.
[0063] 800, use a wool roller to dip the premixed resin coating, apply a layer of premixed resin coating evenly on the surface of the base layer, and then wrap a layer of coarse glass fiber mesh on the surface of the premixed resin coating; then apply a layer of premixed resin coating on the surface of the coarse glass fiber mesh, and then wrap a layer of coarse glass fiber mesh on the surface of the premixed resin coating, and repeat this process until the number of layers specified in the preset formula is reached to form a fixed layer.
[0064] Specifically, the specified amount of resin and hardener is placed in a dry plastic bucket and stirred using a dry wooden stick in accordance with the quantity specified in the design formula to maintain the correct proportion of the mixture to form an adhesive, i.e., premixed resin coating.
[0065] Use premixed resin coating to pre-brush the rough-ground surface and the original pipe surface, and then use a wool roller to dip the premixed resin coating according to the number of layers specified in the formula, and apply it layer by layer and cover the coarse glass fiber mesh. In this embodiment, a total of 28 layers of coarse glass fiber mesh are wrapped. Among them, the coarse glass fiber mesh is completely soaked with the premixed resin coating, and the coarse glass fiber mesh and the pipe, and each layer of coarse glass fiber mesh must be tightly combined, and the coarse glass fiber mesh must not have the defects of looseness and bulging.
[0066] Among them, coarse glass fiber mesh is a mesh structure material made of glass fiber using a certain weaving process. In order to protect the glass fiber and improve the overall performance, the geocomposite is made through a special coating process. It has the characteristics of longitudinal and transverse tensile strength, corrosion resistance, high temperature resistance and low elongation. The use of coarse glass fiber mesh helps to improve the strength of the original pipe fittings.
[0067] 900, apply the surface cushion on the surface of the fixed layer, and the repair is completed after curing.
[0068] Specifically, applying a surface cushion layer on the surface of the fixing layer can help improve the surface finish of the original pipe fitting after repair.
[0069] After the construction is completed, the fixing layer and the surface cushion layer can be allowed to cure naturally at ambient temperature according to the site conditions.
[0070] As another implementation of the RTR pipeline forming and repair construction method, before step 600, it also includes: detecting and trimming the environmental conditions of the surface of the coarse glass fiber mesh.
[0071] Specifically, the environmental conditions on the surface of the coarse glass fiber mesh affect the quality of the repair of the original pipe fittings, and therefore, precautions should be taken to ensure that the coarse glass fiber mesh meets the required humidity and temperature conditions throughout the winding and molding construction process.
[0072] Wherein, when the surface of the coarse glass fiber mesh is wet, it is wiped with a clean, dry and non-lint woven cloth, and then the surface of the coarse glass fiber mesh is heated to ensure that the surface of the coarse glass fiber mesh is dry.
[0073] In addition, the construction environment will also affect the construction quality of the original pipe fittings. Therefore, the construction environment (temperature and weather conditions) is monitored in real time to determine whether the ambient temperature, relative humidity and dew point are within the range of standard construction, so as to carry out on-site winding and connection construction or further processing of the pipeline.
[0074] During the on-site winding process, the ambient temperature should be maintained between 15-45°C and at least 3°C higher than the dew point.
[0075] When the relative humidity of the environment is > 95%, or it is foggy, or there is any form of precipitation (such as rain, snow, hail, etc.), protective measures must be taken, such as using a clean, dry and non-linted fabric to dry the wet surface of the tee, and then preheating the winding and bonding area, so that the winding molding construction process must be carried out under the conditions that meet the construction environment.
[0076] When the construction environment is not suitable for construction, in order to improve construction efficiency, it can be considered to first connect the pipes and fittings in the workshop to reduce the number of connections to be made on site.
[0077] The implementation principle of an RTR pipeline forming and repair construction method in the embodiment of the present application is:
[0078] The defective portion of the RTR pipe fitting is cut and silica powder putty is applied on the cut portion to repair the original RTR pipe fitting, and then the coarse glass fiber mesh is coated by pre-mixed resin coating to help repair the original pipe fitting.
[0079] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A RTR pipeline forming and repair construction method, characterized in that: include: Cutting the defective part of the original pipe fitting; wherein the original pipe fitting includes an RTR straight pipe or a three-way branch pipe; Apply silica powder putty to the gap of the original pipe fitting to perform base bonding; wherein the gap is the cutting part of the original pipe fitting; Sand the cured primer and clean the sanded primer surface with a brush or non-lint cloth; Dipping the premixed resin coating with a wool roller, evenly applying a layer of the premixed resin coating on the surface of the base layer, and then winding a layer of coarse glass fiber mesh on the surface of the premixed resin coating; then applying a layer of the premixed resin coating on the surface of the coarse glass fiber mesh, and then winding a layer of coarse glass fiber mesh on the surface of the premixed resin coating, and repeating this process until the number of layers specified in the preset formula is reached to form a fixed layer; Apply a surface cushion layer on the surface of the fixing layer, and the repair is completed after curing; Before applying silica powder putty to the gap of the original pipe fitting and performing the base bonding step, the method further includes: The wear-resistant outer layer and the epoxy resin structural reinforcement layer of the original pipe fitting are polished with a grinding disc to expose the thermosetting inner lining layer, and the surface of the thermosetting inner lining layer is cleaned; After the step of polishing the cured base layer and cleaning the surface of the polished base layer with a brush or a non-lint-lined woven cloth, the method further comprises: Use rubber-coated fixing brackets or belts to fix the original pipe fittings; Before the fixing layer bonding step is performed, the method further includes: Testing and trimming the environmental conditions on the surface of the coarse glass fiber mesh; The step of detecting and trimming the environmental conditions on the surface of the coarse glass fiber mesh specifically includes: When the surface of the coarse glass fiber mesh is wet, a clean, dry and non-lint woven cloth is used to wipe the surface, and then the surface of the coarse glass fiber mesh is heated; Before the step of cutting the defective part of the original pipe fitting, the method further includes: Monitoring the construction environment, wherein the construction environment includes ambient temperature, relative humidity and dew point; When the relative humidity is greater than 95%, the wet surface of the original pipe is dried with a clean, dry and non-linty cloth, and then the construction site of the original pipe is preheated.
2. The RTR pipeline forming and repair construction method according to claim 1 is characterized in that: The step of cutting the defective part of the original pipe fitting also includes: The original pipe fittings are cleaned.
3. The RTR pipeline forming and repairing construction method according to claim 2 is characterized in that: The step of cleaning the original pipe fittings specifically includes: In the case where the original pipe fittings have been in contact with grease, use a clean cloth soaked in pure acetone to scrub them; or, If the original pipe is free of grease, wipe it with a clean, dry, non-lint cloth.